•   BATMA                 www.batma.org
•   Facebook              www.facebook.com/buckheadtma
•   Slideshare            www.slideshare.net/buckhead
•   Youtube               www.youtube.com/LivableBuckhead
•   “the buc”             www.bucride.com
•   Livable Buckhead      www.livablebuckhead.org
•   Buckhead CID          www.buckheadcid.com
•   Ride match            www.myridesmart.com
•   Commuter Rewards      www.logyourcommute.org
•   MARTA                 www.itsmarta.com
•   Gwinnet Co. Transit   www.gctransit.com
•   Xpress Bus            www.xpressga.com
•   Cobb Co. Transit      www.cobbdot.org/cct.htm
•   Peach Pass            www.peachpass.com
•   Express Lanes         www.georgiatolls.com/programs/i-85-express-lanes/

•   Tony Peters           tony@livablebuckhead.org
•   Scott Cantrell        scott@batma.org
GA 400 Corridor Improvement Projects
                                                                                                                                               Anticipated Schedule:                                   Estimated Funding Needed:
                                                                                                                                               2 years for construction (open 2014)                    $40,000,000



   Description:                                                                                                                                       A. I-85/GA 400 Connector Ramps
   Project includes construction
   of two new single lane
   interchange ramps: one to
                                                                                                                                               I-85 SB




                                                                                                                                                                                         Lenox Roa
                                                                                                                                                                                         Lenox Roa
   serve I-85 southbound to GA
                                                                                                                                                  To
   400 northbound traffic and
                                                                                                                                              GA 400 NB




                                                                                                                                                                                                  dd
   one to serve GA 400
   southbound to I-85




                                                                                                                                     GA
                                                                                                                                     GA
   northbound traffic. This will




                                                                                                                                        400
                                                                                                                                        400
   address the lack of direct                                                                           Sidney Marc
                                                                                                                   us   Boule
                                                                                                                              vard                                                                     ay
   connection between GA 400                                                                                                                                                                     ig hw
                                                                                                                                                                                            ordH
   and I-85. These new ramps                                                                                                                                                             Buf
   are projected to reduce traffic
   along local streets and to
   improve travel times and
                                                                                                                                                                                                                        I -85
   safety along GA 400, I-85,
   and other impacted
   roadways.



                                                                                                                                                                                      GA 400 SB
Note: Final project descriptions are subject to the development process and environmental clearances.                                                                                     To
                                                                                                               Existing Route                                                          I-85 NB
                                                                                                               Proposed Route
overview: I-85 ExprEss LanEs

The United States Department of Transportation awarded a $110 million grant to
the Atlanta region to support a $182 million pilot project through the Congestion
Reduction Demonstration Program. Investments are aimed at providing trip time
reliability, commuter choices, and regional transit enhancements, including 11 new
or expanded park-and-ride facilities, 82 new passenger coach buses, and expansion of
GRTA’s Xpress bus service.

Park-and-Ride Lots and Express Bus Routes
                                                                              985
                                                                                    Hamilton Mill
                                                    I-985 and SR 20
                                                                                                    85
                                                                                                           For more information, please visit:
                                                                       Mall of Georgia                     www.peachpass.com
                                                                                                           Contact:
                                                              85                 Cedars Road               Malika Reed Wilkins
                                                                                                           Director of Marketing &
                                   Discover Mills
                                                                                                           Communications
                                                                 316             Legend
                                                                                                           State Road and Tollway Authority
                                                                                                           404-893-6103 or
                                                                                         Existing or       mwilkins@georgiatolls.com
                                            Indian Trail                                 Planned Park-
           285                                                                           and-Ride Lots
                                                                                                           Karlene Barron
                                                                                         Existing and      Director of Communications,
                                                                                         Planned Express
                                                                                         Bus Routes
                                                                                                           Georgia Department of
                                                                                         I-85 Express
                                                                                         Lanes             Transportation
                                                                                                           404-631-1824 or
                                                                                                           kbarron@dot.ga.gov

