SlideShare une entreprise Scribd logo
1  sur  11
Télécharger pour lire hors ligne
MC Industrial. Where industry goes to get built.

PROVEN   safEty   succEss   ExPERiENcE   PlaNNiNg   PaRtN ERsh iP   PERfORmaNcE   cOmmitmENt    sERVicEs
PROVEN
rove

                                                                                                                                                        safEty
                                                                                                                                                        succEss
       Proven




                                                                                                                                                        ExPERiENcE
       MC Industrial, Inc., an independent McCarthy company, was established in 2005 to serve the specialized construction needs
       of the industrial market nationwide. We’ve built our reputation on decades of proven McCarthy experience in the automotive,
       food and beverage, aviation/aerospace, manufacturing and power markets. And, if your project includes new “shade and shelter”
       and you need it fast, MC Industrial is an authorized distributor/builder of a variety of pre-engineered metal buildings.




                                                                                                                                                        PlaNNiNg
       Synergy

       We haven’t forgotten where we came from. Our procedures and resources are genuine McCarthy. Our industrial focus, however,
       assures our clients the right services, thoughtfully planned and executed, at the right time and price.




                                                                                                                                                        PaRtN ERsh iP
       Even though we’re MC Industrial, our core values are those that have energized McCarthy for more than a century. Old-fashioned
       principles such as taking responsibility for your actions, integrity, respect for the individual, and the importance of relationships
       drive our business. And given the fact that every MC Industrial salaried employee is also an employee owner (of the McCarthy parent
       company), you can count on each of us to deliver above and beyond your expectations.




                                                                                                                                                        PERfORmaNcE
                                                   You’ll know us by the company we keep ...

                                                   MC Industrial is making a name for itself in industrial construction. Just ask any of our clients.
                                                   Here’s a partial list.

                                                   AmerenUE                 Centocor Biologics         MEMC Electronic Materials




                                                                                                                                                        cOmmitmENt
                                                   Anheuser-Busch           ConocoPhillips             MOST, Inc.
                                                   Solutia Inc.             DaimlerChrysler            Pfizer
                                                   Big River Zinc           General Motors             Sigma Aldrich
                                                   Bodine Aluminum          GKN Aerospace              The Boeing Company
                                                   Center Ethanol           Holcim (US)                Toyota Motors Manufacturing North America




                                                                                                                                                        sERVicEs
sERVicEs
cOmmitmENt




                safety
PERfORmaNcE




                When you contract with MC Industrial, you are hiring one of the safest contractors in the nation.

                We are committed to sending everyone home safely every day. Proven procedures and training have paid off for us in safety rates
                that are significantly better than the industry average.
PaRtN ERsh iP




                For us safety is not just a priority, it’s a core value.




                                                                Often, the best Safety advocates are the      Meet a true Safety convert…a worker at our oil
PlaNNiNg




                                                                converts…workers who learned in one way       company project. He didn’t wear fall protection
                                                                or another they weren’t invincible.           and was given three days off. When he returned
                                                                                                              to the job, the first thing he did was put on his
                                                                When a project achieves more than 1 million   harness. Now, when he sees workers attempt
                                                                man hours and can boast ZERO lost time        to get off the ground more than six-feet without
ExPERiENcE




                                                                incidents, we know our program is working.    protection, he gives them a very valuable piece
                                                                We also know our tradespeople have learned    of his experience.
                                                                by example…and those “examples” become
                                                                the greatest Safety preachers.                What’s the moral of the story? MC Industrial
                                                                                                              projects are safe because the men and women
                                                                                                              who work for us know we care about their welfare.
succEss




                                                                                                              We owe it to our people and their families to send
                                                                                                              everyone home at the end of the day the same way




                                                                                                                                                                   safety
                                                                                                              they came in to work…whole and healthy.
safEty
PROVEN
PROVEN
                                                                                                                                                               safEty
                                                                                                                                                               succEss
          success




                                                                                                                                                               ExPERiENcE
          What is your definition of a successful project?

          Is it one that gets your assembly line up and running faster? Or, is it a smoothly run outage project that results in better service
          to your customers? Maybe it’s the project that’s completed without interrupting your on-going operations. Or, is it all of these?




                                                                                                                                                               PlaNNiNg
          Whatever your definition, success is far more complex than the proverbial “on-time, on-budget” answer most often heard in our industry.

          Whether your project is large or small, tough and complex, or just a simple fix, MC Industrial delivers success on your terms.




