UNCONTROLLED DOCUMENT WHEN PRINTED
                                                                            1


Self-Assessment and future planning for business development pages 1 – 12

                              PART TWO

                         Research and Development




   A Folder/File System and Process
                for the
      Integration of Management
               Practices,
                  with
       Risk and Quality Control
   Processes, Systems and Standards


                      Designed and Developed
                                by
                          Clive burgess©
                            April 2008
UNCONTROLLED DOCUMENT WHEN PRINTED
                                            SIA                                                   2
                                 Approved Contractor Scheme




                                              United Kingdom Security trading as Avon Security
Focus on the Future
Proposal Produce by Clive Burgess Security Manager Avon Security 4 April 2008

Aim
To gain recognition as an Approved Contractor by the SIA
To provide a quality service, retain existing customers, attract potential clients and gain their business by
exceeding their expectations

Objectives
To investigate the possibility and potential of United Kingdom Security gaining recognition as an
Approved Contractor by the SIA*

 Standard Documented Record Requirement
 1. Structure
 • Mission                                            The reason for document:
 • Values Stakeholder                                                         See Part One Page 6-8
 • Consumer
 • Customer                                                  To produce a ‘set up structure’ for the organisations
 • Critical Success Factors                           future practices
 • Goals
 • Code of Practice                                        To show the way I gathered the relevant
 • Procedures                                               information required for approval
 • Analysis
 • Performance                                             To set a benchmark and standards as a goal to
 • Approach                                                 achieve prior to the approval audit
 2. Processes                                              To create a process for GAP auditing
 • Key
 • Service Delivery                                        To show a document control system (Folder
 • Process                                                  on PC used for ‘set up the structure’ and new
 • Subcontractor                                            audit folder system and research)
 3. Commercial Relationship Management                     To demonstrate professionalism and
 4. Financial Management                                    commitment made to achieve company goals
 5. Resources                                               and SIA standards
 6. People
 7. Leadership
 8. Corporate Social Responsibility                                                            Clive Burgess
 9. Results

                            CONTINUOUS IMPROVEMENT Monitoring


   UNCONTROLLED DOCUMENT WHEN                           Page 2 of 12 Clive burgess© April 2008
             PRINTED
UNCONTROLLED DOCUMENT WHEN PRINTED

This instruction manual consists of two main sections –Construction of Section One
                                                                                3

Section One: Management Control – To Do                                                     Page 4
Layout of Section One - Documents
Revised Business Plan

       Critical Success Factors* 1: The Customer

Section One: Management Control – Continued –                                                Page 5

       Critical Success Factors* 2: The Employees

Contract of Employment: To Do

The main sections also contain a number of sub- sections.                                    Page 6

A varying number of folders/files systems are in each sub-section. These form the basis of the auditable process

Section One: Management Control has five sub-sections
Layout of pages in sub-sections contained within Section One: Management Control

CONTINUOUS IMPROVEMENT Monitoring                                                            Page 7

0 - Management Control
     Process Control Sub-Section Auditable Documents

PROCESSES
                                            Audit System
1 – Finance
     Service Office EFQM 1

2 – Information
     ISO 9001 2000 EFQM 2

CONTINUOUS IMPROVEMENT Monitoring                                                           Page 8

3 – People
     Management File EFQM 3

4 – Operations
     Visitor Control EFQM 4

5 – Risks
     Risk Management EFQM 5

CONTINUOUS IMPROVEMENT Monitoring                                                            Page 9

5 – Risks
     Management of H&S EFQM 6

Processes FEED-BACK LOOP + INFORMATION CONTROL PROCESS

     ISO 14001 EFQM 7

BENCHMARK: Proposal for a standard audit system for small businesses                        Page 10
Process and methods, profiles and practices that will help us achieve SIA ACS approval Standards

Schematic: Overview of Folders Expansion Filing System - Section One                        Page 11

Schematic: Overview of Folders Expansion Filing System: Section Two                          Page 12
UNCONTROLLED DOCUMENT WHEN PRINTED
        This instruction manual consists of two main sections 4
Section One: Management Control - To Do

Layout of Section One - Documents
                               Identifying Customer Requirements

Company Vision

Core Values and Beliefs

Mission Statement

Company Policy and Responsibilities

      Corporate Social Responsibility

      Health, Safety and Environmental Policy

      Quality Policy

      Information Security and Data Protection
-        Documented procedures" for the following three activities:
           1. Control of documents
           2. Control of records
           3. Internal audit

Code of Conduct

Initial Business Plan (As introduction) – with time limits and given time scale

                                  Identifying Customer Requirements
Revised Business Plan

      Aims and Objectives –

      Goal

       Key priority areas (KPA):
    Critical Success Factors* 1: The Customer

      Strategy

      Partner Development

                    Preparation of management system standards and practices

 Customer Focus
     Control of nonconforming product
     Customer Complains Procedure

      Preventive measures
      Corrective action
                                               Each main section contains a number of sub- sections.

    Page 4 of 12 Clive burgess© April 2008
UNCONTROLLED DOCUMENT WHEN PRINTED
                                                                                                        5
Section One: Management Control - Continued

Critical Success Factors* 2: The Employees

      Organisation and Arrangements
      Objective Plan
      Strategy

Contract of Employment: To Do

      Code of Practice

      Customer Service and External Clients

      Supervision and Leadership

      Roles and Responsibly, Guard – Officer – Dog Warden - Licensing

      Pay Structure and Holiday Payment - Contractual hours and time sheets etc.

      Rules, Regulations, Policies and Procedures
                                                       SECURITY HANDBOOK
      Committees and Communication                    ‘Prevention of damage to a Client’s premises
                                                                and property thus minimising any financial losses.’
                                                               Roles and Responsibilities
      Involvement and Inclusion - Teamwork                    Objective
                                                               Possible Assignments
                                                               Health and Safety Policy    Folder
      Equal Opportunities and Discrimination Policy           Accident Prevention
                                                                                            Manuals
                                                               Fire Safety
                                                               Traffic Management          EFQM 2
      *Risk Policy plus company policies see above            Signs and Signage
                                                               Five types of safety signs
                                                               Risk Management – The Security Guard
      Information, Instruction and Training                   Contingency Preparedness and Emergency
                                                               Response
                                                               Standards of Behaviour
      Induction Training (Produce a booklet)                  Professional Standards
                                                               Dress Code
                                                               Code of Conduct
      Measuring Performance                                   Working with Others – Punctuality
                                                               Customer Service – Standard of Care
      Intervention and Appraisals                             Communication - Getting the right message across
                                                               Dealing with Suspects and Intruders
                                                               Apprehending Suspects and Intruders
      Instigations and Inspections – monitoring               Use of Force
                                                               Observations and Security Inspections
                                                               Organisation at Work
      Emergency Procedures                                    Security Communication Network
                                                               Assignment Details
                                                               Gate Duty and Site Patrols
      Fire Safety                                             Main Objective:-
                                                               Reception Duty and Key Control
                                                               Main Objective:-
      First Aid                                               Daily Occurrence/Security Log and Incident Reports
                                                               Site Patrols
                                                               Searching People and Vehicles
      CCTV’s                                                  Reporting and Arresting Suspects
                                                               Evidence
                                                               On Site Security Control Unit and Welfare Facilities
      Work vehicles                                           Guidelines
                                                               Rules and Regulations, Policies and Procedures
                                                               Legislation – English Law
      Dogs                                                    Client’s Assignment Guidelines
                                                               Taking over an assignment

      Audits and Auditing                                     Confidentiality Use of Telephones
                                                               Fraud
                                                               Time Management and Personal Organisation
      Review of Policies and Procedures etc
                                                            Page 5 0f 12 Clive burgess© April 2008
UNCONTROLLED DOCUMENT WHEN PRINTED
                                                                                                 6

The main sections also contain a number of sub- sections.

