Hydrogen
 Reliability
 Salt Cavern Case Study

 Oil Sands & Heavy
 Oil Technologies
 July 16, 2009




Praxair Canada Inc. – Calgary, Alberta, Canada   -1-
About Praxair
 Largest Industrial Gas Company in North and
  South America, one of the largest worldwide
      –    27,000 employees
      –    2008 sales: $10.8 Billion USD
      –    Global Fortune 300 company listed on NYSE (PX)
      –    Holds almost 3,000 patents
 Praxair's primary products are:
      – atmospheric gases (oxygen, nitrogen, argon and rare gases)
      – process & specialty gases (carbon dioxide, helium, hydrogen,
           semiconductor process gases, acetylene)




Praxair Canada Inc. – Calgary, Alberta, Canada   www.praxair.com
                                                     -2-
Presentation Overview

     Gulf Coast hydrogen infrastructure
            – 310 mile pipeline
     Praxair H2 storage cavern
            – Overview
            – Benefits
     Alberta Cavern Development
            –   Heartland hydrogen demand
            –   Cavern Potential
            –   Cavern supply model
            –   Integration to existing Praxair network


Praxair Canada Inc. – Calgary, Alberta, Canada   -3-
Gulf Coast Hydrogen Infrastructure




                                                                HYDROGEN SOURCES

                                                                CAVERN STORAGE




      Cavern and Pipeline system connected to 11 out of 14 refineries
      Cavern and Pipeline system connected to 11 out of 14 refineries
Praxair Canada Inc. – Calgary, Alberta, Canada   -4-
Praxair’s H2 Cavern Overview
                                                                                 Design Basis
                                                                  Storage Capacity         2.5 Billion CF
                                      H2 to Customers             Working Capacity         1.4 Billion CF
                                                                  Max Storage Pressure     2200 psig
       H2 from PX                        H2 from PX               Working Pressure         800 - 2200 psig
                                                                  Fill Rate                ~ 75 MMCFD
                                                                  Withdrawal Rate          pressure
                                                                                           dependent
  Cap Rock                                                        Commissioned             Q4 2007




                                                            Cavern Consists of:
                                                                 – Injection compressor with
                                                                   ancillary equipment
                                                                 – Hydrogen product dryer
                                                 H2
                             Salt                Storage
                                                                 – Associated metering and
                            Dome                                   control equipment


Praxair Canada Inc. – Calgary, Alberta, Canada             -5-
Cavern Commercialization Goals

      Safe injection / withdrawal of hydrogen
      “Real-time” operation
             – add value for supply-system optimization and peak demand
      Establish operational procedures
             – informed, timely decision making around sales, withdrawals and
               injections
      Key value creation streams:
             – Reliability sales (sales within firm volume)
             – Operational and sourcing optimization
             – Spot sales (sales outside of firm volume)


            Added flexibility for both Praxair and refiners!
Praxair Canada Inc. – Calgary, Alberta, Canada   -6-
Cavern Support Infrastructure




                     More than just a hole in the ground…
Praxair Canada Inc. – Calgary, Alberta, Canada   -7-
Cavern Benefits
 Instant Sales Capability
     – Planned customer turnaround
                                                                    Excess Supply – FILL Cavern
     – Unplanned customer outage




                                                           MMSCFD
     – 3rd party supply interruptions

 Superior System Reliability
     – Praxair facility turnaround
     – Praxair equipment outages                                     Peak Demand - WITHDRAW

     – Feedstock / Utility interruptions                                      Time

                                                        Operational Considerations
                                                         – Enable steady state operations
                                                         – Provide low demand “sink”
                                                         – Improved pipeline operability

Praxair Canada Inc. – Calgary, Alberta, Canada   -8-
Example: Customer Backup
 Daily Purchase
                                                                                         LPG                        Light Naphtha
 X mmscfd H2                                                        Fm FCC

 Cavern Supply
                                                     50 mmscfd H2             Alky
                  LPG                                                                  Alkylate

                                                 Naphtha E                     Gasoline blend
                                                       G
                                                  UTA
                                                 Reformer
                                                 O
                                                                       Kero
                                                                       HDS                            Kero/Jet

                    Crude Unit
                                                                              Diesel              Diesel
Crude                                                                         HDS
                                                                                         G.O.                     PP
                                                                                          HT

                                                                                                       FCC       Gasoline
                                                      Lubes
                                 Vacuum                unit
                                   unit

                                                          Coker
                                                           unit
                                                                                           Coke


    Cavern Supply Can Help Avoid Cutback of Profitable Units
    Cavern Supply Can Help Avoid Cutback of Profitable Units
Praxair Canada Inc. – Calgary, Alberta, Canada                -9-
Cavern Benefit Examples

 Praxair H2 Product Availability
      – 11 Praxair sources on the network
      – Backup supply mitigates risk of H2 production unit outage

 Hydrogen back up on instantaneous basis
      – Unexpected outages at customer sites
      – On purpose H2 production units / byproduct sources / third party

 Operational Flexibility
      – Startup / shutdown of world scale SMRs can be avoided
      – Coverage of SMR type demand for short 24 hour type periods without
        calling on an SMR for start up
             » Example: waiting for demand of large user to stabilize before cycling a
               world scale reformer for start up
      – Sink for excess H2
Praxair Canada Inc. – Calgary, Alberta, Canada   -10-
Praxair H2 System Availability
                     US Gulf Coast Pipeline (BAPOC) 2005-present

          100.00%
           99.00%
           98.00%
           97.00%
           96.00%
           95.00%
           94.00%
           93.00%
           92.00%
           91.00%
           90.00%
           89.00%
           88.00%
           87.00%                                                                                  Cavern                 Hurricanes
           86.00%                       Hurricane Rita                                          Commercialized          Ike and Gustav
           85.00%
                      5             5              6             6              7           7           8           8           9
                    00            00             00            00             00          00          00          00          00
                 /2            /2             /2            /2             /2          /2          /2          /2          /2
              1/1           7/1            1/1           7/1            1/1         7/1         1/1         7/1         1/1




      Cavern provides ability to ramp up production units
Praxair Canada Inc. – Calgary, Alberta, Canada                       -11-
What About Alberta?                                                                                                                        CP RAIL
                                                                                                                                                           NORTHERN
                                                                                                                                                            LIGHTS -
                                                                                                                                                             TOTAL

