SlideShare une entreprise Scribd logo
1  sur  38
Transitioning Your Team to Kanban: Theory and
                              Practice

          Project Summit &
          BusinessAnalystWorld: Boston

          Gil Irizarry
          Constant Contact




Copyright © 2011 Constant Contact Inc.
Learning Objectives


               • Learn what Kanban is


               • Learn value stream mapping and how to apply it
               to your team


               • Learn how to read a cumulative flow diagram




Copyright © 2011 Constant Contact, Inc.                           2
Agenda


               • A bit about me and Constant Contact
               • Theory –
                         • Motivations
                         • Background
                         • What is Kanban and how does it work
               • Practice –
                         • Setting up a Kanban board
                         • Establishing policies and limits

Copyright © 2011 Constant Contact, Inc.                          3
My background


               • Program Manager at Constant Contact
               • Over 20 years software development and
               management experience, over 5 years in an agile
               software development environment
               • CSM and PMP certifications, Kanban coaching
               training with David Anderson
               • BS from Cornell, ALM from Harvard, certificate in
               Management from MIT Sloan
               • girizarry@constantcontact.com, gil@conoa.com
               • http://www.slideshare.net/conoagil
Copyright © 2011 Constant Contact, Inc.                              4
Background on Constant Contact


               • SaaS company offering on-line e-mail marketing,
               event marketing and surveys. Recent
               enhancements extend the services to the social
               media space
               • >$200MM gross revenue per year
               • >850 employees
               • >475K paying customers
               • Engineering and Operations total about 150
               people
               • First Scrum team formed in 2006
Copyright © 2011 Constant Contact, Inc.                            5
Motivations


               • We want to move to Agile management methods.
               Why?
                         • React quicker to changing market conditions
                         • Get new features to users more quickly
                         • Frequent releases are smaller releases
                         • Better Quality




Copyright © 2011 Constant Contact, Inc.                                  6
Quick Review of Scrum


               • Fixed iterations
               • Daily stand-ups
                         • What did you do yesterday, what did you do
                           today, any impediments
               • Retrospectives
               • Burn-down chart
                         • Board with To Do, In Progress and Done
                           states


Copyright © 2011 Constant Contact, Inc.                                 7
Lean Principles


               • Eliminate Waste
               • Build Quality In
               • Create Knowledge
               • Defer Commitment
               • Deliver Fast
               • Respect People
               • Optimize the Whole
               Leading Lean Software Development: Results Are not the Point by Mary
               and Tom Poppendieck

Copyright © 2011 Constant Contact, Inc.                                           8
Foundational Principles of Kanban


               • Start with what you do now
               • Agree to pursue incremental, evolutionary change
               • Respect the current process, roles, responsibilities
               & titles


               From:
               http://agilemanagement.net/index.php/Blog/the_pr
               inciples_of_the_kanban_method (David Anderson)


Copyright © 2011 Constant Contact, Inc.                             9
5 Core Properties of Kanban

               • Visualize the workflow
                         • Team board states are a reflection of the
                           value stream
               • Limit WIP
               • Manage Flow
                         • Implied that flow should be continuous
               • Make Process Policies Explicit
               • Improve Collaboratively (using models & the
               scientific method)

Copyright © 2011 Constant Contact, Inc.                                10
Kanban and Roles




                                                       • Prioritization
                                                       • Definition
                                                       • Ready-Ready
                                                 Org


                      • Work mgmt.
                                                                    • Delivery
                      • Metrics
                                                                    • Flow
                      • Improvement
                                          Lead         Team



Copyright © 2011 Constant Contact, Inc.                                          11
You are one team!




Copyright © 2011 Constant Contact, Inc.   12
Value Mapping Exercise




                                          How do you make dinner?




Copyright © 2011 Constant Contact, Inc.                             13
Sample Value Stream



                                            Shop               Unpack               Cook
  Value:                                  for food            groceries             Food             Eat!
                                           30 min               5 min              15 min




                        Drive to                      Drive                Wash             Serve
   No
                        market                        home                 Pots             Dinner
  Value:
                        30 min                       30 min               15 min            5 min


                                      50 min / 130 min = 38% efficiency




Copyright © 2011 Constant Contact, Inc.                                                                     14
Map the value stream in your group/dept./firm


               • Work with your teams or teams on which you are
               dependent in order to drive more efficiency




Copyright © 2011 Constant Contact, Inc.                       15
Sample Kanban Board

                                               States




      WIP Limits
    Classes of Service




Copyright © 2011 Constant Contact, Inc.                 16
Pull, not Push


               • Work items should be pulled into available lanes
               • Work should not be pushed when completed,
               even if its lane is full

                                          Pull:     Push:




Copyright © 2011 Constant Contact, Inc.                             17
Limit WIP


               • Why?
                         • Less multitasking
                         • Less time lost to context switching
                         • Better quality
                         • Smoother flow




Copyright © 2011 Constant Contact, Inc.                          18
Classes of Service


               • Different types of work need to be handled and
               prioritized differently
               • We manage this through the concept of classes of
               service. Similar projects are grouped into classes
               and each class is assigned an allocation.
                         • For example, we may decide that 20% of ops
                           time should be spent on infrastructure
                           improvements, and 80% spent on servicing
                           development


Copyright © 2011 Constant Contact, Inc.                             19
Sample CFD


         60


                                                                              What happened here?

