Quality Decisions Come From
Quality Data
                 Presented
             Wednesday, May 23
                     By
               Brandon Theiss
          Brandon.Theiss@gmail.com
About Me
•   Academics
     –   MS Industrial Engineering Rutgers University
     –   BS Electrical & Computer Engineering Rutgers University
     –   BA Physics Rutgers University
•   Professional
     –   Principal Industrial Engineer -Medrtonic
     –   Master Black belt- American Standard Brands
     –   Systems Engineer- Johnson Scale Co
•   Awards
     –   ASQ Top 40 Leader in Quality Under 40
•   Certifications
     –   ASQ Certified Manager of Quality/ Org Excellence Cert # 13788
     –   ASQ Certified Quality Auditor Cert # 41232
     –   ASQ Certified Quality Engineer Cert # 56176
     –   ASQ Certified Reliability Engineer Cert #7203
     –   ASQ Certified Six Sigma Green Belt Cert # 3962
     –   ASQ Certified Six Sigma Black Belt Cert # 9641
     –   ASQ Certified Software Quality Engineer Cert # 4941
•   Publications
     –   Going with the Flow- The importance of collecting data without holding up your processes- Quality Progress
         March 2011
     –   "Numbers Are Not Enough: Improved Manufacturing Comes From Using Quality Data the Right Way" (cover
         story). Industrial Engineering Magazine- Journal of the Institute of Industrial Engineers September (2011):
         28-33. Print
Problem Statement
• The era of social networking has enabled a
  person sitting in a café in New York City to
  obtain up to the minute ‘status’ updates
  about a friend or colleague in Shanghai.
  – Do these tweets have value?
  – Is this information “quality data”?
  – Why does business process data not flow with
    the same velocity and volume?
What is Quality Data?
• Quality is defined as
  – Joseph Juran - > "fitness for intended use"
  – W. Edwards Deming -> "meeting or exceeding
    customer expectations."
• Data is to be considered as Quality if it is
  – Relevant
  – Accurate
  – Timely
  – Complete
What is a Process?
• Formal Definition
   – A systematic series of actions directed to some end
• Practical Definition
   – Any Verb Noun Combination
      • Eat Sandwich
      • Read Book
      • Attend Conference
• Implications of Practical Definition
   – Same Tools Techniques and Methods of the Lean Six
     Sigma Methodologies can be used for virtually
     anything
Limitations of Lean Six Sigma
•   Process Intelligence
     – There must exist a critical level of intelligence at the elemental levels in the
       organization. This can be manifest in the operators or machines
•   Process Ownership
     –    The operators need to be sufficiently trained and empowered to take ownership of
         the process so that they can creatively maximize the efficiencies the hardware can
         provide in order to produce a quality work product for their internal or external
         customers.
•   Non Quality data as an input will generate bad conclusions
     – The most elegant of mathematical calculations will not correct errors in the dataset
•   Correlation does not imply causation
     – As the statistics become more elegant often this fact is often forgotten.
•   Utilization of Statistical Tools does not yield absolute truth
     – Statistical Significance Does not Mean actual significance.
          • (See US Supreme Court Matrixx Initiatives, Inc. v. Siracusano )
     – Best Utilization is to direct resources to discovering truth.
Problems with Valuing Data
• Data in the abstract has little value
• Data only begins to have value when connections and
  well reasoned conclusions are drawn from the information
  that these “numbers on a screen” can be translated
  directly to the accountants profit and loss statement.
• “how much should be invested in measuring A when its
  impact on B might not generate enough additional benefit
  to cover the cost of measuring A?”



                              Data Collected




          Capital Allocated                    Value Determined
Scientific Approach to Valuing Data
“Our theories determine what we measure” (Albert Einstein)