                                                                                                                       CP RAIL                                                CP RAIL

                                                                                                                                                         AGRIUM

                                                                                                                                                                                         CP



 Dynamic H2 Market
                                                                                                                                                                                        RAIL
                                                                                                 SUNCOR           FORT HILLS
                                                                                                                    (PETRO
                                                                                                                   CANADA)            NORTH WEST
                                                                                                                                      UPGRADING           IMPERIAL
                                                                                                                                                          PIPELINE
                                                                                                                                DEGUSSA                       STATOIL         TEXACO
                                                                                                                                                              HYDRO




     – Existing large demand
                                                                                                                                                                           KINDER
                                                                                                                                             ACCESS
                                                                                                                                             PIPELINE                      MORGAN

                                                                                                                                                                                     BA
                                                                                                                                                                        ENBRIDGE
                                                                                                                                                                                   ENERGY            CP
                                                                                                                             PROVIDENT
                                                                                                                                                                                                    RAIL


     – Need for reliable supply
                                                                                                                              ENERGY
                                                                                                                                                                                               SUNWEST
                                                                                                                                                       SHELL                                    ENERGY

                                                                                                                              CN                     SCOTFORD
                                                                                                                             RAIL

                                                                                                                                                                               ATCO       STATOIL


     – New upgrading / refining                                                                  STURGEON COUNTY                                                                          HYDRO
                                                                                                                                                         SUNCOR

                                                                                                                                                          GULF        TRANS
                                                                                                                                                          CHEM.


       projects proposed
                                                                                                                                                                     CANADA
                                                                                                                                                              CN

                                                                    Drawing not to scale                                             AUX
                                                                                                                                    SABLE
                                                                                                                                                 TOTAL
                                                                                                                                                             RAIL        STRATHCONA COUNTY

                                                                    – representation only
                                                                                                                                            GEMINI




 Existing Infrastructure
                                                                                                                    KEYERA




                                                                               FORT
                                                                                                                       DOW
                                                                                                                                                              EXISTING
                                                                           SASKATCHEWAN
                                                                                                      AGRIUM                                                 PRAXAIR H2
     – Salt Cavern storage of                                                                      SHERRITT
                                                                                                                                                              PIPELINE
       hydrocarbons                                                                                       21 KM

                                                                                         ALCAN
                                                     EDMONTON
     – Multiple Praxair facilities
                                                                                           PETRO
                                                                                                                             Praxair Infrastructure:
     – Praxair H2 Pipeline                                                GIBSON
                                                                          ENERGY
                                                                                   KINDER
                                                                                          CANADA


                                                                                                                                       ASU Complex
                                                                                  MORGAN
                                                                            PEMBINA
                                                         IMPERIAL
                                                            OIL
                                                                           PIPELINES      ENBRIDGE
                                                                                          PIPELINES
                                                                                                                                       CO2 / Dry Ice Facility
                                                                                                                                       PDI Cylinder Depot
        Similar to US Gulf Coast                                                                                                       Hydrogen Pipeline
                                                           PDI
 Praxair Canada Inc. – Calgary, Alberta, Canada   -12-
                                                                               ALBERTA
                                                                                ENVIRO                                                 Nitrogen Pipeline
                                                                                FUELS
H2 Demand – Industrial Heartland & Edmonton Area
  2




                                            H2 Demand Profile
          2,160
          2,025
          1,890
          1,755
          1,620            Proposed Projects
          1,485
 MMSCFD




          1,350          (new project demand)
          1,215
          1,080
            945
            810
            675
            540                                   Existing Hydrogen Demand
            405
            270
            135
            -
                  9   0   1   2   3   4   5   6   7   8   9   0
               200 201 201 201 201 201 201 201 201 201 201 202
                              Figures above based on existing demand and Project Applications

            Petrochemical volumes not included in above
Praxair Canada Inc. – Calgary, Alberta, Canada            -13-
Ideal Upgrader / Refinery Operation


 Flow
                                                                Unit #2       Hydrogen
                                                                              Production
                                                                Unit #1

                                                                Upgrader / Refinery
                                                                Production


                                                                Time

   By-product Hydrogen (non-SMR) is reliability-challenged and base
    assumption in creation of reliability model
   Reliability model developed to assess impact of different modes of
    operation on the facility when operating ‘non-ideally’

                                        Ideal but unrealistic
Praxair Canada Inc. – Calgary, Alberta, Canada      -14-
Reliability Model
          N+1 Gasifier Reliability         Incl. Switching Losses                          Input Data Only Into Cells Highlighted in Yellow!!
           74%       66%      55%    0%           Vol (MMscfd)             Working Cavern        Reliability 1         Reliability 2                  Reliability 3               Reliability 4
  Days Train 1 Train 2 Train 3 Train 4    Total      Sales       Storage         Vol                90.0%                 90.0%                            90.0%                     80.0%              Reliability
      1     60      60        0           120.0       116           4           323                    9                     8                                7                         8               Shutdowns/year
      2     60      60        0           120.0       116           4           327                  40.6                  45.6                             52.1                      45.6              Cycle length
      3     60      60        0           120.0       116           4           331                  36.0                  41.0                             46.0                      36.0              Days On-Line
      4     60      60        0           120.0       116           4           336                   4.0                   4.0                              6.0                       9.0              Days Off-line
      5     60      60        0           120.0       116           4           340                  360                   360                              364                        360
      6     60      60        0           120.0       116           4           344                Train 1               Train 2                           Train 3                   Train 4
      7     60      60        0           120.0       116           4           349                  90%                   90%                              90%                       80%               Reliability (%)
      8     60      60        0           120.0       116           4           353                    9                     8                                7                         8               Shutdowns per year
      9     60      60        0           120.0       116           4           357                    0                     0                                0                         0               Initial Delay (Days)
     10     60      60        0           120.0       116           4           362                   60                    60                               60                        60               Capacity (MMscfd)
     11     60      60        0           120.0       116           4           366
     12     60      60        0           120.0       116           4           370       Initial Cavern Volume (MMscf)                              No. of Trains        Longest Run length            Delay Gasifier 1 Start
     13     60      60        0           120.0       116           4           375                            318                                         3                       46.0                             No
     14     60      60        0           120.0       116           4           379                                                                                                                     Insert Yes or No to stagger start-up of Gasifier 1
     15     60      60        0           120.0       116           4           383       Avg Daily Sales
     16     60      60        0           120.0       116           4           388                 115.7          MMscfd                                                                                     Spare Operation
     17     60      60        0           120.0       116           4           392                                                                                                                                 Yes
                                                                                                                                                   Switch H2 Loss (% of    2nd Day Upgrader Impact (%   Insert Yes or No to allow
    18       60       60         0        120.0       116            4           396       Simulation Length                                         gasifier output)              of 1st day)          4th Train Standby Option
    19       60       60         0        120.0       116            4           401                2920                    Days                          50                            0
    20       60       60         0        120.0       116            4           405          2920 Maximum                                         (increments of 10)           (increments of 10)
    21       60       60         0        120.0       116            4           409       Cavern Max Vol                           666                                                                          1st Yr Availability
    22       60       60         0        120.0       116            4           413       Cavern Min Vol                           293                                                                            97.0%
    23       60       60         0        120.0       116            4           418       Working Vol                              373                                                                         2nd Yr Availability
    24       60       60         0        120.0       116            4           422       Cavern Size                              666                                                                            96.3%
    25       60       60         0        120.0       116            4           426       Max Cavern Inflow                         4           Cavern - 2.5 bscf size                                       8 Yr Availability Avg
    26       60       60         0        120.0       116            4           431       Max Cavern Outflow                      (116)                                                                           96.4%
    27       60       60         0        120.0       116            4           435
    28       60       60         0        120.0       116            4           439                                                             Multi-Train Gasifier Volumes
    29       60       60         0        120.0       116            4           444                     150.0
                                                                                            Vol MMSCFD