         50




         40
                                                                                                             User Story
                                                                                                             Mockups
                                            Lead Time               Cycle Time                               Ready-Done
         30
                                                                                                             In Development
                                                         WIP                                                 Dev Done
                                                                                                             In Testing
         20                                                                                                  Complete




         10

                                                                          Potential Bottlenecks


          0
        11/9/2010               12/9/2010     1/9/2011         2/9/2011         3/9/2011          4/9/2011


Copyright © 2011 Constant Contact, Inc.                                                                                       20
Team Kanban


               • Teams plan continuously. Backlogs should be
               constantly groomed.
               • Teams test continuously
               • It’s OK if a team finds a defect on the last day of
               the release. Pull the feature or delay the
               release, but keep the flow continuous
               • It’s OK if a team starts work for the next release
               in the current release
               • Aim for development and testing to flow more
               smoothly through your system
Copyright © 2011 Constant Contact, Inc.                                21
Metrics


               • Considering gathering the following:
                         • Cycle time on items after grouping them by
                           size:
                                  • Completion time for small, medium and large
                         • Spread of cycle times
                         • Work items completed
                         • Open defects in production, to give a high-
                           level approximation of technical debt


Copyright © 2011 Constant Contact, Inc.                                           22
Metrics guide planning and estimation

               • Over time, we would expect that the spread of
               cycle times for a given item size goes down.
               • So, over time, an estimate of completion time for
               items of a given size should become more
               accurate.
               • Work items can be sized by t-shirt sizes
               (smalls, mediums or larges) and the average cycle
               times for those sizes from the last release become
               the estimate for the upcoming release.
               • Large items should in most cases be broken down
               into smaller items
Copyright © 2011 Constant Contact, Inc.                             23
Average Cycle Times for work items
        35



        30



        25



        20                                                                                      Average of Cycle Time
                                                                                                (small - 1 Story Point)


        15                                                                                      Average of Cycle Time
                                                                                                (medium - 3 Story
                                                                                                Points)

        10                                                                                      Average of Cycle Time
                                                                                                (large - 5 Story Points)


         5



         0
                   2010 R7                2010 R8       2011 R1   2011 R2   2011 R3   2011 R4




Copyright © 2011 Constant Contact, Inc.                                                                                    24
Kanban in practice




Copyright © 2011 Constant Contact, Inc.                        25
Why Kanban?


         • Shorter sprint lengths were forcing us to
           artificially break up items in order to fit within
           sprint boundaries.
         • Sprint planning consumed the team for an entire
           day.
         • Most of the work for a sprint was getting
           completed all at once, close to the end of the
           sprint.
         • QA had nothing to do at the beginning of a
           sprint, but were overworked at the end.

Copyright © 2011 Constant Contact, Inc.                         26
Mapping the Value Stream


               • At the time, the Website team was really 2
                 teams, Engineering and Design.
               • We asked the teams to map out their current
                 development process.
               • It was really complicated…




Copyright © 2011 Constant Contact, Inc.                        27
Mapping the Value Stream




Copyright © 2011 Constant Contact, Inc.   28
How do you set a WIP limit?


               • Setting WIP limit is more art than science.
               • Don’t overthink the initial WIP limit, it will
                 change based on metrics.
               • Start WIP limit at 1.5X the number of team
                 members.
               • That WIP limit is for the whole board.
               • Divide total WIP amongst the
                 columns, whatever feels right.
               • Take photos of the board daily for Cumulative
                 Flow Diagram.
Copyright © 2011 Constant Contact, Inc.                           29
Policies


               • The team defined policies for moving items into
                 each state.
               • Policies are the requirements that must be met
                 before an item is considered ready for the next
                 state.
               • Policies were written down in a wiki and posted
                 on the board.
               • The team frequently ignores policies, so the
                 scrum master has to keep them honest ;-).


