Project Status Report
                            February 9, 2011




Steven Grossman                                Katherine P. Craven
Chairman, State Treasurer                         Executive Director
Project Status Report
• Enrollment
   – 3 enrollments completed this period
   – Enrollments complete for projects for 68,110 students
• Owner’s Project Manager
   – 3 districts completed OPM procurement
   – 3 Districts scheduled for March action
   – Over $69 million in OPM fees to date
• Designer Selection Panel
   – 2 districts participated in DSP –2 interviews held
   – 7 districts scheduled for DSP in February and March
   – Over $173 million in Designer fees
• Commissioning
   – 3 Commissioning consultant contracts executed this period for
     $189,490
   – Over $6.2 million in consultant contracts to date

  February 9, 2011     The Massachusetts School Building Authority   2
                                www.massschoolbuildings.org
MSBA Visits
      Since the November Board the MSBA has visited 55
                          Districts
     Project Visits          Project Visits               Project Visits   Check Presentations/
                                                                            Ground Breakings

         Andover                 Foxboro                     Norwood              Beverly
  Ashburnham Westminster        Gloucester                   Plymouth            Brookline
           Ayer             Hampden Wilbraham                 Quincy              Billerica
         Bay Path             Mount Greylock                   Natick             Danvers
         Belmont                Lexington                    Rockland             Grafton
      Berkshire Hills          Lynn Malden                    Sharon              Haverhill
          Beverly               Middleton                   Springfield          Somerville
          Billerica              Nashoba                       Stow
         Chicopee              New Bedford                  Sturbridge
          Dalton               Newburyport                    Taunton
         Danvers                  Norton                     Wellesley
         Dedham                North Adams                Whitman Hanson
         Duxbury              North Andover                   Woburn
     East Bridgewater                                       Worcester
         Franklin




February 9, 2011           The Massachusetts School Building Authority                        3
                                     www.massschoolbuildings.org
MSBA Capital Pipeline




February 9, 2011    The Massachusetts School Building Authority   4
                             www.massschoolbuildings.org
Design Development & Construction
                 Phases
• 71 Projects at Estimated $2.17 Billion
  Total Construction Cost:

     – 34 Projects in Design Development ($0.68
       Billion)
                   – 13 Projects Break Ground in 2011
                   – 22 Construction Bids in 2011 ($733.2 Million)


     – 37 Projects in Construction ($1.49 Billion)
                   – 15 Buildings to be Completed in 2011

February 9, 2011          The Massachusetts School Building Authority   5
                                   www.massschoolbuildings.org
Design Development Phase
   MSBA Staff Monitor Scope, Budget & Schedule
          Design Development Phase

             Review Submittals
   for Design Development, 60% and 90%

   Review Bid Amounts and Adjust Grant
            Amount as Needed

 Track Construction Budget Throughout
Design Process Using MSBA Cost Estimate
        Comparison Spreadsheet


 Scope and Budget Fixed Upon Execution
 Scope and Budget Fixed Upon Execution of
               of the PFA
                the PFA



February 9, 2011    The Massachusetts School Building Authority   6
                             www.massschoolbuildings.org
D
                           Andover                                             E

                  Bancroft Elementary School                                   S
                                                                               I
         106,000 sf of new construction to serve projected enrollment of
                                                                               G
         680 students in grades K-5
                                                                               N
•    OPM: Town Employee
•    Designer: Symmes, Maini &
     McKee                                                                     D
•    Project Scope & Budget                                                    E
     November 17, 2010
                                                                               V
•    District Total Project Budget:
     $44,659,837                                                               E
•    Basis of Total Facilities Grant:                                          L
     $38,122,167
•    Reimbursement Rate: 44.00%                                                O
•    MSBA Maximum Grant Amount:                                                P
     $16,773,753                                                               M
•    Construction scheduled to
     commence December 2011                                                    E
•    Substantial Completion forecast                                           N
     for May 27, 2013                                                          T
    February 9, 2011     The Massachusetts School Building Authority       7
                                  www.massschoolbuildings.org
D
                   Ashburnham –Westminster                                    E

                   Briggs Elementary School                                   S
                                                                              I
         85,415 sf of new construction to serve projected enrollment of
                                                                              G
         520 students in grades PK - 5
                                                                              N
•    OPM: STV Construction, Inc.
•    Designer: Lamoureaux Pagano
                                                                              D
•    Project Scope & Budget
     December 17, 2010                                                        E
•    District Total Project Budget:                                           V
     $27,979,738
•    Basis of Total Facilities Grant:                                         E
     $17,471,592                                                              L
•    Reimbursement Rate: 58.46%                                               O
•    MSBA Maximum Grant Amount:
     $16,353,447                                                              P
•    Construction scheduled to                                                M
     commence February 2012
                                                                              E
•    Substantial Completion forecast
     for June 2013                                                            N
                                                                              T
    February 9, 2011     The Massachusetts School Building Authority      8
                                  www.massschoolbuildings.org
D
                              Carlisle                                               E

                       K-8 Elementary School                                         S
                                                                                     I
         139,337 sf addition/renovation of an existing facility built in 1909.
                                                                                     G
         Projected enrollment of 700 students in grades K-8.
                                                                                     N
•     OPM: Daedalus
•     Designer: HMFH Architects                                                      D
•     Project Scope & Budget                                                         E
      approved January, 2010
•     District Total Project Budget:                                                 V
      $20,075,000                                                                    E
•     Basis of Total Facilities Grant:                                               L
      $17,471,592
•     Reimbursement Rate: 40.00%                                                     O
•     MSBA Maximum Grant Amount:                                                     P
      $6,988,637
                                                                                     M
•     Construction scheduled to
      commence February 12, 2011                                                     E
•     Substantial Completion forecast                                                N
      for September 1, 2012
                                                                                     T
    February 9, 2011      The Massachusetts School Building Authority            9
                                   www.massschoolbuildings.org
D
                        Marshfield                                                  E

               Governor Edward Winslow ES                                           S
                                                                                    I
         Repair of HVAC and window replacement in an existing facility
                                                                                    G
         built in 1969. Projected enrollment of 431 students in grades PK-5.
                                                                                    N
•   OPM: Vertex
•   Designer: Knight, Bagge &
    Anderson                                                                        D
•   Project Scope & Budget approved
    May, 2008                                                                       E
•   District Total Project Budget:                                                  V
    $2,400,000                                                                      E
•   Basis of Total Facilities Grant:
    $2,400,000                                                                      L
•   Reimbursement Rate: 46.37%                                                      O
•   MSBA Maximum Grant Amount:                                                      P
    $1,112,880
•   Construction scheduled to                                                       M
    commence week of February 7,                                                    E
    2011
                                                                                    N
•   Substantial completion forecast
    for August 26, 2011                                                             T
    February 9, 2011    The Massachusetts School Building Authority            10
                                 www.massschoolbuildings.org
D
                         Needham                                                      E

                  Newman Elementary School                                            S
                                                                                      I
          HVAC, electrical, roof and ADA repairs in an existing facility built
                                                                                      G
          in 1961. Projected enrollment of 754 students in grades K-5.
                                                                                      N
•   OPM: Town Employee
•   Designer: Drummey, Rosane, Anderson                                               D
•   CM-R: Consigli Construction                                                       E
•   Project Scope & Budget approved
    September, 2009                                                                   V
•   District Total Project Budget:                                                    E
    $27,412,128                                                                       L
•   Basis of Total Facilities Grant:
    $21,497,319                                                                       O
•   Reimbursement Rate: 40.00%                                                        P
•   MSBA Maximum Grant Amount:                                                        M
    $8,598,927
•   Construction commenced June 16, 2010                                              E
•   Substantial Completion forecast for                                               N
    August 27, 2012                                                                   T
     February 9, 2011      The Massachusetts School Building Authority           11
                                    www.massschoolbuildings.org
D
                   Somerville                                                   E
                                                                                S
         East Somerville Community School                                       I
         121,000 sf addition/renovation to serve projected enrollment of        G
         500 students in grades K-8.                                            N
•     OPM: Town Employee.
•     Designer: Maguire Group, Inc.                                             D
•     Project Scope & Budget                                                    E
      September 2010
•     District Total Project Budget:                                            V
      $34,782,578                                                               E
•     Basis of Total Facilities Grant:                                          L
      $19,092,349
•     Reimbursement Rate: 80.00%                                                O
•     MSBA Maximum Grant Amount:                                                P
      $15,273,879
                                                                                M
•     Construction scheduled to
      commence April 2011                                                       E
•     Substantial Completion forecast                                           N
      for December 2012
                                                                                T
    February 9, 2011      The Massachusetts School Building Authority      12
                                   www.massschoolbuildings.org
D
                    Winchester                                                 E
                                                                               S
           Vinson-Owen Elementary School                                       I
         30,290 sf of new construction to serve projected enrollment of        G
         420 students in grades K-5.                                           N
•     OPM: Town Employee
•     Designer: Tappe Associates                                               D
•     Project Scope & Budget                                                   E
      November 17, 2010
•     District Total Project Budget:                                           V
      $28,696,907                                                              E
•     Basis of Total Facilities Grant:                                         L
      $25,998,657
•     Reimbursement Rate: 40.00%                                               O
•     MSBA Maximum Grant Amount:                                               P
      $10,339,463
                                                                               M
•     Construction scheduled to
      commence January 11, 2012                                                E
•     Substantial Completion forecast                                          N
      for March 27, 2013
                                                                               T
    February 9, 2011      The Massachusetts School Building Authority     13
                                   www.massschoolbuildings.org
Burlington                                                     D
                                                                                       E
             Marshall Simonds Middle School                                            S
                                                                                       I
          151,225 sf addition/renovation of an existing facility built in 1961.
          Projected enrollment of 880 students in grades 6-8.                          G
•   OPM: Construction Monitoring Services                                              N
•   Designer: Knight, Bagge & Anderson
•   CM-R: TBD                                                                          D
•   Project Scope & Budget approved May,                                               E
    2010
                                                                                       V
•   District Total Project Budget: $32,865,499
•   Basis of Total Facilities Grant:                                                   E
    $31,741,321                                                                        L
•   Reimbursement Rate: 54.01%                                                         O
•   MSBA Maximum Grant Amount:
    $17,143,488                                                                        P
•   Construction scheduled to commence                                                 M
    March 24, 2011                                                                     E
•   Substantial Completion forecast for March                                          N
    15, 2013                                                                           T
     February 9, 2011      The Massachusetts School Building Authority            14
                                    www.massschoolbuildings.org
D
                         Hudson                                                   E

              John F. Kennedy Middle School                                       S
                                                                                  I
        48,900 sf of new construction to serve projected enrollment of 715
                                                                                  G
        students in grades 5-7. Existing MS built in 1963.
                                                                                  N
•   OPM: PMA Consultants
•   Designer: The Office of Michael
    Rosenfeld, Inc.                                                               D
•   Project Scope & Budget approved                                               E
    November, 2010
•   District Total Project Budget:                                                V
    $44,103,362                                                                   E
•   Basis of Total Facilities Grant:                                              L
    $41,416,977
•   Reimbursement Rate: 58.11%                                                    O
•   MSBA Maximum Grant Amount:                                                    P
    $24,067,405
                                                                                  M
•   Construction scheduled to commence
    September, 2011                                                               E
•   Substantial Completion forecast for                                           N
    November 15, 2013
                                                                                  T
     February 9, 2011    The Massachusetts School Building Authority         15
                                  www.massschoolbuildings.org
D
                             Shrewsbury                                            E

                        Sherwood Middle School                                     S
                                                                                   I
        130,000 sf of new construction to serve projected enrollment of 900
                                                                                   G
        students in grades 5-6. Existing MS built in 1964.
                                                                                   N
•   OPM: PMA Consultants
•   Designer: Lamoureux, Pagano &
    Assoc.                                                                         D
•   CM-R: Gilbane Building Company                                                 E
•   Project Scope & Budget approved
    January, 2010                                                                  V
•   District Total Project Budget:                                                 E
    $47,266,777                                                                    L
•   Basis of Total Facilities Grant:
    $44,981,652                                                                    O
•   Reimbursement Rate: 53.16%                                                     P
•   MSBA Maximum Grant Amount:                                                     M
    $23,912,246
•   Construction scheduled to commence                                             E
    March, 2011                                                                    N
•   Substantial Completion forecast for                                            T
    September 1, 2013
     February 9, 2011      The Massachusetts School Building Authority        16
                                    www.massschoolbuildings.org
D
                           Sutton                                                  E

                     Middle/High School                                            S
                                                                                   I
      171,401 sf addition/renovation of an existing facility built in 1949.        G
      Projected enrollment of 840 students in grades 6-12.
                                                                                   N
•   OPM: Strategic Building
    Solutions
•   Designer: Flansburgh                                                           D
    Associates                                                                     E
•   Project Scope & Budget
    approved March, 2010                                                           V
•   District Total Project Budget:                                                 E
    $59,945,474                                                                    L
•   Basis of Total Facilities Grant:
    $53,878,875                                                                    O
•   Reimbursement Rate: 55.39%                                                     P
•   MSBA Maximum Grant Amount:                                                     M
    $29,843,511
•   Construction scheduled to                                                      E
    commence April 15, 2011                                                        N
•   Substantial Completion forecast                                                T
    for December 31, 2014
February 9, 2011       The Massachusetts School Building Authority            17
                                www.massschoolbuildings.org
D
                 Adams-Cheshire                                                                  E