Phase I of the program will focus on the conversion of the existing High Occupancy                         William Mecke
Vehicle (HOV) lanes to Express Lanes in the northeast Atlanta metropolitan area,                           Deputy Director of Communications
                                                                                                           Georgia Regional Transportation
stretching approximately 16 miles along the I-85 corridor from Chamblee Tucker                             Authority
Road, just south of I-285, to Old Peachtree Road in Gwinnett County. Vehicles that                         404-463-3011 or
will be able to use the Express Lanes toll-free include:                                                   wmecke@grta.org

      •	 Transit vehicles
      •	 Carpools with three or more occupants
      •	 Motorcycles
      •	 Emergency vehicles
      •	 Alternative Fuel Vehicles (AFV) with the proper AFV license plate (does not
         include hybrid vehicles)
Vehicles with fewer than three occupants, including solo drivers, will be able to
choose whether to use the free general purpose lanes or pay for a more reliable trip in
the Express Lanes. Tolls will be collected via Peach Pass, a small, thin electronic toll
collection device similar to the Cruise Card that adheres to a vehicle windshield (see
photo). With the most advanced tolling technology available, customers will be able
to use their Peach Pass or Cruise Card on the I-85 Express Lanes when they open in
summer 2011.




                                                                                                                                       02-2011
Regional Transit Enhancements

• $122 million of potential transit
  investments
    – Doubles Xpress service in the I-
      85 Corridor
    – Supports Xpress facilities
      throughout the region
    – 21 new Xpress coaches, support
      for more in the future if needed

• $60 million in roadside
  investments




4                                  www.PeachPass.com
Alternative commute options
 Carpool
 Vanpool
 Transit
 Telework
 Alternative Work
 Schedules
 Bike
 Walk
Incentives
   First Timers                     Cash for Commuters
                                    Carpoolers, Vanpoolers, Walkers, Bikers, Teleworkers and Transit
      $3/Day                        Users
                                    Earn $3/day up to $100. Log on batma.org to track commute




 Occasional Users                  Commuter Rewards
                                   Log your commute on batma.org and get put in drawing to win $25
$25/Month Drawing                  Visa Gift Card
                                   The more you log, the more you win. 1/10 chance to win




                                    Carpool
  Extreme Users                     Carpoolers automatically receive $20, 40, and $60 gas cards
                                    Log at least 30 trips (15 round trips) on batma.org
$20, $40, $60/Month


Vanpool Subsidies
                                   Vanpool Subsidy
  $75, $90, $100                   Covers half of expenses. Full cost can be $200 or more
                                   Includes van and maintenance costs
 Flat Fare/Month


           Guaranteed Ride Home provides commuters who carpool, vanpool, bike or use transit
          with a reliable ride home if an unexpected event occurs up to 5 trips home or to their car
          each year
           Provided by the                                                    division of the Atlanta Regional Commission
           Federal funding for the GRH program is provided through the Georgia Department of Transportation (GDOT).
www.atlantaregionalroundtable.com