Copyright © 2011 Constant Contact, Inc.                            30
One Team – Single Flow



                                   Produc
                                   e
                                            Tod
                                            o
                                                                Item and task
                                                                 type by color

                                                  Bugs & Footprints on board

                                                           WIPL = 6 full items




                                                  Visible policies
Copyright © 2011 Constant Contact, Inc.                                          31
Metrics are the Key to Improvement


               • Cycle Time – Elapsed time from Design to
                 Release to Production
               • Perceived lack of predictability compared to
                 Scrum was an issue.
               • By tracking Cycle Time, we can eventually
                 provide Service Level Agreements to
                 stakeholders.
               • SLA = Avg. Cycle Time + 2(Standard Deviation)



Copyright © 2011 Constant Contact, Inc.                         32
Cumulative Flow Diagram


               • QA overloaded
               • Worked on more constant delivery
               • Identified a bottleneck with source control
               • Changed our branching strategy to improve




Copyright © 2011 Constant Contact, Inc.                        33
Cumulative Flow Diagram



         • By September, we’re now releasing twice a week to Production

         • Much smoother CFD, continuous deliver improves cycle time




Copyright © 2011 Constant Contact, Inc.                                   34
One Year Later…




                                          New classes of
Copyright © 2011 Constant Contact, Inc.
                                             service       35
What were our objectives?


               • Learn what Kanban is


               • Learn value stream mapping and how to apply it
               to your team


               • Learn how to read a cumulative flow diagram




Copyright © 2011 Constant Contact, Inc.                           36
Resources



                          • Kanban by David J Anderson


                          • Implementing Lean Software Development: From
                          Concept to Cash - by Mary Poppendieck and Tom
                          Poppendieck


                          • Scrumban - Essays on Kanban Systems for Lean
                          Software Development - by Corey Ladas


                          • http://www.netobjectives.com/

Copyright © 2011 Constant Contact, Inc.                                    37
Conclusion




                                          Thank you!


Copyright © 2011 Constant Contact, Inc.                38

Contenu connexe

Tendances

Final linda dulye nj iabc chapter ultimate engagement 110811
Final linda dulye nj iabc chapter ultimate engagement 110811Final linda dulye nj iabc chapter ultimate engagement 110811
Final linda dulye nj iabc chapter ultimate engagement 110811
Dulye
 
Moving a Company from Chaos to Content Management
Moving a Company from Chaos to Content ManagementMoving a Company from Chaos to Content Management
Moving a Company from Chaos to Content Management
Pam Noreault
 
Achieving a common goal creating a center of excellence e roske in-sync10 ora...
Achieving a common goal creating a center of excellence e roske in-sync10 ora...Achieving a common goal creating a center of excellence e roske in-sync10 ora...
Achieving a common goal creating a center of excellence e roske in-sync10 ora...
InSync Conference
 
Developing a Continuous Improvement Plan for Your Clinical and Safety Systems
Developing a Continuous Improvement Plan for Your Clinical and Safety SystemsDeveloping a Continuous Improvement Plan for Your Clinical and Safety Systems
Developing a Continuous Improvement Plan for Your Clinical and Safety Systems
Perficient
 
Kenexa Assessment Deck
Kenexa Assessment DeckKenexa Assessment Deck
Kenexa Assessment Deck
keransaggi7
 
Business process design powerpoint presentation slides ppt templates
Business process design powerpoint presentation slides ppt templatesBusiness process design powerpoint presentation slides ppt templates
Business process design powerpoint presentation slides ppt templates
SlideTeam.net
 
Imitation of diverging 10 stages development process arrows diagram software ...
Imitation of diverging 10 stages development process arrows diagram software ...Imitation of diverging 10 stages development process arrows diagram software ...
Imitation of diverging 10 stages development process arrows diagram software ...
SlideTeam.net
 
Am days tbarr_aso
Am days tbarr_asoAm days tbarr_aso
Am days tbarr_aso
taylorbarr
 

Tendances (20)

Teleopti Workforce Management with a human touch
Teleopti   Workforce Management with a human touch Teleopti   Workforce Management with a human touch
Teleopti Workforce Management with a human touch
 
Seeing the Whole Value Stream
Seeing the Whole Value StreamSeeing the Whole Value Stream
Seeing the Whole Value Stream
 
Final linda dulye nj iabc chapter ultimate engagement 110811
Final linda dulye nj iabc chapter ultimate engagement 110811Final linda dulye nj iabc chapter ultimate engagement 110811
Final linda dulye nj iabc chapter ultimate engagement 110811
 
Lean and the Extended Value Stream
Lean and the Extended Value StreamLean and the Extended Value Stream
Lean and the Extended Value Stream
 
Kanban discussion with David Anderson
Kanban discussion with David AndersonKanban discussion with David Anderson
Kanban discussion with David Anderson
 
Moving a Company from Chaos to Content Management
Moving a Company from Chaos to Content ManagementMoving a Company from Chaos to Content Management
Moving a Company from Chaos to Content Management
 
Achieving a common goal creating a center of excellence e roske in-sync10 ora...
Achieving a common goal creating a center of excellence e roske in-sync10 ora...Achieving a common goal creating a center of excellence e roske in-sync10 ora...
Achieving a common goal creating a center of excellence e roske in-sync10 ora...
 