• In science the goal is the confirmation or
  refutation of a theoretical model.
• In industry the costs, purposes and uses for
  collected data must be tied directly to the
  profitability of the enterprise.
• Many such models for industrial systems exist.
• The strength of the model is only established
  through the course of collecting data and testing
  predictive validity of the theory
• The solution to this dilemma is to a priori declare
  the value.
Data Collection System
• Historically the cost of collecting data has been quite high
  relative to the perceived benefits derived.
• Traditional data collection systems are considered as non
  value added thus ‘muda’
• Data was collected about a product or process either by
  diverting material to a quality lab for inspection or doing
  painstaking time studies of operator actions and then
  auditing the results.
• Fortunately the cost and flexibility of current technology
  allows for process and product specific data to be
  collected in line by the existing operators without
  increasing cycle time or incurring great expense
Case Study 1 (LTL Trucking)
• Less than Truck Load Trucking- handles mostly palletized
  material than handled by FedEx/ UPS and not large
  enough to warrant its own truck
• Freight is billed based upon
   –   Distance
   –   Weight
   –   Volume
   –   Class of Freight
• Traditional Method
   – Shipper would contact Shipping company and provide the
     complete data
   – Shipping company would the pick up the load and transport it
   – The shipping company would invoice the shipper
Case Study 1 (cont)(LTL Trucking)
• Problems with Traditional Method
   – Customer Provided weight and volume information never verified.
   – Heavier pallets = greater fuel costs
   – Larger pallets = fewer pallets in a truck
• Initial Response
   – 30% of inbound freight into the shipping companies terminal was
     diverted to a re-weighing re-dimensioning station
      • Operator weighs pallet, measures dimensions and fills out a paper
        form
      • At the end of the shift the papers are turned into a data entry person
        who keys in the information
      • Billing system corrects invoice and adds surcharge for customer error
Case Study 1 (cont) (LTL Trucking)
• Problems with Initial Response
   – Only 30% of the pallets are analyzed
   – Slower cycle time for reweighed pallets
   – Paper based
       • Transcription errors
       • Lost chits
       • Erroneous Readings
   – Extra Labor required (dimensioning and data entry)
• Final Solution
   – Integrated weighing system in the forks of the forklift
       • As the operator is moving the pallet, the pallet is identified by either
         an RFID tag or scanned barcode. The weight is then captured and
         wirelessly transmitted to the billing system
       • A similar system has been designed which allows for the dimensions
         of the pallet to also be determined
Case Study 2 (Bulk Mixing)
•   A company was manually mixing bulk materials to make a slurry
•   The process of batching consisted of an operator utilizing a bobcat skid
    loader to dump bulk material into a large industrial mixer.
     – At the beginning of the shift the operator was given a pre-printed form that
       prescribed the exact amount of each of the bulk ingredients.
     – Prior to beginning the batching process the operator moved the bobcat onto a floor
       scale and recorded the empty tare weight of the loader.
     – Then the operator navigated the bobcat to the pile of bulk material, scooped up a
       load, navigated back to the scale to record the weight on the pre-printed form
     – Then finally to the mixer to load the material.
     – This process was repeated multiple times for any given ingredient.
     – After completing an ingredient the operator would add up the respective weights,
       using a pocket calculator and recorded the total weights on form.
     – This cycle continued for all of the ingredients in the recipe.
     – Once the recipe was completed the operator turned in the form to his supervisor
       who in turn submitted the form to the quality lab.
Case Study 2 (cont) (Bulk Mixing)
• A Gauge R&R study was performed and the process was
  determined to be highly variable yet adequate.
   – Company was not concerned as the output of the batching
     process was the input to another process that was quite tolerant
     to batching errors (as long as they were reported)
• The downstream processes were having constant quality
  problems
   – Managers in the downstream process complained to the batching
     area claiming they were delivering an inferior product
   – Batching Area managers pointed to the Quality records which
     indicated that everything was made to specification
   – The batching supervisors emphatically argued that if an error
     were reported, he personally would reprimanded the operator and
     in most cases fired them
Case Study 2 (cont) (Bulk Mixing)
•   Problems
    – Opportunities for the data to be corrupted or compromised or lost
        •   manually hand writing data,
        •   using a hand held calculator ,
        •   improperly identifying the materials and
        •   multiple hand offs of the physical form
    – ‘Muda’ in the wasted motion of the operator having to drive to the floor
      scale prior to the delivery of each load
    – Measurement resolution
        • Recipes listed ingredients to fractions of a pound however scale read by 2 lb
          increments
•   True Root Cause
    – Managers Response to Defects
        • Operator knew if they reported the actual amount dispensed they would be
          jeopardizing their jobs
        • Consequently only the correct values were reported
        • The down stream processes were not given accurate data
Case Study 3 (Final Assembly/Packaging)
•   As a result of a bench marking exercise, a multinational manufacturer