A varying number of folders/files systems are in each sub-section. These form the basis of the
auditable process


Section One: Management Control has five sub-sections

Each of these has the description of the specific document/form required for auditing.

Each different document/form requires its own unique reference number

Four of the sub- sections have an auditable process at their heart

The fifth sub- section requires three different auditable processes



Management Control
   Process Control Auditable Documents

1 – Finance
     Service Office EFQM 1

2 – Information
     ISO 9001 2000 EFQM 2

3 – People
     Management File EFQM 3
                                                             A proposal for a folder/file system that
4 – Operations                                          ‘Integrates Management Practices, with Risk and
     Visitor Control EFQM 4                                 Quality Control Processes, Systems and
                                                           Standards’ – See Page 10 of this document
5 – Risks
     Risk Management EFQM 5
     Management of H&S EFQM 6
     ISO 14001 EFQM 7


Layout of pages in sub-sections contained within Section One: Management Control

    1) Contents
    2) Schematic or Process Map
    3) Key
    4) Customer specifications
    5) British or International standards
    6) Product-related legislation
    7) 'Scope'
    8) Definitions of key words used in sub- sections
    9) The auditable process or processes under each management control
    10) Step by step procedural guidelines


                                                          Page 6 of 12 Clive burgess© April 2008
UNCONTROLLED DOCUMENT WHEN PRINTED

                                                      CONTINUOUS IMPROVEMENT                                               7

                                                                                  Monitoring
0 - Management Control
                                                                                            PROCESSES
                      Process Control Sub-Section

                                                           Auditable Documents
                                                                                   Each process links together with the
1 – Finance                                                                        next and so on to form a complete
     Service Office EFQM 1                                                        overview of the social and cultural
                                              1- Contents                          aspects of control used to manage
                                              2- Schematic or Process              workplace situations, as and when they
                                              3- Aims and Objectives               develop…
                                              4- Audits
                                              5- Budgets, Purchasing and Action Planning
                                              6- CAR’s
                                              7- Communication Link                                             Legal
                                                                                                              Guidelines
                                              8- Finance*
                                              9- Insurance*
                                              10- Legal Guidelines*
            Self-Regulating




                                              11- Manuals
                                              12- Policy Proposals*




                                                                                                                                   Conditions
                                              13- Policy Control*                                            COMPLIANCE




                                                                                                   Control
                                              14- Policy Instruction*
                                              15- Quality Standard
                                              16- Records
                                              17- Register
                                              18- Roles and Responsibilities
                                              19- Safe Systems of Work                                        Objective
                                              20- Specifications                                                Plan



                                  2 – Information
                                       ISO 9001 2000 EFQM 2

                                                                 1- Contents
                                                                 2- Schematic or Process
                              Objective                          3- Aims and Objectives
                                Plan                             4- Audits
                                                                 5- Budgets, Purchasing and Action Planning
                                                                 6- CAR’s
                                                                 7- Communication Link
                                                                                                                           Committees




                                                                 8- Manuals – UK S Manual
                                          Implementation




                                                                 9- New Rules and Regulations**
   Review




            CONSULTATION
                                                                 10- Process Control**
                                                                 11- Process Instruction**
                                                                 12- Quality Standards
                                                                 13- Records
                                                                 14- Register
                               Patterns                          15- Roles and Responsibilities
                                  of                             16- Safe Systems of Work
                              Behaviour                          17- Specifications

                                                                            Page 7 of 12 Clive burgess© April 2008
UNCONTROLLED DOCUMENT WHEN PRINTED

                                                                           CONTINUOUS IMPROVEMENT       8
                                                                                             Monitoring


  3 – People
       Management File EFQM 3

                                                       1-  Contents
                                                       2-  Schematic or Process
                            Patterns                   3-  Annual Leave & Official Holiday Dates




                                                                                                                                           Roles and Responsibilities
                               of
                           Behaviour                   4-  Appraisals
                                                       5-  Contractual Obligations, Roles and Responsibilities
                                                       6-  Disciplinary & Grievance Procedures
                                                       7-  Employment t Contract t Research***
 Competition




                                         Cooperation




                           TEAMWORK                    8-  Management Controls, BSO, BSI, Accident Investigations &
                                                           Risk Assessments
                                                       9- Management Supervision and all Leaders
                                                       10- Process Control, Counselling and Retraining
                                                       11- Staff
                            Rational                   12- SIA Licensing
                          Organisation                 13- Shift Rota
                                                       14- Special Occasions and Birthdays etc
                                                       15- Training Folder
                         4 – Operations
                              Visitor Control EFQM 4
                                                                                                               Rational
                                                                                                             Organisation
 Measuring Performance




                                                       1-   Contents
                                                       2-   Schematic or Process
                                                       3-   Customer Representatives




                                                                                                                            Coordination
                                                       4-   Customer Complains
                                                                                                Competence



                                                                                                             MANAGEMENT
                                                       5-   Customer Service – Visitors
                                                       6-   Outside Contractors
                                                       7-   UK S Customers
                                                       8-   Security Partners
                                                                                                                Legal
                                                                                                              Guidelines

                          5 – Risks
                               Risk Management EFQM 5

                                  1- Contents
                                           CONDUCT
                                  2- Schematic or Process
                                  3- Causes of human failure
     Objective         Patterns
       Plan               of      4- Contractors Risk Assessments
                      Behaviour   5- Crime - Understanding of
                                  6- Environmental Risk Assessments
                                  7- HSE Risk Management 2005 – 8
                                  8- Manual Handling Risk Assessments
      Legal            Rational   9- Operations (COSHH) Risk Assessments
    Guidelines        Organisatio
                                  10- PUWER Risk Assessments
                    INCLUSION     11- Risk Assessments used in waste flows
                                  12- Security Implementations & Associated Risk Assessments
      Workplace Environment
                                  13- Security Risk Assessments
                                  14- Weekend & Loan Worker Activity Risk Assessments
CONTINUOUS IMPROVEMENT 15- Work Reports 2007

                                                              Monitoring       Page 8 of 12 Clive burgess© April 2008
CONTINUOUS IMPROVEMENT                                       UNCONTROLLED DOCUMENT WHEN
                      Monitoring                                           PRINTED        9

  Management of H&S EFQM 6
                                                                                                        PROCESSES

                                                                                                                                                       Corrective
     1-  Contents                            Supervision                                                                                                Action
                                                                                     Authority                    Intervention
     2-  Schematic or Process
     3-  Aims and Objectives            COST




                                                                                                                                                               Appraisal
                                                                                                         Committees




                                                                          Analysis
     4-  Audits
     5-  Budgets, Purchasing and Action                                                                  Communication




                                                                                                                                  Roles and Responsibilities
         Planning                            BENEFIT
     6- CAR’s




                                                                                      Self-Regulating
     7- External Sanctions*******                                                                               Commitment
     8- Manuals
     9- Process Control                                                                  Patten Maintenance
     10- Process Instructions
     11- Quality Standards
     12- Records                                                                                         Inspections and