                                                                                                                                                               PaRtN ERsh iP
                                                       When you’re trusted with the single largest body     Success depended on expert logistics, material
                                                       shop equipment installation project ever given to    handling and managing last minute changes.
                                                       one contractor by this automotive manufacturer,      Equipment deliveries were sequenced so
                                                       every move you make must be efficient and            installation could take place directly from




                                                                                                                                                               PERfORmaNcE
                                                       perfectly executed…especially when you only have     the truck to the required area in the body shop.
                                                       9 weeks to install 300 robots, conveyor equipment,   MC Industrial crews unloaded and installed
                                                       control panels, and welding and stamping             more than 50 containers of equipment each




success
                                                       equipment so trucks can begin to roll off the line   week. All 54 bays were installed and powered
                                                       and be shipped to dealerships around the country.    on in just under 9 weeks.

                                                       This labor-intensive project required close          How do you measure success? One happy




                                                                                                                                                               cOmmitmENt
                                                       coordination with all subs. In fact, MC Industrial   client at a time.
                                                       produced an hour-by-hour schedule, and
                                                       conducted two scheduling meetings a day to
                                                       ensure the just-in-time transfer of more than
                                                       450 containers of equipment from the seaport
                                                       to the job site for installation.




                                                                                                                                                               sERVicEs
experience
sERVicEs
cOmmitmENt




                solid Experience
PERfORmaNcE




                There’s not much in industrial construction that intimidates us.

                We’ve faced the tough customer who wants to compress a 14-month power plant project down to 8 months…
                and left him pleased with our performance.
PaRtN ERsh iP




                We’ve expertly phased automotive manufacturing projects to fit into the industry’s notoriously tight shut down schedules
                and watched as the cars rolled off the production line ahead of the client’s schedule.

                We’ve installed new packaging lines and ensured they were up and running so the client’s production schedules…
                and revenues…didn’t suffer.
PlaNNiNg




                                                            If you’re planning on 14 months to complete       Self performance was our ace-in-the-hole.
                                                            installation of two 450,000-pound turbines        We took on the pile driving, concrete, millwright
ExPERiENcE




                                                            along with their 350,000-pound generators         work, ironworker and boilermaker work to help
                                                            on an existing fossil-fuel power plant, shaving   control the schedule.
                                                            time off the schedule unexpectedly can knock
                                                                                                              Teams worked two 10-hour shifts a day, 6-days
                                                            a project team off balance pretty quickly.
                                                                                                              a week through November. With an eye on the
                                                            But, in this case, we’re not talking about
                                                                                                              budget, we scheduled overtime judiciously.
                                                            just any project team.
succEss




                                                                                                              At peak, 200 tradesmen converged on the site
                                                            The project start was delayed three months.       to get the job done.
                                                            Then, the Owner moved up the completion date
                                                                                                              Finally, right on schedule and just in time for the
                                                            another three months. The result? What was
                                                                                                              blazing Midwest heat, the team fired up the first
                                                            once a 14 month project, was now whittled
safEty




                                                                                                              turbine on the scheduled day. Thirteen days later, the
                                                            down to eight.
                                                                                                              switch was flipped on the second unit. Both units
                                                            Tight schedules are pretty much the norm in the   started up with no construction-related problems.
                                                            industrial world and MC Industrial is used to
PROVEN




                                                                                                              In the end, we pleased the client. And we earned
                                                            constructing during two week shutdowns and
                                                                                                              the distinction of pulling off a job some thought
                                                            outages. So, our team came up with a plan
                                                                                                              impossible!
                                                            to meet the new schedule.
PROVEN
                                                                                                                                                                     safEty
                                                                                                                                                                     succEss
           Planning




                                                                                                                                                                     ExPERiENcE
           Industrial construction requires intense planning.

           Labor, materials, equipment, contingency plans for unexpected problems, must all be taken into account before work can begin.

           MC Industrial’s ability to plan and execute at this level of detail is an essential skill for any project we undertake, whether




                                                                                                                                                                     PlaNNiNg
planning
           constructing in the power industry, setting equipment in car plants, or in manufacturing facilities where mistakes can mean
           lost time and revenue for the owner.




                                                                                                                                                                     PaRtN ERsh iP
                                                       It was barely daylight and already more than          goes into assembling the slip deck. Staff has
                                                       20 concrete trucks were lined up at the cement        to know that every needed component is at the
                                                       plant site ready to pour. Tradesmen and women         ready…man power access, on-deck lay down
                                                       were ready too. Standing on the decks of the first    requirements, crane needs. Back-up plans
                                                       two silos to be built, their 12-hour shift was        are in place if problems arise. Everything




                                                                                                                                                                     PERfORmaNcE
                                                       about to begin.                                       has to be right. Mistakes will ultimately
                                                                                                             affect the outcome.
                                                       Slip-forming requires perpetual motion. Concrete
                                                       is poured around the clock while workers set and      MC Industrial’s ability to plan and execute to this
                                                       tie rebar. It is the only way to build a monolithic   level of detail transfers into many of our industrial
                                                       structure so there are no cold joints…a weak          projects…shut-downs at power plants and car
                                                       spot where either product can leak out or water       plants, or any manufacturing facility where there’s




                                                                                                                                                                     cOmmitmENt
                                                       can seep in.                                          a narrow window in which to complete a project.

