The City of San Diego’s
Clean Generation Program

       April 16, 2010



                           1
Clean Generation Program
  Property Assessed Clean Energy Financing
                   (PACE)
Purpose: Allows property owners to finance
renewable energy and energy efficiency
improvements through loans that would be
repaid as an item on the property owner's
property tax bill.

                                             2
The Benefits
•   Loan made to property
•   Transferable on sale
•   Competitive 20 year rate
•   Repayment via property tax bill




                                      3
Why?
• Job / Sector Development
  – Increase demand for local cleantech products and
    services
• Leadership
  – Municipal leadership is required
  – Positive cash flow for participants
  – Low cost / low risk to the City
• Environment
  – GHG reduction

                                                       4
Clean Generation Program
                   Selected Team
Renewable Funding, LLC.
• Short term (Gap Financing)
• Core administrative services

California Center for Sustainable Energy (CCSE)
• Administrative services
• CSI integration (State of California Solar Incentive
  Program)

                                                         5
Clean Generation Program
                      Overview
Funding:

  • 20 million dollars with potential for accessing
    additional funds
     • Fully loaded APR = 8.75% (Estimated)
  • Duration of Loan up to 20 years


                                                      6
Clean Generation Program
                    Eligible Measures
• Energy Efficiency Retrofits   • Renewable Energy Fixtures
   • Insulation                    • Solar
   • Heating and Cooling           • Wind
     Systems                       • Fuel Cells
   • A/C retrofits              • Water Efficiency Fixtures
   • Whole House Fan               • Low flow fixtures
   • Water heaters                 • Reclaimed Water
   • Pool Pumps                      Systems
                                   • Water Efficient Irrigation

                                                              7
Micro-Bond Process
                        Property Owner               Administrator

         1 - Submit Application
         Includes Project Details Package
                                                     • Verify eligibility
         2 - Receive Notice to Proceed
         Includes Funding Reservation


         3 - Install Project


         4 - Submit Funding Request
         Includes Verification Documents
                                                     • Verify project compliance
                                                     • Generate contract docs
         5 - Receive Assessment Contract Documents


         6 - Submit Assessment Contract Package      • Place lien
                                                     • Issue bond
         7 - Receive Payment                         • Remit payment

County   8 - Pay Back via Property Taxes



                                                                            8
Participation Options
• Energy efficiency requirements
• Short term goal
  – Educate and encourage
• Long-term goal
  – Serve as a force for market transformation
• Two Phase EE Implementation
  – Phase I: Thru December 2010
  – Phase II: Starts 2011

                                                 9
Prerequisites for all properties
• Items that must be replaced:
  – Central Air Conditioners (SEER ≤ 7)
  – Single Speed Pool Pumps


• Replaced with:
  – Central Air Conditioners (SEER ≥ 13)
  – Variable Speed Pool Pumps


                                           10
Energy Efficiency Prerequisites
• HERS or equivalent audit
• May bypass audit requirement if you use a BPI
  certified contractor
• Must install fixtures that are pre-approved by
  the program administrator




                                               11
Renewable Energy Prerequisites
• Home Improvement Path
  – Phase I
     • HERS audit
     • Must install fixtures that are pre-approved by the program
       administrator
     • Limited system size (70% of load or 130% of baseline)
  – Phase II
     • HERS audit
     • Participation in prescriptive track of Whole Home Retrofit
       program or HomeStar Silver
     • BPI Certified contractor required


                                                                    12
Renewable Energy Prerequisites
• Home Performance Path
  – Phase I
     • HERS audit (Test out: with 20% reduction or HERS II ≤ 100)
     • Optional participation in either the performance track of the
       Whole Home Retrofit Program, or HomeStar Gold
  – Phase II
     • HERS audit (Test out: with 20% reduction or HERS II ≤ 100)
     • Required participation in either the performance track of the
       Whole Home Retrofit Program, or HomeStar Gold



                                                                   13
Renewable Energy Prerequisites
• Already Efficient Homes
  – Phase I & II
     • HERS audit (HERS II ≤ 100) or Title 24 2005 / 2008
       report
     • Demonstrate historical annual consumption ≤ 130% of
       baseline (Tier 1-2)