          Hoosac Valley Middle/High School                                                       S
                                                                                                 I
          173,999 sf addition/renovation of an existing facility built in 1969.                  G
          Projected enrollment of 805 students in grades 6-12.
                                                                                                 N
•   OPM: URS
•   Designer: Tessier Associates
                                                                                                 D
•   CM-R: TBD
                                                                                                 E
•   Project Scope & Budget approved
    September, 2010                                                                              V
•   District Total Project Budget:                                                               E
    $40,561,257
                                                                                                 L
•   Basis of Total Facilities Grant:
    $36,038,192                                                                                  O
•   Reimbursement Rate: 77.37%, 78.37%*                                                          P
•   MSBA Maximum Grant Amount:                                                                   M
    $28,243,131**
•   Construction scheduled to commence *              Contingent upon approval from the Office E
                                                      of the Inspector General to utilize CM-at-
    June 22, 2011                                     Risk construction delivery method.         N
•   Substantial Completion: TBD         **            Based on reimbursement rate of 78.37% T
     February 9, 2011      The Massachusetts School Building Authority                      18
                                    www.massschoolbuildings.org
D
                          Berlin-Boylston                                          E

                        Middle/High School                                         S
                                                                                   I
        126,100 sf of new construction to serve projected enrollment of 560        G
        students in grades 6-12. Existing M/HS school built in 1962.
                                                                                   N
•     OPM: PMA Consultants
•     Designer: HMFH Architects                                                    D
•     Project Scope & Budget approved                                              E
      March, 2010
•     District Total Project Budget:                                               V
      $43,954,901                                                                  E
•     Basis of Total Facilities Grant:                                             L
      $40,602,855
•     Reimbursement Rate: 52.21%                                                   O
•     MSBA Maximum Grant Amount:                                                   P
      $21,198,751
                                                                                   M
•     Construction scheduled to
      commence May 1, 2011                                                         E
•     Substantial Completion forecast for                                          N
      October 31, 2012
                                                                                   T
    February 9, 2011      The Massachusetts School Building Authority         19
                                   www.massschoolbuildings.org
D
                              Easthampton                                      E

                              High School                                      S
                                                                               I
        110,400 sf of new construction to serve projected enrollment of        G
        510 students in grades 9-12. Existing HS built in 1961.
                                                                               N
•     OPM: Strategic Building Solutions
•     Designer: Caolo & Bieniek Assoc.                                         D
•     Project Scope & Budget approved                                          E
      March, 2010
•     District Total Project Budget:                                           V
      $43,691,108                                                              E
•     Basis of Total Facilities Grant:                                         L
      $40,649,045
•     Reimbursement Rate: 62.84%                                               O
•     MSBA Maximum Grant Amount:                                               P
      $25,543,860
                                                                               M
•     Construction scheduled to
      commence June, 2011                                                      E
•     Substantial Completion forecast                                          N
      for July, 2013
                                                                               T
    February 9, 2011     The Massachusetts School Building Authority      20
                                  www.massschoolbuildings.org
D
       Essex No. Shore Agricultural & Tech. HS District                         E
          Essex No. Shore Agricultural & Tech. HS                               S
                                                                                I
         337,000 sf of new construction of four academies to serve
         projected enrollment of 1,440 students in grades 9-12. Existing        G
         HS built in 1913.                                                      N
•     OPM: PMA Consultants
•     Designer: Design Partnership of                                           D
      Cambridge
                                                                                E
•     CM-R: TBD
•     Project Scope & Budget                                                    V
      approved June, 2009                                                       E
•     District Total Project Budget:                                            L
      $125,000,000
•     Basis of Total Facilities Grant:                                          O
      $125,000,000                                                              P
•     Reimbursement Rate: 62%
                                                                                M
•     Maximum Total Grant Amount:
      $77,500,000                                                               E
•     Construction scheduled to                                                 N
      commence October 20, 2011
                                                                                T
•     Substantial Completion: TBD
    February 9, 2011      The Massachusetts School Building Authority      21
                                   www.massschoolbuildings.org
D
                              Leominster                                              E

                              High School                                             S
                                                                                      I
       13,475 sf addition to and renovation of an existing 282,375 sf facility
                                                                                      G
       built in 1963. Projected enrollment of 1,805 students in grades 9-12.
                                                                                      N
•    OPM: Daedalus
•    Designer: Lamoureux, Pagano                                                      D
     & Assoc.
•    Project Scope & Budget                                                           E
     approved May, 2010                                                               V
•    District Total Project Budget:                                                   E
     $45,955,775
•    Basis of Total Facilities Grant:                                                 L
     $43,103,450                                                                      O
•    Reimbursement Rate: 72.01%
                                                                                      P
•    MSBA Maximum Grant Amount:
     $31,038,794                                                                      M
•    Construction scheduled to                                                        E
     commence July 1, 2011
                                                                                      N
•    Substantial Completion forecast
     for December, 2013                                                               T
    February 9, 2011     The Massachusetts School Building Authority             22
                                  www.massschoolbuildings.org
D
                                  Maynard                                           E

                                 High School                                        S
                                                                                    I
          93,000 sf of new construction to serve projected enrollment of 410        G
          students in grades 8-12. Existing HS built in 1962.
                                                                                    N
•   OPM: Municipal Building Consultants
•   Designer: Tappe Associates, Inc.                                                D
•   Project Scope & Budget approved
    September, 2010                                                                 E
•   District Total Project Budget: $45,769,442                                      V
•   Basis of Total Facilities Grant:                                                E
    $42,280,580
•   Reimbursement Rate: 56.42%                                                      L
•   MSBA Maximum Grant Amount:                                                      O
    $23,854,703                                                                     P
•   Construction scheduled to commence
    August, 2011                                                                    M
•   Substantial Completion forecast for                                             E
    August 9, 2013                                                                  N
                                                                                    T
    February 9, 2011       The Massachusetts School Building Authority         23
                                    www.massschoolbuildings.org
D
                                 Methuen                                              E

                                High School                                           S
                                                                                      I
         368,864 sf addition/renovation of an existing facility built in 1975.        G
         Projected enrollment of 2,075 students in grades 9-12.                       N
•   OPM: KBA/Trident
•   Designer: Finegold, Alexander & Assoc.                                            D
•   CM-R: TBD
                                                                                      E
•   Project Scope & Budget approved May,
    2010                                                                              V
•   District Total Project Budget: $99,063,617                                        E
•   Basis of Total Facilities Grant:
    $94,036,463                                                                       L
•   Reimbursement Rate: 68.84%                                                        O
•   MSBA Maximum Grant Amount:                                                        P
    $64,734,701
                                                                                      M
•   Construction scheduled to commence
    August 1, 2011                                                                    E
•   Substantial Completion forecast for                                               N
    January 1, 2014
                                                                                      T
    February 9, 2011      The Massachusetts School Building Authority            24
                                   www.massschoolbuildings.org
Shawsheen Valley                                            D
                                                                              E
           Vocational Technical High School                                   S
         2,450 sf addition to HS. 12,050 sf renovation of the existing        I
         250,300 sf high school built in 1972. Projected enrollment of        G
         1,300 students in grades 9-12.                                       N
•     OPM: Construction Monitoring
      Services
•     Designer: Knight, Bagge &                                               D
      Anderson                                                                E
•     Project Scope & Budget approved
      May, 2010                                                               V
•     District Total Project Budget:                                          E
      $4,687,847                                                              L
•     Basis of Total Facilities Grant:
      $4,687,847                                                              O
•     Reimbursement Rate: 55.73%                                              P
•     MSBA Maximum Grant Amount:                                              M
      $2,612,537
•     Construction commenced                                                  E
      December 13, 2010                                                       N
•     Substantial Completion forecast for                                     T
      July 30, 2011
    February 9, 2011     The Massachusetts School Building Authority     25
                                  www.massschoolbuildings.org
Uxbridge                                         D
                                                                                 E
                               High School                                       S
          123,000 sf of new construction to serve projected enrollment of        I
          600 students in grades 9-12. Existing HS built in 1937.                G
•   OPM: Joslin, Lesser & Associates                                             N
•   Designer: Raymond Design Associates
•   CM-R: Shawmut Design & Construction
                                                                                 D
•   Project Scope & Budget approved July,
    2010                                                                         E
•   District Total Project Budget:                                               V
    $43,000,000                                                                  E
•   Basis of Total Facilities Grant:                                             L
    $38,870,723
                                                                                 O
•   Reimbursement Rate: 57.53%
                                                                                 P
•   MSBA Maximum Grant Amount:
    $22,362,327                                                                  M
•   Construction commenced February 4,                                           E
    2011                                                                         N
•   Substantial Completion forecast for
                                                                                 T
    June 20, 2012
     February 9, 2011     The Massachusetts School Building Authority       26
                                   www.massschoolbuildings.org
Construction Phase
   MSBA Staff Monitor Scope, Budget & Schedule

             Construction Phase

      Review OPM Monthly Reports

     Bi-Monthly Site Visits & Project
            Status Meetings

   Assess Eligibility of CO’s Including
           Owner Directives

    Review Reimbursement Requests




February 9, 2011      The Massachusetts School Building Authority   27
                               www.massschoolbuildings.org
Construction Projects
• 37 Projects in Construction
     • 1 Green Repair Program Project
     • 11 Elementary Schools
           • Belmont, Billerica, Brookline, Burlington (Memorial), Dedham, Middleton,
             Nashoba, Norfolk, Rochester, Sturbridge & Woburn
     •    4 Middle & Middle/High Schools
           • Rockland, Sharon, Southbridge & Taunton
     • 21 High Schools

              Repair           Add/Reno                   New               Models
           Foxborough           Beverly                 Grafton        Hampden-Wilbraham
             Haverhill          Danvers                 Hanover              Natick
             Holyoke           Falmouth             Longmeadow             Norwood
         Mt. Greylock Reg.      Malden         Springfield Voc Tech Plymouth North
            Wakefield                                  Wayland             Tewksbury
                                                       Wellesley
                                                  Worcester North
February 9, 2011         The Massachusetts School Building Authority                    28
                                  www.massschoolbuildings.org
Project Estimate vs. 2010 Bid Amount
                                                              Total     $928,306,757 $785,464,493 $138,442,264                       -           $78.3M
                                                                         Construction                                        Reimbursement Potential Grant
    District              School               Scope         Bid Date                       Bid Amount        Bid Savings
                                                                          Estimate                                               Rate        Savings *

   Burlington          Memorial ES        New Elem School     Jan-10      $21,700,000       $16,389,000       $5,311,000          52.11%         $2.7M

   Wellesley             Senior HS        New High School     Feb-10      $98,500,000       $83,300,000       $15,200,000         40.00%         $6.0M

   Dartmouth          James Quinn ES           Repair         Feb-10       $1,100,000       $1,212,617         -$112,617          47.69%           $0

    Rockport           Rockport HS             Repair         Feb-10       $1,000,000        $845,000          $155,000           41.10%          $63K

   Springfield        Putnam Vo-tech      New High School     Mar-10      $101,100,000      $86,000,000       $10,700,000         90.00%         $9.6M

    Middleton        Howe-Manning ES      New Elem School     Mar-10      $24,300,000       $17,900,000       $6,400,000          48.47%         $3.1M

    Plymouth             North HS           Model School      Mar-10      $72,000,000       $61,600,000       $10,400,000         58.24%         $6.0M

    Woburn             Goodyear ES        New Elem School     Mar-10      $19,900,000       $17,900,000       $2,000,000          54.21%         $1.0M

Hamilton- Wenham         Cutler ES             Repair         Apr-10       $1,200,000       $1,126,000          $74,000           42.58%          $31K

   N.Attleboro       Joseph Martin ES          Repair         Apr-10        $700,000         $535,000          $165,000           52.06%          $85K

Whittier Regional     Regional VTHS            Repair         Apr-10       $2,600,000       $1,649,600         $950,400           66.18%         $600K

    Ashland          David Mindess ES          Repair         May-10       $2,647,850       $1,719,000         $928,850           48.68%         $450K

    Belmont            Wellington ES      New Elem School     May-10      $28,811,803       $28,037,002        $774,801           40.00%         $310K

    Nashoba            Pomp/Center            Add/Reno        May-10      $28,841,865       $23,640,900       $5,200,965          50.85%         $2.6M

  Mt.Greylock           Regional HS            Repair         May-10       $1,176,074        $799,899          $376,175           54.16%         $204K



        Note: These numbers are based on preliminary information received from the District and are subject to further review and calculation.

February 9, 2011                           The Massachusetts School Building Authority                                                                   29
                                                            www.massschoolbuildings.org
Project Estimate vs. 2010 Bid Amount
                                                                             Construction                                    Reimbursement Potential Grant
      District                School                Scope         Bid Date                    Bid Amount      Bid Savings
                                                                              Estimate                                           Rate         Savings *

       Sharon               Sharon MS              Add/Reno        May-10    $38,663,417      $38,582,781        $80,636          52.68%           $42K

       Florida          Abbott Memorial ES          Repair         Jun-10      $489,393         $356,683        $132,710          60.76%           $81K

     Rochester             Memorial ES             Add/Reno        Jul-10    $20,542,448      $20,428,074       $114,374          57.94%           $66K

Hampden-Wilbraham      Minnechaug Reg. HS        Model School      Jul-10    $66,493,091      $53,618,500      $12,874,591        61.73%           $7.9M

     Sturbridge             Burgess ES             Add/Reno        Jul-10    $36,492,933      $22,931,000      $13,561,933        57.92%           $7.8M

       Natick                Natick HS           Model School      Sep-10    $70,825,000      $60,270,000      $10,555,000        52.63%           $5.6M

      Billerica             Parker ES          New Elem School     Sep-10    $27,056,467      $22,486,000      $4,570,467         55.69%           $2.5M

     Tewksbury              Memorial HS          Model School      Oct-10    $65,946,517      $50,800,000      $15,146,517        60.06%           $9.1M

      Danvers               Danvers HS             Add/Reno        Oct-10    $62,775,490      $51,098,700      $11,676,790        56.11%           $6.6M

      Brookline             Runkle ES              Add/Reno        Oct-10    $22,525,241      $20,584,000      $1,941,241         41.58%           $807K

      Wayland              Wayland HS          New High School     Oct-10    $56,235,511      $56,229,482        $6,029           40.00%           $2.4K

       Norfolk        Freeman Centennial ES New Elem School        Nov-10    $28,940,726      $22,881,000      $6,059,726         53.16%           $3.2M

    Shawsheen          Shawsheen Voc Tech           Repair         Nov-10     $3,822,147       $3,329,510       $492,637          55.73%           $274K

     Needham               Newman ES                Repair         Dec-10    $21,920,784      $19,214,745      $2,706,039         40.00%           $1M

Rockland filed-sub bids have been received. GMP pending.

