CALCULATION OF COSTSCALCULATION OF COSTS
FOR SEISMIC RETROFITFOR SEISMIC RETROFIT
OF STONE MASONRYOF STONE MASONRY
BUILDINGS IN GREECEBUILDINGS IN GREECE
Maria BOSTENARU DANMaria BOSTENARU DAN
Gregor BOURLOTOSGregor BOURLOTOS
OverviewOverview
►IntroductionIntroduction
►Description of the stone masonrDescription of the stone masonry built stocky built stock
in Greecein Greece
►Description of the retrofit measuresDescription of the retrofit measures
►Determination of costsDetermination of costs
►Discussion and conclusionsDiscussion and conclusions
IntroductionIntroduction
►The majority of population lives in existingThe majority of population lives in existing
buildings and will further live in thesebuildings and will further live in these
►BBuildinguilding retrofitretrofit is important for theiris important for their
assurance in earthquake prone regionsassurance in earthquake prone regions
►Ressources are limited, therefore economicRessources are limited, therefore economic
efficiencefficiency is importanty is important
►Stone masonry spread in GreeceStone masonry spread in Greece
►Building element method from Germany, aBuilding element method from Germany, a
method which doesn’t require databasesmethod which doesn’t require databases
Description of the stone masonryDescription of the stone masonry
built stock in Greecebuilt stock in Greece
►Tassios and Syrmakezis (2004) WHETassios and Syrmakezis (2004) WHE
►Historic centres of Greek citiesHistoric centres of Greek cities
►Seismic performance is poorSeismic performance is poor
►Load bearing structure: unreinforced stoneLoad bearing structure: unreinforced stone
masonry walls out of rubble stone with limemasonry walls out of rubble stone with lime
mortarmortar
►floor and roof structures: timber structuresfloor and roof structures: timber structures
Description of the stone masonryDescription of the stone masonry
built stock in Greecebuilt stock in Greece
►Damaged in the Athens 1999 earthquake:Damaged in the Athens 1999 earthquake:
 partial collapse of walls,partial collapse of walls,
 collapse of corners,collapse of corners,
 separation of the two walls converging at aseparation of the two walls converging at a
cornercorner
 extensive crackingextensive cracking
►Vertical and horizontal reinforced concreteVertical and horizontal reinforced concrete
confining elements improve the behaviourconfining elements improve the behaviour
Description of the stone masonryDescription of the stone masonry
built stock in Greece (source: WHE)built stock in Greece (source: WHE)
Description of the retrofit measuresDescription of the retrofit measures
►Retrofit measures in case of pre-damagedRetrofit measures in case of pre-damaged
buildingsbuildings
►Strengthening of a non-damaged buildingStrengthening of a non-damaged building
Retrofit measures in case of pre-Retrofit measures in case of pre-
damaged buildingsdamaged buildings
►Extensive crackingExtensive cracking
►Buckling of masonry wallsBuckling of masonry walls
Retrofit measures in case ofRetrofit measures in case of
extensive crackingextensive cracking
►the plaster is largely removed,the plaster is largely removed,
►the rift is enlarged to several centimetresthe rift is enlarged to several centimetres
with hammer and chipper,with hammer and chipper,
►the rift is cleaned with air under pressure,the rift is cleaned with air under pressure,
►the rubble rests are removed,the rubble rests are removed,
►the rift is filled with cement or reparationthe rift is filled with cement or reparation
mortar,mortar,
►the plaster is re-established.the plaster is re-established.
Retrofit measures in case ofRetrofit measures in case of
extensive crackingextensive cracking
Retrofit measures in case of bucklingRetrofit measures in case of buckling
of masonry wallsof masonry walls
►the loads are catched with a support andthe loads are catched with a support and
lead into the load bearing foundation,lead into the load bearing foundation,
►the old wall is demolished,the old wall is demolished,
►a new wall is built,a new wall is built,
►the wall is loaded again (the support isthe wall is loaded again (the support is
unmounted).unmounted).
Retrofit measures in case of bucklingRetrofit measures in case of buckling
of masonry wallsof masonry walls
Retrofit measures as preventiveRetrofit measures as preventive
measuresmeasures
►Retrofit measures in case of lack ofRetrofit measures in case of lack of
confinement of the cornerconfinement of the corner
►Retrofit measures in case of nonRetrofit measures in case of non
corresponding confinement of the openingscorresponding confinement of the openings
►Shotcreting of the wallShotcreting of the wall
►Creation of a ring beamCreation of a ring beam
Retrofit measures in case of lack ofRetrofit measures in case of lack of
confinement of the cornerconfinement of the corner
► the roof and floor loads are caught with a scaffoldthe roof and floor loads are caught with a scaffold
construction,construction,
► it is bolted in two directions on the inner side of theit is bolted in two directions on the inner side of the
wall,wall,