                                                       Planning for a project that can’t stop is intense.    Whatever the project, MC Industrial expertly
                                                       Detailed plans are checked and double checked         plans the work then works the plan so your
                                                       before work begins. Weeks of planning and thought     outcome is exactly what you envisioned.




                                                                                                                                                                     sERVicEs
partnership
sERVicEs
cOmmitmENt




                 Partnership
PERfORmaNcE




                 What criteria do you use when forming partnerships? Trust? Know-How? Dependability? Tenacity?

                 Partnerships form the basis of our business. They are integral to our success and to our reputation with clients. Partners have
                 common goals. They understand what the outcome needs to look like. They communicate constantly so there are no surprises.
                 They look out for one another.
PaRtN ERsh i P




                 From start to finish, your project is our priority. As your partner, the value we deliver in preconstruction services and value
                 analysis increases the quality of the end result and saves you money.

                 We take a scientific approach to preconstruction. The benefit for you is detailed, accurate and complete data up front so you
                 can make informed decisions throughout the project, resulting in greater cost control and schedule adherence.
PlaNNiNg




                 Our goal is to maximize the effect of every project dollar you spend.
ExPERiENcE




                                                               Creating win/win situations is the stuff              Aside from closely watching the project budget,
                                                               of good partnerships. Such is the case between        MC Industrial developed state-of-the-art
                                                               MC Industrial and a long time client in the           commissioning programs that ensured smooth,
                                                               aerospace industry.                                   expedited turnover of all facilities. The program
                                                                                                                     included extensive training for personnel
                                                               When this high-profile company needed to build        who would be maintaining the building once
succEss




                                                               a 36-acre flight ramp facility on its campus, they    it was occupied.
                                                               turned to a company they could trust…one that
                                                               would look out for their best interests.              The reward for maintaining a true partnership
                                                                                                                     is trust…and trust begets more opportunity…
                                                               Good partnerships bring out the best in both
safEty




                                                                                                                     for the client and for MC Industrial.
                                                               parties. This one was no different. Although
                                                               MC Industrial was not responsible for the
                                                               project’s design, we always reviewed and offered
PROVEN




                                                               a multitude of potential cost-saving ideas. A log
                                                               was kept of all ideas presented and the status
                                                               of each. One idea saved the client nearly $900,000.
performance




                                                                                                                                                                     PROVEN
                                                                                                                                                                     safEty
                                                                                                                                                                     succEss
              self Performance




                                                                                                                                                                     ExPERiENcE
              MC Industrial is a builder—not a paper pusher. Our ability to self perform with our own crews gives us full custody and ownership
              of the work from start to finish so your project won’t experience delays from stalled mobilizations or suffer inefficiencies from
              improper man-loading.




                                                                                                                                                                     PlaNNiNg
                                                        How do you build two, 60-foot in diameter,           Next on the list…two 150-foot in diameter,




                                                                                                                                                                     PaRtN ERsh iP
                                                        275-foot-tall, monolithic concrete structures        207-foot tall clinker silos said to be the largest
                                                        in just 17 days? You use your own labor force.       in the world. By the time the first clinker was
                                                                                                             finished, the 220 tradesmen logged 34,600
                                                        Just outside a small Midwest town, a behemoth        manhours and used 2,500 tons of rebar.
                                                        is being built…the world’s largest, single-line
                                                        cement plant. Thirteen silos of varying dimensions   Over 18 months, MC Industrial placed more
                                                        are needed to accommodate raw and finished           than 90,000-cubic-yards of concrete to complete




                                                                                                                                                                     PERfORmaNcE
                                                        materials storage. MC Industrial started the         all 13 silos. At peak, the project employed
                                                        first two blend silos in the dead of winter.         700 tradespeople who worked round the
                                                                                                             clock on 12-hour shifts.
                                                        The technique used to build these silos is called
                                                        slip forming. Essentially, what slip forming means   The silo project, at the time, ended up being the
                                                        to the tradesmen is 24-7, non-stop work to place     largest self perform contract ever executed by
                                                        and finish the continuous flow of concrete. The      MC Industrial with more than 700,000 manhours.