Grafton filed-sub bids have been received. GMP pending.

          Note: These numbers are based on preliminary information received from the District and are subject to further review and calculation.

 February 9, 2011                              The Massachusetts School Building Authority                                                                 30
                                                                www.massschoolbuildings.org
Belmont
                              Wellington ES                                    C
         93,000 sf of new construction to serve projected enrollment of
                                                                               O
         575 students in grades K-5. Existing ES built in 1917.
                                                                               N
•     OPM: PMA Consultants
                                                                               S
•     Designer: Jonathan Levi Architects
•     CM-R: Skanska                                                            T
•     Project Scope & Budget approved                                          R
      March, 2009
                                                                               U
•     District Total Project Budget:
      $40,664,431                                                              C
•     Basis of Total Facilities Grant:                                         T
      $31,000,050
                                                                               I
•     Reimbursement Rate: 40.00%
•     MSBA Maximum Grant Amount:                                               O
      $12,400,000                                                              N
•     Bid Savings: $774,801
•     Construction commenced April 7,
      2010
•     Substantial Completion forecast for
      July 1, 2011
    February 9, 2011      The Massachusetts School Building Authority     31
                                   www.massschoolbuildings.org
Billerica
                 Parker Elementary School of
         90,600 sf of new construction to serve projected enrollment        C
         500 students in grades K-5. Existing ES built in 1953.
                                                                            O
•   OPM: Joslin, Lesser & Associates                                        N
•   Designer: Symmes, Maini & McKee                                         S
•   GC: CTA Construction                                                    T
•   Project Scope & Budget approved
    September, 2009                                                         R
•   District Total Project Budget:                                          U
    $34,007,436                                                             C
•   Basis of Total Facilities Grant:
    $31,565,064                                                             T
•   Reimbursement Rate: 55.69%                                              I
•   MSBA Maximum Grant Amount:                                              O
    $17,578,584
•   Bid Savings: $4,570,467                                                 N
•   Construction commenced September
    15, 2010
•   Substantial Completion forecast for
    May 24, 2012
    February 9, 2011     The Massachusetts School Building Authority   32
                                  www.massschoolbuildings.org
Brookline
         John D. Runkle Elementary School
                                                                                   C
         104,800 sf of addition/renovation of an existing facility built in
                                                                                   O
         1962. Projected enrollment of 560 students in grades K-8.
                                                                                   N
•   OPM: Town Employee
                                                                                   S
•   Designer: Design Partnership of Cambridge
•   GC: G&R Construction, Inc.                                                     T
•   Project Scope & Budget approved                                                R
    September, 2009
                                                                                   U
•   District Total Project Budget: $29,840,131
•   Basis of Total Facilities Grant: $28,515,877                                   C
•   Reimbursement Rate: 41.58%                                                     T
•   MSBA Maximum Grant Amount:                                                     I
    $11,856,902
                                                                                   O
•   Bid Savings: $1,941,241
•   Construction commenced November 9,                                             N
    2010
•   Substantial Completion forecast for July 10,
    2012


    February 9, 2011      The Massachusetts School Building Authority         33
                                   www.massschoolbuildings.org
Burlington
                 Memorial Elementary School
         78,500 sf of new construction to serve projected enrollment of        C
         500 students in grades K-5. Existing ES built in 1954.                O
•     OPM: Construction Monitoring Services                                    N
•     Designer: Knight, Bagge & Anderson                                       S
•     GC: CTA Construction Co.                                                 T
•     Project Scope & Budget approved
      March, 2009                                                              R
•     District total project budget:                                           U
      $27,923,244
                                                                               C
•     Basis of Total Facilities Grant:
      $26,963,244                                                              T
•     Reimbursement Rate: 52.11%                                               I
•     MSBA Maximum Grant Amount:                                               O
      $14,050,000
•     Bid Savings: $5,311,000                                                  N
•     Construction commenced March 4,
      2010
•     Substantial Completion forecast for
      November 11, 2011
    February 9, 2011     The Massachusetts School Building Authority      34
                                  www.massschoolbuildings.org
Dedham
                       Avery Elementary School                                C
        61,000 sf of new construction to serve projected enrollment of        O
        310 students in grades 1-5. Existing ES built in 1921.                N
•   OPM: Construction Monitoring Services                                     S
•   Designer: Dore & Whittier Architects
                                                                              T
•   CM-R: Consigli Construction
•   Project Scope & Budget approved                                           R
    September, 2009                                                           U
•   District Total Project Budget:                                            C
    $23,366,740
•   Basis of Total Facilities Grant:                                          T
    $21,806,569                                                               I
•   Reimbursement Rate: 50.84%
                                                                              O
•   MSBA Maximum Grant Amount:
    $11,086,460                                                               N
•   Construction commenced October 15,
    2010
•   Substantial Completion forecast for
    January 1, 2012

    February 9, 2011      The Massachusetts School Building Authority    35
                                   www.massschoolbuildings.org
Middleton
         Howe-Manning Elementary School
                                                                               C
         40,400 sf of new construction to serve projected enrollment of
                                                                               O
         553 students in grades 4-6. Existing ES built in 1937.
                                                                               N
•    OPM: RF Walsh Collaborative Partners                                      S
•    Designer: DiNisco Design Partnership                                      T
•    GC: CTA Construction Co.
                                                                               R
•    Project Scope & Budget approved
     March, 2009                                                               U
•    District Total Project Budget:                                            C
     $31,392,734
                                                                               T
•    Basis of Total Facilities Grant:
     $30,114,849                                                               I
•    Reimbursement Rate: 51.47%                                                O
•    MSBA Maximum Grant Amount:
     $15,500,000                                                               N
•    Bid Savings: $6,400,000
•    Construction commenced April 8, 2010
•    Substantial Completion forecast for
     December 2, 2011
    February 9, 2011     The Massachusetts School Building Authority      36
                                  www.massschoolbuildings.org
Nashoba
           Pompositticut Elementary School                                            C
          98,030 sf addition/renovation of an existing facility built in 1954.        O
          Projected enrollment of 600 students in grades K-5.                         N
•     OPM: Construction Monitoring Services                                           S
•     Designer: Symmes, Maini & McKee                                                 T
•     GC: P.J. Stella Construction Corp.
                                                                                      R
•     Project Scope & Budget approved
      September, 2009                                                                 U
•     District Total Project Budget:                                                  C
      $38,420,499
                                                                                      T
•     Basis of Total Facilities Grant:
      $35,658,326                                                                     I
•     Reimbursement Rate: 50.85%                                                      O
•     MSBA Maximum Grant Amount:
      $18,132,259                                                                     N
•     Bid Savings: $5,200,965
•     Construction commenced June 15, 2010
•     Substantial Completion forecast for April
      17, 2012
    February 9, 2011      The Massachusetts School Building Authority            37
                                   www.massschoolbuildings.org
Norfolk
                       Freeman-Centennial ES
                                                                               C
         96,410 sf of new construction to serve projected enrollment of
                                                                               O
         585 students in grades 1-6. Existing ES built in 1950.
                                                                               N
•   OPM: Joslin Lesser
                                                                               S
•   Designer: Flansburgh Associates
•   GC: Fontaine Bros., Inc.                                                   T
•   Project Scope & Budget approved                                            R
    September, 2009
                                                                               U
•   District Total Project Budget:
    $37,543,029                                                                C
•   Basis of Total Facilities Grant:                                           T
    $32,500,093
                                                                               I
•   Reimbursement Rate: 53.16%
•   MSBA Maximum Grant Amount:                                                 O
    $17,277,050                                                                N
•   Bid Savings: $6,059,726
•   Construction commenced
    November 17, 2010
•   Substantial Completion forecast for
    July 4, 2012
    February 9, 2011     The Massachusetts School Building Authority      38
                                  www.massschoolbuildings.org
Rochester
                 Memorial Elementary School                                           C
         105,023 sf addition/renovation of an existing facility built in 1953.        O
         Projected enrollment of 635 students in grades K-6.                          N
                                                                                      S
•     OPM: PMA Consultants
•     Designer: Flansburgh Associates                                                 T
•     CM-R: Gilbane Building Company                                                  R
•     Project Scope & Budget approved                                                 U
      September, 2009
                                                                                      C
•     District Total Project Budget: $26,500,000
•     Basis of Total Facilities Grant: $25,268,708                                    T
•     Reimbursement Rate: 57.94%                                                      I
•     MSBA Maximum Grant Amount:                                                      O
      $14,640,689
•     Bid Savings: $114,374                                                           N
•     Construction commenced April 19, 2010
•     Substantial Completion forecast for
      September 1, 2011

    February 9, 2011      The Massachusetts School Building Authority            39
                                   www.massschoolbuildings.org
Sturbridge
                  Burgess Elementary School                                           C
         129,300 sf addition/renovation of an existing facility built in 1949.        O
         Projected enrollment of 860 students in grades K-6.                          N
•     OPM: Lamoureux, Pagano & Assoc.                                                 S
•     Designer: Drummey, Rosane, Anderson                                             T
•     GC: Fontaine Bros., Inc.                                                        R
•     Project Scope & Budget approved
      September, 2009                                                                 U
•     District Total Project Budget: $46,926,630                                      C
•     Basis of Total Facilities Grant: $41,844,754                                    T
•     Reimbursement Rate: 57.92%                                                      I
•     MSBA Maximum Grant Amount:
      $24,236,481                                                                     O
•     Bid Savings: $13,561,933                                                        N
•     Construction commenced August 10, 2010
•     Substantial Completion forecast for
      October 1, 2012


    February 9, 2011      The Massachusetts School Building Authority            40
                                   www.massschoolbuildings.org
Woburn
                Goodyear Elementary School                                     C
         67,277 sf of new construction to serve projected enrollment of        O
         320 students in grades K-5. Existing ES built in 1927.                N
                                                                               S
•     OPM: Municipal Building Consultants
•     Designer: Tappe Associates                                               T
•     CM-R: Gilbane Building Company                                           R
•     Project Scope & Budget approved July,                                    U
      2009
                                                                               C
•     Basis of Total Facilities Grant:
      $24,375,769                                                              T
•     Reimbursement Rate: 54.21%                                               I
•     MSBA Maximum Grant Amount:
      $13,214,104                                                              O
•     Bid Savings: $2,000,000                                                  N
•     Construction commenced March 9,
      2010
•     Substantial Completion forecast for July
      29, 2011

    February 9, 2011      The Massachusetts School Building Authority     41
                                   www.massschoolbuildings.org
Rockland
           John W. Rogers MS/Rockland HS                                          C
          109,500 sf of new construction of MS. Existing MS built in 1928.        O
          158,606 sf renovation of the existing high school built in 1909.
                                                                                  N
          Projected enrollment of 1,525 students in grades 6-12.
                                                                                  S
•   OPM: Daedalus
•   Designer: Dore & Whittier Architects                                          T
•   CM-R: Agostini Construction                                                   R
•   Project Scope & Budget approved                                               U
    September, 2009
                                                                                  C
•   District Total Project Budget:
    $86,201,449                                                                   T
•   Basis of Total Facilities Grant:                                              I
    $83,032,496
•   Reimbursement Rate: 64.26%                                                    O
•   MSBA Maximum Grant Amount:                                                    N
    $53,356,682
•   Construction commenced November
    15, 2010
•   Substantial Completion forecast for
    August 3, 2012
     February 9, 2011    The Massachusetts School Building Authority         42
                                  www.massschoolbuildings.org
Sharon
                              Middle School                                           C
         170,750 sf addition/renovation of an existing facility built in 1963.        O
         Projected enrollment of 845 students in grades 6-8.                          N
•     OPM: Daedalus                                                                   S
•     Designer: Kaestle Boos Associates                                               T
•     CM-R: Consigli Construction                                                     R
•     Project Scope & Budget approved
      September, 2009                                                                 U
•     District Total Project Budget:                                                  C
      $49,540,287                                                                     T
•     Basis of Total Facilities Grant:
      $43,950,340                                                                     I
•     Reimbursement Rate: 52.68%                                                      O
•     MSBA Maximum Grant Amount:                                                      N
      $23,153,039
•     Construction commenced April 1, 2010
•     Substantial Completion forecast for
      January 23, 2012