► the masonry is demolished and disposed,the masonry is demolished and disposed,
► the corner column is reinforced,the corner column is reinforced,
► forming – concreting – stripping of the cornerforming – concreting – stripping of the corner
column,column,
► creating reinforced masonry in the zone of thecreating reinforced masonry in the zone of the
corner column.corner column.
Retrofit measures in case of lack ofRetrofit measures in case of lack of
confinement of the cornerconfinement of the corner
Unloading of the wall in order to add confinement
Retrofit measures in case of lack ofRetrofit measures in case of lack of
confinement of the cornerconfinement of the corner
Retrofit measures in case of nonRetrofit measures in case of non
corresponding confinement of thecorresponding confinement of the
openingsopenings
► the old door and door frame are demolished andthe old door and door frame are demolished and
disposed,disposed,
► the eventually existing lintel is also demolishedthe eventually existing lintel is also demolished
and disposed,and disposed,
► the masonry adjacent to the door opening isthe masonry adjacent to the door opening is
demolished and disposed,demolished and disposed,
► the reinforcement of the reinforced concrete framethe reinforcement of the reinforced concrete frame
is anchored in the floor slab,is anchored in the floor slab,
► the other reinforcement works are done,the other reinforcement works are done,
► it is formed – concreted – stripped,it is formed – concreted – stripped,
► the new door is introduced.the new door is introduced.
Retrofit measures in case of nonRetrofit measures in case of non
corresponding confinement of thecorresponding confinement of the
openingsopenings
Retrofit measures in case of nonRetrofit measures in case of non
corresponding confinement of thecorresponding confinement of the
openingsopenings
Shotcreting of the wallShotcreting of the wall
► removal of the plaster,removal of the plaster,
► removal of the mortar up to 1 cm deep with a steelremoval of the mortar up to 1 cm deep with a steel
brush,brush,
► cleaning the wall with water,cleaning the wall with water,
► shotcreting in a thickness of 4-8 cm. Alternativelyshotcreting in a thickness of 4-8 cm. Alternatively
a cast in place concrete jacketing of 10 cma cast in place concrete jacketing of 10 cm
thickness can be done. The reinforcement has athickness can be done. The reinforcement has a
diameter of 8/25. The new wall has to be anchoreddiameter of 8/25. The new wall has to be anchored
in the existing masonry wall.in the existing masonry wall.
Shotcreting of the wallShotcreting of the wall
Determination of costsDetermination of costs
►Overview of German costs estimationOverview of German costs estimation
methodsmethods
►Approach to costs calculation of retrofitApproach to costs calculation of retrofit
methodsmethods
►Examples of costs calculationExamples of costs calculation
Overview of German costsOverview of German costs
calculation methodscalculation methods
 Costs estimation:Costs estimation:
►building divided in spaces with different functionsbuilding divided in spaces with different functions
►database necessarydatabase necessary
►suitable in incipient stages of planningsuitable in incipient stages of planning
 Costs calculationCosts calculation
►Building elements divided according to theirBuilding elements divided according to their
execution typeexecution type
►Later stages of planning, more preciseLater stages of planning, more precise
►Different levels of deepnessDifferent levels of deepness
►Neddermann: old building elementsNeddermann: old building elements
Approach to costs calculation ofApproach to costs calculation of
retrofit measuresretrofit measures
►Retrofit elementsRetrofit elements
 recognition characteristics,recognition characteristics,
 construction works with duration/neededconstruction works with duration/needed
resources,resources,
 implied works for retrofit/reparation,implied works for retrofit/reparation,
 earthquake resilient features, seismicearthquake resilient features, seismic
deficiencies and earthquake damage patternsdeficiencies and earthquake damage patterns
Examples of costs calculationExamples of costs calculation
►Reparation of cracking in the wallsReparation of cracking in the walls
►Reparation of buckled wallsReparation of buckled walls
►Retrofit of cornersRetrofit of corners
►Retrofit of door framesRetrofit of door frames
Reparation of cracking in the walls:Reparation of cracking in the walls:
small rifts in non-bearing wallssmall rifts in non-bearing walls
No. Operation Unit Working
time/un
it
Price/unit
(€)
Number of
units
Price /
time
(€)
Whole
price
(€)
1 Removal of the plaster
on big surface
m 0.3 h 1 36 10.8
2 Enlarging the rift with
hammer and chisel
m 0.2 h 1 36 7.2
3 Cleaning the rift m 0.1 h 1 36 3.6
4 Filling the rift with
mortar
m 0.1 h 1 36 3.6
Reparation mortar m 5 1 5
5 Transport of the
removed plaster to
container
m 0.07 h 1 36 2.52
6 Disposal of the removed
plaster
m³ 13+18.40 0 0.05
7 New plaster m 0.14 h 36 5.04
Plaster mortar m 2.5 1 2.5
Price m rift 40.31
Reparation of cracking in the walls:Reparation of cracking in the walls:
rifts in load bearing wallsrifts in load bearing walls
No. Operation Unit Work
time/unit
Price/unit
(€)
Number
units
Price/ time
(€)
Whole
price (€)
1 Large removal of the plaster m 0.3 1 36 10.8
2 Preparation of the base m 0.2 1 36 7.2
3 Drilling m 0.2 1 36 7.2
4 Cleaning of the drill holes m 0.2 1 36 7.2
5 Battering the packer m 0.2 1 36 7.2
6 Isolating m 0.2 1 36 7.2
7 Verifying the patency m 0.2 1 36 7.2
8 Turning in the nipples m 0.2 1 36 7.2
9 Injection m 0.2 1 36 7.2
Injection means m 5 1 5
10 Postinjection m 0.2 1 36 7.2
11 Removing the isolation m 0.2 1 36 7.2
12 Chipping out the packer m 0.2 1 36 7.2
13 Closing the drill hole m 0.2 1 36 7.2
14 Disposal of the removed plaster m³ 13+18.4 0 0.05
15 New plaster m 0.14 1 36 7.2
Plaster mortar m 2.5 1 2.5
Price m rift 111.95
Reparation of buckled wallsReparation of buckled walls
No. Operation Unit Work
time/
unit
Price/unit
(€)
Number
of
units
Price
/time
(€)
Whole
price
(€)
1 Bolts to support the floor piece 2 h 1 36 72
2 Demolition of masonry m³ 5,6 h 1 36 201.6
3 Disposal of demolished
masonry
m³ 13+6 1 19
4 Stonewalling of the
demolished walls
m³ 5.48 h 1 36 197.3
Stones piece 0.25 275 68.75
Mortar litre 3.125/27 233 26.96
Price m³
wall
585.61
Retrofit of cornersRetrofit of corners
No. Operation Unit Work
time/u
nit
Price/unit
(€)
Number of
units
Price/time
(€)
Whole price
1 Bolten in two directions piece 2 h 1 36 72
2 Demolition of masonry m³ 5.6 h 4.38 36 883.01
3 Disposal of the demolished masonry m³ 13+(46/2.5) 4.38 137.53
4 Reinforcement of the corner column piece 0.5 h 1 36 18
Steel (100kg/m³ concrete) t 500 0.05 25
5 Forming the corner column piece 20 min 1 36 13.5
Formwork m² - 8.5 10 - 85/4
Formwork support m - 0.55 25 - 13.75/4
6 Concreting the corner column piece 1 h 1 36 36
Concrete m³ 140 0.48 67.2
7 Striking the corner column piece 20 min 1 36 13.5
8 Stonewalling the demolished walls
(20% more height for the
anchoring of the reinforcement)
m² 2 h 9.6 36 691.2
Masonry stones stone 250/1000
pieces
960 240
Mortar litre 3.125/27 l 816 94.44
Price corner 2448.69
Confinement of door framesConfinement of door frames
No. Operation Unit Work time/
unit
Price/unit (€) Number of
units
Price/ time (€) Whole price
1 Demolition of the door and the door frame
including the transport to the building
site rubble container
door 0.5 h 1 36 18
2 Disposal of the doorframe and the door t 225 0.04 9
container 46 0.25 11.5
3 Demolition of the masonry including the
transport to the building site rubble
container
door 0.5 h 1 36 18
4 Disposal of the demolished masonry m³ 13+46/2.5 0.3 9.42
5 Cleaning of the demolished masonry rests
with steel brush in order to remove
rubble rests
door 0.5 h 1 36 18
6 Reinforcement steel of the door frame out of
reinforced concrete anchored in the
floor
hole 0.5 h/ 8 holes 8 36 18
7 Reinforcement door 45 min. 1 36 27
Steel t 500 0.02 7.5
8 Forming (the door frame has the function of
framework for concreting)
door 20 min 1 36 13.5
9 Concreting door 1 h 1 36 36
Concrete m³ 140 0.3 42
10 Stripping the forms door 20 min 1 36 13.5
11 Acquisition of the door and assembly piece 368 1 368
Price door
frame
609.42
Discussion and conclusionsDiscussion and conclusions
►The employment of the method doesn’tThe employment of the method doesn’t
improve the whole buildingimprove the whole building
►Employed in the past years more and moreEmployed in the past years more and more
in Greecein Greece
►In Greece stone buildings experience atIn Greece stone buildings experience at
least an earthquake during their lifetimeleast an earthquake during their lifetime
►Targeted measures are task of theTargeted measures are task of the
engineersengineers
Discussion and conclusionsDiscussion and conclusions
N
o
.
Measure Costs
1 Small rifts in non-bearing masonry walls 40.31 € / m rift
2 Rifts in load bearing masonry walls 111.95 €/ m rift
3 Rehabilitation of buckled masonry walls 585.61 € / m³
4 Confinement of masonry corners 2448.69 €
/corner
5 Confinement of door frames 609.42 € /door
frame
Discussion and conclusionsDiscussion and conclusions
►Stone masonry houses spread throughoutStone masonry houses spread throughout
the world:the world:
 Algeria, India, Iran, Italy, Nepal, Pakistan,Algeria, India, Iran, Italy, Nepal, Pakistan,
Portugal, Slovenia, and Switzerland (WHE)Portugal, Slovenia, and Switzerland (WHE)
 historic, heritage buildingshistoric, heritage buildings
 no databases of previous performed worksno databases of previous performed works
►The method is useful, all needed are pricesThe method is useful, all needed are prices
of materials and of the hour of workof materials and of the hour of work
►No affirmation about certaintyNo affirmation about certainty
Discussion and conclusionsDiscussion and conclusions
►Research into the structural behaviour ofResearch into the structural behaviour of
seismic retrofit measures is much moreseismic retrofit measures is much more
spread than in the side of application andspread than in the side of application and
economic efficiency.economic efficiency.
►The work presented here builds a begin.The work presented here builds a begin.
Thank you!Thank you!