                                                             14
Clean Generation Program
                   Program Design

Program Eligibility:

• Allocation: First come first serve

• Property must reside within the City of San Diego

• Multifamily - four units or less
                                                      15
Clean Generation Program
                   Program Design

• Underwriting Criteria
   – Ownership: Property owner must initiate and sign
     application
   – Property Tax Payment / Title History:
      • Must have a good payment history
      • No delinquencies in the past 3 years
      • No involuntary liens may be on property
   – Loan to Value Ratio, 10:1 is suggested ratio

                                                        16
Clean Generation Program
        How will people use the program?

• Arguably better financing options exist for solar PV
• Ideal for property owners who:
   • Can’t get a home equity line of credit
   • Are considering a move in the near future
   • Are considering financing whole home retrofits that
     include both EE and renewable energy




                                                           17
Sample Costs

Financed Project Costs: $24,000
Solar / Energy Efficiency Package
• Term: 20 Years
• Fixed APR: 8.74% (Estimated)
• Annual Payment: $2,615
• Application fee: $300




                                    18
Clean Generation Program
                          Timeline
• April - City Council
   – Public hearing on district formation
   – Approval of resolution of intent
   – Ordinance levying special tax approved
   – Approval of administrative agreement
• May- City Council
   – 2nd reading of the ordinance levying special tax approved
   – Hold Public Election
• June– Program Goes Live
                                                                 19
Clean Generation Program


    Questions?


                           20

Contenu connexe

Tendances

Preparing for LEED 2009
Preparing for LEED 2009Preparing for LEED 2009
Preparing for LEED 2009Brian Davie
 
Zoning Ordinance Modernization Project-Minor Modifications Amendment: NVBIA/N...
Zoning Ordinance Modernization Project-Minor Modifications Amendment: NVBIA/N...Zoning Ordinance Modernization Project-Minor Modifications Amendment: NVBIA/N...
Zoning Ordinance Modernization Project-Minor Modifications Amendment: NVBIA/N...Fairfax County
 
Water Wednesday 2009 July Mike Young as Robyn McLeod
Water Wednesday 2009 July Mike Young as Robyn McLeodWater Wednesday 2009 July Mike Young as Robyn McLeod
Water Wednesday 2009 July Mike Young as Robyn McLeodUniversity of Adelaide
 
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Adam Berry
 
3.4 northern everglades payment for environmental services a public private p...
3.4 northern everglades payment for environmental services a public private p...3.4 northern everglades payment for environmental services a public private p...
3.4 northern everglades payment for environmental services a public private p...ascemiami-dade
 
2011 Delta Township Accomplishments
2011 Delta Township Accomplishments2011 Delta Township Accomplishments
2011 Delta Township AccomplishmentsJeffrey C. Hicks
 
Solar Water Heating Contractor and Self Installer Training
Solar Water Heating Contractor and Self Installer TrainingSolar Water Heating Contractor and Self Installer Training
Solar Water Heating Contractor and Self Installer TrainingCenter for Sustainable Energy
 
Primer Taller Gold Standard en Colombia: Nuevos desarrollos sobre protocolos ...
Primer Taller Gold Standard en Colombia: Nuevos desarrollos sobre protocolos ...Primer Taller Gold Standard en Colombia: Nuevos desarrollos sobre protocolos ...
Primer Taller Gold Standard en Colombia: Nuevos desarrollos sobre protocolos ...Fundación Natura Colombia
 
California SB7 Summary - Northern
California SB7 Summary - NorthernCalifornia SB7 Summary - Northern
California SB7 Summary - NorthernJerry Armstrong
 

Tendances (18)

Preparing for LEED 2009
Preparing for LEED 2009Preparing for LEED 2009
Preparing for LEED 2009
 
Zoning Ordinance Modernization Project-Minor Modifications Amendment: NVBIA/N...
Zoning Ordinance Modernization Project-Minor Modifications Amendment: NVBIA/N...Zoning Ordinance Modernization Project-Minor Modifications Amendment: NVBIA/N...
Zoning Ordinance Modernization Project-Minor Modifications Amendment: NVBIA/N...
 