                                                                                                                                                                     cOmmitmENt
                                                        blend silos took 170 MC Industrial tradespeople      Pulling it off successfully required intense detailed
                                                        (85 on each 12-hour shift), 2,125 manhours each      planning. Every component was on hand and there
                                                        day to pour and finish 6,015-yards of concrete       was a good backup plan in place if problems arose.
                                                        to complete. But, these two silos were just
                                                                                                             Managing and directing large amounts of
                                                        a prelude to bigger things.
                                                                                                             manpower allows us to control rather than




                                                                                                                                                                     sERVicEs
                                                                                                             just document the job as some large CM-only
                                                                                                             firms may do.
commitment
sERVicEs
cOmmitmENt




                commitment
PERfORmaNcE




                Our commitment to you is to deliver a quality project that will exceed your expectations on all levels.


                                                         What is commitment? MC Industrials believes          Finally, the opportunity arrived. The client would
PaRtN ERsh iP




                                                         it’s doing “whatever it takes” to get the job        test our mettle. We won $8.8 million worth of work
                                                         done well. Sometimes our commitment is revealed      on 8 hard bid projects. It was our time to shine.
                                                         to an Owner long before a project is awarded and     And shine, we did.
                                                         crews begin to mobilize on the job site. It begins
                                                                                                              At the end of those 8 projects, a major project laid
                                                         in the proving grounds…early in the relationship.
                                                                                                              waiting. We had already paved the way. The client
                                                         It had been 10 years since MC Industrial             knew what to expect.
PlaNNiNg




                                                         last worked on a project for the aerospace
                                                                                                              We approached the next job with the same
                                                         manufacturer and we wanted to work with
                                                                                                              problem-solving mind set and dedication as all
                                                         them again. Giving up wasn’t part of the deal.
                                                                                                              the others. And, despite scheduling complexities
                                                         To prove just how serious our desire to work for
                                                                                                              and logistical challenges, we wowed the client
                                                         this client was, we submitted bids on 26 projects
ExPERiENcE




                                                                                                              with results far beyond their expectations.
                                                         ranging in size from $50,000 to $2 million
                                                         in the span of three years.
succEss
safEty
PROVEN
sERVicEs
cOmmitmENt




                services
PERfORmaNcE




                MC Industrial provides a broad array of construction and construction-related services nationwide.
                Project delivery methods include:

                Construction Management, Design-Build, Negotiated Contract, Hard Bid, Engineer/Procure/Construct
PaRtN ERsh iP




                From comprehensive, value-added preconstruction services to conceptual estimating and scheduling to project closeout,
                MC Industrial uses sophisticated management systems to control every aspect of your project. The tools we use ensure
                that key project team members spend far less time completing paperwork for your project and more time out on the job
                site contributing to a quality project that exceeds your expectations.
PlaNNiNg
ExPERiENcE




                                                                                                                                        St. Louis Office        Atlanta Office
succEss




                                                                                                                                        3117 Big Bend Blvd.     2100 RiverEdge Parkway, Suite 1010
                                                                                                                                        St. Louis, MO 63143     Atlanta, GA 30328
                                                                                                                                        ph: 314.646.4100        ph: 770.980.8183
                                                                                                                                        fx: 314.646.4101        fx: 770.980.8363
safEty




                                                                                                                                        stl@mc-industrial.com   atl@mc-industrial.com
PROVEN
mc industrial   3117 Big Bend Blvd.   st. louis, mO 63143   ph: 314.646.4100   fx: 314.646.4101

Contenu connexe

Similaire à MC Industrial: Where Industry Gets Built

Metro (2)
Metro (2)Metro (2)
Metro (2)foot27
 
I Source Presentation
I Source PresentationI Source Presentation
I Source PresentationDoraTuza
 
ClearedJobs.Net Cleared Job Fair Job Seeker's Handbook April 8th, Crystal City
ClearedJobs.Net Cleared Job Fair Job Seeker's Handbook April 8th, Crystal CityClearedJobs.Net Cleared Job Fair Job Seeker's Handbook April 8th, Crystal City
ClearedJobs.Net Cleared Job Fair Job Seeker's Handbook April 8th, Crystal CityClearedJobs.Net
 
Ic group 4pp_v8_lo_res_single
Ic group 4pp_v8_lo_res_singleIc group 4pp_v8_lo_res_single
Ic group 4pp_v8_lo_res_singleAlok Nagpal
 