Contenu connexe

En vedette

Intro to Structural Engineering
Intro to Structural EngineeringIntro to Structural Engineering
Intro to Structural EngineeringJorge C. Palma
 
L- beams or flanged beams
L- beams or flanged beamsL- beams or flanged beams
L- beams or flanged beamshoneysid
 
Shear and Bending Moment in Beams
Shear and Bending Moment in BeamsShear and Bending Moment in Beams
Shear and Bending Moment in BeamsAmr Hamed
 
Repair and Retrofit on Beam and Column Joints
Repair and Retrofit on Beam and Column JointsRepair and Retrofit on Beam and Column Joints
Repair and Retrofit on Beam and Column Jointsamerald24
 
Singly Reinforce Concrete
Singly Reinforce ConcreteSingly Reinforce Concrete
Singly Reinforce Concreteguest00bb06
 
Shear Force And Bending Moment In Beams
Shear Force And Bending Moment In BeamsShear Force And Bending Moment In Beams
Shear Force And Bending Moment In BeamsAmr Hamed
 
Building Types And Components1
Building Types And Components1Building Types And Components1
Building Types And Components1stooty s
 
Seismic Retrofitting Techniques
Seismic Retrofitting TechniquesSeismic Retrofitting Techniques
Seismic Retrofitting TechniquesAritra Banerjee
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Dhaval Jadhav
 
Beam and slab design
Beam and slab designBeam and slab design
Beam and slab designIvan Ferrer
 
Presentation on Slab, Beam & Column
Presentation on Slab, Beam & ColumnPresentation on Slab, Beam & Column
Presentation on Slab, Beam & Columnমু সা
 
Lecture 9 shear force and bending moment in beams
Lecture 9 shear force and bending moment in beamsLecture 9 shear force and bending moment in beams
Lecture 9 shear force and bending moment in beamsDeepak Agarwal
 
Composite structures of steel and concrete
Composite structures of steel and concreteComposite structures of steel and concrete
Composite structures of steel and concretePashtoon Khan
 
basic structural system in architecture
basic structural system in architecturebasic structural system in architecture
basic structural system in architectureshahul130103
 

En vedette (18)

Intro to Structural Engineering
Intro to Structural EngineeringIntro to Structural Engineering
Intro to Structural Engineering
 
L- beams or flanged beams
L- beams or flanged beamsL- beams or flanged beams
L- beams or flanged beams
 
Shear and Bending Moment in Beams
Shear and Bending Moment in BeamsShear and Bending Moment in Beams
Shear and Bending Moment in Beams
 
Repair and Retrofit on Beam and Column Joints
Repair and Retrofit on Beam and Column JointsRepair and Retrofit on Beam and Column Joints
Repair and Retrofit on Beam and Column Joints
 
Singly Reinforce Concrete
Singly Reinforce ConcreteSingly Reinforce Concrete
Singly Reinforce Concrete
 
Shear Force And Bending Moment In Beams
Shear Force And Bending Moment In BeamsShear Force And Bending Moment In Beams
Shear Force And Bending Moment In Beams
 
Building Types And Components1
Building Types And Components1Building Types And Components1
Building Types And Components1
 
Roof
RoofRoof
Roof
 
Beam Deflection Formulae
Beam Deflection FormulaeBeam Deflection Formulae
Beam Deflection Formulae
 