    30       60       60         0        120.0       116            4           448
                                                                                                         100.0
    31       60       60         0        120.0       116            4           452
    32       60       60         0        120.0       116            4           457                      50.0
    33       60       60         0        120.0       116            4           461
    34       60       60         0        120.0       116            4           465                       0.0
    35       60       60         0        120.0       116            4           470                             1   31      61     91     121       151        181       211       241        271      301         331      361
    36       60       60         0        120.0       116            4           474                                                                            Days
    37        0       60        60        90.0        116           -26          448
   1890      60        60        0        120.0       116            4           453
   1891      60        60        0        120.0       116            4           458
   1892       0        60       60        90.0        116           -26          432
   1893       0         0       60        30.0        116           -86          346
                                                                                                                                                     • •time-series probability model
                                                                                                                                                         time-series probability model
   2917       60        0       60        120.0       116            4           335
   2918       60        0       60        120.0       116            4           340
   2919
   2920
              60
               0
                        0
                       60
                                60
                                60
                                          120.0
                                           90.0
                                                      116
                                                      116
                                                                     4
                                                                    -26
                                                                                 344
                                                                                 318
                                                                                                                                                     • •scenario analysis
                                                                                                                                                         scenario analysis


Praxair Canada Inc. – Calgary, Alberta, Canada                                                                       -15-
Facility Lags Hydrogen




Praxair Canada Inc. – Calgary, Alberta, Canada   -16-
Hydrogen Backup
       Flow

                                       H2 from                  Unit #2        Hydrogen
                                       Network                                 Supply
                                                                Unit #1
                                                                Cavern / Pipeline Supply

                                         Production Levels
                                                                Upgrader / Refinery
                                            Maintained          Production
                                                                Time


         Cavern/pipeline backup adds flexibility, smoothes H2 supply
               – self supporting – store hydrogen during periods of max production
               – allows capture of hydrogen during periods of surplus
               – allows for import of 3rd party hydrogen (and sale of surplus H2)


         Cavern / pipeline integration maximizes reliability
Praxair Canada Inc. – Calgary, Alberta, Canada           -17-
Upgrading Impact – Gasifier Example

                                                  300.0                                         H2 Supply
    U p g r a d in g ( b b l/d a y ) Vol MMSCFD




                                                  200.0
                                                  100.0
                                                     0.0
                                                            1 31 61 91 121151181211241271301331361391421451481511541571601631661691721
                                                  100,000                                  Upgrader Throughput
                                                                                                       Days
                                                   80,000
                                                   60,000
                                                   40,000
                                                                 No Cavern Support
                                                   20,000
                                                                 Cavern Supported
                                                      -
                                                            0          100           200      300                   400   500   600   700
                                                                                                      Time (Days)
                                                                                                      Days


                                                       6% loss in capacity without cavern backup
                                                        6% loss in capacity without cavern backup
                                                     2% loss in capacity if self-supported via cavern
                                                      2% loss in capacity if self-supported via cavern
                                                  0% loss in capacity with 3rd party back-up plus cavern
                                                  0% loss in capacity with 3rd party back-up plus cavern
Praxair Canada Inc. – Calgary, Alberta, Canada                                                 -18-
Alberta Cavern Development

 Pre-feasibility completed
     – Desktop study
     – Preliminary location identified
     – Working with ATCO Energy Solutions
       on Cavern development
                                                        CAVERN
     – Non-invasive testing performed                    SITE


 Lead-time ~3 yrs for 1st cavern
     – Additional year for 2nd cavern

 Financial options
     – Tolling fee / Dedicated volume
     – Joint venture

            Complements Praxair’s
              existing network
Praxair Canada Inc. – Calgary, Alberta, Canada   -19-
Praxair - Oilsands Capabilities

   Mine // SAGD
   Mine SAGD                           Upgrading // Refining
                                       Upgrading Refining                         Reliability
                                                                                  Reliability

                                                  H2           Steam
                                                                            H2 Cavern
                                                                            H2 Cavern
                                                                       H2
                                    Gasifier
                                    Gasifier             SMR
                                                         SMR                H2 Pipeline
                                                                            H2 Pipeline

   Photo: http://news.bbc.co.uk   O2                                           Energy Studies
                                                                               Energy Studies
                                                 CO2
  Utility Nitrogen //
  Utility Nitrogen
                                           CO2
                                           CO2       CO2
                                                     CO2                       EOR //
        Oxygen
        Oxygen                    ASU
                                  ASU                                          EOR
                                          Capture Compression
                                          Capture Compression               Sequestration
                                                                            Sequestration
     Vessel &
      Vessel &
  Pipeline Purging
  Pipeline Purging

        Cylinders
        Cylinders

    ASU - Oxyfuel
    ASU - Oxyfuel                  Purging, Cylinders, N2, O2…
                                   Purging, Cylinders, N2, O2…


                        Upstream, downstream and in between…
Praxair Canada Inc. – Calgary,is your full service Industrial Gas Supplier!
               Praxair Alberta, Canada               -20-
Praxair Alberta Value Proposition