                                                                                                                                                               Assessment
     13- Register                                                                                         Investigation


                                                                          Appeal
     14- Roles and Responsibilities                                                     Measuring Performance
     15- Safe Systems of Work                                                           Sanction                           Strategy
     16- Specifications
                                                                Corrective                                                       Supervision
                                                                 Action
 FEED-BACK LOOP
                                                                              INFORMATION CONTROL
                                                                                    PROCESS
                      CONSULTATION
          Objective                   Patterns
            Plan                         of
                                     Behaviour

     COMPLIANCE                  TEAMWORK                        ISO 14001 EFQM 7


                                                                     1-  Audits
            Legal                    Rational
          Guidelines                Organisatio
                                                                     2-  Budgets, Purchasing and Action Planning
                       MANAGEMENT
                                                                     3-  CAR’s
                                                                     4-  Communication Link & Reportable
                                                                         occupancies
                                                                     5- Current Legislation
Body Corporate            Employees at all levels                    6- Manuals & Register
               Information                                           7- Policy Statement Aims, Objectives & Targets
                     Instruction                                     8- Process Control
     Objective                           Patterns
       Plan           Norms or              of                       9- Process Instructions
                      Conformance       Behaviour                    10- Quality Standards
                                                                     11- Records
   Non-                                                              12- Risk Assessments
   Conscious                           Errors, Mistakes
                                                                     13- Roles and Responsibilities
   Awareness                        Violations                       14- Safe Systems of Work
                                           Training                  15- Site Plans & Site Usage History
 Force                                                               16- Specifications
                                                                     17- Water system Risk Assessment
                                                   Rational
       Legal           Deviant   Focus            Organisatio
     Guidelines

                                                                  CONTINUOUS IMPROVEMENT
                                                  Workplace                            Monitoring
 Government                                      Environment           Page 9 of 12 Clive burgess© April 2008
A proposal for a folder/file system that
                                                                                             10

‘Integrates Management Practices, with Risk and Quality Control
Processes, Systems and Standards’
                                                                    Designed and Developed
        Auditable Documents Links all EFQM folders
                                                                              by
                                                                        Clive burgess©
    Contents                                                              April 2008
    Structure of Organisation and Arrangements

           1- Schematic or Process
           2- Aims and Objectives - Mission
           3- Audits – Internal External (this includes the Initial Internal Audits)
           4- Budgets, Purchasing and Action Planning
           5- CAR’s and Preventative Measures
           6- Communication Link – Web Site Development – Transparency
           7- Finance* Financial Management – Business Stability
           8- Insurance*
           9- Legal Guidelines* Rules, Regulations, Policies & Procedures in relation to Employment
           10- Manuals UK S Manual and Registers
           11- Policy Proposals* Corporate Social Responsibility
           12- Policy Control* Data Protection & Information Control - Policy Instruction*
           13- Quality Standard
           14- New Rules and Regulations**
           15- Process Control**- Process Instruction**
           16- Employees: Values Stakeholders
                    Employment Contract - Annual Leave & Official Holiday Dates – Appraisals -
                      Contractual Obligations - Roles and Responsibilities – Guards – Officers – Dog
                      Warden – Vehicles - Equal Opportunities – Pay Structure - Disciplinary &
                      Grievance Procedures***TUPE - Work vehicles – Dog handlers
           21- Management Controls: Leadership
                    BSO – BSI - Accident Investigations & Risk Assessments - Understanding
                      Crime - Contractors Risk Assessments - Environmental Risk Assessments -
                      HSE Risk Management 2005 – 8 - Manual Handling Risk Assessments -
                      Operations (COSHH) Risk Assessments - PUWER Risk Assessments - Risk
                      Assessments used in waste flows - Security Implementations & Associated Risk
                      Assessments - Security Risk Assessments - Weekend & Loan Worker Activity
                      Risk Assessments - Work Reports 2007 - External Sanctions
           22- Management Supervision and all Leaders Process Control:
                    Counselling and Retraining –Working Shift Rota –SIA Licensing – Holidays -
                      Special Occasions and Birthdays etc - Staff Training Folder Matrix etc
           23- Customers: Commercial Relationship Management
                    Customer Representatives - Customer Complains - Customer Service – Visitors
                      Outside - Contractors UK S - Customers Security Partners
           24- Records
           25- Safe Systems of Work
           26- Specifications


    BENCHMARK:
    Process and methods, profiles and practices that will help us achieve SIA ACS approval Standards


                         UNCONTROLLED DOCUMENT WHEN PRINTED
Schematic: Overview of Folders Expansion Filing System - Section One 11

                                                                      How to access folders and documents in this system
Main Folder

                    QC Process 08
                    US SEC
                                           Management Control          Process Control        Auditable Documents



                                              1 - Finance               Service Office                 Full System
                                                                        EFQM 1                              One




                                              2 - Information           ISO 9001 2000                  Full System
                                                                        EFQM 2                             Two
 Section One: Management Control




                                              3 - People                Management File                Full System
                                                                        EFQM 3                            Three




                                              4 - Operations            Visitor Control                Full System
                                                                        EFQM 4                            Four

                                                                        Work Vehicles


                                                                        Agenda
                                                                        Templates


                                                                                                       Full System
                                              5 - Risks                 Risk Management                    Five
                                                                        EFQM 5


           Folders 6 - 8                                                Management of                  Full System
                                                                        H&S EFQM 6                          Six
Research and Development Section:
information used for creating new processes                             ISO 14001
                                                                        EFQM 7                         Full System
                                                                                                         Seven
    BENCHMARK:
    Process and methods, profiles and practices that will help us achieve SIA ACS approval Standards

                   UNCONTROLLED DOCUMENT WHEN PRINTED                           Page 11 of 12 Clive burgess© April 2008
Schematic: Overview of Folders Expansion Filing System: Section Two
                                                                                                                                                                                                      12
       Main Folder

                                                                                                                                Management Control     Process Control           Non-Auditable Documents
                                       QC Process 08
                                       US SEC
                                                                                                                               6 - Research           QC Process                           1 QC Tools
                                                                                                                                                      Research                             2 SAP
                                                                                                                                                                                           3 Six Sigma



                                                                                                                                                                                            ISO
                                                                                                                               7 - Process            Seven Word                            9001
                                                                                                                                                      Documents on                          Researc
                                                                                                                                                      Processes and
Research and Development Section: Use for Information Only:




                                                                                                                                                                                            h
                                                                                                                                                      Systems used
                                                                                                                                                      in practice



                                                                                                                               8 – Profile              Security
                                                                                                                               Standard                 Associations 08               Join NASP files
                                                                                                                                                                                      Membership Form 1



                                                                                                                                                      Two Word
                                                                                                                                                      Documents on
                                                                                                                                                      Projects and
                                                              Process and methods, profiles and practices that will help us




                                                                                                                                                      processes



                                                                                                                                                     Four PDFs files on
                                                                                                                                                     Business                                                Web
                                                                                                                                                     standards, services                  1 ACS Assessors
                                                                                                                                                     and practices                        2 ACS Assistance
                                                              achieve SIA ACS approval Standards




                                                                                                                                                                                          3 Approval Criteria



                                                                                                                                                                                           Eight PDFs SIA ACS
                                                                                                                              9 – SIA ACS 08            ACS Approval                       Workbooks, Guides,
                                                                                                                                                                                           Standards etc
                                                              BENCHMARK:




                                                                                                                                                        SI Acts and
                                                                                                                                                        Regulations                   Two PDFs CBI
                                                                                                                                                                                      spotlight
                                                                                                                                                                                      SIA Impact of Regs
                                                                                                                                                        SIA Plans & Case
                                                                                                                              10 – UK S                 Studies
                                                                                                                              Internet info
                                                                                                                                                                                        SIA Case Study – 4
                                                                                                                                                                                        SIA 05 08 Business
                                                                                                                                                        Multi - Documents on
                                                                                                                                                        web UK S                        Plans

                                                              UNCONTROLLED DOCUMENT WHEN                                                                                 Page 12 of 12 Clive burgess© April 2008
                                                                        PRINTED

Contenu connexe

Tendances

AIA SOX Conference May 2009 - CCM & Data Analytics
AIA SOX Conference May 2009 - CCM & Data AnalyticsAIA SOX Conference May 2009 - CCM & Data Analytics
AIA SOX Conference May 2009 - CCM & Data Analyticsprosenzw69
 
TQA Cat 6 Process Management
TQA Cat 6 Process ManagementTQA Cat 6 Process Management
TQA Cat 6 Process ManagementAreté Partners
 
Advance controls 2013
Advance controls 2013Advance controls 2013
Advance controls 2013Zeeshan Khan
 
SOP Management Factsheet
SOP Management FactsheetSOP Management Factsheet
SOP Management FactsheetNextDocs
 
Progress Through Process
Progress Through ProcessProgress Through Process
Progress Through Processmanageit
 
CMMI v 1.2 Basics
CMMI v 1.2 BasicsCMMI v 1.2 Basics
CMMI v 1.2 BasicsQAI
 
Critical Success Factors for Contract Management Automation_IACCM
Critical Success Factors for Contract Management Automation_IACCMCritical Success Factors for Contract Management Automation_IACCM
Critical Success Factors for Contract Management Automation_IACCMZycus
 
Is an agile SDLC an oxymoron?
Is an agile SDLC an oxymoron? Is an agile SDLC an oxymoron?
Is an agile SDLC an oxymoron? Dave Sharrock
 

Tendances (9)

AIA SOX Conference May 2009 - CCM & Data Analytics
AIA SOX Conference May 2009 - CCM & Data AnalyticsAIA SOX Conference May 2009 - CCM & Data Analytics
AIA SOX Conference May 2009 - CCM & Data Analytics
 
TQA Cat 6 Process Management
TQA Cat 6 Process ManagementTQA Cat 6 Process Management
TQA Cat 6 Process Management
 
COBIT 5 & 4.1 Comparison
COBIT 5 & 4.1 ComparisonCOBIT 5 & 4.1 Comparison
COBIT 5 & 4.1 Comparison
 
Advance controls 2013
Advance controls 2013Advance controls 2013
Advance controls 2013
 
SOP Management Factsheet
SOP Management FactsheetSOP Management Factsheet
SOP Management Factsheet
 
Progress Through Process
Progress Through ProcessProgress Through Process
Progress Through Process
 
CMMI v 1.2 Basics
CMMI v 1.2 BasicsCMMI v 1.2 Basics
CMMI v 1.2 Basics
 
Critical Success Factors for Contract Management Automation_IACCM
Critical Success Factors for Contract Management Automation_IACCMCritical Success Factors for Contract Management Automation_IACCM
Critical Success Factors for Contract Management Automation_IACCM
 
Is an agile SDLC an oxymoron?
Is an agile SDLC an oxymoron? Is an agile SDLC an oxymoron?
Is an agile SDLC an oxymoron?
 

Similaire à A folder sysem for uks 2008 2011

Basic Internal Auditing Presentation
Basic Internal Auditing PresentationBasic Internal Auditing Presentation
Basic Internal Auditing PresentationVernon Benjamin
 
Internal auditor training
Internal auditor trainingInternal auditor training
Internal auditor trainingqauditor11
 
Process Documentation
Process DocumentationProcess Documentation
Process DocumentationJobaq
 
Rob kloots auditingforscyandbcm
Rob kloots auditingforscyandbcmRob kloots auditingforscyandbcm
Rob kloots auditingforscyandbcmRobert Kloots
 
Iso9001 implementation increasing-value_reducing_leadtime
Iso9001 implementation increasing-value_reducing_leadtimeIso9001 implementation increasing-value_reducing_leadtime
Iso9001 implementation increasing-value_reducing_leadtimeOmnex Inc.
 
Business Continuity and Information Security- An Excellent Fit!
Business Continuity and Information Security- An Excellent Fit!Business Continuity and Information Security- An Excellent Fit!
Business Continuity and Information Security- An Excellent Fit!Continuity and Resilience
 
Approach note on internal audit [compatibility mode]
Approach note on internal audit [compatibility mode]Approach note on internal audit [compatibility mode]
Approach note on internal audit [compatibility mode]Deep Kumar Mendiratta
 
Getting Started With CMMi level 3
Getting Started With CMMi level 3Getting Started With CMMi level 3
Getting Started With CMMi level 3Manas Das
 
Get Ready for Solvency II with Oracle's Hyperion Profitability and Cost Manag...
Get Ready for Solvency II with Oracle's Hyperion Profitability and Cost Manag...Get Ready for Solvency II with Oracle's Hyperion Profitability and Cost Manag...
Get Ready for Solvency II with Oracle's Hyperion Profitability and Cost Manag...Alithya
 
G12: Implementation to Business Value
G12: Implementation to Business ValueG12: Implementation to Business Value
G12: Implementation to Business ValueHyTrust
 
INTEGRATED MANAGEMENT SYSTEM IMS
INTEGRATED MANAGEMENT SYSTEM IMSINTEGRATED MANAGEMENT SYSTEM IMS
INTEGRATED MANAGEMENT SYSTEM IMSSEHAR AREEJ
 
Business process improvement (special report) presentation
Business process improvement (special report) presentationBusiness process improvement (special report) presentation
Business process improvement (special report) presentationMichael Ligayo
 
Pm for application development
Pm for application developmentPm for application development
Pm for application developmentAbdelrahman Serag
 
Solvency - II Programme Setup
Solvency - II Programme SetupSolvency - II Programme Setup
Solvency - II Programme Setupgainline
 
Merger Implementation Steps+Issues
Merger Implementation Steps+IssuesMerger Implementation Steps+Issues
Merger Implementation Steps+IssuesHal Amens
 
4 Quality System Musts for Medtech Startups to Get Safer Products to Market F...
4 Quality System Musts for Medtech Startups to Get Safer Products to Market F...4 Quality System Musts for Medtech Startups to Get Safer Products to Market F...
4 Quality System Musts for Medtech Startups to Get Safer Products to Market F...Greenlight Guru
 

Similaire à A folder sysem for uks 2008 2011 (20)

Basic Internal Auditing Presentation
Basic Internal Auditing PresentationBasic Internal Auditing Presentation
Basic Internal Auditing Presentation
 
Diskusi buku: Securing an IT Organization through Governance, Risk Management...
Diskusi buku: Securing an IT Organization through Governance, Risk Management...Diskusi buku: Securing an IT Organization through Governance, Risk Management...
Diskusi buku: Securing an IT Organization through Governance, Risk Management...
 