Seismic Retrofitting Techniques
Seismic Retrofitting TechniquesSeismic Retrofitting Techniques
Seismic Retrofitting Techniques
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012
 
9 beam deflection
9 beam deflection9 beam deflection
9 beam deflection
 
Beam and slab design
Beam and slab designBeam and slab design
Beam and slab design
 
Presentation on Slab, Beam & Column
Presentation on Slab, Beam & ColumnPresentation on Slab, Beam & Column
Presentation on Slab, Beam & Column
 
Lecture 9 shear force and bending moment in beams
Lecture 9 shear force and bending moment in beamsLecture 9 shear force and bending moment in beams
Lecture 9 shear force and bending moment in beams
 
Composite structures of steel and concrete
Composite structures of steel and concreteComposite structures of steel and concrete
Composite structures of steel and concrete
 
Retrofitting
RetrofittingRetrofitting
Retrofitting
 
basic structural system in architecture
basic structural system in architecturebasic structural system in architecture
basic structural system in architecture
 

Plus de Maria Bostenaru

Plus de Maria Bostenaru (20)

INCD presentation
INCD presentationINCD presentation
INCD presentation
 
KAB MTA presentation
KAB MTA presentationKAB MTA presentation
KAB MTA presentation
 
New concepts of mobility to foster career development
New concepts of mobility to foster career developmentNew concepts of mobility to foster career development
New concepts of mobility to foster career development
 
Egu 1689
Egu 1689Egu 1689
Egu 1689
 
Women bostenaru
Women bostenaruWomen bostenaru
Women bostenaru
 
Becominglocal
BecominglocalBecominglocal
Becominglocal
 
Bostenaru Sibiu 2014
Bostenaru Sibiu 2014Bostenaru Sibiu 2014
Bostenaru Sibiu 2014
 
Simpozion CSAU bostenaru
Simpozion CSAU bostenaruSimpozion CSAU bostenaru
Simpozion CSAU bostenaru
 
Budapest eurodoc
Budapest eurodocBudapest eurodoc
Budapest eurodoc
 
The beginnings of reinforced concrete
The beginnings of reinforced concreteThe beginnings of reinforced concrete
The beginnings of reinforced concrete
 
Padurea din oras Carei si Karlsruhe
Padurea din oras Carei si KarlsruhePadurea din oras Carei si Karlsruhe
Padurea din oras Carei si Karlsruhe
 
COST Madrid
COST MadridCOST Madrid
COST Madrid
 
PIANO final report
PIANO final reportPIANO final report
PIANO final report
 
Hamburg 2012
Hamburg 2012Hamburg 2012
Hamburg 2012
 
Architecture and urban planning (3 d) representation
Architecture and urban planning (3 d) representationArchitecture and urban planning (3 d) representation
Architecture and urban planning (3 d) representation
 
Uzina de apa Suceava
Uzina de apa SuceavaUzina de apa Suceava
Uzina de apa Suceava
 
Water Junior sumitt Stresa
Water Junior sumitt StresaWater Junior sumitt Stresa
Water Junior sumitt Stresa
 
Living walls - romana
Living walls - romanaLiving walls - romana
Living walls - romana
 
Economics and retrofit
Economics and retrofitEconomics and retrofit
Economics and retrofit
 
NED COST IS1104
NED COST IS1104NED COST IS1104
NED COST IS1104
 

Dernier

8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 

Dernier (20)