                                                         - Air Separation Unit
                                                         - Bulk Industrial Gases
                                                         - CO2 Capture and Compression
                                                         - Cylinders, Welding Supplies
                                      Jim McKay            & Related Equipment
      Oilsands Business Development                      - Energy Studies
                     Calgary, Alberta                    - High Performance Coatings
                                                         - Hydrogen Supply
                         (O) 403-385-2348                - Leak Detection
                                                         - Oxyfuel Burners
                         (C) 403-462-5768                - Sulphur Recovery Unit Oxygen
                                                         - Vessel and Pipeline Purging Services
                jim_s_mckay@praxair.com




Praxair Canada Inc. – Calgary, Alberta, Canada    -21-

Contenu connexe

Tendances

Panel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRI
Panel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRIPanel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRI
Panel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRIGlobal CCS Institute
 
Hot producer gas cleaning system
Hot producer gas cleaning systemHot producer gas cleaning system
Hot producer gas cleaning systemNainesh Patel
 
The role of Direct Air Capture and Carbon Dioxide Removal in well below 2C sc...
The role of Direct Air Capture and Carbon Dioxide Removal in well below 2C sc...The role of Direct Air Capture and Carbon Dioxide Removal in well below 2C sc...
The role of Direct Air Capture and Carbon Dioxide Removal in well below 2C sc...IEA-ETSAP
 
Solution manual chemical reaction engineering, 3rd edition Octave levenspiel
Solution manual chemical reaction engineering, 3rd edition Octave levenspielSolution manual chemical reaction engineering, 3rd edition Octave levenspiel
Solution manual chemical reaction engineering, 3rd edition Octave levenspielAna Lu Hernandez Chavarria
 
Environmental-pollution-control-by-CS RAO
Environmental-pollution-control-by-CS RAOEnvironmental-pollution-control-by-CS RAO
Environmental-pollution-control-by-CS RAOSatGur Masters Academy
 
Gasifier presentation - Prof. K.R.Shrestha
Gasifier presentation - Prof. K.R.ShresthaGasifier presentation - Prof. K.R.Shrestha
Gasifier presentation - Prof. K.R.ShresthaDr.Krishna Shrestha
 
CO2 to fuels and chemicals course material final version
CO2 to fuels and chemicals course material final versionCO2 to fuels and chemicals course material final version
CO2 to fuels and chemicals course material final versionHariprasad Narayanan
 
Mass Transfer Principles for Vapor-Liquid Unit Operations (2 of 3)
Mass Transfer Principles for Vapor-Liquid Unit Operations (2 of 3)Mass Transfer Principles for Vapor-Liquid Unit Operations (2 of 3)
Mass Transfer Principles for Vapor-Liquid Unit Operations (2 of 3)Chemical Engineering Guy
 
Carbon-di-oxide into fuel
Carbon-di-oxide into fuelCarbon-di-oxide into fuel
Carbon-di-oxide into fuelNithyamadhavan
 
CO2 effective utilization
CO2 effective utilizationCO2 effective utilization
CO2 effective utilizationbharathbalji
 
Hydrogen Plant Flowsheet - Effects of Low Steam Ratio
Hydrogen Plant Flowsheet - Effects of Low Steam RatioHydrogen Plant Flowsheet - Effects of Low Steam Ratio
Hydrogen Plant Flowsheet - Effects of Low Steam RatioGerard B. Hawkins
 

Tendances (20)

Panel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRI
Panel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRIPanel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRI
Panel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRI
 
CO2 to Chemicals : An Overview
CO2 to Chemicals : An Overview CO2 to Chemicals : An Overview
CO2 to Chemicals : An Overview
 
Hot producer gas cleaning system
Hot producer gas cleaning systemHot producer gas cleaning system
Hot producer gas cleaning system
 
Status and Results from the Norcem CO2 Capture Project, Liv Bjerge (Norcem) U...
Status and Results from the Norcem CO2 Capture Project, Liv Bjerge (Norcem) U...Status and Results from the Norcem CO2 Capture Project, Liv Bjerge (Norcem) U...
Status and Results from the Norcem CO2 Capture Project, Liv Bjerge (Norcem) U...
 
The role of Direct Air Capture and Carbon Dioxide Removal in well below 2C sc...
The role of Direct Air Capture and Carbon Dioxide Removal in well below 2C sc...The role of Direct Air Capture and Carbon Dioxide Removal in well below 2C sc...
The role of Direct Air Capture and Carbon Dioxide Removal in well below 2C sc...
 
LNG
LNGLNG
LNG
 
Solution manual chemical reaction engineering, 3rd edition Octave levenspiel
Solution manual chemical reaction engineering, 3rd edition Octave levenspielSolution manual chemical reaction engineering, 3rd edition Octave levenspiel
Solution manual chemical reaction engineering, 3rd edition Octave levenspiel
 
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
 
Carbon Dioxide Capture Technology
Carbon Dioxide Capture TechnologyCarbon Dioxide Capture Technology
Carbon Dioxide Capture Technology
 
carbon capture and sequestration
carbon capture and sequestrationcarbon capture and sequestration
carbon capture and sequestration
 
Bio cng
Bio cngBio cng
Bio cng
 
Environmental-pollution-control-by-CS RAO
Environmental-pollution-control-by-CS RAOEnvironmental-pollution-control-by-CS RAO
Environmental-pollution-control-by-CS RAO
 
Gasifier presentation - Prof. K.R.Shrestha
Gasifier presentation - Prof. K.R.ShresthaGasifier presentation - Prof. K.R.Shrestha
Gasifier presentation - Prof. K.R.Shrestha
 
CO2 to fuels and chemicals course material final version
CO2 to fuels and chemicals course material final versionCO2 to fuels and chemicals course material final version
CO2 to fuels and chemicals course material final version
 
CNG & LPG
 CNG & LPG CNG & LPG
CNG & LPG
 
Mass Transfer Principles for Vapor-Liquid Unit Operations (2 of 3)
Mass Transfer Principles for Vapor-Liquid Unit Operations (2 of 3)Mass Transfer Principles for Vapor-Liquid Unit Operations (2 of 3)
Mass Transfer Principles for Vapor-Liquid Unit Operations (2 of 3)
 
Carbon-di-oxide into fuel
Carbon-di-oxide into fuelCarbon-di-oxide into fuel
Carbon-di-oxide into fuel
 
CO2 effective utilization
CO2 effective utilizationCO2 effective utilization
CO2 effective utilization
 