Developing a Continuous Improvement Plan for Your Clinical and Safety Systems
Developing a Continuous Improvement Plan for Your Clinical and Safety SystemsDeveloping a Continuous Improvement Plan for Your Clinical and Safety Systems
Developing a Continuous Improvement Plan for Your Clinical and Safety Systems
 
Baker Photo Final
Baker Photo FinalBaker Photo Final
Baker Photo Final
 
Top Ways Agile Adoption Fails, How to Avoid Them!
Top Ways Agile Adoption Fails, How to Avoid Them!Top Ways Agile Adoption Fails, How to Avoid Them!
Top Ways Agile Adoption Fails, How to Avoid Them!
 
Using Agile and Lean to Stay Ahead in a Tough Economy
Using Agile and Lean to Stay Ahead in a Tough EconomyUsing Agile and Lean to Stay Ahead in a Tough Economy
Using Agile and Lean to Stay Ahead in a Tough Economy
 
Scrum All Day Training
Scrum All Day TrainingScrum All Day Training
Scrum All Day Training
 
Overview of Agile for Business Analysts
Overview of Agile for Business AnalystsOverview of Agile for Business Analysts
Overview of Agile for Business Analysts
 
Kenexa Assessment Deck
Kenexa Assessment DeckKenexa Assessment Deck
Kenexa Assessment Deck
 
Business process design powerpoint presentation slides ppt templates
Business process design powerpoint presentation slides ppt templatesBusiness process design powerpoint presentation slides ppt templates
Business process design powerpoint presentation slides ppt templates
 
Imitation of diverging 10 stages development process arrows diagram software ...
Imitation of diverging 10 stages development process arrows diagram software ...Imitation of diverging 10 stages development process arrows diagram software ...
Imitation of diverging 10 stages development process arrows diagram software ...
 
Fully Distributed Scrum Schoonheim Sutherland Agile2009
Fully Distributed Scrum Schoonheim Sutherland Agile2009Fully Distributed Scrum Schoonheim Sutherland Agile2009
Fully Distributed Scrum Schoonheim Sutherland Agile2009
 
Sfs12 1 why bplan pdf
Sfs12 1 why bplan pdfSfs12 1 why bplan pdf
Sfs12 1 why bplan pdf
 
Am days tbarr_aso
Am days tbarr_asoAm days tbarr_aso
Am days tbarr_aso
 
Transforming The Workplace At Scan Health.Ifma Wwp.10 8 09
Transforming The Workplace At Scan Health.Ifma Wwp.10 8 09Transforming The Workplace At Scan Health.Ifma Wwp.10 8 09
Transforming The Workplace At Scan Health.Ifma Wwp.10 8 09
 

En vedette

En vedette (7)

Transitioning to Kanban
Transitioning to KanbanTransitioning to Kanban
Transitioning to Kanban
 
Value stream mapping for non manufacturing environments
Value stream mapping for non manufacturing environmentsValue stream mapping for non manufacturing environments
Value stream mapping for non manufacturing environments
 
Value stream mapping ppt
Value stream mapping pptValue stream mapping ppt
Value stream mapping ppt
 
Value Stream Mapping Workshop
Value Stream Mapping WorkshopValue Stream Mapping Workshop
Value Stream Mapping Workshop
 
Value Stream Mapping -The Concept
Value Stream Mapping -The ConceptValue Stream Mapping -The Concept
Value Stream Mapping -The Concept
 
Value Stream Mapping in the Office
Value Stream Mapping in the Office Value Stream Mapping in the Office
Value Stream Mapping in the Office
 
Value Stream Mapping in Office & Service Setttings
Value Stream Mapping in Office & Service SetttingsValue Stream Mapping in Office & Service Setttings
Value Stream Mapping in Office & Service Setttings
 

Similaire à Transitioning to Kanban: Theory and Practice - Project Summit Boston 2011

Gil Irizarry, Constant Contact presentation from MassTLC seminar on taking yo...
Gil Irizarry, Constant Contact presentation from MassTLC seminar on taking yo...Gil Irizarry, Constant Contact presentation from MassTLC seminar on taking yo...
Gil Irizarry, Constant Contact presentation from MassTLC seminar on taking yo...
MassTLC
 
Our approach to kaizen, lean it summit, prochazka, chmelar
Our approach to kaizen, lean it summit, prochazka, chmelarOur approach to kaizen, lean it summit, prochazka, chmelar
Our approach to kaizen, lean it summit, prochazka, chmelar
Jaroslav Procházka
 