    February 9, 2011      The Massachusetts School Building Authority            43
                                   www.massschoolbuildings.org
Southbridge
                        Middle/High School                                      C
         199,784 sf of new construction to serve projected enrollment of
         550 students in grades 6-8 and 500 students in grades 9-12.            O
         Existing facility built in 1927.                                       N
                                                                                S
•     OPM: Joslin, Lesser & Associates                                          T
•     Designer: Tappe Associates                                                R
•     CM-R: Consigli Construction
                                                                                U
•     Project Scope & Budget approved
      January, 2010                                                             C
•     District Total Project Budget: $76,517,078                                T
•     Basis of Total Facilities Grant:
      $67,196,298                                                               I
•     Reimbursement Rate: 80.00%                                                O
•     MSBA Maximum Grant Amount:                                                N
      $53,757,038
•     Construction commenced November 13,
      2010
•     Substantial Completion forecast for
      October 5, 2012
    February 9, 2011      The Massachusetts School Building Authority      44
                                   www.massschoolbuildings.org
Taunton
                   Parker Middle/High School                                 C
         70,000 sf addition/renovation of MS and 450,000 sf                  O
         addition/renovation of HS. Existing facility built in 1975.         N
         Projected enrollment of 593 students in grades 5-7 and 1,947        S
         students in grades 8-12.
                                                                             T
•   OPM: Gilbane
                                                                             R
•   Designer: Design Partnership of Cambridge
•   GC: Bacon-Agostini                                                       U
•   Project Funding Agreement executed March                                 C
    18, 2008
                                                                             T
•   District Total Project Budget: $112,759,827
•   Basis of Total Facilities Grant: $112,759,827                            I
•   Reimbursement Rate: 83.0%                                                O
•   MSBA Maximum Grant Amount:                                               N
    $93,590,065
•   Construction commenced July 1, 2008
•   Substantial Completion forecast for August
    29, 2011

    February 9, 2011      The Massachusetts School Building Authority   45
                                   www.massschoolbuildings.org
Beverly
                                High School                                   C
       368,300 sf of new construction to serve projected enrollment of        O
       1,200 students in grades 9-12. Existing HS built in 1965.              N
                                                                              S
•     OPM: Heery International
•     Designer: Mount Vernon Group Architects                                 T
•     GC: CTA Construction Co.                                                R
•     Project Scope & Budget approved                                         U
      November, 2008
                                                                              C
•     District Total Project Budget: $81,500,000
•     Basis of Total Facilities Grant:                                        T
      $80,155,000                                                             I
•     Reimbursement Rate: 58.42%
                                                                              O
•     MSBA Maximum Grant Amount:
      $46,826,551                                                             N
•     Construction commenced January 6,
      2009
•     Substantial Completion forecast for
      November 18, 2011

    February 9, 2011      The Massachusetts School Building Authority    46
                                   www.massschoolbuildings.org
Danvers
                                 High School                                           C
          249,792 sf addition/renovation of an existing facility built in 1960.        O
          Projected enrollment of 1,000 students in grades 9-12.                       N
•   OPM: Construction Monitoring Services                                              S
•   Designer: DiNisco Design Partnership                                               T
•   GC: Bacon Construction Co.
                                                                                       R
•   Project Scope & Budget approved
    September, 2009                                                                    U
•   District Total Project Budget: $83,063,992                                         C
•   Basis of Total Facilities Grant:                                                   T
    $74,983,855
•   Reimbursement Rate: 56.11%                                                         I
•   MSBA Maximum Grant Amount:                                                         O
    $42,022,942
                                                                                       N
•   Bid Savings: $11,676,790
•   Construction commenced October 22,
    2010
•   Substantial Completion forecast for July
    2, 2013
     February 9, 2011      The Massachusetts School Building Authority            47
                                    www.massschoolbuildings.org
Falmouth
                                High School                                       C
         266,654 sf addition/renovation of an existing facility. Projected        O
         enrollment of 1,366 students in grades 9-12.                             N
•     OPM: Gilbane                                                                S
•     Designer: DiNisco Design Partnership                                        T
•     GC: TLT Construction
                                                                                  R
•     Project Funding Agreement executed
      May 17, 2006                                                                U
•     District Total Project Budget:                                              C
      $86,325,000
                                                                                  T
•     Basis of Total Facilities Grant:
      $58,906,136                                                                 I
•     Reimbursement Rate: 59.70%                                                  O
•     MSBA Maximum Grant Amount:
      $35,166,963                                                                 N
•     Construction commenced May, 2005
•     Substantial Completion: October 29,
      2010

    February 9, 2011      The Massachusetts School Building Authority        48
                                   www.massschoolbuildings.org
Foxborough
                                 High School
                                                                                  C
          218,500 sf repair of an existing facility built in 1972 to serve
          students in grades 9-12.                                                O

•   Repair: Fire alarms, HVAC, toilet rooms,                                      N
    roof replacement, boilers, asbestos                                           S
    abatement & science wing renovations
                                                                                  T
•   OPM: Construction Monitoring Services
•   Designer: Kaestle Boos Associates                                             R
•   GC: CTA Construction Co.                                                      U
•   Project Scope & Budget approved March,                                        C
    2009
                                                                                  T
•   District Total Project Budget: $19,993,000
•   Basis of Total Facilities Grant: $19,037,185                                  I
•   Reimbursement Rate: 49.31%                                                    O
•   MSBA Maximum Grant Amount:                                                    N
    $9,387,000
•   Bid Savings: $3,942,295
•   Construction commenced January 25, 2010
•   Substantial Completion forecast for August
    17, 2011
     February 9, 2011      The Massachusetts School Building Authority       49
                                    www.massschoolbuildings.org
Grafton
                       Memorial Sr. High School                                C
        186,019 sf of new construction to serve projected enrollment of        O
        900 students in grades 9-12. Existing HS built in 1962.
                                                                               N
•     OPM: Joslin, Lesser & Associates                                         S
•     Designer: Symmes, Maini & McKee
                                                                               T
•     CM-R: Dimeo
•     Project Scope & Budget approved                                          R
      January, 2010                                                            U
•     District Total Project Budget:                                           C
      $72,437,020
•     Basis of Total Facilities Grant:                                         T
      $64,305,275                                                              I
•     Reimbursement Rate: 56.89%
                                                                               O
•     MSBA Maximum Grant Amount:
      $36,583,271                                                              N
•     Construction commenced August
      18, 2010
•     Substantial Completion forecast for
      July 17, 2012

    February 9, 2011      The Massachusetts School Building Authority     50
                                   www.massschoolbuildings.org
Hampden – Wilbraham
           Minnechaug Regional High School                                      C
         231,467 sf of new construction to serve projected enrollment of        O
         1,225 students in grades 9-12. Existing HS built in 1958.
                                                                                N
•   OPM: Arcadis                                                                S
•   Designer: Mount Vernon Group Architects                                     T
•   GC: Fontaine Bros., Inc.
                                                                                R
•   Project Scope & Budget approved July,
    2009                                                                        U
•   District Total Project Budget: $78,986,658                                  C
•   Basis of Total Facilities Grant: $76,796,379                                T
•   Reimbursement Rate: 61.73%
                                                                                I
•   MSBA Maximum Grant Amount:
    $47,406,405                                                                 O
•   Bid Savings: $12,874,591                                                    N
•   Construction commenced July 22, 2010
•   Substantial Completion forecast for June
    28, 2012


     February 9, 2011      The Massachusetts School Building Authority     51
                                    www.massschoolbuildings.org
Hanover
                               High School
                                                                               C
        156,000 sf of new construction to serve projected enrollment of
                                                                               O
        800 students in grades 9-12. Existing HS built in 1958.
                                                                               N
•     OPM: PMA Consultants
                                                                               S
•     Designer: HMFH Architects
•     GC: Callahan, Inc.                                                       T
•     Project Scope & Budget approved                                          R
      November, 2008
                                                                               U
•     District Total Project Budget:
      $59,953,688                                                              C
•     Basis of Total Facilities Grant:                                         T
      $59,484,384
                                                                               I
•     Reimbursement Rate: 47.21%
•     MSBA Maximum Grant Amount:                                               O
      $28,082,578                                                              N
•     Bid Savings: $10,950,096
•     Construction commenced September
      28, 2009
•     Substantial Completion forecast for June
      1, 2011
    February 9, 2011     The Massachusetts School Building Authority      52
                                  www.massschoolbuildings.org
Haverhill
                                High School                                       C

         ADA upgrades, fire protection, lockers and boiler repairs of an          O
         existing facility built in 1962 to serve students in grades 9-12.        N
                                                                                  S
•   OPM: Jeff Dill
•   Designer: Knight, Bagge & Anderson                                            T
•   GC: Various                                                                   R
•   Project Funding Agreement executed                                            U
    March 22, 2006
                                                                                  C
•   District Total Project Budget:
    $33,739,532                                                                   T
•   Basis of Total Facilities Grant:                                              I
    $33,739,532
•   Reimbursement Rate: 68.48%                                                    O
•   MSBA Maximum Grant Amount:                                                    N
    $23,104,832
•   Construction commenced June, 2005
•   Substantial Completion achieved
    November, 2007

    February 9, 2011      The Massachusetts School Building Authority        53
                                   www.massschoolbuildings.org
Holyoke
                               High School                                      C
         HVAC upgrades to an existing 199,560 sf facility built in 1964.        O
         Projected enrollment of 1,278 students in grades 9-12.                 N
•   OPM: Strategic Building Solutions                                           S
•   Designer: Design Partnership of                                             T
    Cambridge, Ins.                                                             R
•   GC: WJ Mountford
•   Project Funding Agreement executed                                          U
    May 28, 2009                                                                C
•   District Total Project Budget:                                              T
    $22,738,000
•   Basis of Total Facilities Grant:                                            I
    $15,964,800                                                                 O
•   Reimbursement Rate: 90.0%                                                   N
•   MSBA Maximum Grant Amount:
    $14,368,320
•   Construction commenced June 30, 2009
•   Substantial Completion achieved
    September 1, 2010
    February 9, 2011     The Massachusetts School Building Authority       54
                                  www.massschoolbuildings.org
Longmeadow
                                 High School                                      C
          184,365 sf of new construction to serve students in grades 9-12.        O
          Existing HS built in 1954.                                              N
•   OPM: Joslin, Lesser & Associates                                              S
•   Designer: The Office of Michael Rosenfeld                                     T
•   CM-R: Gilbane Building Company                                                R
•   Project Scope & Budget approved March,
    2010                                                                          U
•   District Total Project Budget: $78,452,888                                    C
•   Basis of Total Facilities Grant: $65,595,405                                  T
     – (Excludes renovation costs of 1971
       building)                                                                  I
•   Reimbursement Rate: 51.84%                                                    O
•   MSBA Maximum Grant Amount: $34,004,658                                        N
•   Construction commenced November 1, 2010
•   Substantial Completion forecast for
    December 26, 2012


     February 9, 2011      The Massachusetts School Building Authority       55
                                    www.massschoolbuildings.org
Malden
                               High School                                         C
       448,000 sf renovation of an existing facility built in 1939 to serve        O
       students in grades 9-12.                                                    N
•     OPM: URS                                                                     S
•     Designer: Flansburgh Associates                                              T
•     CM-R: Gilbane Building Company
                                                                                   R
•     Project Funding Agreement
      executed November 23, 2009                                                   U
•     District Total Project Budget:                                               C
      $81,000,000
                                                                                   T
•     Basis of Total Facilities Grant:
      $77,072,181                                                                  I
•     Reimbursement Rate: 90.0%                                                    O
•     MSBA Maximum Grant Amount:
      $69,364,963                                                                  N
•     Construction commenced April 20,
      2009
•     Substantial Completion forecast
      for January 6, 2012
    February 9, 2011     The Massachusetts School Building Authority          56
                                  www.massschoolbuildings.org
Mount Greylock
                       Regional High School                                        C
          Boiler installation, locker rooms and ceiling repairs of an              O
          existing facility built in 1957 to serve students in grades 9-12.        N
•   OPM: N/A                                                                       S
•   Designer: Hesnor Engineering & Barry Architects                                T
•   GC: Adams Plumbing & Heating                                                   R
•   Project Scope & Budget approved November,                                      U
    2009 for boilers & March, 2010 for Locker Rooms
    & Ceiling Repairs                                                              C
•   District Total Project Budget: $2,419,893                                      T
•   Basis of Total Facilities Grant: $2,400,833
                                                                                   I
•   Reimbursement Rate: 54.16%
•   MSBA Maximum Grant Amount for the Total                                        O
    Project (boilers, locker rooms & ceiling repairs):                             N
    $1,300,291
•   Bid Savings: $376,175
•   Construction commenced May 6, 2010
•   Substantial Completion achieved December 1,
    2010
    February 9, 2011     The Massachusetts School Building Authority          57
                                  www.massschoolbuildings.org
Natick
                                High School
                                                                                C
         254,095 sf of new construction to serve projected enrollment of
                                                                                O
         1,300 students in grades 9-12. Existing HS built in 1954.
                                                                                N
•   OPM: RF Walsh Collaborative Partners
                                                                                S
•   Designer: Ai3 Architects
•   GC: Brait Builders, Corp.                                                   T
•   Project Scope & Budget approved                                             R
    January, 2010
                                                                                U
•   District Total Project Budget:
    $88,987,414                                                                 C
•   Basis of Total Facilities Grant:                                            T
    $82,016,562
                                                                                I
•   Reimbursement Rate: 52.63%
•   MSBA Maximum Grant Amount:                                                  O
    $43,165,316                                                                 N
•   Bid Savings: $10,555,000
•   Construction commenced September 13,
    2010
•   Substantial Completion forecast for June
    15, 2013
     February 9, 2011     The Massachusetts School Building Authority      58
                                   www.massschoolbuildings.org
Norwood
                               High School
                                                                                C
         227,374 sf of new construction to serve projected enrollment of
                                                                                O
         1,100 students in grades 9-12. Existing HS built in 1925.
                                                                                N
•   OPM: Compass Project Management
                                                                                S
•   Designer: Ai3 Architects
                                                                                T
•   GC: Agostini Construction Company
                                                                                R
•   Project Scope & Budget approved
    January, 2009                                                               U
•   District Total Project Budget:                                              C
    $79,138,965
                                                                                T
•   Basis of Total Facilities Grant:
    $73,940,000                                                                 I
•   Reimbursement Rate: 59.21%                                                  O
•   MSBA Maximum Grant Amount:                                                  N
    $43,779,874
•   Bid Savings: $10,000,000
•   Construction commenced May 19, 2009
•   Substantial Completion forecast for
    June 1, 2011
    February 9, 2011     The Massachusetts School Building Authority       59
                                  www.massschoolbuildings.org
Plymouth
                      North High School                                    C
    267,357 sf of new construction to serve projected enrollment of        O
    1,350 students in grades 9-12. Existing school built in 1963.          N
•   OPM: Ted Gentry Associates                                             S
•   Designer: Ai3 Architects                                               T
•   GC: J&J Contractors, Inc.
•   Project Scope & Budget approved
                                                                           R
    September, 2009                                                        U
•   District Total Project Budget:
    $92,249,040                                                            C
•   Basis of Total Facilities Grant:                                       T
    $79,420,894
•   Reimbursement Rate: 58.24%                                             I
•   MSBA Maximum Grant Amount:                                             O
    $46,254,729
•   Bid Savings: $10,400,000                                               N
•   Construction commenced May 3, 2010
•   Substantial Completion forecast for
    May 15, 2012