8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 

Azores Bostenaru Bourlotos

  • 1. CALCULATION OF COSTSCALCULATION OF COSTS FOR SEISMIC RETROFITFOR SEISMIC RETROFIT OF STONE MASONRYOF STONE MASONRY BUILDINGS IN GREECEBUILDINGS IN GREECE Maria BOSTENARU DANMaria BOSTENARU DAN Gregor BOURLOTOSGregor BOURLOTOS
  • 2. OverviewOverview ►IntroductionIntroduction ►Description of the stone masonrDescription of the stone masonry built stocky built stock in Greecein Greece ►Description of the retrofit measuresDescription of the retrofit measures ►Determination of costsDetermination of costs ►Discussion and conclusionsDiscussion and conclusions
  • 3. IntroductionIntroduction ►The majority of population lives in existingThe majority of population lives in existing buildings and will further live in thesebuildings and will further live in these ►BBuildinguilding retrofitretrofit is important for theiris important for their assurance in earthquake prone regionsassurance in earthquake prone regions ►Ressources are limited, therefore economicRessources are limited, therefore economic efficiencefficiency is importanty is important ►Stone masonry spread in GreeceStone masonry spread in Greece ►Building element method from Germany, aBuilding element method from Germany, a method which doesn’t require databasesmethod which doesn’t require databases
  • 4. Description of the stone masonryDescription of the stone masonry built stock in Greecebuilt stock in Greece ►Tassios and Syrmakezis (2004) WHETassios and Syrmakezis (2004) WHE ►Historic centres of Greek citiesHistoric centres of Greek cities ►Seismic performance is poorSeismic performance is poor ►Load bearing structure: unreinforced stoneLoad bearing structure: unreinforced stone masonry walls out of rubble stone with limemasonry walls out of rubble stone with lime mortarmortar ►floor and roof structures: timber structuresfloor and roof structures: timber structures
  • 5. Description of the stone masonryDescription of the stone masonry built stock in Greecebuilt stock in Greece ►Damaged in the Athens 1999 earthquake:Damaged in the Athens 1999 earthquake:  partial collapse of walls,partial collapse of walls,  collapse of corners,collapse of corners,  separation of the two walls converging at aseparation of the two walls converging at a cornercorner  extensive crackingextensive cracking ►Vertical and horizontal reinforced concreteVertical and horizontal reinforced concrete confining elements improve the behaviourconfining elements improve the behaviour
  • 6. Description of the stone masonryDescription of the stone masonry built stock in Greece (source: WHE)built stock in Greece (source: WHE)
  • 7. Description of the retrofit measuresDescription of the retrofit measures ►Retrofit measures in case of pre-damagedRetrofit measures in case of pre-damaged buildingsbuildings ►Strengthening of a non-damaged buildingStrengthening of a non-damaged building
  • 8. Retrofit measures in case of pre-Retrofit measures in case of pre- damaged buildingsdamaged buildings ►Extensive crackingExtensive cracking ►Buckling of masonry wallsBuckling of masonry walls
  • 9. Retrofit measures in case ofRetrofit measures in case of extensive crackingextensive cracking ►the plaster is largely removed,the plaster is largely removed, ►the rift is enlarged to several centimetresthe rift is enlarged to several centimetres with hammer and chipper,with hammer and chipper, ►the rift is cleaned with air under pressure,the rift is cleaned with air under pressure, ►the rubble rests are removed,the rubble rests are removed, ►the rift is filled with cement or reparationthe rift is filled with cement or reparation mortar,mortar, ►the plaster is re-established.the plaster is re-established.
  • 10. Retrofit measures in case ofRetrofit measures in case of extensive crackingextensive cracking
  • 11. Retrofit measures in case of bucklingRetrofit measures in case of buckling of masonry wallsof masonry walls ►the loads are catched with a support andthe loads are catched with a support and lead into the load bearing foundation,lead into the load bearing foundation, ►the old wall is demolished,the old wall is demolished, ►a new wall is built,a new wall is built, ►the wall is loaded again (the support isthe wall is loaded again (the support is unmounted).unmounted).
  • 12. Retrofit measures in case of bucklingRetrofit measures in case of buckling of masonry wallsof masonry walls
  • 13. Retrofit measures as preventiveRetrofit measures as preventive measuresmeasures ►Retrofit measures in case of lack ofRetrofit measures in case of lack of confinement of the cornerconfinement of the corner ►Retrofit measures in case of nonRetrofit measures in case of non corresponding confinement of the openingscorresponding confinement of the openings ►Shotcreting of the wallShotcreting of the wall ►Creation of a ring beamCreation of a ring beam