Transitioning to Kanban - Aug 11
Transitioning to Kanban - Aug 11Transitioning to Kanban - Aug 11
Transitioning to Kanban - Aug 11
Gil Irizarry
 
Building The Agile Enterprise - LSSC '12
Building The Agile Enterprise - LSSC '12Building The Agile Enterprise - LSSC '12
Building The Agile Enterprise - LSSC '12
Gil Irizarry
 
Bi ecm a_shotgun_wedding
Bi ecm a_shotgun_weddingBi ecm a_shotgun_wedding
Bi ecm a_shotgun_wedding
QuestexConf
 
Intranet Design: A Business Approach to a Winning Design
Intranet Design: A Business Approach to a Winning DesignIntranet Design: A Business Approach to a Winning Design
Intranet Design: A Business Approach to a Winning Design
michaelmarchionda
 

Similaire à Transitioning to Kanban: Theory and Practice - Project Summit Boston 2011 (20)

Dan perron lim
Dan perron limDan perron lim
Dan perron lim
 
Gil Irizarry, Constant Contact presentation from MassTLC seminar on taking yo...
Gil Irizarry, Constant Contact presentation from MassTLC seminar on taking yo...Gil Irizarry, Constant Contact presentation from MassTLC seminar on taking yo...
Gil Irizarry, Constant Contact presentation from MassTLC seminar on taking yo...
 
2011 lean kanban-scrum
2011 lean kanban-scrum2011 lean kanban-scrum
2011 lean kanban-scrum
 
SharePoint Conference Recap - Project Server
SharePoint Conference Recap - Project Server SharePoint Conference Recap - Project Server
SharePoint Conference Recap - Project Server
 
Using Lean and Kanban to Revolutionize Your Organization
Using Lean and Kanban to Revolutionize Your OrganizationUsing Lean and Kanban to Revolutionize Your Organization
Using Lean and Kanban to Revolutionize Your Organization
 
"Our approach to Kaizen" by J Prochazka and M Chmelar
"Our approach to Kaizen" by J Prochazka and M Chmelar "Our approach to Kaizen" by J Prochazka and M Chmelar
"Our approach to Kaizen" by J Prochazka and M Chmelar
 
Our approach to kaizen, lean it summit, prochazka, chmelar
Our approach to kaizen, lean it summit, prochazka, chmelarOur approach to kaizen, lean it summit, prochazka, chmelar
Our approach to kaizen, lean it summit, prochazka, chmelar
 
Utah PMA Quarterly Meeting, June, 2009
Utah PMA Quarterly Meeting, June, 2009Utah PMA Quarterly Meeting, June, 2009
Utah PMA Quarterly Meeting, June, 2009
 
A Decade of SharePoint Adoption Best Practices
A Decade of SharePoint Adoption Best PracticesA Decade of SharePoint Adoption Best Practices
A Decade of SharePoint Adoption Best Practices
 
Transitioning to Kanban - Aug 11
Transitioning to Kanban - Aug 11Transitioning to Kanban - Aug 11
Transitioning to Kanban - Aug 11
 
RedEApp Presentation @ IABC-KY
RedEApp Presentation @ IABC-KYRedEApp Presentation @ IABC-KY
RedEApp Presentation @ IABC-KY
 
Introduction to kanban calgary .net user group - feb 6
Introduction to kanban   calgary .net user group - feb 6Introduction to kanban   calgary .net user group - feb 6
Introduction to kanban calgary .net user group - feb 6
 
Intro Of Agile
Intro Of AgileIntro Of Agile
Intro Of Agile
 
Lifeworks - Tradeline Space Strategies
Lifeworks - Tradeline Space StrategiesLifeworks - Tradeline Space Strategies
Lifeworks - Tradeline Space Strategies
 
Building The Agile Enterprise - LSSC '12
Building The Agile Enterprise - LSSC '12Building The Agile Enterprise - LSSC '12
Building The Agile Enterprise - LSSC '12
 
SharePoint Conference Recap - Adoption Session
SharePoint Conference Recap - Adoption SessionSharePoint Conference Recap - Adoption Session
SharePoint Conference Recap - Adoption Session
 
SharePoint Conference Recap - Extranets & FAST
SharePoint Conference Recap - Extranets & FASTSharePoint Conference Recap - Extranets & FAST
SharePoint Conference Recap - Extranets & FAST
 
Bi ecm a_shotgun_wedding
Bi ecm a_shotgun_weddingBi ecm a_shotgun_wedding
Bi ecm a_shotgun_wedding
 