February 9, 2011       The Massachusetts School Building Authority    60
                                www.massschoolbuildings.org
Springfield
      Putnam Vocational Technical High School                                  C
        315,000 sf of new construction to serve projected enrollment of        O
        1,400 students in grades 9-12. Existing HS built in 1938.              N
•    OPM: Arcadis                                                              S
•    Designer: Drummey, Rosane, Anderson                                       T
•    CM-R: Consigli Construction
                                                                               R
•    Project Funding Agreement executed
     November 23, 2009                                                         U
•    District Total Project Budget:                                            C
     $114,303,152
                                                                               T
•    Basis of Total Facilities Grant:
     $114,303,152                                                              I
•    Reimbursement Rate: 90.0%                                                 O
•    MSBA Maximum Grant Amount:
     $102,872,837                                                              N
•    Bid Savings: $10,700,000
•    Construction commenced May 18, 2010
•    Substantial Completion forecast for July
     20, 2012
    February 9, 2011      The Massachusetts School Building Authority     61
                                   www.massschoolbuildings.org
Tewksbury
                       Memorial High School                                     C
         218,781 sf of new construction to serve projected enrollment of        O
         1,100 students in grades 9-12. Existing HS built in 1959.
                                                                                N
•     OPM: Heery International                                                  S
•     Designer: Symmes, Maini & McKee
                                                                                T
•     GC: CTA/Methuen
•     Project Scope & Budget approved                                           R
      January, 2010                                                             U
•     District Total Project Budget: $83,173,174
                                                                                C
•     Basis of Total Facilities Grant:
      $73,584,127                                                               T
•     Reimbursement Rate: 60.06%                                                I
•     MSBA Maximum Grant Amount:                                                O
      $44,194,627
•     Bid Savings: $15,146,517                                                  N
•     Construction commenced October 15,
      2010
•     Substantial Completion forecast for August
      3, 2012
    February 9, 2011     The Massachusetts School Building Authority       62
                                  www.massschoolbuildings.org
Wayland
                                High School                                       C
       171,000 sf of new construction to serve projected enrollment of 900        O
       students in grades 9-12. Existing facility built in 1959.                  N
•     OPM: KV Associates                                                          S
•     Designer: HMFH Architects                                                   T
•     CM-R: Shawmut Construction
                                                                                  R
•     Project Scope & Budget approved
      September, 2009                                                             U
•     District Total Project Budget:                                              C
      $70,800,000
                                                                                  T
•     Basis of Total Facilities Grant:
      $62,500,000                                                                 I
•     Reimbursement Rate: 40.00%                                                  O
•     MSBA Maximum Grant Amount:
      $25,000,000                                                                 N
•     Construction commenced June 28,
      2010
•     Substantial Completion forecast for
      November 9, 2011
    February 9, 2011      The Massachusetts School Building Authority        63
                                   www.massschoolbuildings.org
February 9, 2011 Board Meeting, Project Overview Presentation
February 9, 2011 Board Meeting, Project Overview Presentation

Contenu connexe

En vedette

En vedette (10)

Digital futures 2012 conference
Digital futures 2012 conferenceDigital futures 2012 conference
Digital futures 2012 conference
 
Gov.uk Beta - Corporate platform
Gov.uk Beta - Corporate platform Gov.uk Beta - Corporate platform
Gov.uk Beta - Corporate platform
 
Directgov
DirectgovDirectgov
Directgov
 
GDS IT
GDS IT GDS IT
GDS IT
 
Government Digital Service's Launch 8.12.11
Government Digital Service's Launch 8.12.11Government Digital Service's Launch 8.12.11
Government Digital Service's Launch 8.12.11
 
ConCon Manchester: keynote
ConCon Manchester: keynoteConCon Manchester: keynote
ConCon Manchester: keynote
 
Newcastle content meetup: import and export
Newcastle content meetup: import and exportNewcastle content meetup: import and export
Newcastle content meetup: import and export
 
How to write a good change request
How to write a good change requestHow to write a good change request
How to write a good change request
 
Introducing Yammer in your organisation - illustrated guide
Introducing Yammer in your organisation - illustrated guideIntroducing Yammer in your organisation - illustrated guide
Introducing Yammer in your organisation - illustrated guide
 
Why We Should Use Yammer
Why We Should Use YammerWhy We Should Use Yammer
Why We Should Use Yammer
 

Similaire à February 9, 2011 Board Meeting, Project Overview Presentation (9)

September Board meeting presentation
September Board meeting presentationSeptember Board meeting presentation
September Board meeting presentation
 
September Board meeting Presentation
September Board meeting PresentationSeptember Board meeting Presentation
September Board meeting Presentation
 
South Hadley Plains Elementary School Schematic Design presentation
South Hadley Plains Elementary School Schematic Design presentationSouth Hadley Plains Elementary School Schematic Design presentation
South Hadley Plains Elementary School Schematic Design presentation
 
February 9, 2011 Board Meeting, Model School Update Presentation
February 9, 2011 Board Meeting, Model School Update PresentationFebruary 9, 2011 Board Meeting, Model School Update Presentation
February 9, 2011 Board Meeting, Model School Update Presentation
 
Nicholas S. Emma - Professional Work Portfolio
Nicholas S. Emma - Professional Work PortfolioNicholas S. Emma - Professional Work Portfolio
Nicholas S. Emma - Professional Work Portfolio
 
RL Newsletter Aug 10
RL Newsletter Aug 10RL Newsletter Aug 10
RL Newsletter Aug 10
 
Resume 2017
Resume 2017 Resume 2017
Resume 2017
 
Alan D Souza Overview
Alan D Souza OverviewAlan D Souza Overview
Alan D Souza Overview
 
INDA Design Build for Communities
INDA Design Build for CommunitiesINDA Design Build for Communities
INDA Design Build for Communities
 

Plus de Massachusetts School Building Authority

Plus de Massachusetts School Building Authority (11)

Cefpi power point presentation revised
Cefpi power point presentation revisedCefpi power point presentation revised
Cefpi power point presentation revised
 
May 5, 2011 society of marketing professionals services forum
May 5, 2011 society of marketing professionals services forumMay 5, 2011 society of marketing professionals services forum
May 5, 2011 society of marketing professionals services forum
 
Bourne elementary and ecc timeline v2
Bourne elementary and ecc timeline v2Bourne elementary and ecc timeline v2
Bourne elementary and ecc timeline v2
 
February 9, 2011 Board Meeting, Audit Division Presentation
February 9, 2011 Board Meeting, Audit Division PresentationFebruary 9, 2011 Board Meeting, Audit Division Presentation
February 9, 2011 Board Meeting, Audit Division Presentation
 
MSBA Project Division PowerPoint, 2.9.11 Board Meeting
MSBA Project Division PowerPoint, 2.9.11 Board MeetingMSBA Project Division PowerPoint, 2.9.11 Board Meeting
MSBA Project Division PowerPoint, 2.9.11 Board Meeting
 
Board meeting presentation 11 17-10 - final
Board meeting presentation 11 17-10 - finalBoard meeting presentation 11 17-10 - final
Board meeting presentation 11 17-10 - final
 
January 2010 MA Municipal Association Presentation
January 2010 MA Municipal Association PresentationJanuary 2010 MA Municipal Association Presentation
January 2010 MA Municipal Association Presentation
 
June 2010_MACHPS_green_schools
June 2010_MACHPS_green_schoolsJune 2010_MACHPS_green_schools
June 2010_MACHPS_green_schools
 
January 2010 Presentation to MMA Conference
January 2010 Presentation to MMA ConferenceJanuary 2010 Presentation to MMA Conference
January 2010 Presentation to MMA Conference
 
7.28.10 Board Meeting Presentation
7.28.10 Board Meeting Presentation7.28.10 Board Meeting Presentation
7.28.10 Board Meeting Presentation
 
Mars april 2010 final
Mars april 2010 finalMars april 2010 final
Mars april 2010 final
 