Internal auditor training
Internal auditor trainingInternal auditor training
Internal auditor training
 
API Q1.pptx
API Q1.pptxAPI Q1.pptx
API Q1.pptx
 
Process Documentation
Process DocumentationProcess Documentation
Process Documentation
 
Rob kloots auditingforscyandbcm
Rob kloots auditingforscyandbcmRob kloots auditingforscyandbcm
Rob kloots auditingforscyandbcm
 
Iso9001 implementation increasing-value_reducing_leadtime
Iso9001 implementation increasing-value_reducing_leadtimeIso9001 implementation increasing-value_reducing_leadtime
Iso9001 implementation increasing-value_reducing_leadtime
 
Business Continuity and Information Security- An Excellent Fit!
Business Continuity and Information Security- An Excellent Fit!Business Continuity and Information Security- An Excellent Fit!
Business Continuity and Information Security- An Excellent Fit!
 
Approach note on internal audit [compatibility mode]
Approach note on internal audit [compatibility mode]Approach note on internal audit [compatibility mode]
Approach note on internal audit [compatibility mode]
 
Getting Started With CMMi level 3
Getting Started With CMMi level 3Getting Started With CMMi level 3
Getting Started With CMMi level 3
 
Get Ready for Solvency II with Oracle's Hyperion Profitability and Cost Manag...
Get Ready for Solvency II with Oracle's Hyperion Profitability and Cost Manag...Get Ready for Solvency II with Oracle's Hyperion Profitability and Cost Manag...
Get Ready for Solvency II with Oracle's Hyperion Profitability and Cost Manag...
 
G12: Implementation to Business Value
G12: Implementation to Business ValueG12: Implementation to Business Value
G12: Implementation to Business Value
 
INTEGRATED MANAGEMENT SYSTEM IMS
INTEGRATED MANAGEMENT SYSTEM IMSINTEGRATED MANAGEMENT SYSTEM IMS
INTEGRATED MANAGEMENT SYSTEM IMS
 
Business process improvement (special report) presentation
Business process improvement (special report) presentationBusiness process improvement (special report) presentation
Business process improvement (special report) presentation
 
Pm for application development
Pm for application developmentPm for application development
Pm for application development
 
Process
ProcessProcess
Process
 
Solvency - II Programme Setup
Solvency - II Programme SetupSolvency - II Programme Setup
Solvency - II Programme Setup
 
Merger Implementation Steps+Issues
Merger Implementation Steps+IssuesMerger Implementation Steps+Issues
Merger Implementation Steps+Issues
 
Iso9000
Iso9000Iso9000
Iso9000
 
4 Quality System Musts for Medtech Startups to Get Safer Products to Market F...
4 Quality System Musts for Medtech Startups to Get Safer Products to Market F...4 Quality System Musts for Medtech Startups to Get Safer Products to Market F...
4 Quality System Musts for Medtech Startups to Get Safer Products to Market F...
 

Plus de Clive Burgess

The year of the horse 2014 enter the dragon Clive Burgess The Sociology of co...
The year of the horse 2014 enter the dragon Clive Burgess The Sociology of co...The year of the horse 2014 enter the dragon Clive Burgess The Sociology of co...
The year of the horse 2014 enter the dragon Clive Burgess The Sociology of co...Clive Burgess
 
Pbog in defence of safety at work 2014 pp22
Pbog in defence of safety at work 2014 pp22Pbog in defence of safety at work 2014 pp22
Pbog in defence of safety at work 2014 pp22Clive Burgess
 
Pbog in defence of Safety at Work 2014 - Wake Up Britain!!!
Pbog in defence of Safety at Work 2014 - Wake Up Britain!!!Pbog in defence of Safety at Work 2014 - Wake Up Britain!!!
Pbog in defence of Safety at Work 2014 - Wake Up Britain!!!Clive Burgess
 
Pbog the sociology of organisational life - The problems with labour in relat...
Pbog the sociology of organisational life - The problems with labour in relat...Pbog the sociology of organisational life - The problems with labour in relat...
Pbog the sociology of organisational life - The problems with labour in relat...Clive Burgess
 
The problems of labour and the renewal of socialism by colin burgess
The problems of labour and the renewal of socialism by colin burgessThe problems of labour and the renewal of socialism by colin burgess
The problems of labour and the renewal of socialism by colin burgessClive Burgess
 
Action science 2 facebook may 2013 (2)
Action science 2 facebook may 2013 (2)Action science 2 facebook may 2013 (2)
Action science 2 facebook may 2013 (2)Clive Burgess
 
Pbog 50 days to save the planet 9 2012
Pbog 50 days to save the planet 9 2012Pbog 50 days to save the planet 9 2012
Pbog 50 days to save the planet 9 2012Clive Burgess
 
Pbog 50 days to save the planet behavioural economics 2012
Pbog 50 days to save the planet   behavioural economics 2012Pbog 50 days to save the planet   behavioural economics 2012
Pbog 50 days to save the planet behavioural economics 2012Clive Burgess
 
Pbog 50 days to save the planet 5 oct 2012
Pbog 50 days to save the planet 5 oct 2012Pbog 50 days to save the planet 5 oct 2012
Pbog 50 days to save the planet 5 oct 2012Clive Burgess
 
Pbog 50 days to save the planet 4 oct 2012
Pbog 50 days to save the planet 4 oct 2012Pbog 50 days to save the planet 4 oct 2012
Pbog 50 days to save the planet 4 oct 2012Clive Burgess
 
Pbog 50 days to save the planet 3 oct 2012
Pbog 50 days to save the planet 3 oct 2012Pbog 50 days to save the planet 3 oct 2012
Pbog 50 days to save the planet 3 oct 2012Clive Burgess
 
Pbog 50 days to save the planet 2 oct 2012
Pbog 50 days to save the planet 2 oct 2012Pbog 50 days to save the planet 2 oct 2012
Pbog 50 days to save the planet 2 oct 2012Clive Burgess
 
Pbog 50 days to save the planet oct 2012
Pbog 50 days to save the planet oct 2012Pbog 50 days to save the planet oct 2012
Pbog 50 days to save the planet oct 2012Clive Burgess
 
Pbog getting it together oct 2012 clive burgess, clive live, good stuff
Pbog getting it together oct 2012 clive burgess, clive live, good stuffPbog getting it together oct 2012 clive burgess, clive live, good stuff
Pbog getting it together oct 2012 clive burgess, clive live, good stuffClive Burgess
 
Pbog on sklair oct 2012 2
Pbog on sklair oct 2012   2Pbog on sklair oct 2012   2
Pbog on sklair oct 2012 2Clive Burgess
 
Pbog the brain to law oct 2012
Pbog   the brain to law oct 2012Pbog   the brain to law oct 2012
Pbog the brain to law oct 2012Clive Burgess
 
Twitter stuff 1 oct 2012
Twitter stuff 1 oct 2012Twitter stuff 1 oct 2012
Twitter stuff 1 oct 2012Clive Burgess
 
Sustainable development 2012 stuff 2
Sustainable development 2012 stuff 2Sustainable development 2012 stuff 2
Sustainable development 2012 stuff 2Clive Burgess
 
Site induction uks 2007 2011
Site induction uks 2007   2011Site induction uks 2007   2011
Site induction uks 2007 2011Clive Burgess
 
Wow complex pbog - they 2008
Wow   complex pbog - they 2008Wow   complex pbog - they 2008
Wow complex pbog - they 2008Clive Burgess
 

Plus de Clive Burgess (20)

The year of the horse 2014 enter the dragon Clive Burgess The Sociology of co...
The year of the horse 2014 enter the dragon Clive Burgess The Sociology of co...The year of the horse 2014 enter the dragon Clive Burgess The Sociology of co...
The year of the horse 2014 enter the dragon Clive Burgess The Sociology of co...
 