 Traffic Relief Is In Your Hands                                                Key Points
 The Transportation Investment Act of 2010 created the opportunity              	•	All	money	raised	
 for residents to vote on a penny sales tax to support transportation              in	the	region,	
 improvements throughout the Atlanta region. All funds raised will stay in         stays	in	the	
 the 10-county region and can be used to support a wide range of projects          region.	
 that would combat congestion.
                                                                                •	The	list	of	projects	
 Transportation Investment Act of 2010: Why Now?                                  is	developed	by	
                                                                                  local	officials	and	
 Metro Atlanta faces a transportation funding crisis. Revenues from gas           voted	on	by	the	
 taxes, the primary source of federal and state funding, are declining            public.	
 as cars become more fuel efficient. In fact, 70 percent of the region’s
 transportation funding will be spent to simply maintain the existing           •	15	percent	of	all	
 roads and systems over the next 30 years, leaving little room for                funds	raised	in	
 expansion. This means that as the region grows, congestion will worsen.          the	region	will	
 The Transportation Investment Act can inject critical funds to maintain          go	directly	to	
 our region’s competitive advantage.                                              local	jurisdictions	
                                                                                  to	use	on	any	
                                                                                  transportation	
 How Regional Transportation Funding Works                                        projects	they	
 The Transportation Investment Act calls for the formation of a Regional          choose.	
 Roundtable, made up of county commissioners and mayors from all
 counties. Projects to be considered for funding by the referendum have been    •	Without	new	
 submitted by local governments throughout the region. Georgia Department         transportation	
                                                                                  resources,	our	
 of Transportation’s Planning Director considers these submissions as he          region’s	economic	
 creates and delivers an unconstrained list to the Roundtable.                    future	is	at	risk.	
 With input from residents, the Roundtable will work through the
 summer and fall of 2011 to select a list of regionally significant, priority   •	Metro	Atlantans	
 transportation projects that could realistically be funded with the sales        may	not	get	
 tax revenue over a 10-year period. The list will include transit, roads,         another	chance	
 safety, pedestrian and bike improvements and technology updates and              to	say	“yes”	to	
 will be finalized in October 2011. In July 2012, residents will decide           traffic	solutions	
                                                                                  for	years.	
 whether or not to approve a penny sales tax to support these projects.

 The Atlanta Region:
 Cherokee, Clayton, Cobb, DeKalb, Douglas, Fayette, Fulton, Gwinnett,
 Henry and Rockdale counties
Atlanta Regional Roundtable Commitment
The Atlanta Regional Roundtable is committed to an open and transparent process that creates a
regional project list that:
	 •	 Considers	transportation	projects	that	create	significant	regional	impact,	yet	reflects	the	unique	
     conditions of different areas in the region
	 •	 Values	connectivity	across	the	region
	 •	 Is	multimodal	
	 •	 Relieves	congestion,	expands	transportation	options	and	creates	jobs
	 •	 Can	be	delivered	on	time	and	on	budget
	 •	 Reflects	the	community’s	priorities	as	gathered	through	extensive	community	input	
	 •	 Is	a	strategic	piece	of	a	larger	effort	to	dramatically	improve	mobility	and	advance	PLAN	2040,	
     the regional transportation, transit and land use plan
	 •	 Leverages	the	maximum	amount	of	federal	funds	available	to	the	region
	 •	 Creates	short	term	and	long	term	solutions	to	Atlanta’s	transportation	problems
	 •	 Serves	all	segments	of	the	region’s	diverse	population	through	comprehensive	solutions
	 •	 Uses	technology	where	appropriate	to	improve	efficiency	and	safety
	 •	 Considers	connections	to	adjoining	regions
The list will complement and supplement existing transportation and land use plans. It will position
Atlanta	to	compete	for	businesses	and	jobs	while	improving	the	quality	of	life,	reducing	traffic	
congestion and enhancing safety.
Adopted June 9, 2011


                       Atlanta Regional Roundtable Milestones

Contenu connexe

Plus de Livable Buckhead / BATMA

Creating Greenspace: Capping GA400 in Buckhead
Creating Greenspace: Capping GA400 in BuckheadCreating Greenspace: Capping GA400 in Buckhead
Creating Greenspace: Capping GA400 in BuckheadLivable Buckhead / BATMA
 
Trends in the Atlanta Region and Buckhead — Demographics and Growth Seminar –...
Trends in the Atlanta Region and Buckhead — Demographics and Growth Seminar –...Trends in the Atlanta Region and Buckhead — Demographics and Growth Seminar –...
Trends in the Atlanta Region and Buckhead — Demographics and Growth Seminar –...Livable Buckhead / BATMA
 