    identified that one of its plants was 3 times more productive than the
    worst performing plant in the same geographic region for the final
    assembly and packaging area
•   An investigation was performed comparing the standard operating
    procedures, line layouts, tools, training and staffing of the lines at the
    respective plants.
     – Minor differences were observed and were immediately changed to adopt
       the best practices of the higher performing plant. As a result de minimis
       incremental improvements were observed however the plant continued to
       under perform.
     – A team of interns to observer the line and record the ‘up time’. After
       collecting data around the clock for a week, the team determined that the
       line was only meeting its target cycle time 65% of the time.
     – Process maps were drawn and one of the last steps was to scan the
       unique part barcode so that product would be flowed in the ERP system
       as a finished good
Case Study 3 (cont) (Final Assembly/Packaging)
• Initial Solution
   – Using the time stamp information, the time between
     successive scans was revealed.
   – By plotting this information on a SPC chart, out of
     control conditions (line stoppages) would be obvious.
     Once the problems were identified and quantified
     resources could be allocated to developing their
     solution
   – With the help of operations and IT, software was
     written that would automatically generate the control
     chart.
   – The front line supervisors were instructed that prior to
     letting the operators leave for the day, each one of the
     out of control conditions had to be explained
Case Study 3 (cont)(Final Assembly/Packaging)
•   Why the Initial Solution Failed
     – After 10 hour shift, operators did not want to spend 20 minutes doing
       paper work
     – 9 hours after the fact, no one could recall why exactly the line had
       stopped
•   Final Solution
     – Modified Line Software
         • When an operator failed to scan a barcode in the allocated period of time, a
           window would popup and would not allow the system to proceed.
         • Window presented 4 options (Materials, Machines, Manning or Other).
         • The operator would use the touch screen interface and poke at the option that
           matched the line stoppage. For instance if there was a stock out in a given
           box, the operator would poke at the option for materials and then would be
           presented with an option of all the potential stock out materials.
     – Stoppage Data was then used in Pareto Charts which lead to the
       improvement in upstream data collection
Case Study 4 (High Volume Manufacturer )
• A manufacturer of hand tools could not account for
  discrepancies of 300,000 parts per facility per month. The
  manufacturer had made a large investment in an ERP
  which automatically translated customer orders directly to
  the production schedule and manufactured pieces the
  Achilles heel of the system was the quality of the input
  data.
   – If information were not entered, then the ERP would respond by
     scheduling more production of the piece.
   – If a wrong number were entered, then the ERP would fail to
     schedule the part for production.
   – Managers lacked sufficient information as to the whereabouts of
     the material or which manufacturing stage it was in.
Case Study 4 (cont) (High Volume Manufacturer )
•   The process of collecting data was convoluted,
    – the operator would hand record on a chit of paper the number of parts
      produced.
    – At the conclusion of the shift these notes were turned in to the area
      supervisor,
    – The supervisor would either personally key the information into the ERP
      system or delegate the task to a data entry person.
•   Problems
    –   The paper notes were frequently lost;
    –   Accidental and deliberate transcription errors
    –   Lots of ‘Muda’
    –   ERP Amplifying Feedback Loop
         • If a sheet was lost, the ERP would drive more production of the part, though in
           the physical reality it had been produced or conversely if due to a over
           reporting error the ERP would not schedule production.
Case Study 4 (cont) (High Volume Manufacturer )
•   The solution
    – Hardware
        • a simple counting scale,
        • a barcode scanner and
        • a printer.
    – Process
        • Operator to scanned a barcode to identify the product
        • The associated average piece weight for that part and step in the
          manufacturing process was downloaded from database to the scale.
        • Placing items on the scale then instantly yielded the correct number of pieces,
        • The operator then pressed a button to indicate a finished count.
        • The part was then flowed from one WIP state to the next in the ERP system
        • A label was printed to confirm that the transaction was received.
•   Results
    – The number of misattributed parts of this manufacturer was reduced to
      less than 300 while the cycle time increased by less than 15 seconds.
Conclusions
 “Data enables an individual, company or society to rise from
              the bondage of myths and half truths.”
• The tools technique and methods of Lean Six Sigma help
   to reveal truth yet are limited by the input quality of the
   data. Inserting garbage data into the most elegant of
   calculations will still result in nonsensical analysis and
   decisions.
• Getting enough of the right data, at the right time, to the
   right people is the constantly evolving challenge that must
   be met. Technology now facilitates the real time flow of
   this information. The technology can only be implemented
   and process improvements achieved if an enterprise is
   willing to make the investment.
Questions?
• Contact Information
  – Brandon Theiss
  – Brandon.Theiss@gmail.com
  – Linkedin-
    http://www.linkedin.com/in/brandontheiss