February 9, 2011 Board Meeting, Project Overview Presentation

  • 1. Project Status Report February 9, 2011 Steven Grossman Katherine P. Craven Chairman, State Treasurer Executive Director
  • 2. Project Status Report • Enrollment – 3 enrollments completed this period – Enrollments complete for projects for 68,110 students • Owner’s Project Manager – 3 districts completed OPM procurement – 3 Districts scheduled for March action – Over $69 million in OPM fees to date • Designer Selection Panel – 2 districts participated in DSP –2 interviews held – 7 districts scheduled for DSP in February and March – Over $173 million in Designer fees • Commissioning – 3 Commissioning consultant contracts executed this period for $189,490 – Over $6.2 million in consultant contracts to date February 9, 2011 The Massachusetts School Building Authority 2 www.massschoolbuildings.org
  • 3. MSBA Visits Since the November Board the MSBA has visited 55 Districts Project Visits Project Visits Project Visits Check Presentations/ Ground Breakings Andover Foxboro Norwood Beverly Ashburnham Westminster Gloucester Plymouth Brookline Ayer Hampden Wilbraham Quincy Billerica Bay Path Mount Greylock Natick Danvers Belmont Lexington Rockland Grafton Berkshire Hills Lynn Malden Sharon Haverhill Beverly Middleton Springfield Somerville Billerica Nashoba Stow Chicopee New Bedford Sturbridge Dalton Newburyport Taunton Danvers Norton Wellesley Dedham North Adams Whitman Hanson Duxbury North Andover Woburn East Bridgewater Worcester Franklin February 9, 2011 The Massachusetts School Building Authority 3 www.massschoolbuildings.org
  • 4. MSBA Capital Pipeline February 9, 2011 The Massachusetts School Building Authority 4 www.massschoolbuildings.org
  • 5. Design Development & Construction Phases • 71 Projects at Estimated $2.17 Billion Total Construction Cost: – 34 Projects in Design Development ($0.68 Billion) – 13 Projects Break Ground in 2011 – 22 Construction Bids in 2011 ($733.2 Million) – 37 Projects in Construction ($1.49 Billion) – 15 Buildings to be Completed in 2011 February 9, 2011 The Massachusetts School Building Authority 5 www.massschoolbuildings.org
  • 6. Design Development Phase MSBA Staff Monitor Scope, Budget & Schedule Design Development Phase Review Submittals for Design Development, 60% and 90% Review Bid Amounts and Adjust Grant Amount as Needed Track Construction Budget Throughout Design Process Using MSBA Cost Estimate Comparison Spreadsheet Scope and Budget Fixed Upon Execution Scope and Budget Fixed Upon Execution of of the PFA the PFA February 9, 2011 The Massachusetts School Building Authority 6 www.massschoolbuildings.org
  • 7. D Andover E Bancroft Elementary School S I 106,000 sf of new construction to serve projected enrollment of G 680 students in grades K-5 N • OPM: Town Employee • Designer: Symmes, Maini & McKee D • Project Scope & Budget E November 17, 2010 V • District Total Project Budget: $44,659,837 E • Basis of Total Facilities Grant: L $38,122,167 • Reimbursement Rate: 44.00% O • MSBA Maximum Grant Amount: P $16,773,753 M • Construction scheduled to commence December 2011 E • Substantial Completion forecast N for May 27, 2013 T February 9, 2011 The Massachusetts School Building Authority 7 www.massschoolbuildings.org
  • 8. D Ashburnham –Westminster E Briggs Elementary School S I 85,415 sf of new construction to serve projected enrollment of G 520 students in grades PK - 5 N • OPM: STV Construction, Inc. • Designer: Lamoureaux Pagano D • Project Scope & Budget December 17, 2010 E • District Total Project Budget: V $27,979,738 • Basis of Total Facilities Grant: E $17,471,592 L • Reimbursement Rate: 58.46% O • MSBA Maximum Grant Amount: $16,353,447 P • Construction scheduled to M commence February 2012 E • Substantial Completion forecast for June 2013 N T February 9, 2011 The Massachusetts School Building Authority 8 www.massschoolbuildings.org
  • 9. D Carlisle E K-8 Elementary School S I 139,337 sf addition/renovation of an existing facility built in 1909. G Projected enrollment of 700 students in grades K-8. N • OPM: Daedalus • Designer: HMFH Architects D • Project Scope & Budget E approved January, 2010 • District Total Project Budget: V $20,075,000 E • Basis of Total Facilities Grant: L $17,471,592 • Reimbursement Rate: 40.00% O • MSBA Maximum Grant Amount: P $6,988,637 M • Construction scheduled to commence February 12, 2011 E • Substantial Completion forecast N for September 1, 2012 T February 9, 2011 The Massachusetts School Building Authority 9 www.massschoolbuildings.org
  • 10. D Marshfield E Governor Edward Winslow ES S I Repair of HVAC and window replacement in an existing facility G built in 1969. Projected enrollment of 431 students in grades PK-5. N • OPM: Vertex • Designer: Knight, Bagge & Anderson D • Project Scope & Budget approved May, 2008 E • District Total Project Budget: V $2,400,000 E • Basis of Total Facilities Grant: $2,400,000 L • Reimbursement Rate: 46.37% O • MSBA Maximum Grant Amount: P $1,112,880 • Construction scheduled to M commence week of February 7, E 2011 N • Substantial completion forecast for August 26, 2011 T February 9, 2011 The Massachusetts School Building Authority 10 www.massschoolbuildings.org
  • 11. D Needham E Newman Elementary School S I HVAC, electrical, roof and ADA repairs in an existing facility built G in 1961. Projected enrollment of 754 students in grades K-5. N • OPM: Town Employee • Designer: Drummey, Rosane, Anderson D • CM-R: Consigli Construction E • Project Scope & Budget approved September, 2009 V • District Total Project Budget: E $27,412,128 L • Basis of Total Facilities Grant: $21,497,319 O • Reimbursement Rate: 40.00% P • MSBA Maximum Grant Amount: M $8,598,927 • Construction commenced June 16, 2010 E • Substantial Completion forecast for N August 27, 2012 T February 9, 2011 The Massachusetts School Building Authority 11 www.massschoolbuildings.org
  • 12. D Somerville E S East Somerville Community School I 121,000 sf addition/renovation to serve projected enrollment of G 500 students in grades K-8. N • OPM: Town Employee. • Designer: Maguire Group, Inc. D • Project Scope & Budget E September 2010 • District Total Project Budget: V $34,782,578 E • Basis of Total Facilities Grant: L $19,092,349 • Reimbursement Rate: 80.00% O • MSBA Maximum Grant Amount: P $15,273,879 M • Construction scheduled to commence April 2011 E • Substantial Completion forecast N for December 2012 T February 9, 2011 The Massachusetts School Building Authority 12 www.massschoolbuildings.org
  • 13. D Winchester E S Vinson-Owen Elementary School I 30,290 sf of new construction to serve projected enrollment of G 420 students in grades K-5. N • OPM: Town Employee • Designer: Tappe Associates D • Project Scope & Budget E November 17, 2010 • District Total Project Budget: V $28,696,907 E • Basis of Total Facilities Grant: L $25,998,657 • Reimbursement Rate: 40.00% O • MSBA Maximum Grant Amount: P $10,339,463 M • Construction scheduled to commence January 11, 2012 E • Substantial Completion forecast N for March 27, 2013 T February 9, 2011 The Massachusetts School Building Authority 13 www.massschoolbuildings.org
  • 14. Burlington D E Marshall Simonds Middle School S I 151,225 sf addition/renovation of an existing facility built in 1961. Projected enrollment of 880 students in grades 6-8. G • OPM: Construction Monitoring Services N • Designer: Knight, Bagge & Anderson • CM-R: TBD D • Project Scope & Budget approved May, E 2010 V • District Total Project Budget: $32,865,499 • Basis of Total Facilities Grant: E $31,741,321 L • Reimbursement Rate: 54.01% O • MSBA Maximum Grant Amount: $17,143,488 P • Construction scheduled to commence M March 24, 2011 E • Substantial Completion forecast for March N 15, 2013 T February 9, 2011 The Massachusetts School Building Authority 14 www.massschoolbuildings.org
  • 15. D Hudson E John F. Kennedy Middle School S I 48,900 sf of new construction to serve projected enrollment of 715 G students in grades 5-7. Existing MS built in 1963. N • OPM: PMA Consultants • Designer: The Office of Michael Rosenfeld, Inc. D • Project Scope & Budget approved E November, 2010 • District Total Project Budget: V $44,103,362 E • Basis of Total Facilities Grant: L $41,416,977 • Reimbursement Rate: 58.11% O • MSBA Maximum Grant Amount: P $24,067,405 M • Construction scheduled to commence September, 2011 E • Substantial Completion forecast for N November 15, 2013 T February 9, 2011 The Massachusetts School Building Authority 15 www.massschoolbuildings.org
  • 16. D Shrewsbury E Sherwood Middle School S I 130,000 sf of new construction to serve projected enrollment of 900 G students in grades 5-6. Existing MS built in 1964. N • OPM: PMA Consultants • Designer: Lamoureux, Pagano & Assoc. D • CM-R: Gilbane Building Company E • Project Scope & Budget approved January, 2010 V • District Total Project Budget: E $47,266,777 L • Basis of Total Facilities Grant: $44,981,652 O • Reimbursement Rate: 53.16% P • MSBA Maximum Grant Amount: M $23,912,246 • Construction scheduled to commence E March, 2011 N • Substantial Completion forecast for T September 1, 2013 February 9, 2011 The Massachusetts School Building Authority 16 www.massschoolbuildings.org
  • 17. D Sutton E Middle/High School S I 171,401 sf addition/renovation of an existing facility built in 1949. G Projected enrollment of 840 students in grades 6-12. N • OPM: Strategic Building Solutions • Designer: Flansburgh D Associates E • Project Scope & Budget approved March, 2010 V • District Total Project Budget: E $59,945,474 L • Basis of Total Facilities Grant: $53,878,875 O • Reimbursement Rate: 55.39% P • MSBA Maximum Grant Amount: M $29,843,511 • Construction scheduled to E commence April 15, 2011 N • Substantial Completion forecast T for December 31, 2014 February 9, 2011 The Massachusetts School Building Authority 17 www.massschoolbuildings.org
  • 18. D Adams-Cheshire E Hoosac Valley Middle/High School S I 173,999 sf addition/renovation of an existing facility built in 1969. G Projected enrollment of 805 students in grades 6-12. N • OPM: URS • Designer: Tessier Associates D • CM-R: TBD E • Project Scope & Budget approved September, 2010 V • District Total Project Budget: E $40,561,257 L • Basis of Total Facilities Grant: $36,038,192 O • Reimbursement Rate: 77.37%, 78.37%* P • MSBA Maximum Grant Amount: M $28,243,131** • Construction scheduled to commence * Contingent upon approval from the Office E of the Inspector General to utilize CM-at- June 22, 2011 Risk construction delivery method. N • Substantial Completion: TBD ** Based on reimbursement rate of 78.37% T February 9, 2011 The Massachusetts School Building Authority 18 www.massschoolbuildings.org
  • 19. D Berlin-Boylston E Middle/High School S I 126,100 sf of new construction to serve projected enrollment of 560 G students in grades 6-12. Existing M/HS school built in 1962. N • OPM: PMA Consultants • Designer: HMFH Architects D • Project Scope & Budget approved E March, 2010 • District Total Project Budget: V $43,954,901 E • Basis of Total Facilities Grant: L $40,602,855 • Reimbursement Rate: 52.21% O • MSBA Maximum Grant Amount: P $21,198,751 M • Construction scheduled to commence May 1, 2011 E • Substantial Completion forecast for N October 31, 2012 T February 9, 2011 The Massachusetts School Building Authority 19 www.massschoolbuildings.org
  • 20. D Easthampton E High School S I 110,400 sf of new construction to serve projected enrollment of G 510 students in grades 9-12. Existing HS built in 1961. N • OPM: Strategic Building Solutions • Designer: Caolo & Bieniek Assoc. D • Project Scope & Budget approved E March, 2010 • District Total Project Budget: V $43,691,108 E • Basis of Total Facilities Grant: L $40,649,045 • Reimbursement Rate: 62.84% O • MSBA Maximum Grant Amount: P $25,543,860 M • Construction scheduled to commence June, 2011 E • Substantial Completion forecast N for July, 2013 T February 9, 2011 The Massachusetts School Building Authority 20 www.massschoolbuildings.org
  • 21. D Essex No. Shore Agricultural & Tech. HS District E Essex No. Shore Agricultural & Tech. HS S I 337,000 sf of new construction of four academies to serve projected enrollment of 1,440 students in grades 9-12. Existing G HS built in 1913. N • OPM: PMA Consultants • Designer: Design Partnership of D Cambridge E • CM-R: TBD • Project Scope & Budget V approved June, 2009 E • District Total Project Budget: L $125,000,000 • Basis of Total Facilities Grant: O $125,000,000 P • Reimbursement Rate: 62% M • Maximum Total Grant Amount: $77,500,000 E • Construction scheduled to N commence October 20, 2011 T • Substantial Completion: TBD February 9, 2011 The Massachusetts School Building Authority 21 www.massschoolbuildings.org
  • 22. D Leominster E High School S I 13,475 sf addition to and renovation of an existing 282,375 sf facility G built in 1963. Projected enrollment of 1,805 students in grades 9-12. N • OPM: Daedalus • Designer: Lamoureux, Pagano D & Assoc. • Project Scope & Budget E approved May, 2010 V • District Total Project Budget: E $45,955,775 • Basis of Total Facilities Grant: L $43,103,450 O • Reimbursement Rate: 72.01% P • MSBA Maximum Grant Amount: $31,038,794 M • Construction scheduled to E commence July 1, 2011 N • Substantial Completion forecast for December, 2013 T February 9, 2011 The Massachusetts School Building Authority 22 www.massschoolbuildings.org
  • 23. D Maynard E High School S I 93,000 sf of new construction to serve projected enrollment of 410 G students in grades 8-12. Existing HS built in 1962. N • OPM: Municipal Building Consultants • Designer: Tappe Associates, Inc. D • Project Scope & Budget approved September, 2010 E • District Total Project Budget: $45,769,442 V • Basis of Total Facilities Grant: E $42,280,580 • Reimbursement Rate: 56.42% L • MSBA Maximum Grant Amount: O $23,854,703 P • Construction scheduled to commence August, 2011 M • Substantial Completion forecast for E August 9, 2013 N T February 9, 2011 The Massachusetts School Building Authority 23 www.massschoolbuildings.org
  • 24. D Methuen E High School S I 368,864 sf addition/renovation of an existing facility built in 1975. G Projected enrollment of 2,075 students in grades 9-12. N • OPM: KBA/Trident • Designer: Finegold, Alexander & Assoc. D • CM-R: TBD E • Project Scope & Budget approved May, 2010 V • District Total Project Budget: $99,063,617 E • Basis of Total Facilities Grant: $94,036,463 L • Reimbursement Rate: 68.84% O • MSBA Maximum Grant Amount: P $64,734,701 M • Construction scheduled to commence August 1, 2011 E • Substantial Completion forecast for N January 1, 2014 T February 9, 2011 The Massachusetts School Building Authority 24 www.massschoolbuildings.org