MRO Services
MRO ServicesMRO Services
MRO Servicesparkerrob
 
Site Masters Plc
Site Masters PlcSite Masters Plc
Site Masters PlcJody5802
 
Site masters plc presentation
Site masters plc presentation Site masters plc presentation
Site masters plc presentation j5802
 
PT TIMAS SUPLINDO: Transforming the EPCIC Industry with Excellence and Innova...
PT TIMAS SUPLINDO: Transforming the EPCIC Industry with Excellence and Innova...PT TIMAS SUPLINDO: Transforming the EPCIC Industry with Excellence and Innova...
PT TIMAS SUPLINDO: Transforming the EPCIC Industry with Excellence and Innova...theindustryviewmagaz
 
Daviscomms Profile Mod - 051815
Daviscomms Profile Mod - 051815Daviscomms Profile Mod - 051815
Daviscomms Profile Mod - 051815Andy Dendis
 
H7149 Final Essays From Creative
H7149 Final Essays From CreativeH7149 Final Essays From Creative
H7149 Final Essays From Creativefionaoriordan
 
MMC Presentation
MMC PresentationMMC Presentation
MMC PresentationJJM Company
 
Micro Presentation
Micro PresentationMicro Presentation
Micro PresentationJJM Company
 
Support HR solutions | Company Overview
Support HR solutions | Company OverviewSupport HR solutions | Company Overview
Support HR solutions | Company OverviewDomenico Mistri
 
Texcom Mining & Civil
Texcom Mining & CivilTexcom Mining & Civil
Texcom Mining & CivilMining Global
 
The Telco Innovation Toolbox: Economic Models for Managing Disruption and Rei...
The Telco Innovation Toolbox: Economic Models for Managing Disruption and Rei...The Telco Innovation Toolbox: Economic Models for Managing Disruption and Rei...
The Telco Innovation Toolbox: Economic Models for Managing Disruption and Rei...Ericsson Russia
 

Similaire à MC Industrial: Where Industry Gets Built (20)

Fut2 10 Eng New
Fut2 10 Eng NewFut2 10 Eng New
Fut2 10 Eng New
 
Metro (2)
Metro (2)Metro (2)
Metro (2)
 
I Source Presentation
I Source PresentationI Source Presentation
I Source Presentation
 
ClearedJobs.Net Cleared Job Fair Job Seeker's Handbook April 8th, Crystal City
ClearedJobs.Net Cleared Job Fair Job Seeker's Handbook April 8th, Crystal CityClearedJobs.Net Cleared Job Fair Job Seeker's Handbook April 8th, Crystal City
ClearedJobs.Net Cleared Job Fair Job Seeker's Handbook April 8th, Crystal City
 
AMD_AR2002
AMD_AR2002AMD_AR2002
AMD_AR2002
 
Renewable Energy Flyer
Renewable Energy FlyerRenewable Energy Flyer
Renewable Energy Flyer
 
Ic group 4pp_v8_lo_res_single
Ic group 4pp_v8_lo_res_singleIc group 4pp_v8_lo_res_single
Ic group 4pp_v8_lo_res_single
 
MRO Services
MRO ServicesMRO Services
MRO Services
 
Site Masters Plc
Site Masters PlcSite Masters Plc
Site Masters Plc
 
Site masters plc presentation
Site masters plc presentation Site masters plc presentation
Site masters plc presentation
 
PT TIMAS SUPLINDO: Transforming the EPCIC Industry with Excellence and Innova...
PT TIMAS SUPLINDO: Transforming the EPCIC Industry with Excellence and Innova...PT TIMAS SUPLINDO: Transforming the EPCIC Industry with Excellence and Innova...
PT TIMAS SUPLINDO: Transforming the EPCIC Industry with Excellence and Innova...
 
Daviscomms Profile Mod - 051815
Daviscomms Profile Mod - 051815Daviscomms Profile Mod - 051815
Daviscomms Profile Mod - 051815
 
H7149 Final Essays From Creative
H7149 Final Essays From CreativeH7149 Final Essays From Creative
H7149 Final Essays From Creative
 
Profile
ProfileProfile
Profile
 
MMC Presentation
MMC PresentationMMC Presentation
MMC Presentation
 
Micro Presentation
Micro PresentationMicro Presentation
Micro Presentation
 
40 in 4
40 in 440 in 4
40 in 4
 
Support HR solutions | Company Overview
Support HR solutions | Company OverviewSupport HR solutions | Company Overview
Support HR solutions | Company Overview
 
Texcom Mining & Civil
Texcom Mining & CivilTexcom Mining & Civil
Texcom Mining & Civil
 
The Telco Innovation Toolbox: Economic Models for Managing Disruption and Rei...
The Telco Innovation Toolbox: Economic Models for Managing Disruption and Rei...The Telco Innovation Toolbox: Economic Models for Managing Disruption and Rei...
The Telco Innovation Toolbox: Economic Models for Managing Disruption and Rei...
 