Basic CCUS.pptx
Basic CCUS.pptxBasic CCUS.pptx
Basic CCUS.pptx
 
Hydrogen Plant Flowsheet - Effects of Low Steam Ratio
Hydrogen Plant Flowsheet - Effects of Low Steam RatioHydrogen Plant Flowsheet - Effects of Low Steam Ratio
Hydrogen Plant Flowsheet - Effects of Low Steam Ratio
 

En vedette

air products & chemicals 3 December 2007 Citigroup Non ChemConf
air products & chemicals 3 December 2007 Citigroup Non ChemConfair products & chemicals 3 December 2007 Citigroup Non ChemConf
air products & chemicals 3 December 2007 Citigroup Non ChemConffinance26
 
Pro mailege booster
Pro mailege boosterPro mailege booster
Pro mailege boosterYateen Desai
 
Future strategies in gas retailing in india
Future strategies in gas retailing in indiaFuture strategies in gas retailing in india
Future strategies in gas retailing in indiaChetan Sharma
 
4th Energy Wave - Emergence of Heavy Duty Fuel Cell Market
4th Energy Wave - Emergence of Heavy Duty Fuel Cell Market4th Energy Wave - Emergence of Heavy Duty Fuel Cell Market
4th Energy Wave - Emergence of Heavy Duty Fuel Cell MarketKerry-Ann Adamson
 
U.S. Industrial Gas Market. Analysis And Forecast to 2020
U.S. Industrial Gas Market. Analysis And Forecast to 2020U.S. Industrial Gas Market. Analysis And Forecast to 2020
U.S. Industrial Gas Market. Analysis And Forecast to 2020IndexBox Marketing
 
1) uriarte presentation advisory panel
1) uriarte presentation   advisory panel1) uriarte presentation   advisory panel
1) uriarte presentation advisory panelcahouser
 
Ultra Low Emission Transit Buses - 4.27.2010 - Richard Thompson
Ultra Low Emission Transit Buses - 4.27.2010 - Richard ThompsonUltra Low Emission Transit Buses - 4.27.2010 - Richard Thompson
Ultra Low Emission Transit Buses - 4.27.2010 - Richard Thompsoncahouser
 
MMO titanium anodes, cathodes, HHO Generator, Fuel Cell Kits, Dry Cell Kit ,...
MMO titanium anodes,  cathodes, HHO Generator, Fuel Cell Kits, Dry Cell Kit ,...MMO titanium anodes,  cathodes, HHO Generator, Fuel Cell Kits, Dry Cell Kit ,...
MMO titanium anodes, cathodes, HHO Generator, Fuel Cell Kits, Dry Cell Kit ,...Madambakkam, Chennai
 
India Automobiles Sector Report April 2014
India Automobiles Sector Report April 2014India Automobiles Sector Report April 2014
India Automobiles Sector Report April 2014iimjobs.com
 

En vedette (11)

air products & chemicals 3 December 2007 Citigroup Non ChemConf
air products & chemicals 3 December 2007 Citigroup Non ChemConfair products & chemicals 3 December 2007 Citigroup Non ChemConf
air products & chemicals 3 December 2007 Citigroup Non ChemConf
 
Pro mailege booster
Pro mailege boosterPro mailege booster
Pro mailege booster
 
Future strategies in gas retailing in india
Future strategies in gas retailing in indiaFuture strategies in gas retailing in india
Future strategies in gas retailing in india
 
4th Energy Wave - Emergence of Heavy Duty Fuel Cell Market
4th Energy Wave - Emergence of Heavy Duty Fuel Cell Market4th Energy Wave - Emergence of Heavy Duty Fuel Cell Market
4th Energy Wave - Emergence of Heavy Duty Fuel Cell Market
 
U.S. Industrial Gas Market. Analysis And Forecast to 2020
U.S. Industrial Gas Market. Analysis And Forecast to 2020U.S. Industrial Gas Market. Analysis And Forecast to 2020
U.S. Industrial Gas Market. Analysis And Forecast to 2020
 
Document 19
Document 19Document 19
Document 19
 
1) uriarte presentation advisory panel
1) uriarte presentation   advisory panel1) uriarte presentation   advisory panel
1) uriarte presentation advisory panel
 
Presentation
PresentationPresentation
Presentation
 
Ultra Low Emission Transit Buses - 4.27.2010 - Richard Thompson
Ultra Low Emission Transit Buses - 4.27.2010 - Richard ThompsonUltra Low Emission Transit Buses - 4.27.2010 - Richard Thompson
Ultra Low Emission Transit Buses - 4.27.2010 - Richard Thompson
 
MMO titanium anodes, cathodes, HHO Generator, Fuel Cell Kits, Dry Cell Kit ,...
MMO titanium anodes,  cathodes, HHO Generator, Fuel Cell Kits, Dry Cell Kit ,...MMO titanium anodes,  cathodes, HHO Generator, Fuel Cell Kits, Dry Cell Kit ,...
MMO titanium anodes, cathodes, HHO Generator, Fuel Cell Kits, Dry Cell Kit ,...
 
India Automobiles Sector Report April 2014
India Automobiles Sector Report April 2014India Automobiles Sector Report April 2014
India Automobiles Sector Report April 2014
 

Similaire à Hydrogen Reliability Cavern Storage

Variax2000 presentation
Variax2000  presentationVariax2000  presentation
Variax2000 presentationXINGNONG
 
Commercialization of IH2Technology for Conversion of Biomass to Fungible Rene...
Commercialization of IH2Technology for Conversion of Biomass to Fungible Rene...Commercialization of IH2Technology for Conversion of Biomass to Fungible Rene...
Commercialization of IH2Technology for Conversion of Biomass to Fungible Rene...CRICatalyst
 
Hvm10th will barton-oxfordcatalysts
Hvm10th will barton-oxfordcatalystsHvm10th will barton-oxfordcatalysts
Hvm10th will barton-oxfordcatalystsJustin Hayward
 
Us Chamber Of Commerce (May 20)Final
Us Chamber Of Commerce (May 20)FinalUs Chamber Of Commerce (May 20)Final
Us Chamber Of Commerce (May 20)Finalfijigeorge
 
C:\Fakepath\=Amor Hydrocarbon
C:\Fakepath\=Amor Hydrocarbon C:\Fakepath\=Amor Hydrocarbon
C:\Fakepath\=Amor Hydrocarbon stuyoungenduro
 
el paso 08_11_Leland_UBS
el paso  08_11_Leland_UBSel paso  08_11_Leland_UBS
el paso 08_11_Leland_UBSfinance49
 