Pbog in defence of safety at work 2014 pp22
Pbog in defence of safety at work 2014 pp22Pbog in defence of safety at work 2014 pp22
Pbog in defence of safety at work 2014 pp22
 
Pbog in defence of Safety at Work 2014 - Wake Up Britain!!!
Pbog in defence of Safety at Work 2014 - Wake Up Britain!!!Pbog in defence of Safety at Work 2014 - Wake Up Britain!!!
Pbog in defence of Safety at Work 2014 - Wake Up Britain!!!
 
Pbog the sociology of organisational life - The problems with labour in relat...
Pbog the sociology of organisational life - The problems with labour in relat...Pbog the sociology of organisational life - The problems with labour in relat...
Pbog the sociology of organisational life - The problems with labour in relat...
 
The problems of labour and the renewal of socialism by colin burgess
The problems of labour and the renewal of socialism by colin burgessThe problems of labour and the renewal of socialism by colin burgess
The problems of labour and the renewal of socialism by colin burgess
 
Action science 2 facebook may 2013 (2)
Action science 2 facebook may 2013 (2)Action science 2 facebook may 2013 (2)
Action science 2 facebook may 2013 (2)
 
Pbog 50 days to save the planet 9 2012
Pbog 50 days to save the planet 9 2012Pbog 50 days to save the planet 9 2012
Pbog 50 days to save the planet 9 2012
 
Pbog 50 days to save the planet behavioural economics 2012
Pbog 50 days to save the planet   behavioural economics 2012Pbog 50 days to save the planet   behavioural economics 2012
Pbog 50 days to save the planet behavioural economics 2012
 
Pbog 50 days to save the planet 5 oct 2012
Pbog 50 days to save the planet 5 oct 2012Pbog 50 days to save the planet 5 oct 2012
Pbog 50 days to save the planet 5 oct 2012
 
Pbog 50 days to save the planet 4 oct 2012
Pbog 50 days to save the planet 4 oct 2012Pbog 50 days to save the planet 4 oct 2012
Pbog 50 days to save the planet 4 oct 2012
 
Pbog 50 days to save the planet 3 oct 2012
Pbog 50 days to save the planet 3 oct 2012Pbog 50 days to save the planet 3 oct 2012
Pbog 50 days to save the planet 3 oct 2012
 
Pbog 50 days to save the planet 2 oct 2012
Pbog 50 days to save the planet 2 oct 2012Pbog 50 days to save the planet 2 oct 2012
Pbog 50 days to save the planet 2 oct 2012
 
Pbog 50 days to save the planet oct 2012
Pbog 50 days to save the planet oct 2012Pbog 50 days to save the planet oct 2012
Pbog 50 days to save the planet oct 2012
 
Pbog getting it together oct 2012 clive burgess, clive live, good stuff
Pbog getting it together oct 2012 clive burgess, clive live, good stuffPbog getting it together oct 2012 clive burgess, clive live, good stuff
Pbog getting it together oct 2012 clive burgess, clive live, good stuff
 
Pbog on sklair oct 2012 2
Pbog on sklair oct 2012   2Pbog on sklair oct 2012   2
Pbog on sklair oct 2012 2
 
Pbog the brain to law oct 2012
Pbog   the brain to law oct 2012Pbog   the brain to law oct 2012
Pbog the brain to law oct 2012
 
Twitter stuff 1 oct 2012
Twitter stuff 1 oct 2012Twitter stuff 1 oct 2012
Twitter stuff 1 oct 2012
 
Sustainable development 2012 stuff 2
Sustainable development 2012 stuff 2Sustainable development 2012 stuff 2
Sustainable development 2012 stuff 2
 
Site induction uks 2007 2011
Site induction uks 2007   2011Site induction uks 2007   2011
Site induction uks 2007 2011
 
Wow complex pbog - they 2008
Wow   complex pbog - they 2008Wow   complex pbog - they 2008
Wow complex pbog - they 2008
 

Dernier

The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceDamini Dixit
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876dlhescort
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceDamini Dixit
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 

Dernier (20)