Atlanta Plaza - 2012 BCID/BATMA/LBI Presentation
Atlanta Plaza - 2012 BCID/BATMA/LBI PresentationAtlanta Plaza - 2012 BCID/BATMA/LBI Presentation
Atlanta Plaza - 2012 BCID/BATMA/LBI PresentationLivable Buckhead / BATMA
 
Monarch Plaza - 2011 general presentation monarch
Monarch Plaza - 2011 general presentation monarchMonarch Plaza - 2011 general presentation monarch
Monarch Plaza - 2011 general presentation monarchLivable Buckhead / BATMA
 
Jim Durrett's keynote address - Pace Awards 2011
Jim Durrett's keynote address - Pace Awards 2011Jim Durrett's keynote address - Pace Awards 2011
Jim Durrett's keynote address - Pace Awards 2011Livable Buckhead / BATMA
 

Plus de Livable Buckhead / BATMA (15)

Path400 Capital Campaign
Path400 Capital CampaignPath400 Capital Campaign
Path400 Capital Campaign
 
Creating Greenspace: Capping GA400 in Buckhead
Creating Greenspace: Capping GA400 in BuckheadCreating Greenspace: Capping GA400 in Buckhead
Creating Greenspace: Capping GA400 in Buckhead
 
Trends in the Atlanta Region and Buckhead — Demographics and Growth Seminar –...
Trends in the Atlanta Region and Buckhead — Demographics and Growth Seminar –...Trends in the Atlanta Region and Buckhead — Demographics and Growth Seminar –...
Trends in the Atlanta Region and Buckhead — Demographics and Growth Seminar –...
 
GA400 trail presentation - 30% design
GA400 trail presentation - 30% designGA400 trail presentation - 30% design
GA400 trail presentation - 30% design
 
BATMA - General Presentation
BATMA - General PresentationBATMA - General Presentation
BATMA - General Presentation
 
Buckhead Business Association - 5.10.2012
Buckhead Business Association - 5.10.2012Buckhead Business Association - 5.10.2012
Buckhead Business Association - 5.10.2012
 
Atlanta Plaza - 2012 BCID/BATMA/LBI Presentation
Atlanta Plaza - 2012 BCID/BATMA/LBI PresentationAtlanta Plaza - 2012 BCID/BATMA/LBI Presentation
Atlanta Plaza - 2012 BCID/BATMA/LBI Presentation
 
WellPoint - 2011 general presentation
WellPoint - 2011 general presentation WellPoint - 2011 general presentation
WellPoint - 2011 general presentation
 
Monarch Plaza - 2011 general presentation monarch
Monarch Plaza - 2011 general presentation monarchMonarch Plaza - 2011 general presentation monarch
Monarch Plaza - 2011 general presentation monarch
 
Jim Durrett's keynote address - Pace Awards 2011
Jim Durrett's keynote address - Pace Awards 2011Jim Durrett's keynote address - Pace Awards 2011
Jim Durrett's keynote address - Pace Awards 2011
 
Commuter Choice
Commuter ChoiceCommuter Choice
Commuter Choice
 
Resurgens Plaza Presentation
Resurgens Plaza PresentationResurgens Plaza Presentation
Resurgens Plaza Presentation
 
Terminus Presentation terminus
Terminus Presentation terminusTerminus Presentation terminus
Terminus Presentation terminus
 
2011 General Presentation
2011 General Presentation2011 General Presentation
2011 General Presentation
 
Atlanta Financial Center Presentation
Atlanta Financial Center PresentationAtlanta Financial Center Presentation
Atlanta Financial Center Presentation
 

Dernier

(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 

Dernier (20)