  • 25. Shawsheen Valley D E Vocational Technical High School S 2,450 sf addition to HS. 12,050 sf renovation of the existing I 250,300 sf high school built in 1972. Projected enrollment of G 1,300 students in grades 9-12. N • OPM: Construction Monitoring Services • Designer: Knight, Bagge & D Anderson E • Project Scope & Budget approved May, 2010 V • District Total Project Budget: E $4,687,847 L • Basis of Total Facilities Grant: $4,687,847 O • Reimbursement Rate: 55.73% P • MSBA Maximum Grant Amount: M $2,612,537 • Construction commenced E December 13, 2010 N • Substantial Completion forecast for T July 30, 2011 February 9, 2011 The Massachusetts School Building Authority 25 www.massschoolbuildings.org
  • 26. Uxbridge D E High School S 123,000 sf of new construction to serve projected enrollment of I 600 students in grades 9-12. Existing HS built in 1937. G • OPM: Joslin, Lesser & Associates N • Designer: Raymond Design Associates • CM-R: Shawmut Design & Construction D • Project Scope & Budget approved July, 2010 E • District Total Project Budget: V $43,000,000 E • Basis of Total Facilities Grant: L $38,870,723 O • Reimbursement Rate: 57.53% P • MSBA Maximum Grant Amount: $22,362,327 M • Construction commenced February 4, E 2011 N • Substantial Completion forecast for T June 20, 2012 February 9, 2011 The Massachusetts School Building Authority 26 www.massschoolbuildings.org
  • 27. Construction Phase MSBA Staff Monitor Scope, Budget & Schedule Construction Phase Review OPM Monthly Reports Bi-Monthly Site Visits & Project Status Meetings Assess Eligibility of CO’s Including Owner Directives Review Reimbursement Requests February 9, 2011 The Massachusetts School Building Authority 27 www.massschoolbuildings.org
  • 28. Construction Projects • 37 Projects in Construction • 1 Green Repair Program Project • 11 Elementary Schools • Belmont, Billerica, Brookline, Burlington (Memorial), Dedham, Middleton, Nashoba, Norfolk, Rochester, Sturbridge & Woburn • 4 Middle & Middle/High Schools • Rockland, Sharon, Southbridge & Taunton • 21 High Schools Repair Add/Reno New Models Foxborough Beverly Grafton Hampden-Wilbraham Haverhill Danvers Hanover Natick Holyoke Falmouth Longmeadow Norwood Mt. Greylock Reg. Malden Springfield Voc Tech Plymouth North Wakefield Wayland Tewksbury Wellesley Worcester North February 9, 2011 The Massachusetts School Building Authority 28 www.massschoolbuildings.org
  • 29. Project Estimate vs. 2010 Bid Amount Total $928,306,757 $785,464,493 $138,442,264 - $78.3M Construction Reimbursement Potential Grant District School Scope Bid Date Bid Amount Bid Savings Estimate Rate Savings * Burlington Memorial ES New Elem School Jan-10 $21,700,000 $16,389,000 $5,311,000 52.11% $2.7M Wellesley Senior HS New High School Feb-10 $98,500,000 $83,300,000 $15,200,000 40.00% $6.0M Dartmouth James Quinn ES Repair Feb-10 $1,100,000 $1,212,617 -$112,617 47.69% $0 Rockport Rockport HS Repair Feb-10 $1,000,000 $845,000 $155,000 41.10% $63K Springfield Putnam Vo-tech New High School Mar-10 $101,100,000 $86,000,000 $10,700,000 90.00% $9.6M Middleton Howe-Manning ES New Elem School Mar-10 $24,300,000 $17,900,000 $6,400,000 48.47% $3.1M Plymouth North HS Model School Mar-10 $72,000,000 $61,600,000 $10,400,000 58.24% $6.0M Woburn Goodyear ES New Elem School Mar-10 $19,900,000 $17,900,000 $2,000,000 54.21% $1.0M Hamilton- Wenham Cutler ES Repair Apr-10 $1,200,000 $1,126,000 $74,000 42.58% $31K N.Attleboro Joseph Martin ES Repair Apr-10 $700,000 $535,000 $165,000 52.06% $85K Whittier Regional Regional VTHS Repair Apr-10 $2,600,000 $1,649,600 $950,400 66.18% $600K Ashland David Mindess ES Repair May-10 $2,647,850 $1,719,000 $928,850 48.68% $450K Belmont Wellington ES New Elem School May-10 $28,811,803 $28,037,002 $774,801 40.00% $310K Nashoba Pomp/Center Add/Reno May-10 $28,841,865 $23,640,900 $5,200,965 50.85% $2.6M Mt.Greylock Regional HS Repair May-10 $1,176,074 $799,899 $376,175 54.16% $204K Note: These numbers are based on preliminary information received from the District and are subject to further review and calculation. February 9, 2011 The Massachusetts School Building Authority 29 www.massschoolbuildings.org
  • 30. Project Estimate vs. 2010 Bid Amount Construction Reimbursement Potential Grant District School Scope Bid Date Bid Amount Bid Savings Estimate Rate Savings * Sharon Sharon MS Add/Reno May-10 $38,663,417 $38,582,781 $80,636 52.68% $42K Florida Abbott Memorial ES Repair Jun-10 $489,393 $356,683 $132,710 60.76% $81K Rochester Memorial ES Add/Reno Jul-10 $20,542,448 $20,428,074 $114,374 57.94% $66K Hampden-Wilbraham Minnechaug Reg. HS Model School Jul-10 $66,493,091 $53,618,500 $12,874,591 61.73% $7.9M Sturbridge Burgess ES Add/Reno Jul-10 $36,492,933 $22,931,000 $13,561,933 57.92% $7.8M Natick Natick HS Model School Sep-10 $70,825,000 $60,270,000 $10,555,000 52.63% $5.6M Billerica Parker ES New Elem School Sep-10 $27,056,467 $22,486,000 $4,570,467 55.69% $2.5M Tewksbury Memorial HS Model School Oct-10 $65,946,517 $50,800,000 $15,146,517 60.06% $9.1M Danvers Danvers HS Add/Reno Oct-10 $62,775,490 $51,098,700 $11,676,790 56.11% $6.6M Brookline Runkle ES Add/Reno Oct-10 $22,525,241 $20,584,000 $1,941,241 41.58% $807K Wayland Wayland HS New High School Oct-10 $56,235,511 $56,229,482 $6,029 40.00% $2.4K Norfolk Freeman Centennial ES New Elem School Nov-10 $28,940,726 $22,881,000 $6,059,726 53.16% $3.2M Shawsheen Shawsheen Voc Tech Repair Nov-10 $3,822,147 $3,329,510 $492,637 55.73% $274K Needham Newman ES Repair Dec-10 $21,920,784 $19,214,745 $2,706,039 40.00% $1M Rockland filed-sub bids have been received. GMP pending. Grafton filed-sub bids have been received. GMP pending. Note: These numbers are based on preliminary information received from the District and are subject to further review and calculation. February 9, 2011 The Massachusetts School Building Authority 30 www.massschoolbuildings.org
  • 31. Belmont Wellington ES C 93,000 sf of new construction to serve projected enrollment of O 575 students in grades K-5. Existing ES built in 1917. N • OPM: PMA Consultants S • Designer: Jonathan Levi Architects • CM-R: Skanska T • Project Scope & Budget approved R March, 2009 U • District Total Project Budget: $40,664,431 C • Basis of Total Facilities Grant: T $31,000,050 I • Reimbursement Rate: 40.00% • MSBA Maximum Grant Amount: O $12,400,000 N • Bid Savings: $774,801 • Construction commenced April 7, 2010 • Substantial Completion forecast for July 1, 2011 February 9, 2011 The Massachusetts School Building Authority 31 www.massschoolbuildings.org
  • 32. Billerica Parker Elementary School of 90,600 sf of new construction to serve projected enrollment C 500 students in grades K-5. Existing ES built in 1953. O • OPM: Joslin, Lesser & Associates N • Designer: Symmes, Maini & McKee S • GC: CTA Construction T • Project Scope & Budget approved September, 2009 R • District Total Project Budget: U $34,007,436 C • Basis of Total Facilities Grant: $31,565,064 T • Reimbursement Rate: 55.69% I • MSBA Maximum Grant Amount: O $17,578,584 • Bid Savings: $4,570,467 N • Construction commenced September 15, 2010 • Substantial Completion forecast for May 24, 2012 February 9, 2011 The Massachusetts School Building Authority 32 www.massschoolbuildings.org
  • 33. Brookline John D. Runkle Elementary School C 104,800 sf of addition/renovation of an existing facility built in O 1962. Projected enrollment of 560 students in grades K-8. N • OPM: Town Employee S • Designer: Design Partnership of Cambridge • GC: G&R Construction, Inc. T • Project Scope & Budget approved R September, 2009 U • District Total Project Budget: $29,840,131 • Basis of Total Facilities Grant: $28,515,877 C • Reimbursement Rate: 41.58% T • MSBA Maximum Grant Amount: I $11,856,902 O • Bid Savings: $1,941,241 • Construction commenced November 9, N 2010 • Substantial Completion forecast for July 10, 2012 February 9, 2011 The Massachusetts School Building Authority 33 www.massschoolbuildings.org
  • 34. Burlington Memorial Elementary School 78,500 sf of new construction to serve projected enrollment of C 500 students in grades K-5. Existing ES built in 1954. O • OPM: Construction Monitoring Services N • Designer: Knight, Bagge & Anderson S • GC: CTA Construction Co. T • Project Scope & Budget approved March, 2009 R • District total project budget: U $27,923,244 C • Basis of Total Facilities Grant: $26,963,244 T • Reimbursement Rate: 52.11% I • MSBA Maximum Grant Amount: O $14,050,000 • Bid Savings: $5,311,000 N • Construction commenced March 4, 2010 • Substantial Completion forecast for November 11, 2011 February 9, 2011 The Massachusetts School Building Authority 34 www.massschoolbuildings.org
  • 35. Dedham Avery Elementary School C 61,000 sf of new construction to serve projected enrollment of O 310 students in grades 1-5. Existing ES built in 1921. N • OPM: Construction Monitoring Services S • Designer: Dore & Whittier Architects T • CM-R: Consigli Construction • Project Scope & Budget approved R September, 2009 U • District Total Project Budget: C $23,366,740 • Basis of Total Facilities Grant: T $21,806,569 I • Reimbursement Rate: 50.84% O • MSBA Maximum Grant Amount: $11,086,460 N • Construction commenced October 15, 2010 • Substantial Completion forecast for January 1, 2012 February 9, 2011 The Massachusetts School Building Authority 35 www.massschoolbuildings.org
  • 36. Middleton Howe-Manning Elementary School C 40,400 sf of new construction to serve projected enrollment of O 553 students in grades 4-6. Existing ES built in 1937. N • OPM: RF Walsh Collaborative Partners S • Designer: DiNisco Design Partnership T • GC: CTA Construction Co. R • Project Scope & Budget approved March, 2009 U • District Total Project Budget: C $31,392,734 T • Basis of Total Facilities Grant: $30,114,849 I • Reimbursement Rate: 51.47% O • MSBA Maximum Grant Amount: $15,500,000 N • Bid Savings: $6,400,000 • Construction commenced April 8, 2010 • Substantial Completion forecast for December 2, 2011 February 9, 2011 The Massachusetts School Building Authority 36 www.massschoolbuildings.org
  • 37. Nashoba Pompositticut Elementary School C 98,030 sf addition/renovation of an existing facility built in 1954. O Projected enrollment of 600 students in grades K-5. N • OPM: Construction Monitoring Services S • Designer: Symmes, Maini & McKee T • GC: P.J. Stella Construction Corp. R • Project Scope & Budget approved September, 2009 U • District Total Project Budget: C $38,420,499 T • Basis of Total Facilities Grant: $35,658,326 I • Reimbursement Rate: 50.85% O • MSBA Maximum Grant Amount: $18,132,259 N • Bid Savings: $5,200,965 • Construction commenced June 15, 2010 • Substantial Completion forecast for April 17, 2012 February 9, 2011 The Massachusetts School Building Authority 37 www.massschoolbuildings.org
  • 38. Norfolk Freeman-Centennial ES C 96,410 sf of new construction to serve projected enrollment of O 585 students in grades 1-6. Existing ES built in 1950. N • OPM: Joslin Lesser S • Designer: Flansburgh Associates • GC: Fontaine Bros., Inc. T • Project Scope & Budget approved R September, 2009 U • District Total Project Budget: $37,543,029 C • Basis of Total Facilities Grant: T $32,500,093 I • Reimbursement Rate: 53.16% • MSBA Maximum Grant Amount: O $17,277,050 N • Bid Savings: $6,059,726 • Construction commenced November 17, 2010 • Substantial Completion forecast for July 4, 2012 February 9, 2011 The Massachusetts School Building Authority 38 www.massschoolbuildings.org
  • 39. Rochester Memorial Elementary School C 105,023 sf addition/renovation of an existing facility built in 1953. O Projected enrollment of 635 students in grades K-6. N S • OPM: PMA Consultants • Designer: Flansburgh Associates T • CM-R: Gilbane Building Company R • Project Scope & Budget approved U September, 2009 C • District Total Project Budget: $26,500,000 • Basis of Total Facilities Grant: $25,268,708 T • Reimbursement Rate: 57.94% I • MSBA Maximum Grant Amount: O $14,640,689 • Bid Savings: $114,374 N • Construction commenced April 19, 2010 • Substantial Completion forecast for September 1, 2011 February 9, 2011 The Massachusetts School Building Authority 39 www.massschoolbuildings.org
  • 40. Sturbridge Burgess Elementary School C 129,300 sf addition/renovation of an existing facility built in 1949. O Projected enrollment of 860 students in grades K-6. N • OPM: Lamoureux, Pagano & Assoc. S • Designer: Drummey, Rosane, Anderson T • GC: Fontaine Bros., Inc. R • Project Scope & Budget approved September, 2009 U • District Total Project Budget: $46,926,630 C • Basis of Total Facilities Grant: $41,844,754 T • Reimbursement Rate: 57.92% I • MSBA Maximum Grant Amount: $24,236,481 O • Bid Savings: $13,561,933 N • Construction commenced August 10, 2010 • Substantial Completion forecast for October 1, 2012 February 9, 2011 The Massachusetts School Building Authority 40 www.massschoolbuildings.org
  • 41. Woburn Goodyear Elementary School C 67,277 sf of new construction to serve projected enrollment of O 320 students in grades K-5. Existing ES built in 1927. N S • OPM: Municipal Building Consultants • Designer: Tappe Associates T • CM-R: Gilbane Building Company R • Project Scope & Budget approved July, U 2009 C • Basis of Total Facilities Grant: $24,375,769 T • Reimbursement Rate: 54.21% I • MSBA Maximum Grant Amount: $13,214,104 O • Bid Savings: $2,000,000 N • Construction commenced March 9, 2010 • Substantial Completion forecast for July 29, 2011 February 9, 2011 The Massachusetts School Building Authority 41 www.massschoolbuildings.org
  • 42. Rockland John W. Rogers MS/Rockland HS C 109,500 sf of new construction of MS. Existing MS built in 1928. O 158,606 sf renovation of the existing high school built in 1909. N Projected enrollment of 1,525 students in grades 6-12. S • OPM: Daedalus • Designer: Dore & Whittier Architects T • CM-R: Agostini Construction R • Project Scope & Budget approved U September, 2009 C • District Total Project Budget: $86,201,449 T • Basis of Total Facilities Grant: I $83,032,496 • Reimbursement Rate: 64.26% O • MSBA Maximum Grant Amount: N $53,356,682 • Construction commenced November 15, 2010 • Substantial Completion forecast for August 3, 2012 February 9, 2011 The Massachusetts School Building Authority 42 www.massschoolbuildings.org