The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 

A folder sysem for uks 2008 2011

  • 1. UNCONTROLLED DOCUMENT WHEN PRINTED 1 Self-Assessment and future planning for business development pages 1 – 12 PART TWO Research and Development A Folder/File System and Process for the Integration of Management Practices, with Risk and Quality Control Processes, Systems and Standards Designed and Developed by Clive burgess© April 2008
  • 2. UNCONTROLLED DOCUMENT WHEN PRINTED SIA 2 Approved Contractor Scheme United Kingdom Security trading as Avon Security Focus on the Future Proposal Produce by Clive Burgess Security Manager Avon Security 4 April 2008 Aim To gain recognition as an Approved Contractor by the SIA To provide a quality service, retain existing customers, attract potential clients and gain their business by exceeding their expectations Objectives To investigate the possibility and potential of United Kingdom Security gaining recognition as an Approved Contractor by the SIA* Standard Documented Record Requirement 1. Structure • Mission The reason for document: • Values Stakeholder See Part One Page 6-8 • Consumer • Customer  To produce a ‘set up structure’ for the organisations • Critical Success Factors future practices • Goals • Code of Practice  To show the way I gathered the relevant • Procedures information required for approval • Analysis • Performance  To set a benchmark and standards as a goal to • Approach achieve prior to the approval audit 2. Processes  To create a process for GAP auditing • Key • Service Delivery  To show a document control system (Folder • Process on PC used for ‘set up the structure’ and new • Subcontractor audit folder system and research) 3. Commercial Relationship Management  To demonstrate professionalism and 4. Financial Management commitment made to achieve company goals 5. Resources and SIA standards 6. People 7. Leadership 8. Corporate Social Responsibility Clive Burgess 9. Results CONTINUOUS IMPROVEMENT Monitoring UNCONTROLLED DOCUMENT WHEN Page 2 of 12 Clive burgess© April 2008 PRINTED
  • 3. UNCONTROLLED DOCUMENT WHEN PRINTED This instruction manual consists of two main sections –Construction of Section One 3 Section One: Management Control – To Do Page 4 Layout of Section One - Documents Revised Business Plan  Critical Success Factors* 1: The Customer Section One: Management Control – Continued – Page 5  Critical Success Factors* 2: The Employees Contract of Employment: To Do The main sections also contain a number of sub- sections. Page 6 A varying number of folders/files systems are in each sub-section. These form the basis of the auditable process Section One: Management Control has five sub-sections Layout of pages in sub-sections contained within Section One: Management Control CONTINUOUS IMPROVEMENT Monitoring Page 7 0 - Management Control  Process Control Sub-Section Auditable Documents PROCESSES Audit System 1 – Finance  Service Office EFQM 1 2 – Information  ISO 9001 2000 EFQM 2 CONTINUOUS IMPROVEMENT Monitoring Page 8 3 – People  Management File EFQM 3 4 – Operations  Visitor Control EFQM 4 5 – Risks  Risk Management EFQM 5 CONTINUOUS IMPROVEMENT Monitoring Page 9 5 – Risks  Management of H&S EFQM 6 Processes FEED-BACK LOOP + INFORMATION CONTROL PROCESS  ISO 14001 EFQM 7 BENCHMARK: Proposal for a standard audit system for small businesses Page 10 Process and methods, profiles and practices that will help us achieve SIA ACS approval Standards Schematic: Overview of Folders Expansion Filing System - Section One Page 11 Schematic: Overview of Folders Expansion Filing System: Section Two Page 12
  • 4. UNCONTROLLED DOCUMENT WHEN PRINTED This instruction manual consists of two main sections 4 Section One: Management Control - To Do Layout of Section One - Documents Identifying Customer Requirements Company Vision Core Values and Beliefs Mission Statement Company Policy and Responsibilities  Corporate Social Responsibility  Health, Safety and Environmental Policy  Quality Policy  Information Security and Data Protection - Documented procedures" for the following three activities: 1. Control of documents 2. Control of records 3. Internal audit Code of Conduct Initial Business Plan (As introduction) – with time limits and given time scale Identifying Customer Requirements Revised Business Plan  Aims and Objectives –  Goal  Key priority areas (KPA): Critical Success Factors* 1: The Customer  Strategy  Partner Development Preparation of management system standards and practices Customer Focus  Control of nonconforming product  Customer Complains Procedure  Preventive measures  Corrective action Each main section contains a number of sub- sections. Page 4 of 12 Clive burgess© April 2008
  • 5. UNCONTROLLED DOCUMENT WHEN PRINTED 5 Section One: Management Control - Continued Critical Success Factors* 2: The Employees  Organisation and Arrangements  Objective Plan  Strategy Contract of Employment: To Do  Code of Practice  Customer Service and External Clients  Supervision and Leadership  Roles and Responsibly, Guard – Officer – Dog Warden - Licensing  Pay Structure and Holiday Payment - Contractual hours and time sheets etc.  Rules, Regulations, Policies and Procedures SECURITY HANDBOOK  Committees and Communication ‘Prevention of damage to a Client’s premises and property thus minimising any financial losses.’  Roles and Responsibilities  Involvement and Inclusion - Teamwork  Objective  Possible Assignments  Health and Safety Policy Folder  Equal Opportunities and Discrimination Policy  Accident Prevention Manuals  Fire Safety  Traffic Management EFQM 2  *Risk Policy plus company policies see above  Signs and Signage  Five types of safety signs  Risk Management – The Security Guard  Information, Instruction and Training  Contingency Preparedness and Emergency  Response  Standards of Behaviour  Induction Training (Produce a booklet)  Professional Standards  Dress Code  Code of Conduct  Measuring Performance  Working with Others – Punctuality  Customer Service – Standard of Care  Intervention and Appraisals  Communication - Getting the right message across  Dealing with Suspects and Intruders  Apprehending Suspects and Intruders  Instigations and Inspections – monitoring  Use of Force  Observations and Security Inspections  Organisation at Work  Emergency Procedures  Security Communication Network  Assignment Details  Gate Duty and Site Patrols  Fire Safety  Main Objective:-  Reception Duty and Key Control  Main Objective:-  First Aid  Daily Occurrence/Security Log and Incident Reports  Site Patrols  Searching People and Vehicles  CCTV’s  Reporting and Arresting Suspects  Evidence  On Site Security Control Unit and Welfare Facilities  Work vehicles  Guidelines  Rules and Regulations, Policies and Procedures  Legislation – English Law  Dogs  Client’s Assignment Guidelines  Taking over an assignment  Audits and Auditing  Confidentiality Use of Telephones  Fraud  Time Management and Personal Organisation  Review of Policies and Procedures etc Page 5 0f 12 Clive burgess© April 2008
  • 6. UNCONTROLLED DOCUMENT WHEN PRINTED 6 The main sections also contain a number of sub- sections. A varying number of folders/files systems are in each sub-section. These form the basis of the auditable process Section One: Management Control has five sub-sections Each of these has the description of the specific document/form required for auditing. Each different document/form requires its own unique reference number Four of the sub- sections have an auditable process at their heart The fifth sub- section requires three different auditable processes Management Control  Process Control Auditable Documents 1 – Finance  Service Office EFQM 1 2 – Information  ISO 9001 2000 EFQM 2 3 – People  Management File EFQM 3 A proposal for a folder/file system that 4 – Operations ‘Integrates Management Practices, with Risk and  Visitor Control EFQM 4 Quality Control Processes, Systems and Standards’ – See Page 10 of this document 5 – Risks  Risk Management EFQM 5  Management of H&S EFQM 6  ISO 14001 EFQM 7 Layout of pages in sub-sections contained within Section One: Management Control 1) Contents 2) Schematic or Process Map 3) Key 4) Customer specifications 5) British or International standards 6) Product-related legislation 7) 'Scope' 8) Definitions of key words used in sub- sections 9) The auditable process or processes under each management control 10) Step by step procedural guidelines Page 6 of 12 Clive burgess© April 2008