Contenu connexe

Tendances

UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingLean6Sigma4all
 
Quality Management and Statistical Process Control
Quality Management and Statistical Process ControlQuality Management and Statistical Process Control
Quality Management and Statistical Process ControlMahmudul Hasan
 
Measuremen Systems Analysis Training Module
Measuremen Systems Analysis Training ModuleMeasuremen Systems Analysis Training Module
Measuremen Systems Analysis Training ModuleFrank-G. Adler
 
T 1 industry preparedness training course
T 1 industry preparedness training courseT 1 industry preparedness training course
T 1 industry preparedness training coursenewar_07
 
Six Sigma : Process Capability
Six Sigma : Process CapabilitySix Sigma : Process Capability
Six Sigma : Process CapabilityLalit Padekar
 
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortHow A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortGoLeanSixSigma.com
 
Introduction to plant design economics
Introduction to plant design economicsIntroduction to plant design economics
Introduction to plant design economicsSunita Jobli
 
Lead Time: What We Know About It...
Lead Time: What We Know About It...Lead Time: What We Know About It...
Lead Time: What We Know About It...azheglov
 
Statistical Process Control Tools
Statistical Process Control ToolsStatistical Process Control Tools
Statistical Process Control ToolsRaja Farhan Saeed
 
Queues & Batches in Product Development
Queues & Batches in Product DevelopmentQueues & Batches in Product Development
Queues & Batches in Product DevelopmentPlaybook
 
1 2 chem plantdesign-intro to plant design economics
1 2 chem plantdesign-intro to plant design  economics1 2 chem plantdesign-intro to plant design  economics
1 2 chem plantdesign-intro to plant design economicsayimsevenfold
 
Site Overview & 5 S
Site Overview & 5 SSite Overview & 5 S
Site Overview & 5 SJohn Henry
 

Tendances (20)

UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream Mapping
 
Spc
SpcSpc
Spc
 
Quality Management and Statistical Process Control
Quality Management and Statistical Process ControlQuality Management and Statistical Process Control
Quality Management and Statistical Process Control
 
Measuremen Systems Analysis Training Module
Measuremen Systems Analysis Training ModuleMeasuremen Systems Analysis Training Module
Measuremen Systems Analysis Training Module
 
T 1 industry preparedness training course
T 1 industry preparedness training courseT 1 industry preparedness training course
T 1 industry preparedness training course
 
Attribute MSA presentation
Attribute MSA presentationAttribute MSA presentation
Attribute MSA presentation
 
Six Sigma : Process Capability
Six Sigma : Process CapabilitySix Sigma : Process Capability
Six Sigma : Process Capability
 
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortHow A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
 
Introduction to plant design economics
Introduction to plant design economicsIntroduction to plant design economics
Introduction to plant design economics
 
Attribute measurement analysis
Attribute measurement analysis Attribute measurement analysis
Attribute measurement analysis
 
Lead Time: What We Know About It...
Lead Time: What We Know About It...Lead Time: What We Know About It...
Lead Time: What We Know About It...
 
Scm and ddmrp
Scm and ddmrpScm and ddmrp
Scm and ddmrp
 
Statistical Process Control Tools
Statistical Process Control ToolsStatistical Process Control Tools
Statistical Process Control Tools
 
Queues & Batches in Product Development
Queues & Batches in Product DevelopmentQueues & Batches in Product Development
Queues & Batches in Product Development
 
1 2 chem plantdesign-intro to plant design economics
1 2 chem plantdesign-intro to plant design  economics1 2 chem plantdesign-intro to plant design  economics
1 2 chem plantdesign-intro to plant design economics
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
 
Site Overview & 5 S
Site Overview & 5 SSite Overview & 5 S
Site Overview & 5 S
 
7 QC Tools Training
7 QC Tools Training7 QC Tools Training
7 QC Tools Training
 
Spc training
Spc trainingSpc training
Spc training
 
PROCESS CAPABILITY
PROCESS CAPABILITYPROCESS CAPABILITY
PROCESS CAPABILITY
 

Similaire à IIE Conference Presentation

LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC Julian Kalac P.Eng
 
The Benefits of Applying Lean Sigma for Service
The Benefits of Applying Lean Sigma for ServiceThe Benefits of Applying Lean Sigma for Service
The Benefits of Applying Lean Sigma for ServiceWillie Carter
 
Enhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean SigmaEnhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean SigmaWillie Carter
 
Enhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean SigmaEnhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean SigmaWillie Carter
 
Supply Chain Management.ppt
Supply Chain Management.pptSupply Chain Management.ppt
Supply Chain Management.pptAlokKumar233477
 
Operation Mangement Suppl.-SPC training-ppt
Operation Mangement Suppl.-SPC training-pptOperation Mangement Suppl.-SPC training-ppt
Operation Mangement Suppl.-SPC training-pptRanjeet338208
 
An introduction to lean six sigma
An introduction to lean six sigmaAn introduction to lean six sigma
An introduction to lean six sigmaRahul Singh
 
An introduction to lean six sigma
An introduction to lean six sigmaAn introduction to lean six sigma
An introduction to lean six sigmaRashil Shah
 
An Introduction to Lean Six Sigma.pptx
An Introduction to Lean Six Sigma.pptxAn Introduction to Lean Six Sigma.pptx
An Introduction to Lean Six Sigma.pptxDrmahmoudAhmedabdeen1
 
Supply chain management satyen
Supply chain management satyenSupply chain management satyen
Supply chain management satyensatyenbharti
 
Lesson 10 - Value stream mapping
Lesson 10 - Value stream mappingLesson 10 - Value stream mapping
Lesson 10 - Value stream mappingTunAnhTrnh9
 
supply chain management
supply chain management supply chain management
supply chain management ItiDubey3
 
Logistics and supply chain management
Logistics and supply chain managementLogistics and supply chain management
Logistics and supply chain managementMamta Kumari
 
Quality Assurance in Modern Software Development
Quality Assurance in Modern Software DevelopmentQuality Assurance in Modern Software Development
Quality Assurance in Modern Software DevelopmentZahra Sadeghi
 