Water/Energy Pilot - SDGE
Water/Energy Pilot - SDGEWater/Energy Pilot - SDGE
Water/Energy Pilot - SDGE
 
Water Wednesday 2009 July Mike Young as Robyn McLeod
Water Wednesday 2009 July Mike Young as Robyn McLeodWater Wednesday 2009 July Mike Young as Robyn McLeod
Water Wednesday 2009 July Mike Young as Robyn McLeod
 
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
 
Usgbc leed
Usgbc leedUsgbc leed
Usgbc leed
 
2017 ZOAWP
2017 ZOAWP2017 ZOAWP
2017 ZOAWP
 
2014 Economic Summit - City of Norman
2014  Economic Summit - City of Norman2014  Economic Summit - City of Norman
2014 Economic Summit - City of Norman
 
3.4 northern everglades payment for environmental services a public private p...
3.4 northern everglades payment for environmental services a public private p...3.4 northern everglades payment for environmental services a public private p...
3.4 northern everglades payment for environmental services a public private p...
 
2011 Delta Township Accomplishments
2011 Delta Township Accomplishments2011 Delta Township Accomplishments
2011 Delta Township Accomplishments
 
LEED Project Case Studies
LEED Project Case StudiesLEED Project Case Studies
LEED Project Case Studies
 
federal reserve.
federal reserve.federal reserve.
federal reserve.
 
Solar Water Heating Contractor and Self Installer Training
Solar Water Heating Contractor and Self Installer TrainingSolar Water Heating Contractor and Self Installer Training
Solar Water Heating Contractor and Self Installer Training
 
LEED
LEEDLEED
LEED
 
Primer Taller Gold Standard en Colombia: Nuevos desarrollos sobre protocolos ...
Primer Taller Gold Standard en Colombia: Nuevos desarrollos sobre protocolos ...Primer Taller Gold Standard en Colombia: Nuevos desarrollos sobre protocolos ...
Primer Taller Gold Standard en Colombia: Nuevos desarrollos sobre protocolos ...
 
Carlsbad Desalination Project Water CEQA Compliance
Carlsbad Desalination Project Water CEQA ComplianceCarlsbad Desalination Project Water CEQA Compliance
Carlsbad Desalination Project Water CEQA Compliance
 
LEED ND Squalicum Lofts
LEED ND Squalicum LoftsLEED ND Squalicum Lofts
LEED ND Squalicum Lofts
 
California SB7 Summary - Northern
California SB7 Summary - NorthernCalifornia SB7 Summary - Northern
California SB7 Summary - Northern
 

Similaire à Erik caldwell clean generation program pp 04162010

Property Assessed Clean Energy (PACE) Program
Property Assessed Clean Energy (PACE) ProgramProperty Assessed Clean Energy (PACE) Program
Property Assessed Clean Energy (PACE) Programlerchearly
 
Multifamily Energy Retrofit-Saving Money and Getting your Energy Company to p...
Multifamily Energy Retrofit-Saving Money and Getting your Energy Company to p...Multifamily Energy Retrofit-Saving Money and Getting your Energy Company to p...
Multifamily Energy Retrofit-Saving Money and Getting your Energy Company to p...Ryan Slack
 
Bemidji Guaranteed Energy Savings Program
Bemidji Guaranteed Energy Savings ProgramBemidji Guaranteed Energy Savings Program
Bemidji Guaranteed Energy Savings ProgramUniversity of Minnesota
 
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...REBNY
 
Ohio's Urban Opportunity
Ohio's Urban OpportunityOhio's Urban Opportunity
Ohio's Urban OpportunityHeritage Ohio
 
DPBCapitalOutlayPPT_832015
DPBCapitalOutlayPPT_832015DPBCapitalOutlayPPT_832015
DPBCapitalOutlayPPT_832015Liliana Judge
 