  • 7. UNCONTROLLED DOCUMENT WHEN PRINTED CONTINUOUS IMPROVEMENT 7 Monitoring 0 - Management Control PROCESSES  Process Control Sub-Section Auditable Documents Each process links together with the 1 – Finance next and so on to form a complete  Service Office EFQM 1 overview of the social and cultural 1- Contents aspects of control used to manage 2- Schematic or Process workplace situations, as and when they 3- Aims and Objectives develop… 4- Audits 5- Budgets, Purchasing and Action Planning 6- CAR’s 7- Communication Link Legal Guidelines 8- Finance* 9- Insurance* 10- Legal Guidelines* Self-Regulating 11- Manuals 12- Policy Proposals* Conditions 13- Policy Control* COMPLIANCE Control 14- Policy Instruction* 15- Quality Standard 16- Records 17- Register 18- Roles and Responsibilities 19- Safe Systems of Work Objective 20- Specifications Plan 2 – Information  ISO 9001 2000 EFQM 2 1- Contents 2- Schematic or Process Objective 3- Aims and Objectives Plan 4- Audits 5- Budgets, Purchasing and Action Planning 6- CAR’s 7- Communication Link Committees 8- Manuals – UK S Manual Implementation 9- New Rules and Regulations** Review CONSULTATION 10- Process Control** 11- Process Instruction** 12- Quality Standards 13- Records 14- Register Patterns 15- Roles and Responsibilities of 16- Safe Systems of Work Behaviour 17- Specifications Page 7 of 12 Clive burgess© April 2008
  • 8. UNCONTROLLED DOCUMENT WHEN PRINTED CONTINUOUS IMPROVEMENT 8 Monitoring 3 – People  Management File EFQM 3 1- Contents 2- Schematic or Process Patterns 3- Annual Leave & Official Holiday Dates Roles and Responsibilities of Behaviour 4- Appraisals 5- Contractual Obligations, Roles and Responsibilities 6- Disciplinary & Grievance Procedures 7- Employment t Contract t Research*** Competition Cooperation TEAMWORK 8- Management Controls, BSO, BSI, Accident Investigations & Risk Assessments 9- Management Supervision and all Leaders 10- Process Control, Counselling and Retraining 11- Staff Rational 12- SIA Licensing Organisation 13- Shift Rota 14- Special Occasions and Birthdays etc 15- Training Folder 4 – Operations  Visitor Control EFQM 4 Rational Organisation Measuring Performance 1- Contents 2- Schematic or Process 3- Customer Representatives Coordination 4- Customer Complains Competence MANAGEMENT 5- Customer Service – Visitors 6- Outside Contractors 7- UK S Customers 8- Security Partners Legal Guidelines 5 – Risks  Risk Management EFQM 5 1- Contents CONDUCT 2- Schematic or Process 3- Causes of human failure Objective Patterns Plan of 4- Contractors Risk Assessments Behaviour 5- Crime - Understanding of 6- Environmental Risk Assessments 7- HSE Risk Management 2005 – 8 8- Manual Handling Risk Assessments Legal Rational 9- Operations (COSHH) Risk Assessments Guidelines Organisatio 10- PUWER Risk Assessments INCLUSION 11- Risk Assessments used in waste flows 12- Security Implementations & Associated Risk Assessments Workplace Environment 13- Security Risk Assessments 14- Weekend & Loan Worker Activity Risk Assessments CONTINUOUS IMPROVEMENT 15- Work Reports 2007 Monitoring Page 8 of 12 Clive burgess© April 2008
  • 9. CONTINUOUS IMPROVEMENT UNCONTROLLED DOCUMENT WHEN Monitoring PRINTED 9  Management of H&S EFQM 6 PROCESSES Corrective 1- Contents Supervision Action Authority Intervention 2- Schematic or Process 3- Aims and Objectives COST Appraisal Committees Analysis 4- Audits 5- Budgets, Purchasing and Action Communication Roles and Responsibilities Planning BENEFIT 6- CAR’s Self-Regulating 7- External Sanctions******* Commitment 8- Manuals 9- Process Control Patten Maintenance 10- Process Instructions 11- Quality Standards 12- Records Inspections and Assessment 13- Register Investigation Appeal 14- Roles and Responsibilities Measuring Performance 15- Safe Systems of Work Sanction Strategy 16- Specifications Corrective Supervision Action FEED-BACK LOOP INFORMATION CONTROL PROCESS CONSULTATION Objective Patterns Plan of Behaviour COMPLIANCE TEAMWORK  ISO 14001 EFQM 7 1- Audits Legal Rational Guidelines Organisatio 2- Budgets, Purchasing and Action Planning MANAGEMENT 3- CAR’s 4- Communication Link & Reportable occupancies 5- Current Legislation Body Corporate Employees at all levels 6- Manuals & Register Information 7- Policy Statement Aims, Objectives & Targets Instruction 8- Process Control Objective Patterns Plan Norms or of 9- Process Instructions Conformance Behaviour 10- Quality Standards 11- Records Non- 12- Risk Assessments Conscious Errors, Mistakes 13- Roles and Responsibilities Awareness Violations 14- Safe Systems of Work Training 15- Site Plans & Site Usage History Force 16- Specifications 17- Water system Risk Assessment Rational Legal Deviant Focus Organisatio Guidelines CONTINUOUS IMPROVEMENT Workplace Monitoring Government Environment Page 9 of 12 Clive burgess© April 2008
  • 10. A proposal for a folder/file system that 10 ‘Integrates Management Practices, with Risk and Quality Control Processes, Systems and Standards’ Designed and Developed  Auditable Documents Links all EFQM folders by Clive burgess© Contents April 2008 Structure of Organisation and Arrangements 1- Schematic or Process 2- Aims and Objectives - Mission 3- Audits – Internal External (this includes the Initial Internal Audits) 4- Budgets, Purchasing and Action Planning 5- CAR’s and Preventative Measures 6- Communication Link – Web Site Development – Transparency 7- Finance* Financial Management – Business Stability 8- Insurance* 9- Legal Guidelines* Rules, Regulations, Policies & Procedures in relation to Employment 10- Manuals UK S Manual and Registers 11- Policy Proposals* Corporate Social Responsibility 12- Policy Control* Data Protection & Information Control - Policy Instruction* 13- Quality Standard 14- New Rules and Regulations** 15- Process Control**- Process Instruction** 16- Employees: Values Stakeholders  Employment Contract - Annual Leave & Official Holiday Dates – Appraisals - Contractual Obligations - Roles and Responsibilities – Guards – Officers – Dog Warden – Vehicles - Equal Opportunities – Pay Structure - Disciplinary & Grievance Procedures***TUPE - Work vehicles – Dog handlers 21- Management Controls: Leadership  BSO – BSI - Accident Investigations & Risk Assessments - Understanding Crime - Contractors Risk Assessments - Environmental Risk Assessments - HSE Risk Management 2005 – 8 - Manual Handling Risk Assessments - Operations (COSHH) Risk Assessments - PUWER Risk Assessments - Risk Assessments used in waste flows - Security Implementations & Associated Risk Assessments - Security Risk Assessments - Weekend & Loan Worker Activity Risk Assessments - Work Reports 2007 - External Sanctions 22- Management Supervision and all Leaders Process Control:  Counselling and Retraining –Working Shift Rota –SIA Licensing – Holidays - Special Occasions and Birthdays etc - Staff Training Folder Matrix etc 23- Customers: Commercial Relationship Management  Customer Representatives - Customer Complains - Customer Service – Visitors Outside - Contractors UK S - Customers Security Partners 24- Records 25- Safe Systems of Work 26- Specifications BENCHMARK: Process and methods, profiles and practices that will help us achieve SIA ACS approval Standards UNCONTROLLED DOCUMENT WHEN PRINTED
  • 11. Schematic: Overview of Folders Expansion Filing System - Section One 11 How to access folders and documents in this system Main Folder QC Process 08 US SEC Management Control Process Control Auditable Documents 1 - Finance Service Office Full System EFQM 1 One 2 - Information ISO 9001 2000 Full System EFQM 2 Two Section One: Management Control 3 - People Management File Full System EFQM 3 Three 4 - Operations Visitor Control Full System EFQM 4 Four Work Vehicles Agenda Templates Full System 5 - Risks Risk Management Five EFQM 5 Folders 6 - 8 Management of Full System H&S EFQM 6 Six Research and Development Section: information used for creating new processes ISO 14001 EFQM 7 Full System Seven BENCHMARK: Process and methods, profiles and practices that will help us achieve SIA ACS approval Standards UNCONTROLLED DOCUMENT WHEN PRINTED Page 11 of 12 Clive burgess© April 2008
  • 12. Schematic: Overview of Folders Expansion Filing System: Section Two 12 Main Folder Management Control Process Control Non-Auditable Documents QC Process 08 US SEC 6 - Research QC Process 1 QC Tools Research 2 SAP 3 Six Sigma ISO 7 - Process Seven Word 9001 Documents on Researc Processes and Research and Development Section: Use for Information Only: h Systems used in practice 8 – Profile Security Standard Associations 08 Join NASP files Membership Form 1 Two Word Documents on Projects and Process and methods, profiles and practices that will help us processes Four PDFs files on Business Web standards, services 1 ACS Assessors and practices 2 ACS Assistance achieve SIA ACS approval Standards 3 Approval Criteria Eight PDFs SIA ACS 9 – SIA ACS 08 ACS Approval Workbooks, Guides, Standards etc BENCHMARK: SI Acts and Regulations Two PDFs CBI spotlight SIA Impact of Regs SIA Plans & Case 10 – UK S Studies Internet info SIA Case Study – 4 SIA 05 08 Business Multi - Documents on web UK S Plans UNCONTROLLED DOCUMENT WHEN Page 12 of 12 Clive burgess© April 2008 PRINTED