MC Industrial: Where Industry Gets Built

  • 1. MC Industrial. Where industry goes to get built. PROVEN safEty succEss ExPERiENcE PlaNNiNg PaRtN ERsh iP PERfORmaNcE cOmmitmENt sERVicEs
  • 2. PROVEN rove safEty succEss Proven ExPERiENcE MC Industrial, Inc., an independent McCarthy company, was established in 2005 to serve the specialized construction needs of the industrial market nationwide. We’ve built our reputation on decades of proven McCarthy experience in the automotive, food and beverage, aviation/aerospace, manufacturing and power markets. And, if your project includes new “shade and shelter” and you need it fast, MC Industrial is an authorized distributor/builder of a variety of pre-engineered metal buildings. PlaNNiNg Synergy We haven’t forgotten where we came from. Our procedures and resources are genuine McCarthy. Our industrial focus, however, assures our clients the right services, thoughtfully planned and executed, at the right time and price. PaRtN ERsh iP Even though we’re MC Industrial, our core values are those that have energized McCarthy for more than a century. Old-fashioned principles such as taking responsibility for your actions, integrity, respect for the individual, and the importance of relationships drive our business. And given the fact that every MC Industrial salaried employee is also an employee owner (of the McCarthy parent company), you can count on each of us to deliver above and beyond your expectations. PERfORmaNcE You’ll know us by the company we keep ... MC Industrial is making a name for itself in industrial construction. Just ask any of our clients. Here’s a partial list. AmerenUE Centocor Biologics MEMC Electronic Materials cOmmitmENt Anheuser-Busch ConocoPhillips MOST, Inc. Solutia Inc. DaimlerChrysler Pfizer Big River Zinc General Motors Sigma Aldrich Bodine Aluminum GKN Aerospace The Boeing Company Center Ethanol Holcim (US) Toyota Motors Manufacturing North America sERVicEs
  • 3. sERVicEs cOmmitmENt safety PERfORmaNcE When you contract with MC Industrial, you are hiring one of the safest contractors in the nation. We are committed to sending everyone home safely every day. Proven procedures and training have paid off for us in safety rates that are significantly better than the industry average. PaRtN ERsh iP For us safety is not just a priority, it’s a core value. Often, the best Safety advocates are the Meet a true Safety convert…a worker at our oil PlaNNiNg converts…workers who learned in one way company project. He didn’t wear fall protection or another they weren’t invincible. and was given three days off. When he returned to the job, the first thing he did was put on his When a project achieves more than 1 million harness. Now, when he sees workers attempt man hours and can boast ZERO lost time to get off the ground more than six-feet without ExPERiENcE incidents, we know our program is working. protection, he gives them a very valuable piece We also know our tradespeople have learned of his experience. by example…and those “examples” become the greatest Safety preachers. What’s the moral of the story? MC Industrial projects are safe because the men and women who work for us know we care about their welfare. succEss We owe it to our people and their families to send everyone home at the end of the day the same way safety they came in to work…whole and healthy. safEty PROVEN
  • 4. PROVEN safEty succEss success ExPERiENcE What is your definition of a successful project? Is it one that gets your assembly line up and running faster? Or, is it a smoothly run outage project that results in better service to your customers? Maybe it’s the project that’s completed without interrupting your on-going operations. Or, is it all of these? PlaNNiNg Whatever your definition, success is far more complex than the proverbial “on-time, on-budget” answer most often heard in our industry. Whether your project is large or small, tough and complex, or just a simple fix, MC Industrial delivers success on your terms. PaRtN ERsh iP When you’re trusted with the single largest body Success depended on expert logistics, material shop equipment installation project ever given to handling and managing last minute changes. one contractor by this automotive manufacturer, Equipment deliveries were sequenced so every move you make must be efficient and installation could take place directly from PERfORmaNcE perfectly executed…especially when you only have the truck to the required area in the body shop. 9 weeks to install 300 robots, conveyor equipment, MC Industrial crews unloaded and installed control panels, and welding and stamping more than 50 containers of equipment each success equipment so trucks can begin to roll off the line week. All 54 bays were installed and powered and be shipped to dealerships around the country. on in just under 9 weeks. This labor-intensive project required close How do you measure success? One happy cOmmitmENt coordination with all subs. In fact, MC Industrial client at a time. produced an hour-by-hour schedule, and conducted two scheduling meetings a day to ensure the just-in-time transfer of more than 450 containers of equipment from the seaport to the job site for installation. sERVicEs