  • 43. Sharon Middle School C 170,750 sf addition/renovation of an existing facility built in 1963. O Projected enrollment of 845 students in grades 6-8. N • OPM: Daedalus S • Designer: Kaestle Boos Associates T • CM-R: Consigli Construction R • Project Scope & Budget approved September, 2009 U • District Total Project Budget: C $49,540,287 T • Basis of Total Facilities Grant: $43,950,340 I • Reimbursement Rate: 52.68% O • MSBA Maximum Grant Amount: N $23,153,039 • Construction commenced April 1, 2010 • Substantial Completion forecast for January 23, 2012 February 9, 2011 The Massachusetts School Building Authority 43 www.massschoolbuildings.org
  • 44. Southbridge Middle/High School C 199,784 sf of new construction to serve projected enrollment of 550 students in grades 6-8 and 500 students in grades 9-12. O Existing facility built in 1927. N S • OPM: Joslin, Lesser & Associates T • Designer: Tappe Associates R • CM-R: Consigli Construction U • Project Scope & Budget approved January, 2010 C • District Total Project Budget: $76,517,078 T • Basis of Total Facilities Grant: $67,196,298 I • Reimbursement Rate: 80.00% O • MSBA Maximum Grant Amount: N $53,757,038 • Construction commenced November 13, 2010 • Substantial Completion forecast for October 5, 2012 February 9, 2011 The Massachusetts School Building Authority 44 www.massschoolbuildings.org
  • 45. Taunton Parker Middle/High School C 70,000 sf addition/renovation of MS and 450,000 sf O addition/renovation of HS. Existing facility built in 1975. N Projected enrollment of 593 students in grades 5-7 and 1,947 S students in grades 8-12. T • OPM: Gilbane R • Designer: Design Partnership of Cambridge • GC: Bacon-Agostini U • Project Funding Agreement executed March C 18, 2008 T • District Total Project Budget: $112,759,827 • Basis of Total Facilities Grant: $112,759,827 I • Reimbursement Rate: 83.0% O • MSBA Maximum Grant Amount: N $93,590,065 • Construction commenced July 1, 2008 • Substantial Completion forecast for August 29, 2011 February 9, 2011 The Massachusetts School Building Authority 45 www.massschoolbuildings.org
  • 46. Beverly High School C 368,300 sf of new construction to serve projected enrollment of O 1,200 students in grades 9-12. Existing HS built in 1965. N S • OPM: Heery International • Designer: Mount Vernon Group Architects T • GC: CTA Construction Co. R • Project Scope & Budget approved U November, 2008 C • District Total Project Budget: $81,500,000 • Basis of Total Facilities Grant: T $80,155,000 I • Reimbursement Rate: 58.42% O • MSBA Maximum Grant Amount: $46,826,551 N • Construction commenced January 6, 2009 • Substantial Completion forecast for November 18, 2011 February 9, 2011 The Massachusetts School Building Authority 46 www.massschoolbuildings.org
  • 47. Danvers High School C 249,792 sf addition/renovation of an existing facility built in 1960. O Projected enrollment of 1,000 students in grades 9-12. N • OPM: Construction Monitoring Services S • Designer: DiNisco Design Partnership T • GC: Bacon Construction Co. R • Project Scope & Budget approved September, 2009 U • District Total Project Budget: $83,063,992 C • Basis of Total Facilities Grant: T $74,983,855 • Reimbursement Rate: 56.11% I • MSBA Maximum Grant Amount: O $42,022,942 N • Bid Savings: $11,676,790 • Construction commenced October 22, 2010 • Substantial Completion forecast for July 2, 2013 February 9, 2011 The Massachusetts School Building Authority 47 www.massschoolbuildings.org
  • 48. Falmouth High School C 266,654 sf addition/renovation of an existing facility. Projected O enrollment of 1,366 students in grades 9-12. N • OPM: Gilbane S • Designer: DiNisco Design Partnership T • GC: TLT Construction R • Project Funding Agreement executed May 17, 2006 U • District Total Project Budget: C $86,325,000 T • Basis of Total Facilities Grant: $58,906,136 I • Reimbursement Rate: 59.70% O • MSBA Maximum Grant Amount: $35,166,963 N • Construction commenced May, 2005 • Substantial Completion: October 29, 2010 February 9, 2011 The Massachusetts School Building Authority 48 www.massschoolbuildings.org
  • 49. Foxborough High School C 218,500 sf repair of an existing facility built in 1972 to serve students in grades 9-12. O • Repair: Fire alarms, HVAC, toilet rooms, N roof replacement, boilers, asbestos S abatement & science wing renovations T • OPM: Construction Monitoring Services • Designer: Kaestle Boos Associates R • GC: CTA Construction Co. U • Project Scope & Budget approved March, C 2009 T • District Total Project Budget: $19,993,000 • Basis of Total Facilities Grant: $19,037,185 I • Reimbursement Rate: 49.31% O • MSBA Maximum Grant Amount: N $9,387,000 • Bid Savings: $3,942,295 • Construction commenced January 25, 2010 • Substantial Completion forecast for August 17, 2011 February 9, 2011 The Massachusetts School Building Authority 49 www.massschoolbuildings.org
  • 50. Grafton Memorial Sr. High School C 186,019 sf of new construction to serve projected enrollment of O 900 students in grades 9-12. Existing HS built in 1962. N • OPM: Joslin, Lesser & Associates S • Designer: Symmes, Maini & McKee T • CM-R: Dimeo • Project Scope & Budget approved R January, 2010 U • District Total Project Budget: C $72,437,020 • Basis of Total Facilities Grant: T $64,305,275 I • Reimbursement Rate: 56.89% O • MSBA Maximum Grant Amount: $36,583,271 N • Construction commenced August 18, 2010 • Substantial Completion forecast for July 17, 2012 February 9, 2011 The Massachusetts School Building Authority 50 www.massschoolbuildings.org
  • 51. Hampden – Wilbraham Minnechaug Regional High School C 231,467 sf of new construction to serve projected enrollment of O 1,225 students in grades 9-12. Existing HS built in 1958. N • OPM: Arcadis S • Designer: Mount Vernon Group Architects T • GC: Fontaine Bros., Inc. R • Project Scope & Budget approved July, 2009 U • District Total Project Budget: $78,986,658 C • Basis of Total Facilities Grant: $76,796,379 T • Reimbursement Rate: 61.73% I • MSBA Maximum Grant Amount: $47,406,405 O • Bid Savings: $12,874,591 N • Construction commenced July 22, 2010 • Substantial Completion forecast for June 28, 2012 February 9, 2011 The Massachusetts School Building Authority 51 www.massschoolbuildings.org
  • 52. Hanover High School C 156,000 sf of new construction to serve projected enrollment of O 800 students in grades 9-12. Existing HS built in 1958. N • OPM: PMA Consultants S • Designer: HMFH Architects • GC: Callahan, Inc. T • Project Scope & Budget approved R November, 2008 U • District Total Project Budget: $59,953,688 C • Basis of Total Facilities Grant: T $59,484,384 I • Reimbursement Rate: 47.21% • MSBA Maximum Grant Amount: O $28,082,578 N • Bid Savings: $10,950,096 • Construction commenced September 28, 2009 • Substantial Completion forecast for June 1, 2011 February 9, 2011 The Massachusetts School Building Authority 52 www.massschoolbuildings.org
  • 53. Haverhill High School C ADA upgrades, fire protection, lockers and boiler repairs of an O existing facility built in 1962 to serve students in grades 9-12. N S • OPM: Jeff Dill • Designer: Knight, Bagge & Anderson T • GC: Various R • Project Funding Agreement executed U March 22, 2006 C • District Total Project Budget: $33,739,532 T • Basis of Total Facilities Grant: I $33,739,532 • Reimbursement Rate: 68.48% O • MSBA Maximum Grant Amount: N $23,104,832 • Construction commenced June, 2005 • Substantial Completion achieved November, 2007 February 9, 2011 The Massachusetts School Building Authority 53 www.massschoolbuildings.org
  • 54. Holyoke High School C HVAC upgrades to an existing 199,560 sf facility built in 1964. O Projected enrollment of 1,278 students in grades 9-12. N • OPM: Strategic Building Solutions S • Designer: Design Partnership of T Cambridge, Ins. R • GC: WJ Mountford • Project Funding Agreement executed U May 28, 2009 C • District Total Project Budget: T $22,738,000 • Basis of Total Facilities Grant: I $15,964,800 O • Reimbursement Rate: 90.0% N • MSBA Maximum Grant Amount: $14,368,320 • Construction commenced June 30, 2009 • Substantial Completion achieved September 1, 2010 February 9, 2011 The Massachusetts School Building Authority 54 www.massschoolbuildings.org
  • 55. Longmeadow High School C 184,365 sf of new construction to serve students in grades 9-12. O Existing HS built in 1954. N • OPM: Joslin, Lesser & Associates S • Designer: The Office of Michael Rosenfeld T • CM-R: Gilbane Building Company R • Project Scope & Budget approved March, 2010 U • District Total Project Budget: $78,452,888 C • Basis of Total Facilities Grant: $65,595,405 T – (Excludes renovation costs of 1971 building) I • Reimbursement Rate: 51.84% O • MSBA Maximum Grant Amount: $34,004,658 N • Construction commenced November 1, 2010 • Substantial Completion forecast for December 26, 2012 February 9, 2011 The Massachusetts School Building Authority 55 www.massschoolbuildings.org
  • 56. Malden High School C 448,000 sf renovation of an existing facility built in 1939 to serve O students in grades 9-12. N • OPM: URS S • Designer: Flansburgh Associates T • CM-R: Gilbane Building Company R • Project Funding Agreement executed November 23, 2009 U • District Total Project Budget: C $81,000,000 T • Basis of Total Facilities Grant: $77,072,181 I • Reimbursement Rate: 90.0% O • MSBA Maximum Grant Amount: $69,364,963 N • Construction commenced April 20, 2009 • Substantial Completion forecast for January 6, 2012 February 9, 2011 The Massachusetts School Building Authority 56 www.massschoolbuildings.org
  • 57. Mount Greylock Regional High School C Boiler installation, locker rooms and ceiling repairs of an O existing facility built in 1957 to serve students in grades 9-12. N • OPM: N/A S • Designer: Hesnor Engineering & Barry Architects T • GC: Adams Plumbing & Heating R • Project Scope & Budget approved November, U 2009 for boilers & March, 2010 for Locker Rooms & Ceiling Repairs C • District Total Project Budget: $2,419,893 T • Basis of Total Facilities Grant: $2,400,833 I • Reimbursement Rate: 54.16% • MSBA Maximum Grant Amount for the Total O Project (boilers, locker rooms & ceiling repairs): N $1,300,291 • Bid Savings: $376,175 • Construction commenced May 6, 2010 • Substantial Completion achieved December 1, 2010 February 9, 2011 The Massachusetts School Building Authority 57 www.massschoolbuildings.org
  • 58. Natick High School C 254,095 sf of new construction to serve projected enrollment of O 1,300 students in grades 9-12. Existing HS built in 1954. N • OPM: RF Walsh Collaborative Partners S • Designer: Ai3 Architects • GC: Brait Builders, Corp. T • Project Scope & Budget approved R January, 2010 U • District Total Project Budget: $88,987,414 C • Basis of Total Facilities Grant: T $82,016,562 I • Reimbursement Rate: 52.63% • MSBA Maximum Grant Amount: O $43,165,316 N • Bid Savings: $10,555,000 • Construction commenced September 13, 2010 • Substantial Completion forecast for June 15, 2013 February 9, 2011 The Massachusetts School Building Authority 58 www.massschoolbuildings.org
  • 59. Norwood High School C 227,374 sf of new construction to serve projected enrollment of O 1,100 students in grades 9-12. Existing HS built in 1925. N • OPM: Compass Project Management S • Designer: Ai3 Architects T • GC: Agostini Construction Company R • Project Scope & Budget approved January, 2009 U • District Total Project Budget: C $79,138,965 T • Basis of Total Facilities Grant: $73,940,000 I • Reimbursement Rate: 59.21% O • MSBA Maximum Grant Amount: N $43,779,874 • Bid Savings: $10,000,000 • Construction commenced May 19, 2009 • Substantial Completion forecast for June 1, 2011 February 9, 2011 The Massachusetts School Building Authority 59 www.massschoolbuildings.org
  • 60. Plymouth North High School C 267,357 sf of new construction to serve projected enrollment of O 1,350 students in grades 9-12. Existing school built in 1963. N • OPM: Ted Gentry Associates S • Designer: Ai3 Architects T • GC: J&J Contractors, Inc. • Project Scope & Budget approved R September, 2009 U • District Total Project Budget: $92,249,040 C • Basis of Total Facilities Grant: T $79,420,894 • Reimbursement Rate: 58.24% I • MSBA Maximum Grant Amount: O $46,254,729 • Bid Savings: $10,400,000 N • Construction commenced May 3, 2010 • Substantial Completion forecast for May 15, 2012 February 9, 2011 The Massachusetts School Building Authority 60 www.massschoolbuildings.org
  • 61. Springfield Putnam Vocational Technical High School C 315,000 sf of new construction to serve projected enrollment of O 1,400 students in grades 9-12. Existing HS built in 1938. N • OPM: Arcadis S • Designer: Drummey, Rosane, Anderson T • CM-R: Consigli Construction R • Project Funding Agreement executed November 23, 2009 U • District Total Project Budget: C $114,303,152 T • Basis of Total Facilities Grant: $114,303,152 I • Reimbursement Rate: 90.0% O • MSBA Maximum Grant Amount: $102,872,837 N • Bid Savings: $10,700,000 • Construction commenced May 18, 2010 • Substantial Completion forecast for July 20, 2012 February 9, 2011 The Massachusetts School Building Authority 61 www.massschoolbuildings.org
  • 62. Tewksbury Memorial High School C 218,781 sf of new construction to serve projected enrollment of O 1,100 students in grades 9-12. Existing HS built in 1959. N • OPM: Heery International S • Designer: Symmes, Maini & McKee T • GC: CTA/Methuen • Project Scope & Budget approved R January, 2010 U • District Total Project Budget: $83,173,174 C • Basis of Total Facilities Grant: $73,584,127 T • Reimbursement Rate: 60.06% I • MSBA Maximum Grant Amount: O $44,194,627 • Bid Savings: $15,146,517 N • Construction commenced October 15, 2010 • Substantial Completion forecast for August 3, 2012 February 9, 2011 The Massachusetts School Building Authority 62 www.massschoolbuildings.org
  • 63. Wayland High School C 171,000 sf of new construction to serve projected enrollment of 900 O students in grades 9-12. Existing facility built in 1959. N • OPM: KV Associates S • Designer: HMFH Architects T • CM-R: Shawmut Construction R • Project Scope & Budget approved September, 2009 U • District Total Project Budget: C $70,800,000 T • Basis of Total Facilities Grant: $62,500,000 I • Reimbursement Rate: 40.00% O • MSBA Maximum Grant Amount: $25,000,000 N • Construction commenced June 28, 2010 • Substantial Completion forecast for November 9, 2011 February 9, 2011 The Massachusetts School Building Authority 63 www.massschoolbuildings.org