So Cal Gas General Session
So Cal Gas  General  SessionSo Cal Gas  General  Session
So Cal Gas General Sessionkiakaha
 
Griffith Uni Presentation 040815
Griffith Uni Presentation 040815Griffith Uni Presentation 040815
Griffith Uni Presentation 040815Gerry Chia
 
Save Money ARISEIA.pptx
Save Money ARISEIA.pptxSave Money ARISEIA.pptx
Save Money ARISEIA.pptxTorin Sadow
 
2011 expo-asilp-presentation cgbf
2011 expo-asilp-presentation cgbf2011 expo-asilp-presentation cgbf
2011 expo-asilp-presentation cgbfEllieNowels
 
Green Bank Products - Commercial Efficiency
Green Bank Products - Commercial EfficiencyGreen Bank Products - Commercial Efficiency
Green Bank Products - Commercial EfficiencyCGC CGC
 
Green Bank Products - Commercial Efficiency
Green Bank Products - Commercial EfficiencyGreen Bank Products - Commercial Efficiency
Green Bank Products - Commercial EfficiencyReed Hundt
 
PGE Profiting from EE PDF
PGE Profiting from EE PDFPGE Profiting from EE PDF
PGE Profiting from EE PDFRick Williams
 
13th Annual Chamber Energy Conference - EE Funding
13th Annual Chamber Energy Conference - EE Funding13th Annual Chamber Energy Conference - EE Funding
13th Annual Chamber Energy Conference - EE FundingTim Rushenberg
 
Energy Savings for Hotel & Lodging Industry
Energy Savings for Hotel & Lodging IndustryEnergy Savings for Hotel & Lodging Industry
Energy Savings for Hotel & Lodging IndustryRayco Energy
 

Similaire à Erik caldwell clean generation program pp 04162010 (20)

Property Assessed Clean Energy (PACE) Program
Property Assessed Clean Energy (PACE) ProgramProperty Assessed Clean Energy (PACE) Program
Property Assessed Clean Energy (PACE) Program
 
Multifamily Energy Retrofit-Saving Money and Getting your Energy Company to p...
Multifamily Energy Retrofit-Saving Money and Getting your Energy Company to p...Multifamily Energy Retrofit-Saving Money and Getting your Energy Company to p...
Multifamily Energy Retrofit-Saving Money and Getting your Energy Company to p...
 
Aci mass heat-loan-carlfawcett-csg
Aci mass heat-loan-carlfawcett-csgAci mass heat-loan-carlfawcett-csg
Aci mass heat-loan-carlfawcett-csg
 
Big Savings for Clean Generation Part III
Big Savings for Clean Generation Part IIIBig Savings for Clean Generation Part III
Big Savings for Clean Generation Part III
 
Bemidji Guaranteed Energy Savings Program
Bemidji Guaranteed Energy Savings ProgramBemidji Guaranteed Energy Savings Program
Bemidji Guaranteed Energy Savings Program
 
Asset management review
Asset management reviewAsset management review
Asset management review
 
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...
 
Ohio's Urban Opportunity
Ohio's Urban OpportunityOhio's Urban Opportunity
Ohio's Urban Opportunity
 
DPBCapitalOutlayPPT_832015
DPBCapitalOutlayPPT_832015DPBCapitalOutlayPPT_832015
DPBCapitalOutlayPPT_832015
 
So Cal Gas General Session
So Cal Gas  General  SessionSo Cal Gas  General  Session
So Cal Gas General Session
 
Griffith Uni Presentation 040815
Griffith Uni Presentation 040815Griffith Uni Presentation 040815
Griffith Uni Presentation 040815
 
Save Money ARISEIA.pptx
Save Money ARISEIA.pptxSave Money ARISEIA.pptx
Save Money ARISEIA.pptx
 
2011 expo-asilp-presentation cgbf
2011 expo-asilp-presentation cgbf2011 expo-asilp-presentation cgbf
2011 expo-asilp-presentation cgbf
 
Green Bank Products - Commercial Efficiency
Green Bank Products - Commercial EfficiencyGreen Bank Products - Commercial Efficiency
Green Bank Products - Commercial Efficiency
 