(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 

Wellpoint presentation

  • 1. Resources • BATMA www.batma.org • Facebook www.facebook.com/buckheadtma • Slideshare www.slideshare.net/buckhead • Youtube www.youtube.com/LivableBuckhead • “the buc” www.bucride.com • Livable Buckhead www.livablebuckhead.org • Buckhead CID www.buckheadcid.com • Ride match www.myridesmart.com • Commuter Rewards www.logyourcommute.org • MARTA www.itsmarta.com • Gwinnet Co. Transit www.gctransit.com • Xpress Bus www.xpressga.com • Cobb Co. Transit www.cobbdot.org/cct.htm • Peach Pass www.peachpass.com • Express Lanes www.georgiatolls.com/programs/i-85-express-lanes/ • Tony Peters tony@livablebuckhead.org • Scott Cantrell scott@batma.org
  • 2. GA 400 Corridor Improvement Projects Anticipated Schedule: Estimated Funding Needed: 2 years for construction (open 2014) $40,000,000 Description: A. I-85/GA 400 Connector Ramps Project includes construction of two new single lane interchange ramps: one to I-85 SB Lenox Roa Lenox Roa serve I-85 southbound to GA To 400 northbound traffic and GA 400 NB dd one to serve GA 400 southbound to I-85 GA GA northbound traffic. This will 400 400 address the lack of direct Sidney Marc us Boule vard ay connection between GA 400 ig hw ordH and I-85. These new ramps Buf are projected to reduce traffic along local streets and to improve travel times and I -85 safety along GA 400, I-85, and other impacted roadways. GA 400 SB Note: Final project descriptions are subject to the development process and environmental clearances. To Existing Route I-85 NB Proposed Route
  • 3. overview: I-85 ExprEss LanEs The United States Department of Transportation awarded a $110 million grant to the Atlanta region to support a $182 million pilot project through the Congestion Reduction Demonstration Program. Investments are aimed at providing trip time reliability, commuter choices, and regional transit enhancements, including 11 new or expanded park-and-ride facilities, 82 new passenger coach buses, and expansion of GRTA’s Xpress bus service. Park-and-Ride Lots and Express Bus Routes 985 Hamilton Mill I-985 and SR 20 85 For more information, please visit: Mall of Georgia www.peachpass.com Contact: 85 Cedars Road Malika Reed Wilkins Director of Marketing & Discover Mills Communications 316 Legend State Road and Tollway Authority 404-893-6103 or Existing or mwilkins@georgiatolls.com Indian Trail Planned Park- 285 and-Ride Lots Karlene Barron Existing and Director of Communications, Planned Express Bus Routes Georgia Department of I-85 Express Lanes Transportation 404-631-1824 or kbarron@dot.ga.gov Phase I of the program will focus on the conversion of the existing High Occupancy William Mecke Vehicle (HOV) lanes to Express Lanes in the northeast Atlanta metropolitan area, Deputy Director of Communications Georgia Regional Transportation stretching approximately 16 miles along the I-85 corridor from Chamblee Tucker Authority Road, just south of I-285, to Old Peachtree Road in Gwinnett County. Vehicles that 404-463-3011 or will be able to use the Express Lanes toll-free include: wmecke@grta.org • Transit vehicles • Carpools with three or more occupants • Motorcycles • Emergency vehicles • Alternative Fuel Vehicles (AFV) with the proper AFV license plate (does not include hybrid vehicles) Vehicles with fewer than three occupants, including solo drivers, will be able to choose whether to use the free general purpose lanes or pay for a more reliable trip in the Express Lanes. Tolls will be collected via Peach Pass, a small, thin electronic toll collection device similar to the Cruise Card that adheres to a vehicle windshield (see photo). With the most advanced tolling technology available, customers will be able to use their Peach Pass or Cruise Card on the I-85 Express Lanes when they open in summer 2011. 02-2011
  • 4. Regional Transit Enhancements • $122 million of potential transit investments – Doubles Xpress service in the I- 85 Corridor – Supports Xpress facilities throughout the region – 21 new Xpress coaches, support for more in the future if needed • $60 million in roadside investments 4 www.PeachPass.com
  • 5. Alternative commute options Carpool Vanpool Transit Telework Alternative Work Schedules Bike Walk