  • 5. experience sERVicEs cOmmitmENt solid Experience PERfORmaNcE There’s not much in industrial construction that intimidates us. We’ve faced the tough customer who wants to compress a 14-month power plant project down to 8 months… and left him pleased with our performance. PaRtN ERsh iP We’ve expertly phased automotive manufacturing projects to fit into the industry’s notoriously tight shut down schedules and watched as the cars rolled off the production line ahead of the client’s schedule. We’ve installed new packaging lines and ensured they were up and running so the client’s production schedules… and revenues…didn’t suffer. PlaNNiNg If you’re planning on 14 months to complete Self performance was our ace-in-the-hole. installation of two 450,000-pound turbines We took on the pile driving, concrete, millwright ExPERiENcE along with their 350,000-pound generators work, ironworker and boilermaker work to help on an existing fossil-fuel power plant, shaving control the schedule. time off the schedule unexpectedly can knock Teams worked two 10-hour shifts a day, 6-days a project team off balance pretty quickly. a week through November. With an eye on the But, in this case, we’re not talking about budget, we scheduled overtime judiciously. just any project team. succEss At peak, 200 tradesmen converged on the site The project start was delayed three months. to get the job done. Then, the Owner moved up the completion date Finally, right on schedule and just in time for the another three months. The result? What was blazing Midwest heat, the team fired up the first once a 14 month project, was now whittled safEty turbine on the scheduled day. Thirteen days later, the down to eight. switch was flipped on the second unit. Both units Tight schedules are pretty much the norm in the started up with no construction-related problems. industrial world and MC Industrial is used to PROVEN In the end, we pleased the client. And we earned constructing during two week shutdowns and the distinction of pulling off a job some thought outages. So, our team came up with a plan impossible! to meet the new schedule.
  • 6. PROVEN safEty succEss Planning ExPERiENcE Industrial construction requires intense planning. Labor, materials, equipment, contingency plans for unexpected problems, must all be taken into account before work can begin. MC Industrial’s ability to plan and execute at this level of detail is an essential skill for any project we undertake, whether PlaNNiNg planning constructing in the power industry, setting equipment in car plants, or in manufacturing facilities where mistakes can mean lost time and revenue for the owner. PaRtN ERsh iP It was barely daylight and already more than goes into assembling the slip deck. Staff has 20 concrete trucks were lined up at the cement to know that every needed component is at the plant site ready to pour. Tradesmen and women ready…man power access, on-deck lay down were ready too. Standing on the decks of the first requirements, crane needs. Back-up plans two silos to be built, their 12-hour shift was are in place if problems arise. Everything PERfORmaNcE about to begin. has to be right. Mistakes will ultimately affect the outcome. Slip-forming requires perpetual motion. Concrete is poured around the clock while workers set and MC Industrial’s ability to plan and execute to this tie rebar. It is the only way to build a monolithic level of detail transfers into many of our industrial structure so there are no cold joints…a weak projects…shut-downs at power plants and car spot where either product can leak out or water plants, or any manufacturing facility where there’s cOmmitmENt can seep in. a narrow window in which to complete a project. Planning for a project that can’t stop is intense. Whatever the project, MC Industrial expertly Detailed plans are checked and double checked plans the work then works the plan so your before work begins. Weeks of planning and thought outcome is exactly what you envisioned. sERVicEs
  • 7. partnership sERVicEs cOmmitmENt Partnership PERfORmaNcE What criteria do you use when forming partnerships? Trust? Know-How? Dependability? Tenacity? Partnerships form the basis of our business. They are integral to our success and to our reputation with clients. Partners have common goals. They understand what the outcome needs to look like. They communicate constantly so there are no surprises. They look out for one another. PaRtN ERsh i P From start to finish, your project is our priority. As your partner, the value we deliver in preconstruction services and value analysis increases the quality of the end result and saves you money. We take a scientific approach to preconstruction. The benefit for you is detailed, accurate and complete data up front so you can make informed decisions throughout the project, resulting in greater cost control and schedule adherence. PlaNNiNg Our goal is to maximize the effect of every project dollar you spend. ExPERiENcE Creating win/win situations is the stuff Aside from closely watching the project budget, of good partnerships. Such is the case between MC Industrial developed state-of-the-art MC Industrial and a long time client in the commissioning programs that ensured smooth, aerospace industry. expedited turnover of all facilities. The program included extensive training for personnel When this high-profile company needed to build who would be maintaining the building once succEss a 36-acre flight ramp facility on its campus, they it was occupied. turned to a company they could trust…one that would look out for their best interests. The reward for maintaining a true partnership is trust…and trust begets more opportunity… Good partnerships bring out the best in both safEty for the client and for MC Industrial. parties. This one was no different. Although MC Industrial was not responsible for the project’s design, we always reviewed and offered PROVEN a multitude of potential cost-saving ideas. A log was kept of all ideas presented and the status of each. One idea saved the client nearly $900,000.