Green Bank Products - Commercial Efficiency
Green Bank Products - Commercial EfficiencyGreen Bank Products - Commercial Efficiency
Green Bank Products - Commercial Efficiency
 
AESP_Spring
AESP_SpringAESP_Spring
AESP_Spring
 
NYASBO Webinar
NYASBO Webinar NYASBO Webinar
NYASBO Webinar
 
PGE Profiting from EE PDF
PGE Profiting from EE PDFPGE Profiting from EE PDF
PGE Profiting from EE PDF
 
13th Annual Chamber Energy Conference - EE Funding
13th Annual Chamber Energy Conference - EE Funding13th Annual Chamber Energy Conference - EE Funding
13th Annual Chamber Energy Conference - EE Funding
 
Energy Savings for Hotel & Lodging Industry
Energy Savings for Hotel & Lodging IndustryEnergy Savings for Hotel & Lodging Industry
Energy Savings for Hotel & Lodging Industry
 

Plus de Center for Sustainable Energy

San Joaquin Valley PEV Readiness Plan: Phase One Regional PEV Assessment
San Joaquin Valley PEV Readiness Plan: Phase One Regional PEV AssessmentSan Joaquin Valley PEV Readiness Plan: Phase One Regional PEV Assessment
San Joaquin Valley PEV Readiness Plan: Phase One Regional PEV AssessmentCenter for Sustainable Energy
 
San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...
San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...
San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...Center for Sustainable Energy
 
Modesto Irrigation District: PEV Impact to Grid and Utility Bills
Modesto Irrigation District: PEV Impact to Grid and Utility BillsModesto Irrigation District: PEV Impact to Grid and Utility Bills
Modesto Irrigation District: PEV Impact to Grid and Utility BillsCenter for Sustainable Energy
 
California Center for Sustainable Energy: PEV Benefits and Incentives
California Center for Sustainable Energy: PEV Benefits and IncentivesCalifornia Center for Sustainable Energy: PEV Benefits and Incentives
California Center for Sustainable Energy: PEV Benefits and IncentivesCenter for Sustainable Energy
 
Updating the 2013 Title 24 Building Efficiency Codes
Updating the 2013 Title 24 Building Efficiency CodesUpdating the 2013 Title 24 Building Efficiency Codes
Updating the 2013 Title 24 Building Efficiency CodesCenter for Sustainable Energy
 
The Economics & Financial Options in Retrofitting Commercial Buildings
The Economics & Financial Options in Retrofitting Commercial BuildingsThe Economics & Financial Options in Retrofitting Commercial Buildings
The Economics & Financial Options in Retrofitting Commercial BuildingsCenter for Sustainable Energy
 
Residential Title-24 Lighting & ASHRAE 62.2 Ventilation Codes.
 Residential Title-24 Lighting & ASHRAE 62.2 Ventilation Codes. Residential Title-24 Lighting & ASHRAE 62.2 Ventilation Codes.
Residential Title-24 Lighting & ASHRAE 62.2 Ventilation Codes.Center for Sustainable Energy
 
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)Center for Sustainable Energy
 

Plus de Center for Sustainable Energy (20)

Appendix: San Joaquin Valley PEV Readiness Plan
Appendix: San Joaquin Valley PEV Readiness PlanAppendix: San Joaquin Valley PEV Readiness Plan
Appendix: San Joaquin Valley PEV Readiness Plan
 
San Joaquin Valley PEV Readiness Plan: Phase One Regional PEV Assessment
San Joaquin Valley PEV Readiness Plan: Phase One Regional PEV AssessmentSan Joaquin Valley PEV Readiness Plan: Phase One Regional PEV Assessment
San Joaquin Valley PEV Readiness Plan: Phase One Regional PEV Assessment
 
Appendix: San Diego PEV Readiness Plan
Appendix: San Diego PEV Readiness PlanAppendix: San Diego PEV Readiness Plan
Appendix: San Diego PEV Readiness Plan
 
San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...
San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...
San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...
 