Intranet Design: A Business Approach to a Winning Design
Intranet Design: A Business Approach to a Winning DesignIntranet Design: A Business Approach to a Winning Design
Intranet Design: A Business Approach to a Winning Design
 
Last brisbane 2018 why
Last brisbane 2018   whyLast brisbane 2018   why
Last brisbane 2018 why
 

Plus de Gil Irizarry

Make Mobile Apps Quickly
Make Mobile Apps QuicklyMake Mobile Apps Quickly
Make Mobile Apps Quickly
Gil Irizarry
 

Plus de Gil Irizarry (13)

A Rose By Any Other Name.pdf
A Rose By Any Other Name.pdfA Rose By Any Other Name.pdf
A Rose By Any Other Name.pdf
 
[Apple-organization] and [oranges-fruit] - How to evaluate NLP tools - Basis ...
[Apple-organization] and [oranges-fruit] - How to evaluate NLP tools - Basis ...[Apple-organization] and [oranges-fruit] - How to evaluate NLP tools - Basis ...
[Apple-organization] and [oranges-fruit] - How to evaluate NLP tools - Basis ...
 
[Apple|organization] and [oranges|fruit]: How to evaluate NLP tools for entit...
[Apple|organization] and [oranges|fruit]: How to evaluate NLP tools for entit...[Apple|organization] and [oranges|fruit]: How to evaluate NLP tools for entit...
[Apple|organization] and [oranges|fruit]: How to evaluate NLP tools for entit...
 
Ai for Good: Bad Guys, Messy Data, & NLP
Ai for Good: Bad Guys, Messy Data, & NLPAi for Good: Bad Guys, Messy Data, & NLP
Ai for Good: Bad Guys, Messy Data, & NLP
 
DevSecOps Orchestration of Text Analytics with Containers
DevSecOps Orchestration of Text Analytics with ContainersDevSecOps Orchestration of Text Analytics with Containers
DevSecOps Orchestration of Text Analytics with Containers
 
Towards Identity Resolution: The Challenge of Name Matching
Towards Identity Resolution: The Challenge of Name MatchingTowards Identity Resolution: The Challenge of Name Matching
Towards Identity Resolution: The Challenge of Name Matching
 
RapidMiner - Don’t Forget to Pack Text Analytics on Your Data Exploration Jou...
RapidMiner - Don’t Forget to Pack Text Analytics on Your Data Exploration Jou...RapidMiner - Don’t Forget to Pack Text Analytics on Your Data Exploration Jou...
RapidMiner - Don’t Forget to Pack Text Analytics on Your Data Exploration Jou...
 
Beginning Native Android Apps
Beginning Native Android AppsBeginning Native Android Apps
Beginning Native Android Apps
 
From Silos to DevOps: Our Story
From Silos to DevOps:  Our StoryFrom Silos to DevOps:  Our Story
From Silos to DevOps: Our Story
 
Make Cross-platform Mobile Apps Quickly - SIGGRAPH 2014
Make Cross-platform Mobile Apps Quickly - SIGGRAPH 2014Make Cross-platform Mobile Apps Quickly - SIGGRAPH 2014
Make Cross-platform Mobile Apps Quickly - SIGGRAPH 2014
 
Graphics on the Go
Graphics on the GoGraphics on the Go
Graphics on the Go
 
Make Mobile Apps Quickly
Make Mobile Apps QuicklyMake Mobile Apps Quickly
Make Mobile Apps Quickly
 
Beyond Scrum of Scrums
Beyond Scrum of ScrumsBeyond Scrum of Scrums
Beyond Scrum of Scrums
 

Dernier

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Dernier (20)

Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 

Transitioning to Kanban: Theory and Practice - Project Summit Boston 2011

  • 1. Transitioning Your Team to Kanban: Theory and Practice Project Summit & BusinessAnalystWorld: Boston Gil Irizarry Constant Contact Copyright © 2011 Constant Contact Inc.
  • 2. Learning Objectives • Learn what Kanban is • Learn value stream mapping and how to apply it to your team • Learn how to read a cumulative flow diagram Copyright © 2011 Constant Contact, Inc. 2
  • 3. Agenda • A bit about me and Constant Contact • Theory – • Motivations • Background • What is Kanban and how does it work • Practice – • Setting up a Kanban board • Establishing policies and limits Copyright © 2011 Constant Contact, Inc. 3
  • 4. My background • Program Manager at Constant Contact • Over 20 years software development and management experience, over 5 years in an agile software development environment • CSM and PMP certifications, Kanban coaching training with David Anderson • BS from Cornell, ALM from Harvard, certificate in Management from MIT Sloan • girizarry@constantcontact.com, gil@conoa.com • http://www.slideshare.net/conoagil Copyright © 2011 Constant Contact, Inc. 4
  • 5. Background on Constant Contact • SaaS company offering on-line e-mail marketing, event marketing and surveys. Recent enhancements extend the services to the social media space • >$200MM gross revenue per year • >850 employees • >475K paying customers • Engineering and Operations total about 150 people • First Scrum team formed in 2006 Copyright © 2011 Constant Contact, Inc. 5
  • 6. Motivations • We want to move to Agile management methods. Why? • React quicker to changing market conditions • Get new features to users more quickly • Frequent releases are smaller releases • Better Quality Copyright © 2011 Constant Contact, Inc. 6
  • 7. Quick Review of Scrum • Fixed iterations • Daily stand-ups • What did you do yesterday, what did you do today, any impediments • Retrospectives • Burn-down chart • Board with To Do, In Progress and Done states Copyright © 2011 Constant Contact, Inc. 7
  • 8. Lean Principles • Eliminate Waste • Build Quality In • Create Knowledge • Defer Commitment • Deliver Fast • Respect People • Optimize the Whole Leading Lean Software Development: Results Are not the Point by Mary and Tom Poppendieck Copyright © 2011 Constant Contact, Inc. 8
  • 9. Foundational Principles of Kanban • Start with what you do now • Agree to pursue incremental, evolutionary change • Respect the current process, roles, responsibilities & titles From: http://agilemanagement.net/index.php/Blog/the_pr inciples_of_the_kanban_method (David Anderson) Copyright © 2011 Constant Contact, Inc. 9
  • 10. 5 Core Properties of Kanban • Visualize the workflow • Team board states are a reflection of the value stream • Limit WIP • Manage Flow • Implied that flow should be continuous • Make Process Policies Explicit • Improve Collaboratively (using models & the scientific method) Copyright © 2011 Constant Contact, Inc. 10
  • 11. Kanban and Roles • Prioritization • Definition • Ready-Ready Org • Work mgmt. • Delivery • Metrics • Flow • Improvement Lead Team Copyright © 2011 Constant Contact, Inc. 11
  • 12. You are one team! Copyright © 2011 Constant Contact, Inc. 12
  • 13. Value Mapping Exercise How do you make dinner? Copyright © 2011 Constant Contact, Inc. 13
  • 14. Sample Value Stream Shop Unpack Cook Value: for food groceries Food Eat! 30 min 5 min 15 min Drive to Drive Wash Serve No market home Pots Dinner Value: 30 min 30 min 15 min 5 min 50 min / 130 min = 38% efficiency Copyright © 2011 Constant Contact, Inc. 14
  • 15. Map the value stream in your group/dept./firm • Work with your teams or teams on which you are dependent in order to drive more efficiency Copyright © 2011 Constant Contact, Inc. 15
  • 16. Sample Kanban Board States WIP Limits Classes of Service Copyright © 2011 Constant Contact, Inc. 16
  • 17. Pull, not Push • Work items should be pulled into available lanes • Work should not be pushed when completed, even if its lane is full Pull: Push: Copyright © 2011 Constant Contact, Inc. 17
  • 18. Limit WIP • Why? • Less multitasking • Less time lost to context switching • Better quality • Smoother flow Copyright © 2011 Constant Contact, Inc. 18
  • 19. Classes of Service • Different types of work need to be handled and prioritized differently • We manage this through the concept of classes of service. Similar projects are grouped into classes and each class is assigned an allocation. • For example, we may decide that 20% of ops time should be spent on infrastructure improvements, and 80% spent on servicing development Copyright © 2011 Constant Contact, Inc. 19
  • 20. Sample CFD 60 What happened here? 50 40 User Story Mockups Lead Time Cycle Time Ready-Done 30 In Development WIP Dev Done In Testing 20 Complete 10 Potential Bottlenecks 0 11/9/2010 12/9/2010 1/9/2011 2/9/2011 3/9/2011 4/9/2011 Copyright © 2011 Constant Contact, Inc. 20
  • 21. Team Kanban • Teams plan continuously. Backlogs should be constantly groomed. • Teams test continuously • It’s OK if a team finds a defect on the last day of the release. Pull the feature or delay the release, but keep the flow continuous • It’s OK if a team starts work for the next release in the current release • Aim for development and testing to flow more smoothly through your system Copyright © 2011 Constant Contact, Inc. 21