  • 8. performance PROVEN safEty succEss self Performance ExPERiENcE MC Industrial is a builder—not a paper pusher. Our ability to self perform with our own crews gives us full custody and ownership of the work from start to finish so your project won’t experience delays from stalled mobilizations or suffer inefficiencies from improper man-loading. PlaNNiNg How do you build two, 60-foot in diameter, Next on the list…two 150-foot in diameter, PaRtN ERsh iP 275-foot-tall, monolithic concrete structures 207-foot tall clinker silos said to be the largest in just 17 days? You use your own labor force. in the world. By the time the first clinker was finished, the 220 tradesmen logged 34,600 Just outside a small Midwest town, a behemoth manhours and used 2,500 tons of rebar. is being built…the world’s largest, single-line cement plant. Thirteen silos of varying dimensions Over 18 months, MC Industrial placed more are needed to accommodate raw and finished than 90,000-cubic-yards of concrete to complete PERfORmaNcE materials storage. MC Industrial started the all 13 silos. At peak, the project employed first two blend silos in the dead of winter. 700 tradespeople who worked round the clock on 12-hour shifts. The technique used to build these silos is called slip forming. Essentially, what slip forming means The silo project, at the time, ended up being the to the tradesmen is 24-7, non-stop work to place largest self perform contract ever executed by and finish the continuous flow of concrete. The MC Industrial with more than 700,000 manhours. cOmmitmENt blend silos took 170 MC Industrial tradespeople Pulling it off successfully required intense detailed (85 on each 12-hour shift), 2,125 manhours each planning. Every component was on hand and there day to pour and finish 6,015-yards of concrete was a good backup plan in place if problems arose. to complete. But, these two silos were just Managing and directing large amounts of a prelude to bigger things. manpower allows us to control rather than sERVicEs just document the job as some large CM-only firms may do.
  • 9. commitment sERVicEs cOmmitmENt commitment PERfORmaNcE Our commitment to you is to deliver a quality project that will exceed your expectations on all levels. What is commitment? MC Industrials believes Finally, the opportunity arrived. The client would PaRtN ERsh iP it’s doing “whatever it takes” to get the job test our mettle. We won $8.8 million worth of work done well. Sometimes our commitment is revealed on 8 hard bid projects. It was our time to shine. to an Owner long before a project is awarded and And shine, we did. crews begin to mobilize on the job site. It begins At the end of those 8 projects, a major project laid in the proving grounds…early in the relationship. waiting. We had already paved the way. The client It had been 10 years since MC Industrial knew what to expect. PlaNNiNg last worked on a project for the aerospace We approached the next job with the same manufacturer and we wanted to work with problem-solving mind set and dedication as all them again. Giving up wasn’t part of the deal. the others. And, despite scheduling complexities To prove just how serious our desire to work for and logistical challenges, we wowed the client this client was, we submitted bids on 26 projects ExPERiENcE with results far beyond their expectations. ranging in size from $50,000 to $2 million in the span of three years. succEss safEty PROVEN
  • 10. sERVicEs cOmmitmENt services PERfORmaNcE MC Industrial provides a broad array of construction and construction-related services nationwide. Project delivery methods include: Construction Management, Design-Build, Negotiated Contract, Hard Bid, Engineer/Procure/Construct PaRtN ERsh iP From comprehensive, value-added preconstruction services to conceptual estimating and scheduling to project closeout, MC Industrial uses sophisticated management systems to control every aspect of your project. The tools we use ensure that key project team members spend far less time completing paperwork for your project and more time out on the job site contributing to a quality project that exceeds your expectations. PlaNNiNg ExPERiENcE St. Louis Office Atlanta Office succEss 3117 Big Bend Blvd. 2100 RiverEdge Parkway, Suite 1010 St. Louis, MO 63143 Atlanta, GA 30328 ph: 314.646.4100 ph: 770.980.8183 fx: 314.646.4101 fx: 770.980.8363 safEty stl@mc-industrial.com atl@mc-industrial.com PROVEN
  • 11. mc industrial 3117 Big Bend Blvd. st. louis, mO 63143 ph: 314.646.4100 fx: 314.646.4101