PA2557_SQM_Lecture2 - Quality Basics.pdf
PA2557_SQM_Lecture2 - Quality Basics.pdfPA2557_SQM_Lecture2 - Quality Basics.pdf
PA2557_SQM_Lecture2 - Quality Basics.pdfhulk smash
 
Lecture # 08 Reverse Engineering
Lecture # 08 Reverse EngineeringLecture # 08 Reverse Engineering
Lecture # 08 Reverse EngineeringSolomon Tekeste
 

Similaire à IIE Conference Presentation (20)

LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
 
The Benefits of Applying Lean Sigma for Service
The Benefits of Applying Lean Sigma for ServiceThe Benefits of Applying Lean Sigma for Service
The Benefits of Applying Lean Sigma for Service
 
Enhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean SigmaEnhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean Sigma
 
Enhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean SigmaEnhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean Sigma
 
Supply Chain Management.ppt
Supply Chain Management.pptSupply Chain Management.ppt
Supply Chain Management.ppt
 
Operation Mangement Suppl.-SPC training-ppt
Operation Mangement Suppl.-SPC training-pptOperation Mangement Suppl.-SPC training-ppt
Operation Mangement Suppl.-SPC training-ppt
 
An introduction to lean six sigma
An introduction to lean six sigmaAn introduction to lean six sigma
An introduction to lean six sigma
 
An introduction to lean six sigma
An introduction to lean six sigmaAn introduction to lean six sigma
An introduction to lean six sigma
 
An Introduction to Lean Six Sigma.pptx
An Introduction to Lean Six Sigma.pptxAn Introduction to Lean Six Sigma.pptx
An Introduction to Lean Six Sigma.pptx
 
Software metrics by Dr. B. J. Mohite
Software metrics by Dr. B. J. MohiteSoftware metrics by Dr. B. J. Mohite
Software metrics by Dr. B. J. Mohite
 
Supply chain management satyen
Supply chain management satyenSupply chain management satyen
Supply chain management satyen
 
Lesson 10 - Value stream mapping
Lesson 10 - Value stream mappingLesson 10 - Value stream mapping
Lesson 10 - Value stream mapping
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
supply chain management
supply chain management supply chain management
supply chain management
 
Logistics and supply chain management
Logistics and supply chain managementLogistics and supply chain management
Logistics and supply chain management
 
Quality Assurance in Modern Software Development
Quality Assurance in Modern Software DevelopmentQuality Assurance in Modern Software Development
Quality Assurance in Modern Software Development
 
PA2557_SQM_Lecture2 - Quality Basics.pdf
PA2557_SQM_Lecture2 - Quality Basics.pdfPA2557_SQM_Lecture2 - Quality Basics.pdf
PA2557_SQM_Lecture2 - Quality Basics.pdf
 
Lecture # 08 Reverse Engineering
Lecture # 08 Reverse EngineeringLecture # 08 Reverse Engineering
Lecture # 08 Reverse Engineering
 
16 lean manufacturing
16 lean manufacturing16 lean manufacturing
16 lean manufacturing
 

Plus de Brandon Theiss, PE

A Six Sigma Analysis of Mobile Data Usage
A Six Sigma Analysis of Mobile Data UsageA Six Sigma Analysis of Mobile Data Usage
A Six Sigma Analysis of Mobile Data UsageBrandon Theiss, PE
 
Six Sigma Analysis of Daily Cycling Commute
Six Sigma Analysis of Daily Cycling Commute Six Sigma Analysis of Daily Cycling Commute
Six Sigma Analysis of Daily Cycling Commute Brandon Theiss, PE
 
Teaching tactical industrial engineering to high school students
Teaching tactical industrial engineering to high school studentsTeaching tactical industrial engineering to high school students
Teaching tactical industrial engineering to high school studentsBrandon Theiss, PE
 
Is the Rate of Events of Terrorism Increasing?
Is the Rate of Events of Terrorism Increasing?Is the Rate of Events of Terrorism Increasing?
Is the Rate of Events of Terrorism Increasing?Brandon Theiss, PE
 
Teaching Six Sigma Using Six Sigma
Teaching Six Sigma Using Six SigmaTeaching Six Sigma Using Six Sigma
Teaching Six Sigma Using Six SigmaBrandon Theiss, PE
 
15th QMOD conference on Quality and Service Sciences 9/07/2012
15th QMOD conference on Quality and Service Sciences 9/07/201215th QMOD conference on Quality and Service Sciences 9/07/2012
15th QMOD conference on Quality and Service Sciences 9/07/2012Brandon Theiss, PE
 
Rutgers Governor School - Six Sigma
Rutgers Governor School - Six Sigma  Rutgers Governor School - Six Sigma
Rutgers Governor School - Six Sigma Brandon Theiss, PE
 

Plus de Brandon Theiss, PE (14)