WF Basin Book July 2018.pdf
WF Basin Book July 2018.pdfWF Basin Book July 2018.pdf
WF Basin Book July 2018.pdfEagleFord1
 
WF Basin Book July 2018.pdf
WF Basin Book July 2018.pdfWF Basin Book July 2018.pdf
WF Basin Book July 2018.pdfEagleFord1
 
Fea Services
Fea ServicesFea Services
Fea Servicespfrayser
 
Gas Recovery Systems Vopak VCM Sphere Project
Gas Recovery Systems Vopak VCM Sphere ProjectGas Recovery Systems Vopak VCM Sphere Project
Gas Recovery Systems Vopak VCM Sphere ProjectFred Reyes
 
Plg argentina frac supply chain
Plg argentina frac supply chainPlg argentina frac supply chain
Plg argentina frac supply chainPLG Consulting
 
Cv Asa May 2008 Compl
Cv Asa May 2008 ComplCv Asa May 2008 Compl
Cv Asa May 2008 Complanwarsansari
 
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...Global CCS Institute
 
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLSSRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLSiQHub
 

Similaire à Hydrogen Reliability Cavern Storage (20)

Variax2000 presentation
Variax2000  presentationVariax2000  presentation
Variax2000 presentation
 
Commercialization of IH2Technology for Conversion of Biomass to Fungible Rene...
Commercialization of IH2Technology for Conversion of Biomass to Fungible Rene...Commercialization of IH2Technology for Conversion of Biomass to Fungible Rene...
Commercialization of IH2Technology for Conversion of Biomass to Fungible Rene...
 
Hvm10th will barton-oxfordcatalysts
Hvm10th will barton-oxfordcatalystsHvm10th will barton-oxfordcatalysts
Hvm10th will barton-oxfordcatalysts
 
QATAR GAS
QATAR GASQATAR GAS
QATAR GAS
 
PAK June 2012
PAK June 2012PAK June 2012
PAK June 2012
 
07 carey- Early careers winter school, 9-12th January 2012, University of Cam...
07 carey- Early careers winter school, 9-12th January 2012, University of Cam...07 carey- Early careers winter school, 9-12th January 2012, University of Cam...
07 carey- Early careers winter school, 9-12th January 2012, University of Cam...
 
Us Chamber Of Commerce (May 20)Final
Us Chamber Of Commerce (May 20)FinalUs Chamber Of Commerce (May 20)Final
Us Chamber Of Commerce (May 20)Final
 
C:\Fakepath\=Amor Hydrocarbon
C:\Fakepath\=Amor Hydrocarbon C:\Fakepath\=Amor Hydrocarbon
C:\Fakepath\=Amor Hydrocarbon
 
UMAR FAROOQ CV
UMAR FAROOQ CVUMAR FAROOQ CV
UMAR FAROOQ CV
 
el paso 08_11_Leland_UBS
el paso  08_11_Leland_UBSel paso  08_11_Leland_UBS
el paso 08_11_Leland_UBS
 
WF Basin Book July 2018.pdf
WF Basin Book July 2018.pdfWF Basin Book July 2018.pdf
WF Basin Book July 2018.pdf
 
WF Basin Book July 2018.pdf
WF Basin Book July 2018.pdfWF Basin Book July 2018.pdf
WF Basin Book July 2018.pdf
 
Fea Services
Fea ServicesFea Services
Fea Services
 
john foran
john foranjohn foran
john foran
 
Gas Recovery Systems Vopak VCM Sphere Project
Gas Recovery Systems Vopak VCM Sphere ProjectGas Recovery Systems Vopak VCM Sphere Project
Gas Recovery Systems Vopak VCM Sphere Project
 
Plg argentina frac supply chain
Plg argentina frac supply chainPlg argentina frac supply chain
Plg argentina frac supply chain
 
Cv Asa May 2008 Compl
Cv Asa May 2008 ComplCv Asa May 2008 Compl
Cv Asa May 2008 Compl
 
Aker Clean Carbon
Aker Clean CarbonAker Clean Carbon
Aker Clean Carbon
 
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
 
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLSSRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
 