  • 14. Retrofit measures in case of lack ofRetrofit measures in case of lack of confinement of the cornerconfinement of the corner ► the roof and floor loads are caught with a scaffoldthe roof and floor loads are caught with a scaffold construction,construction, ► it is bolted in two directions on the inner side of theit is bolted in two directions on the inner side of the wall,wall, ► the masonry is demolished and disposed,the masonry is demolished and disposed, ► the corner column is reinforced,the corner column is reinforced, ► forming – concreting – stripping of the cornerforming – concreting – stripping of the corner column,column, ► creating reinforced masonry in the zone of thecreating reinforced masonry in the zone of the corner column.corner column.
  • 15. Retrofit measures in case of lack ofRetrofit measures in case of lack of confinement of the cornerconfinement of the corner Unloading of the wall in order to add confinement
  • 16. Retrofit measures in case of lack ofRetrofit measures in case of lack of confinement of the cornerconfinement of the corner
  • 17. Retrofit measures in case of nonRetrofit measures in case of non corresponding confinement of thecorresponding confinement of the openingsopenings ► the old door and door frame are demolished andthe old door and door frame are demolished and disposed,disposed, ► the eventually existing lintel is also demolishedthe eventually existing lintel is also demolished and disposed,and disposed, ► the masonry adjacent to the door opening isthe masonry adjacent to the door opening is demolished and disposed,demolished and disposed, ► the reinforcement of the reinforced concrete framethe reinforcement of the reinforced concrete frame is anchored in the floor slab,is anchored in the floor slab, ► the other reinforcement works are done,the other reinforcement works are done, ► it is formed – concreted – stripped,it is formed – concreted – stripped, ► the new door is introduced.the new door is introduced.
  • 18. Retrofit measures in case of nonRetrofit measures in case of non corresponding confinement of thecorresponding confinement of the openingsopenings
  • 19. Retrofit measures in case of nonRetrofit measures in case of non corresponding confinement of thecorresponding confinement of the openingsopenings
  • 20. Shotcreting of the wallShotcreting of the wall ► removal of the plaster,removal of the plaster, ► removal of the mortar up to 1 cm deep with a steelremoval of the mortar up to 1 cm deep with a steel brush,brush, ► cleaning the wall with water,cleaning the wall with water, ► shotcreting in a thickness of 4-8 cm. Alternativelyshotcreting in a thickness of 4-8 cm. Alternatively a cast in place concrete jacketing of 10 cma cast in place concrete jacketing of 10 cm thickness can be done. The reinforcement has athickness can be done. The reinforcement has a diameter of 8/25. The new wall has to be anchoreddiameter of 8/25. The new wall has to be anchored in the existing masonry wall.in the existing masonry wall.
  • 21. Shotcreting of the wallShotcreting of the wall
  • 22. Determination of costsDetermination of costs ►Overview of German costs estimationOverview of German costs estimation methodsmethods ►Approach to costs calculation of retrofitApproach to costs calculation of retrofit methodsmethods ►Examples of costs calculationExamples of costs calculation
  • 23. Overview of German costsOverview of German costs calculation methodscalculation methods  Costs estimation:Costs estimation: ►building divided in spaces with different functionsbuilding divided in spaces with different functions ►database necessarydatabase necessary ►suitable in incipient stages of planningsuitable in incipient stages of planning  Costs calculationCosts calculation ►Building elements divided according to theirBuilding elements divided according to their execution typeexecution type ►Later stages of planning, more preciseLater stages of planning, more precise ►Different levels of deepnessDifferent levels of deepness ►Neddermann: old building elementsNeddermann: old building elements
  • 24. Approach to costs calculation ofApproach to costs calculation of retrofit measuresretrofit measures ►Retrofit elementsRetrofit elements  recognition characteristics,recognition characteristics,  construction works with duration/neededconstruction works with duration/needed resources,resources,  implied works for retrofit/reparation,implied works for retrofit/reparation,  earthquake resilient features, seismicearthquake resilient features, seismic deficiencies and earthquake damage patternsdeficiencies and earthquake damage patterns
  • 25. Examples of costs calculationExamples of costs calculation ►Reparation of cracking in the wallsReparation of cracking in the walls ►Reparation of buckled wallsReparation of buckled walls ►Retrofit of cornersRetrofit of corners ►Retrofit of door framesRetrofit of door frames
  • 26. Reparation of cracking in the walls:Reparation of cracking in the walls: small rifts in non-bearing wallssmall rifts in non-bearing walls No. Operation Unit Working time/un it Price/unit (€) Number of units Price / time (€) Whole price (€) 1 Removal of the plaster on big surface m 0.3 h 1 36 10.8 2 Enlarging the rift with hammer and chisel m 0.2 h 1 36 7.2 3 Cleaning the rift m 0.1 h 1 36 3.6 4 Filling the rift with mortar m 0.1 h 1 36 3.6 Reparation mortar m 5 1 5 5 Transport of the removed plaster to container m 0.07 h 1 36 2.52 6 Disposal of the removed plaster m³ 13+18.40 0 0.05 7 New plaster m 0.14 h 36 5.04 Plaster mortar m 2.5 1 2.5 Price m rift 40.31