A Six Sigma Analysis of Mobile Data Usage
A Six Sigma Analysis of Mobile Data UsageA Six Sigma Analysis of Mobile Data Usage
A Six Sigma Analysis of Mobile Data Usage
 
Six Sigma Analysis of Daily Cycling Commute
Six Sigma Analysis of Daily Cycling Commute Six Sigma Analysis of Daily Cycling Commute
Six Sigma Analysis of Daily Cycling Commute
 
Teaching tactical industrial engineering to high school students
Teaching tactical industrial engineering to high school studentsTeaching tactical industrial engineering to high school students
Teaching tactical industrial engineering to high school students
 
Is the Rate of Events of Terrorism Increasing?
Is the Rate of Events of Terrorism Increasing?Is the Rate of Events of Terrorism Increasing?
Is the Rate of Events of Terrorism Increasing?
 
2013 QMOD Presentation
2013 QMOD Presentation 2013 QMOD Presentation
2013 QMOD Presentation
 
Starbucks Wait Time Analysis
Starbucks Wait Time AnalysisStarbucks Wait Time Analysis
Starbucks Wait Time Analysis
 
Teaching Six Sigma Using Six Sigma
Teaching Six Sigma Using Six SigmaTeaching Six Sigma Using Six Sigma
Teaching Six Sigma Using Six Sigma
 
Neqc poster
Neqc posterNeqc poster
Neqc poster
 
Greenbelt review
Greenbelt reviewGreenbelt review
Greenbelt review
 
15th QMOD conference on Quality and Service Sciences 9/07/2012
15th QMOD conference on Quality and Service Sciences 9/07/201215th QMOD conference on Quality and Service Sciences 9/07/2012
15th QMOD conference on Quality and Service Sciences 9/07/2012
 
Rutgers Green Belt
Rutgers Green BeltRutgers Green Belt
Rutgers Green Belt
 
SQC Guest Lecture- Starbucks
SQC Guest Lecture- StarbucksSQC Guest Lecture- Starbucks
SQC Guest Lecture- Starbucks
 
Rutgers Governor School - Six Sigma
Rutgers Governor School - Six Sigma  Rutgers Governor School - Six Sigma
Rutgers Governor School - Six Sigma
 
Starbucks Wait Time Analysis
Starbucks Wait Time AnalysisStarbucks Wait Time Analysis
Starbucks Wait Time Analysis
 

Dernier

Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxBkGupta21
 

Dernier (20)

Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptx
 

IIE Conference Presentation

  • 1. Quality Decisions Come From Quality Data Presented Wednesday, May 23 By Brandon Theiss Brandon.Theiss@gmail.com
  • 2. About Me • Academics – MS Industrial Engineering Rutgers University – BS Electrical & Computer Engineering Rutgers University – BA Physics Rutgers University • Professional – Principal Industrial Engineer -Medrtonic – Master Black belt- American Standard Brands – Systems Engineer- Johnson Scale Co • Awards – ASQ Top 40 Leader in Quality Under 40 • Certifications – ASQ Certified Manager of Quality/ Org Excellence Cert # 13788 – ASQ Certified Quality Auditor Cert # 41232 – ASQ Certified Quality Engineer Cert # 56176 – ASQ Certified Reliability Engineer Cert #7203 – ASQ Certified Six Sigma Green Belt Cert # 3962 – ASQ Certified Six Sigma Black Belt Cert # 9641 – ASQ Certified Software Quality Engineer Cert # 4941 • Publications – Going with the Flow- The importance of collecting data without holding up your processes- Quality Progress March 2011 – "Numbers Are Not Enough: Improved Manufacturing Comes From Using Quality Data the Right Way" (cover story). Industrial Engineering Magazine- Journal of the Institute of Industrial Engineers September (2011): 28-33. Print
  • 3. Problem Statement • The era of social networking has enabled a person sitting in a café in New York City to obtain up to the minute ‘status’ updates about a friend or colleague in Shanghai. – Do these tweets have value? – Is this information “quality data”? – Why does business process data not flow with the same velocity and volume?
  • 4. What is Quality Data? • Quality is defined as – Joseph Juran - > "fitness for intended use" – W. Edwards Deming -> "meeting or exceeding customer expectations." • Data is to be considered as Quality if it is – Relevant – Accurate – Timely – Complete
  • 5. What is a Process? • Formal Definition – A systematic series of actions directed to some end • Practical Definition – Any Verb Noun Combination • Eat Sandwich • Read Book • Attend Conference • Implications of Practical Definition – Same Tools Techniques and Methods of the Lean Six Sigma Methodologies can be used for virtually anything
  • 6. Limitations of Lean Six Sigma • Process Intelligence – There must exist a critical level of intelligence at the elemental levels in the organization. This can be manifest in the operators or machines • Process Ownership – The operators need to be sufficiently trained and empowered to take ownership of the process so that they can creatively maximize the efficiencies the hardware can provide in order to produce a quality work product for their internal or external customers. • Non Quality data as an input will generate bad conclusions – The most elegant of mathematical calculations will not correct errors in the dataset • Correlation does not imply causation – As the statistics become more elegant often this fact is often forgotten. • Utilization of Statistical Tools does not yield absolute truth – Statistical Significance Does not Mean actual significance. • (See US Supreme Court Matrixx Initiatives, Inc. v. Siracusano ) – Best Utilization is to direct resources to discovering truth.
  • 7. Problems with Valuing Data • Data in the abstract has little value • Data only begins to have value when connections and well reasoned conclusions are drawn from the information that these “numbers on a screen” can be translated directly to the accountants profit and loss statement. • “how much should be invested in measuring A when its impact on B might not generate enough additional benefit to cover the cost of measuring A?” Data Collected Capital Allocated Value Determined
  • 8. Scientific Approach to Valuing Data “Our theories determine what we measure” (Albert Einstein) • In science the goal is the confirmation or refutation of a theoretical model. • In industry the costs, purposes and uses for collected data must be tied directly to the profitability of the enterprise. • Many such models for industrial systems exist. • The strength of the model is only established through the course of collecting data and testing predictive validity of the theory • The solution to this dilemma is to a priori declare the value.
  • 9. Data Collection System • Historically the cost of collecting data has been quite high relative to the perceived benefits derived. • Traditional data collection systems are considered as non value added thus ‘muda’ • Data was collected about a product or process either by diverting material to a quality lab for inspection or doing painstaking time studies of operator actions and then auditing the results. • Fortunately the cost and flexibility of current technology allows for process and product specific data to be collected in line by the existing operators without increasing cycle time or incurring great expense
  • 10. Case Study 1 (LTL Trucking) • Less than Truck Load Trucking- handles mostly palletized material than handled by FedEx/ UPS and not large enough to warrant its own truck • Freight is billed based upon – Distance – Weight – Volume – Class of Freight • Traditional Method – Shipper would contact Shipping company and provide the complete data – Shipping company would the pick up the load and transport it – The shipping company would invoice the shipper
  • 11. Case Study 1 (cont)(LTL Trucking) • Problems with Traditional Method – Customer Provided weight and volume information never verified. – Heavier pallets = greater fuel costs – Larger pallets = fewer pallets in a truck • Initial Response – 30% of inbound freight into the shipping companies terminal was diverted to a re-weighing re-dimensioning station • Operator weighs pallet, measures dimensions and fills out a paper form • At the end of the shift the papers are turned into a data entry person who keys in the information • Billing system corrects invoice and adds surcharge for customer error
  • 12. Case Study 1 (cont) (LTL Trucking) • Problems with Initial Response – Only 30% of the pallets are analyzed – Slower cycle time for reweighed pallets – Paper based • Transcription errors • Lost chits • Erroneous Readings – Extra Labor required (dimensioning and data entry) • Final Solution – Integrated weighing system in the forks of the forklift • As the operator is moving the pallet, the pallet is identified by either an RFID tag or scanned barcode. The weight is then captured and wirelessly transmitted to the billing system • A similar system has been designed which allows for the dimensions of the pallet to also be determined
  • 13. Case Study 2 (Bulk Mixing) • A company was manually mixing bulk materials to make a slurry • The process of batching consisted of an operator utilizing a bobcat skid loader to dump bulk material into a large industrial mixer. – At the beginning of the shift the operator was given a pre-printed form that prescribed the exact amount of each of the bulk ingredients. – Prior to beginning the batching process the operator moved the bobcat onto a floor scale and recorded the empty tare weight of the loader. – Then the operator navigated the bobcat to the pile of bulk material, scooped up a load, navigated back to the scale to record the weight on the pre-printed form – Then finally to the mixer to load the material. – This process was repeated multiple times for any given ingredient. – After completing an ingredient the operator would add up the respective weights, using a pocket calculator and recorded the total weights on form. – This cycle continued for all of the ingredients in the recipe. – Once the recipe was completed the operator turned in the form to his supervisor who in turn submitted the form to the quality lab.