Hydrogen Reliability Cavern Storage

  • 1. Hydrogen Reliability Salt Cavern Case Study Oil Sands & Heavy Oil Technologies July 16, 2009 Praxair Canada Inc. – Calgary, Alberta, Canada -1-
  • 2. About Praxair  Largest Industrial Gas Company in North and South America, one of the largest worldwide – 27,000 employees – 2008 sales: $10.8 Billion USD – Global Fortune 300 company listed on NYSE (PX) – Holds almost 3,000 patents  Praxair's primary products are: – atmospheric gases (oxygen, nitrogen, argon and rare gases) – process & specialty gases (carbon dioxide, helium, hydrogen, semiconductor process gases, acetylene) Praxair Canada Inc. – Calgary, Alberta, Canada www.praxair.com -2-
  • 3. Presentation Overview  Gulf Coast hydrogen infrastructure – 310 mile pipeline  Praxair H2 storage cavern – Overview – Benefits  Alberta Cavern Development – Heartland hydrogen demand – Cavern Potential – Cavern supply model – Integration to existing Praxair network Praxair Canada Inc. – Calgary, Alberta, Canada -3-
  • 4. Gulf Coast Hydrogen Infrastructure HYDROGEN SOURCES CAVERN STORAGE Cavern and Pipeline system connected to 11 out of 14 refineries Cavern and Pipeline system connected to 11 out of 14 refineries Praxair Canada Inc. – Calgary, Alberta, Canada -4-
  • 5. Praxair’s H2 Cavern Overview Design Basis Storage Capacity 2.5 Billion CF H2 to Customers Working Capacity 1.4 Billion CF Max Storage Pressure 2200 psig H2 from PX H2 from PX Working Pressure 800 - 2200 psig Fill Rate ~ 75 MMCFD Withdrawal Rate pressure dependent Cap Rock Commissioned Q4 2007  Cavern Consists of: – Injection compressor with ancillary equipment – Hydrogen product dryer H2 Salt Storage – Associated metering and Dome control equipment Praxair Canada Inc. – Calgary, Alberta, Canada -5-
  • 6. Cavern Commercialization Goals  Safe injection / withdrawal of hydrogen  “Real-time” operation – add value for supply-system optimization and peak demand  Establish operational procedures – informed, timely decision making around sales, withdrawals and injections  Key value creation streams: – Reliability sales (sales within firm volume) – Operational and sourcing optimization – Spot sales (sales outside of firm volume) Added flexibility for both Praxair and refiners! Praxair Canada Inc. – Calgary, Alberta, Canada -6-
  • 7. Cavern Support Infrastructure More than just a hole in the ground… Praxair Canada Inc. – Calgary, Alberta, Canada -7-
  • 8. Cavern Benefits  Instant Sales Capability – Planned customer turnaround Excess Supply – FILL Cavern – Unplanned customer outage MMSCFD – 3rd party supply interruptions  Superior System Reliability – Praxair facility turnaround – Praxair equipment outages Peak Demand - WITHDRAW – Feedstock / Utility interruptions Time  Operational Considerations – Enable steady state operations – Provide low demand “sink” – Improved pipeline operability Praxair Canada Inc. – Calgary, Alberta, Canada -8-
  • 9. Example: Customer Backup Daily Purchase LPG Light Naphtha X mmscfd H2 Fm FCC Cavern Supply 50 mmscfd H2 Alky LPG Alkylate Naphtha E Gasoline blend G UTA Reformer O Kero HDS Kero/Jet Crude Unit Diesel Diesel Crude HDS G.O. PP HT FCC Gasoline Lubes Vacuum unit unit Coker unit Coke Cavern Supply Can Help Avoid Cutback of Profitable Units Cavern Supply Can Help Avoid Cutback of Profitable Units Praxair Canada Inc. – Calgary, Alberta, Canada -9-
  • 10. Cavern Benefit Examples  Praxair H2 Product Availability – 11 Praxair sources on the network – Backup supply mitigates risk of H2 production unit outage  Hydrogen back up on instantaneous basis – Unexpected outages at customer sites – On purpose H2 production units / byproduct sources / third party  Operational Flexibility – Startup / shutdown of world scale SMRs can be avoided – Coverage of SMR type demand for short 24 hour type periods without calling on an SMR for start up » Example: waiting for demand of large user to stabilize before cycling a world scale reformer for start up – Sink for excess H2 Praxair Canada Inc. – Calgary, Alberta, Canada -10-
  • 11. Praxair H2 System Availability US Gulf Coast Pipeline (BAPOC) 2005-present 100.00% 99.00% 98.00% 97.00% 96.00% 95.00% 94.00% 93.00% 92.00% 91.00% 90.00% 89.00% 88.00% 87.00% Cavern Hurricanes 86.00% Hurricane Rita Commercialized Ike and Gustav 85.00% 5 5 6 6 7 7 8 8 9 00 00 00 00 00 00 00 00 00 /2 /2 /2 /2 /2 /2 /2 /2 /2 1/1 7/1 1/1 7/1 1/1 7/1 1/1 7/1 1/1 Cavern provides ability to ramp up production units Praxair Canada Inc. – Calgary, Alberta, Canada -11-
  • 12. What About Alberta? CP RAIL NORTHERN LIGHTS - TOTAL CP RAIL CP RAIL AGRIUM CP  Dynamic H2 Market RAIL SUNCOR FORT HILLS (PETRO CANADA) NORTH WEST UPGRADING IMPERIAL PIPELINE DEGUSSA STATOIL TEXACO HYDRO – Existing large demand KINDER ACCESS PIPELINE MORGAN BA ENBRIDGE ENERGY CP PROVIDENT RAIL – Need for reliable supply ENERGY SUNWEST SHELL ENERGY CN SCOTFORD RAIL ATCO STATOIL – New upgrading / refining STURGEON COUNTY HYDRO SUNCOR GULF TRANS CHEM. projects proposed CANADA CN Drawing not to scale AUX SABLE TOTAL RAIL STRATHCONA COUNTY – representation only GEMINI  Existing Infrastructure KEYERA FORT DOW EXISTING SASKATCHEWAN AGRIUM PRAXAIR H2 – Salt Cavern storage of SHERRITT PIPELINE hydrocarbons 21 KM ALCAN EDMONTON – Multiple Praxair facilities PETRO Praxair Infrastructure: – Praxair H2 Pipeline GIBSON ENERGY KINDER CANADA ASU Complex MORGAN PEMBINA IMPERIAL OIL PIPELINES ENBRIDGE PIPELINES CO2 / Dry Ice Facility PDI Cylinder Depot Similar to US Gulf Coast Hydrogen Pipeline PDI Praxair Canada Inc. – Calgary, Alberta, Canada -12- ALBERTA ENVIRO Nitrogen Pipeline FUELS
  • 13. H2 Demand – Industrial Heartland & Edmonton Area 2 H2 Demand Profile 2,160 2,025 1,890 1,755 1,620 Proposed Projects 1,485 MMSCFD 1,350 (new project demand) 1,215 1,080 945 810 675 540 Existing Hydrogen Demand 405 270 135 - 9 0 1 2 3 4 5 6 7 8 9 0 200 201 201 201 201 201 201 201 201 201 201 202 Figures above based on existing demand and Project Applications Petrochemical volumes not included in above Praxair Canada Inc. – Calgary, Alberta, Canada -13-