Sustainable communities - Porrecca
Sustainable communities  - PorreccaSustainable communities  - Porrecca
Sustainable communities - Porrecca
 
Sustainable communities - Blackson
Sustainable communities  - BlacksonSustainable communities  - Blackson
Sustainable communities - Blackson
 
Sustainable communities - Benfield
Sustainable communities -   BenfieldSustainable communities -   Benfield
Sustainable communities - Benfield
 
SJVAPCD: Drive Clean! Rebate Program
SJVAPCD: Drive Clean! Rebate ProgramSJVAPCD: Drive Clean! Rebate Program
SJVAPCD: Drive Clean! Rebate Program
 
Modesto Irrigation District: PEV Impact to Grid and Utility Bills
Modesto Irrigation District: PEV Impact to Grid and Utility BillsModesto Irrigation District: PEV Impact to Grid and Utility Bills
Modesto Irrigation District: PEV Impact to Grid and Utility Bills
 
California Center for Sustainable Energy: PEV Benefits and Incentives
California Center for Sustainable Energy: PEV Benefits and IncentivesCalifornia Center for Sustainable Energy: PEV Benefits and Incentives
California Center for Sustainable Energy: PEV Benefits and Incentives
 
Michelle Kaufmann Presents - Simplicity -
Michelle Kaufmann Presents   - Simplicity -Michelle Kaufmann Presents   - Simplicity -
Michelle Kaufmann Presents - Simplicity -
 
Updating the 2013 Title 24 Building Efficiency Codes
Updating the 2013 Title 24 Building Efficiency CodesUpdating the 2013 Title 24 Building Efficiency Codes
Updating the 2013 Title 24 Building Efficiency Codes
 
Water Harvesting for Landscape Irrigation
Water Harvesting for Landscape IrrigationWater Harvesting for Landscape Irrigation
Water Harvesting for Landscape Irrigation
 
The Economics & Financial Options in Retrofitting Commercial Buildings
The Economics & Financial Options in Retrofitting Commercial BuildingsThe Economics & Financial Options in Retrofitting Commercial Buildings
The Economics & Financial Options in Retrofitting Commercial Buildings
 
Sustainable Architecture Without Architects
Sustainable Architecture Without ArchitectsSustainable Architecture Without Architects
Sustainable Architecture Without Architects
 
Examining Window Retrofit Options
Examining Window Retrofit OptionsExamining Window Retrofit Options
Examining Window Retrofit Options
 
Residential Title-24 Lighting & ASHRAE 62.2 Ventilation Codes.
 Residential Title-24 Lighting & ASHRAE 62.2 Ventilation Codes. Residential Title-24 Lighting & ASHRAE 62.2 Ventilation Codes.
Residential Title-24 Lighting & ASHRAE 62.2 Ventilation Codes.
 
The Green Real Estate Investing Opportunity
The Green Real Estate Investing OpportunityThe Green Real Estate Investing Opportunity
The Green Real Estate Investing Opportunity
 
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)
 
Residential lighting technologies
Residential lighting technologiesResidential lighting technologies
Residential lighting technologies
 