  • 14. Case Study 2 (cont) (Bulk Mixing) • A Gauge R&R study was performed and the process was determined to be highly variable yet adequate. – Company was not concerned as the output of the batching process was the input to another process that was quite tolerant to batching errors (as long as they were reported) • The downstream processes were having constant quality problems – Managers in the downstream process complained to the batching area claiming they were delivering an inferior product – Batching Area managers pointed to the Quality records which indicated that everything was made to specification – The batching supervisors emphatically argued that if an error were reported, he personally would reprimanded the operator and in most cases fired them
  • 15. Case Study 2 (cont) (Bulk Mixing) • Problems – Opportunities for the data to be corrupted or compromised or lost • manually hand writing data, • using a hand held calculator , • improperly identifying the materials and • multiple hand offs of the physical form – ‘Muda’ in the wasted motion of the operator having to drive to the floor scale prior to the delivery of each load – Measurement resolution • Recipes listed ingredients to fractions of a pound however scale read by 2 lb increments • True Root Cause – Managers Response to Defects • Operator knew if they reported the actual amount dispensed they would be jeopardizing their jobs • Consequently only the correct values were reported • The down stream processes were not given accurate data
  • 16. Case Study 3 (Final Assembly/Packaging) • As a result of a bench marking exercise, a multinational manufacturer identified that one of its plants was 3 times more productive than the worst performing plant in the same geographic region for the final assembly and packaging area • An investigation was performed comparing the standard operating procedures, line layouts, tools, training and staffing of the lines at the respective plants. – Minor differences were observed and were immediately changed to adopt the best practices of the higher performing plant. As a result de minimis incremental improvements were observed however the plant continued to under perform. – A team of interns to observer the line and record the ‘up time’. After collecting data around the clock for a week, the team determined that the line was only meeting its target cycle time 65% of the time. – Process maps were drawn and one of the last steps was to scan the unique part barcode so that product would be flowed in the ERP system as a finished good
  • 17. Case Study 3 (cont) (Final Assembly/Packaging) • Initial Solution – Using the time stamp information, the time between successive scans was revealed. – By plotting this information on a SPC chart, out of control conditions (line stoppages) would be obvious. Once the problems were identified and quantified resources could be allocated to developing their solution – With the help of operations and IT, software was written that would automatically generate the control chart. – The front line supervisors were instructed that prior to letting the operators leave for the day, each one of the out of control conditions had to be explained
  • 18. Case Study 3 (cont)(Final Assembly/Packaging) • Why the Initial Solution Failed – After 10 hour shift, operators did not want to spend 20 minutes doing paper work – 9 hours after the fact, no one could recall why exactly the line had stopped • Final Solution – Modified Line Software • When an operator failed to scan a barcode in the allocated period of time, a window would popup and would not allow the system to proceed. • Window presented 4 options (Materials, Machines, Manning or Other). • The operator would use the touch screen interface and poke at the option that matched the line stoppage. For instance if there was a stock out in a given box, the operator would poke at the option for materials and then would be presented with an option of all the potential stock out materials. – Stoppage Data was then used in Pareto Charts which lead to the improvement in upstream data collection
  • 19. Case Study 4 (High Volume Manufacturer ) • A manufacturer of hand tools could not account for discrepancies of 300,000 parts per facility per month. The manufacturer had made a large investment in an ERP which automatically translated customer orders directly to the production schedule and manufactured pieces the Achilles heel of the system was the quality of the input data. – If information were not entered, then the ERP would respond by scheduling more production of the piece. – If a wrong number were entered, then the ERP would fail to schedule the part for production. – Managers lacked sufficient information as to the whereabouts of the material or which manufacturing stage it was in.
  • 20. Case Study 4 (cont) (High Volume Manufacturer ) • The process of collecting data was convoluted, – the operator would hand record on a chit of paper the number of parts produced. – At the conclusion of the shift these notes were turned in to the area supervisor, – The supervisor would either personally key the information into the ERP system or delegate the task to a data entry person. • Problems – The paper notes were frequently lost; – Accidental and deliberate transcription errors – Lots of ‘Muda’ – ERP Amplifying Feedback Loop • If a sheet was lost, the ERP would drive more production of the part, though in the physical reality it had been produced or conversely if due to a over reporting error the ERP would not schedule production.
  • 21. Case Study 4 (cont) (High Volume Manufacturer ) • The solution – Hardware • a simple counting scale, • a barcode scanner and • a printer. – Process • Operator to scanned a barcode to identify the product • The associated average piece weight for that part and step in the manufacturing process was downloaded from database to the scale. • Placing items on the scale then instantly yielded the correct number of pieces, • The operator then pressed a button to indicate a finished count. • The part was then flowed from one WIP state to the next in the ERP system • A label was printed to confirm that the transaction was received. • Results – The number of misattributed parts of this manufacturer was reduced to less than 300 while the cycle time increased by less than 15 seconds.
  • 22. Conclusions “Data enables an individual, company or society to rise from the bondage of myths and half truths.” • The tools technique and methods of Lean Six Sigma help to reveal truth yet are limited by the input quality of the data. Inserting garbage data into the most elegant of calculations will still result in nonsensical analysis and decisions. • Getting enough of the right data, at the right time, to the right people is the constantly evolving challenge that must be met. Technology now facilitates the real time flow of this information. The technology can only be implemented and process improvements achieved if an enterprise is willing to make the investment.
  • 23. Questions? • Contact Information – Brandon Theiss – Brandon.Theiss@gmail.com – Linkedin- http://www.linkedin.com/in/brandontheiss