  • 27. Reparation of cracking in the walls:Reparation of cracking in the walls: rifts in load bearing wallsrifts in load bearing walls No. Operation Unit Work time/unit Price/unit (€) Number units Price/ time (€) Whole price (€) 1 Large removal of the plaster m 0.3 1 36 10.8 2 Preparation of the base m 0.2 1 36 7.2 3 Drilling m 0.2 1 36 7.2 4 Cleaning of the drill holes m 0.2 1 36 7.2 5 Battering the packer m 0.2 1 36 7.2 6 Isolating m 0.2 1 36 7.2 7 Verifying the patency m 0.2 1 36 7.2 8 Turning in the nipples m 0.2 1 36 7.2 9 Injection m 0.2 1 36 7.2 Injection means m 5 1 5 10 Postinjection m 0.2 1 36 7.2 11 Removing the isolation m 0.2 1 36 7.2 12 Chipping out the packer m 0.2 1 36 7.2 13 Closing the drill hole m 0.2 1 36 7.2 14 Disposal of the removed plaster m³ 13+18.4 0 0.05 15 New plaster m 0.14 1 36 7.2 Plaster mortar m 2.5 1 2.5 Price m rift 111.95
  • 28. Reparation of buckled wallsReparation of buckled walls No. Operation Unit Work time/ unit Price/unit (€) Number of units Price /time (€) Whole price (€) 1 Bolts to support the floor piece 2 h 1 36 72 2 Demolition of masonry m³ 5,6 h 1 36 201.6 3 Disposal of demolished masonry m³ 13+6 1 19 4 Stonewalling of the demolished walls m³ 5.48 h 1 36 197.3 Stones piece 0.25 275 68.75 Mortar litre 3.125/27 233 26.96 Price m³ wall 585.61
  • 29. Retrofit of cornersRetrofit of corners No. Operation Unit Work time/u nit Price/unit (€) Number of units Price/time (€) Whole price 1 Bolten in two directions piece 2 h 1 36 72 2 Demolition of masonry m³ 5.6 h 4.38 36 883.01 3 Disposal of the demolished masonry m³ 13+(46/2.5) 4.38 137.53 4 Reinforcement of the corner column piece 0.5 h 1 36 18 Steel (100kg/m³ concrete) t 500 0.05 25 5 Forming the corner column piece 20 min 1 36 13.5 Formwork m² - 8.5 10 - 85/4 Formwork support m - 0.55 25 - 13.75/4 6 Concreting the corner column piece 1 h 1 36 36 Concrete m³ 140 0.48 67.2 7 Striking the corner column piece 20 min 1 36 13.5 8 Stonewalling the demolished walls (20% more height for the anchoring of the reinforcement) m² 2 h 9.6 36 691.2 Masonry stones stone 250/1000 pieces 960 240 Mortar litre 3.125/27 l 816 94.44 Price corner 2448.69
  • 30. Confinement of door framesConfinement of door frames No. Operation Unit Work time/ unit Price/unit (€) Number of units Price/ time (€) Whole price 1 Demolition of the door and the door frame including the transport to the building site rubble container door 0.5 h 1 36 18 2 Disposal of the doorframe and the door t 225 0.04 9 container 46 0.25 11.5 3 Demolition of the masonry including the transport to the building site rubble container door 0.5 h 1 36 18 4 Disposal of the demolished masonry m³ 13+46/2.5 0.3 9.42 5 Cleaning of the demolished masonry rests with steel brush in order to remove rubble rests door 0.5 h 1 36 18 6 Reinforcement steel of the door frame out of reinforced concrete anchored in the floor hole 0.5 h/ 8 holes 8 36 18 7 Reinforcement door 45 min. 1 36 27 Steel t 500 0.02 7.5 8 Forming (the door frame has the function of framework for concreting) door 20 min 1 36 13.5 9 Concreting door 1 h 1 36 36 Concrete m³ 140 0.3 42 10 Stripping the forms door 20 min 1 36 13.5 11 Acquisition of the door and assembly piece 368 1 368 Price door frame 609.42
  • 31. Discussion and conclusionsDiscussion and conclusions ►The employment of the method doesn’tThe employment of the method doesn’t improve the whole buildingimprove the whole building ►Employed in the past years more and moreEmployed in the past years more and more in Greecein Greece ►In Greece stone buildings experience atIn Greece stone buildings experience at least an earthquake during their lifetimeleast an earthquake during their lifetime ►Targeted measures are task of theTargeted measures are task of the engineersengineers
  • 32. Discussion and conclusionsDiscussion and conclusions N o . Measure Costs 1 Small rifts in non-bearing masonry walls 40.31 € / m rift 2 Rifts in load bearing masonry walls 111.95 €/ m rift 3 Rehabilitation of buckled masonry walls 585.61 € / m³ 4 Confinement of masonry corners 2448.69 € /corner 5 Confinement of door frames 609.42 € /door frame
  • 33. Discussion and conclusionsDiscussion and conclusions ►Stone masonry houses spread throughoutStone masonry houses spread throughout the world:the world:  Algeria, India, Iran, Italy, Nepal, Pakistan,Algeria, India, Iran, Italy, Nepal, Pakistan, Portugal, Slovenia, and Switzerland (WHE)Portugal, Slovenia, and Switzerland (WHE)  historic, heritage buildingshistoric, heritage buildings  no databases of previous performed worksno databases of previous performed works ►The method is useful, all needed are pricesThe method is useful, all needed are prices of materials and of the hour of workof materials and of the hour of work ►No affirmation about certaintyNo affirmation about certainty
  • 34. Discussion and conclusionsDiscussion and conclusions ►Research into the structural behaviour ofResearch into the structural behaviour of seismic retrofit measures is much moreseismic retrofit measures is much more spread than in the side of application andspread than in the side of application and economic efficiency.economic efficiency. ►The work presented here builds a begin.The work presented here builds a begin.