Erik caldwell clean generation program pp 04162010

  • 1. The City of San Diego’s Clean Generation Program April 16, 2010 1
  • 2. Clean Generation Program Property Assessed Clean Energy Financing (PACE) Purpose: Allows property owners to finance renewable energy and energy efficiency improvements through loans that would be repaid as an item on the property owner's property tax bill. 2
  • 3. The Benefits • Loan made to property • Transferable on sale • Competitive 20 year rate • Repayment via property tax bill 3
  • 4. Why? • Job / Sector Development – Increase demand for local cleantech products and services • Leadership – Municipal leadership is required – Positive cash flow for participants – Low cost / low risk to the City • Environment – GHG reduction 4
  • 5. Clean Generation Program Selected Team Renewable Funding, LLC. • Short term (Gap Financing) • Core administrative services California Center for Sustainable Energy (CCSE) • Administrative services • CSI integration (State of California Solar Incentive Program) 5
  • 6. Clean Generation Program Overview Funding: • 20 million dollars with potential for accessing additional funds • Fully loaded APR = 8.75% (Estimated) • Duration of Loan up to 20 years 6
  • 7. Clean Generation Program Eligible Measures • Energy Efficiency Retrofits • Renewable Energy Fixtures • Insulation • Solar • Heating and Cooling • Wind Systems • Fuel Cells • A/C retrofits • Water Efficiency Fixtures • Whole House Fan • Low flow fixtures • Water heaters • Reclaimed Water • Pool Pumps Systems • Water Efficient Irrigation 7
  • 8. Micro-Bond Process Property Owner Administrator 1 - Submit Application Includes Project Details Package • Verify eligibility 2 - Receive Notice to Proceed Includes Funding Reservation 3 - Install Project 4 - Submit Funding Request Includes Verification Documents • Verify project compliance • Generate contract docs 5 - Receive Assessment Contract Documents 6 - Submit Assessment Contract Package • Place lien • Issue bond 7 - Receive Payment • Remit payment County 8 - Pay Back via Property Taxes 8
  • 9. Participation Options • Energy efficiency requirements • Short term goal – Educate and encourage • Long-term goal – Serve as a force for market transformation • Two Phase EE Implementation – Phase I: Thru December 2010 – Phase II: Starts 2011 9
  • 10. Prerequisites for all properties • Items that must be replaced: – Central Air Conditioners (SEER ≤ 7) – Single Speed Pool Pumps • Replaced with: – Central Air Conditioners (SEER ≥ 13) – Variable Speed Pool Pumps 10
  • 11. Energy Efficiency Prerequisites • HERS or equivalent audit • May bypass audit requirement if you use a BPI certified contractor • Must install fixtures that are pre-approved by the program administrator 11
  • 12. Renewable Energy Prerequisites • Home Improvement Path – Phase I • HERS audit • Must install fixtures that are pre-approved by the program administrator • Limited system size (70% of load or 130% of baseline) – Phase II • HERS audit • Participation in prescriptive track of Whole Home Retrofit program or HomeStar Silver • BPI Certified contractor required 12
  • 13. Renewable Energy Prerequisites • Home Performance Path – Phase I • HERS audit (Test out: with 20% reduction or HERS II ≤ 100) • Optional participation in either the performance track of the Whole Home Retrofit Program, or HomeStar Gold – Phase II • HERS audit (Test out: with 20% reduction or HERS II ≤ 100) • Required participation in either the performance track of the Whole Home Retrofit Program, or HomeStar Gold 13
  • 14. Renewable Energy Prerequisites • Already Efficient Homes – Phase I & II • HERS audit (HERS II ≤ 100) or Title 24 2005 / 2008 report • Demonstrate historical annual consumption ≤ 130% of baseline (Tier 1-2) 14
  • 15. Clean Generation Program Program Design Program Eligibility: • Allocation: First come first serve • Property must reside within the City of San Diego • Multifamily - four units or less 15
  • 16. Clean Generation Program Program Design • Underwriting Criteria – Ownership: Property owner must initiate and sign application – Property Tax Payment / Title History: • Must have a good payment history • No delinquencies in the past 3 years • No involuntary liens may be on property – Loan to Value Ratio, 10:1 is suggested ratio 16
  • 17. Clean Generation Program How will people use the program? • Arguably better financing options exist for solar PV • Ideal for property owners who: • Can’t get a home equity line of credit • Are considering a move in the near future • Are considering financing whole home retrofits that include both EE and renewable energy 17
  • 18. Sample Costs Financed Project Costs: $24,000 Solar / Energy Efficiency Package • Term: 20 Years • Fixed APR: 8.74% (Estimated) • Annual Payment: $2,615 • Application fee: $300 18
  • 19. Clean Generation Program Timeline • April - City Council – Public hearing on district formation – Approval of resolution of intent – Ordinance levying special tax approved – Approval of administrative agreement • May- City Council – 2nd reading of the ordinance levying special tax approved – Hold Public Election • June– Program Goes Live 19
  • 20. Clean Generation Program Questions? 20