  • 14. Ideal Upgrader / Refinery Operation Flow Unit #2 Hydrogen Production Unit #1 Upgrader / Refinery Production Time  By-product Hydrogen (non-SMR) is reliability-challenged and base assumption in creation of reliability model  Reliability model developed to assess impact of different modes of operation on the facility when operating ‘non-ideally’ Ideal but unrealistic Praxair Canada Inc. – Calgary, Alberta, Canada -14-
  • 15. Reliability Model N+1 Gasifier Reliability Incl. Switching Losses Input Data Only Into Cells Highlighted in Yellow!! 74% 66% 55% 0% Vol (MMscfd) Working Cavern Reliability 1 Reliability 2 Reliability 3 Reliability 4 Days Train 1 Train 2 Train 3 Train 4 Total Sales Storage Vol 90.0% 90.0% 90.0% 80.0% Reliability 1 60 60 0 120.0 116 4 323 9 8 7 8 Shutdowns/year 2 60 60 0 120.0 116 4 327 40.6 45.6 52.1 45.6 Cycle length 3 60 60 0 120.0 116 4 331 36.0 41.0 46.0 36.0 Days On-Line 4 60 60 0 120.0 116 4 336 4.0 4.0 6.0 9.0 Days Off-line 5 60 60 0 120.0 116 4 340 360 360 364 360 6 60 60 0 120.0 116 4 344 Train 1 Train 2 Train 3 Train 4 7 60 60 0 120.0 116 4 349 90% 90% 90% 80% Reliability (%) 8 60 60 0 120.0 116 4 353 9 8 7 8 Shutdowns per year 9 60 60 0 120.0 116 4 357 0 0 0 0 Initial Delay (Days) 10 60 60 0 120.0 116 4 362 60 60 60 60 Capacity (MMscfd) 11 60 60 0 120.0 116 4 366 12 60 60 0 120.0 116 4 370 Initial Cavern Volume (MMscf) No. of Trains Longest Run length Delay Gasifier 1 Start 13 60 60 0 120.0 116 4 375 318 3 46.0 No 14 60 60 0 120.0 116 4 379 Insert Yes or No to stagger start-up of Gasifier 1 15 60 60 0 120.0 116 4 383 Avg Daily Sales 16 60 60 0 120.0 116 4 388 115.7 MMscfd Spare Operation 17 60 60 0 120.0 116 4 392 Yes Switch H2 Loss (% of 2nd Day Upgrader Impact (% Insert Yes or No to allow 18 60 60 0 120.0 116 4 396 Simulation Length gasifier output) of 1st day) 4th Train Standby Option 19 60 60 0 120.0 116 4 401 2920 Days 50 0 20 60 60 0 120.0 116 4 405 2920 Maximum (increments of 10) (increments of 10) 21 60 60 0 120.0 116 4 409 Cavern Max Vol 666 1st Yr Availability 22 60 60 0 120.0 116 4 413 Cavern Min Vol 293 97.0% 23 60 60 0 120.0 116 4 418 Working Vol 373 2nd Yr Availability 24 60 60 0 120.0 116 4 422 Cavern Size 666 96.3% 25 60 60 0 120.0 116 4 426 Max Cavern Inflow 4 Cavern - 2.5 bscf size 8 Yr Availability Avg 26 60 60 0 120.0 116 4 431 Max Cavern Outflow (116) 96.4% 27 60 60 0 120.0 116 4 435 28 60 60 0 120.0 116 4 439 Multi-Train Gasifier Volumes 29 60 60 0 120.0 116 4 444 150.0 Vol MMSCFD 30 60 60 0 120.0 116 4 448 100.0 31 60 60 0 120.0 116 4 452 32 60 60 0 120.0 116 4 457 50.0 33 60 60 0 120.0 116 4 461 34 60 60 0 120.0 116 4 465 0.0 35 60 60 0 120.0 116 4 470 1 31 61 91 121 151 181 211 241 271 301 331 361 36 60 60 0 120.0 116 4 474 Days 37 0 60 60 90.0 116 -26 448 1890 60 60 0 120.0 116 4 453 1891 60 60 0 120.0 116 4 458 1892 0 60 60 90.0 116 -26 432 1893 0 0 60 30.0 116 -86 346 • •time-series probability model time-series probability model 2917 60 0 60 120.0 116 4 335 2918 60 0 60 120.0 116 4 340 2919 2920 60 0 0 60 60 60 120.0 90.0 116 116 4 -26 344 318 • •scenario analysis scenario analysis Praxair Canada Inc. – Calgary, Alberta, Canada -15-
  • 16. Facility Lags Hydrogen Praxair Canada Inc. – Calgary, Alberta, Canada -16-
  • 17. Hydrogen Backup Flow H2 from Unit #2 Hydrogen Network Supply Unit #1 Cavern / Pipeline Supply Production Levels Upgrader / Refinery Maintained Production Time  Cavern/pipeline backup adds flexibility, smoothes H2 supply – self supporting – store hydrogen during periods of max production – allows capture of hydrogen during periods of surplus – allows for import of 3rd party hydrogen (and sale of surplus H2) Cavern / pipeline integration maximizes reliability Praxair Canada Inc. – Calgary, Alberta, Canada -17-
  • 18. Upgrading Impact – Gasifier Example 300.0 H2 Supply U p g r a d in g ( b b l/d a y ) Vol MMSCFD 200.0 100.0 0.0 1 31 61 91 121151181211241271301331361391421451481511541571601631661691721 100,000 Upgrader Throughput Days 80,000 60,000 40,000 No Cavern Support 20,000 Cavern Supported - 0 100 200 300 400 500 600 700 Time (Days) Days 6% loss in capacity without cavern backup 6% loss in capacity without cavern backup 2% loss in capacity if self-supported via cavern 2% loss in capacity if self-supported via cavern 0% loss in capacity with 3rd party back-up plus cavern 0% loss in capacity with 3rd party back-up plus cavern Praxair Canada Inc. – Calgary, Alberta, Canada -18-
  • 19. Alberta Cavern Development  Pre-feasibility completed – Desktop study – Preliminary location identified – Working with ATCO Energy Solutions on Cavern development CAVERN – Non-invasive testing performed SITE  Lead-time ~3 yrs for 1st cavern – Additional year for 2nd cavern  Financial options – Tolling fee / Dedicated volume – Joint venture Complements Praxair’s existing network Praxair Canada Inc. – Calgary, Alberta, Canada -19-
  • 20. Praxair - Oilsands Capabilities Mine // SAGD Mine SAGD Upgrading // Refining Upgrading Refining Reliability Reliability H2 Steam H2 Cavern H2 Cavern H2 Gasifier Gasifier SMR SMR H2 Pipeline H2 Pipeline Photo: http://news.bbc.co.uk O2 Energy Studies Energy Studies CO2 Utility Nitrogen // Utility Nitrogen CO2 CO2 CO2 CO2 EOR // Oxygen Oxygen ASU ASU EOR Capture Compression Capture Compression Sequestration Sequestration Vessel & Vessel & Pipeline Purging Pipeline Purging Cylinders Cylinders ASU - Oxyfuel ASU - Oxyfuel Purging, Cylinders, N2, O2… Purging, Cylinders, N2, O2… Upstream, downstream and in between… Praxair Canada Inc. – Calgary,is your full service Industrial Gas Supplier! Praxair Alberta, Canada -20-
  • 21. Praxair Alberta Value Proposition - Air Separation Unit - Bulk Industrial Gases - CO2 Capture and Compression - Cylinders, Welding Supplies Jim McKay & Related Equipment Oilsands Business Development - Energy Studies Calgary, Alberta - High Performance Coatings - Hydrogen Supply (O) 403-385-2348 - Leak Detection - Oxyfuel Burners (C) 403-462-5768 - Sulphur Recovery Unit Oxygen - Vessel and Pipeline Purging Services jim_s_mckay@praxair.com Praxair Canada Inc. – Calgary, Alberta, Canada -21-