  • 6. Incentives First Timers Cash for Commuters Carpoolers, Vanpoolers, Walkers, Bikers, Teleworkers and Transit $3/Day Users Earn $3/day up to $100. Log on batma.org to track commute Occasional Users Commuter Rewards Log your commute on batma.org and get put in drawing to win $25 $25/Month Drawing Visa Gift Card The more you log, the more you win. 1/10 chance to win Carpool Extreme Users Carpoolers automatically receive $20, 40, and $60 gas cards Log at least 30 trips (15 round trips) on batma.org $20, $40, $60/Month Vanpool Subsidies Vanpool Subsidy $75, $90, $100 Covers half of expenses. Full cost can be $200 or more Includes van and maintenance costs Flat Fare/Month Guaranteed Ride Home provides commuters who carpool, vanpool, bike or use transit with a reliable ride home if an unexpected event occurs up to 5 trips home or to their car each year Provided by the division of the Atlanta Regional Commission Federal funding for the GRH program is provided through the Georgia Department of Transportation (GDOT).
  • 7. www.atlantaregionalroundtable.com Traffic Relief Is In Your Hands Key Points The Transportation Investment Act of 2010 created the opportunity • All money raised for residents to vote on a penny sales tax to support transportation in the region, improvements throughout the Atlanta region. All funds raised will stay in stays in the the 10-county region and can be used to support a wide range of projects region. that would combat congestion. • The list of projects Transportation Investment Act of 2010: Why Now? is developed by local officials and Metro Atlanta faces a transportation funding crisis. Revenues from gas voted on by the taxes, the primary source of federal and state funding, are declining public. as cars become more fuel efficient. In fact, 70 percent of the region’s transportation funding will be spent to simply maintain the existing • 15 percent of all roads and systems over the next 30 years, leaving little room for funds raised in expansion. This means that as the region grows, congestion will worsen. the region will The Transportation Investment Act can inject critical funds to maintain go directly to our region’s competitive advantage. local jurisdictions to use on any transportation How Regional Transportation Funding Works projects they The Transportation Investment Act calls for the formation of a Regional choose. Roundtable, made up of county commissioners and mayors from all counties. Projects to be considered for funding by the referendum have been • Without new submitted by local governments throughout the region. Georgia Department transportation resources, our of Transportation’s Planning Director considers these submissions as he region’s economic creates and delivers an unconstrained list to the Roundtable. future is at risk. With input from residents, the Roundtable will work through the summer and fall of 2011 to select a list of regionally significant, priority • Metro Atlantans transportation projects that could realistically be funded with the sales may not get tax revenue over a 10-year period. The list will include transit, roads, another chance safety, pedestrian and bike improvements and technology updates and to say “yes” to will be finalized in October 2011. In July 2012, residents will decide traffic solutions for years. whether or not to approve a penny sales tax to support these projects. The Atlanta Region: Cherokee, Clayton, Cobb, DeKalb, Douglas, Fayette, Fulton, Gwinnett, Henry and Rockdale counties
  • 8. Atlanta Regional Roundtable Commitment The Atlanta Regional Roundtable is committed to an open and transparent process that creates a regional project list that: • Considers transportation projects that create significant regional impact, yet reflects the unique conditions of different areas in the region • Values connectivity across the region • Is multimodal • Relieves congestion, expands transportation options and creates jobs • Can be delivered on time and on budget • Reflects the community’s priorities as gathered through extensive community input • Is a strategic piece of a larger effort to dramatically improve mobility and advance PLAN 2040, the regional transportation, transit and land use plan • Leverages the maximum amount of federal funds available to the region • Creates short term and long term solutions to Atlanta’s transportation problems • Serves all segments of the region’s diverse population through comprehensive solutions • Uses technology where appropriate to improve efficiency and safety • Considers connections to adjoining regions The list will complement and supplement existing transportation and land use plans. It will position Atlanta to compete for businesses and jobs while improving the quality of life, reducing traffic congestion and enhancing safety. Adopted June 9, 2011 Atlanta Regional Roundtable Milestones