  • 22. Metrics • Considering gathering the following: • Cycle time on items after grouping them by size: • Completion time for small, medium and large • Spread of cycle times • Work items completed • Open defects in production, to give a high- level approximation of technical debt Copyright © 2011 Constant Contact, Inc. 22
  • 23. Metrics guide planning and estimation • Over time, we would expect that the spread of cycle times for a given item size goes down. • So, over time, an estimate of completion time for items of a given size should become more accurate. • Work items can be sized by t-shirt sizes (smalls, mediums or larges) and the average cycle times for those sizes from the last release become the estimate for the upcoming release. • Large items should in most cases be broken down into smaller items Copyright © 2011 Constant Contact, Inc. 23
  • 24. Average Cycle Times for work items 35 30 25 20 Average of Cycle Time (small - 1 Story Point) 15 Average of Cycle Time (medium - 3 Story Points) 10 Average of Cycle Time (large - 5 Story Points) 5 0 2010 R7 2010 R8 2011 R1 2011 R2 2011 R3 2011 R4 Copyright © 2011 Constant Contact, Inc. 24
  • 25. Kanban in practice Copyright © 2011 Constant Contact, Inc. 25
  • 26. Why Kanban? • Shorter sprint lengths were forcing us to artificially break up items in order to fit within sprint boundaries. • Sprint planning consumed the team for an entire day. • Most of the work for a sprint was getting completed all at once, close to the end of the sprint. • QA had nothing to do at the beginning of a sprint, but were overworked at the end. Copyright © 2011 Constant Contact, Inc. 26
  • 27. Mapping the Value Stream • At the time, the Website team was really 2 teams, Engineering and Design. • We asked the teams to map out their current development process. • It was really complicated… Copyright © 2011 Constant Contact, Inc. 27
  • 28. Mapping the Value Stream Copyright © 2011 Constant Contact, Inc. 28
  • 29. How do you set a WIP limit? • Setting WIP limit is more art than science. • Don’t overthink the initial WIP limit, it will change based on metrics. • Start WIP limit at 1.5X the number of team members. • That WIP limit is for the whole board. • Divide total WIP amongst the columns, whatever feels right. • Take photos of the board daily for Cumulative Flow Diagram. Copyright © 2011 Constant Contact, Inc. 29
  • 30. Policies • The team defined policies for moving items into each state. • Policies are the requirements that must be met before an item is considered ready for the next state. • Policies were written down in a wiki and posted on the board. • The team frequently ignores policies, so the scrum master has to keep them honest ;-). Copyright © 2011 Constant Contact, Inc. 30
  • 31. One Team – Single Flow Produc e Tod o Item and task type by color Bugs & Footprints on board WIPL = 6 full items Visible policies Copyright © 2011 Constant Contact, Inc. 31
  • 32. Metrics are the Key to Improvement • Cycle Time – Elapsed time from Design to Release to Production • Perceived lack of predictability compared to Scrum was an issue. • By tracking Cycle Time, we can eventually provide Service Level Agreements to stakeholders. • SLA = Avg. Cycle Time + 2(Standard Deviation) Copyright © 2011 Constant Contact, Inc. 32
  • 33. Cumulative Flow Diagram • QA overloaded • Worked on more constant delivery • Identified a bottleneck with source control • Changed our branching strategy to improve Copyright © 2011 Constant Contact, Inc. 33
  • 34. Cumulative Flow Diagram • By September, we’re now releasing twice a week to Production • Much smoother CFD, continuous deliver improves cycle time Copyright © 2011 Constant Contact, Inc. 34
  • 35. One Year Later… New classes of Copyright © 2011 Constant Contact, Inc. service 35
  • 36. What were our objectives? • Learn what Kanban is • Learn value stream mapping and how to apply it to your team • Learn how to read a cumulative flow diagram Copyright © 2011 Constant Contact, Inc. 36
  • 37. Resources • Kanban by David J Anderson • Implementing Lean Software Development: From Concept to Cash - by Mary Poppendieck and Tom Poppendieck • Scrumban - Essays on Kanban Systems for Lean Software Development - by Corey Ladas • http://www.netobjectives.com/ Copyright © 2011 Constant Contact, Inc. 37
  • 38. Conclusion Thank you! Copyright © 2011 Constant Contact, Inc. 38

Notes de l'éditeur

  1. We had 3 “swim lanes” “P1” or “expedite”, Engineering and Design. The lanes converged in the verify column.We had WIP limits for each column or “state”Engineering Lanes: Queue, Requirements & Test Plans, Design, Review& Revision, Code, Review & Revision, Verify, DoneDesign Lanes: Queue, User Experience, UX Review & Revision, Design, Review& Revision, Test Plan, Code, Review & Revision, Verify, Done
  2. We had trouble managing dependencies between the two boards/teamsWe decided to pull together as one team, one board, one goal
  3. This example is from September of last year. Pretty smooth.
  4. Throughput was down because we had 4 large projects going on simultaneously, so smaller items blocked.Infrastructure work (e.g. code cleanup, upgrades, etc.) were not getting done.Team defined classes of service – pebbles, rocks, sand, plus infrastructure and design only.