SlideShare a Scribd company logo
1 of 23
Download to read offline
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
Environmental benefits
of two-lift pavement
A quantitative perspective based on life cycle
assessment (LCA)
Joep Meijer
President of theRightenvironment
In collaboration with the CP Tech Center
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
Topics
1. What is LCA?
2. Our experience
3. Two-lift case
4. What’s next
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
Life cycle assessment (LCA)
LCA is a powerful tool for assessing the environmental
performance of products, services or scenarios
It is based on material and energy flows for processes
and materials that together form a life cycle
Resource A
Resource B
Production Assembly
Use
Maintenance
Recycling
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
Life cycle assessment (LCA)
We use world-leading software and databases and
apply ISO standards
- ISO 14041 Goal and Scope Definition
- ISO 14042 Inventory Analysis
- ISO 14043 Interpretation
- ISO 14044 Guidelines and principles
- ISO 14025 Type III environmental declarations
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
Goal and Scope
Functional unit: what is to be assessed in terms of:
- Amount
- Unit
- Functions
- Requirements
- Geographical considerations
- Timeframe
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
Inventory
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
Impact Assessment
A range of impact categories
• global warming (CO2-eq)
• depletion of non-renewables (Sb-eq)
• depletion of the ozone layer (CFC-11-eq)
• Acidification (SO2-eq)
• Eutrophication (PO4
3--eq)
• Summersmog (Ethylene-eq)
• aquatic ecotoxicity (CTUea)
• terrrestrial ecotoxicity (CTUet)
• human toxicity (CUTh)
• Energy (MJ)
• non-hazardous waste (kg)
• hazardous waste (kg)
• …
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
Impact Assessment
The result is an Environmental profile
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
Interpretation
Major contributions give options for improvements
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
Two-lift Kansas
Comparison of:
1. Traditional
2. Two-lift
3. Optimized two-lift
Together with Tom Van Dam, APTech
Gary Fick, Trinity Construction Management
Peter Taylor, CP Tech Center
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
Two-lift Kansas
Functional unit
The material acquisition and construction of 1 km of a
two lane highway with a total width of 7.4 m according
to KDOT requirements in Kansas
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
Two-lift Kansas
3.7 m 3.7 m
Conventional
concrete with a
thickness of 340 mm
150 mm Cement
Treated Base
Traditional
3.7 m 3.7 m
Tie bar: deformed No. 5
reinforcing bar (Grade
30), 915 mm long, spaced
every 760 mm across the
longitudinal contraction
joint, formed by saw
cutting D/3
Lower-lift of concrete
with a thickness of
300 mm
150 mm Cement
Treated Base
Top-lift of
concrete with a
thickness of 40
Two-lift
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
System boundaries
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
Two-lift Kansas
Key differences
1. Traditional
• Primary aggregate from OK for PCC
• Portland cement
2. Two-lift (same plus)
• CTB secondary aggregates on-site crusher
• Part fly ash in CTB and top lift
3. Optimized two-lift (same plus)
• CTB and bottom lift on-site crusher
• Fly ash in bottom lift
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
Two-lift Kansas
Limitations
• Average European data for materials, processes,
allocation parameters
• “just” material acquisition and construction
Look for relative differences not numbers
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
Comparison
Significant
1. Traditional 2. Two-lift 3. Optimized
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
All recycling off-site, no on-site recycling
Sensitivity analysis
Significant
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
Comparison
Significant
1. Traditional 2. Two-lift 3. Optimized
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
Sensitivity analysis
All primary aggregates local, no recycled aggregate
Significant
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
Conclusions
• Two-lift shows great potential
• Reducing clinker content is a sound strategy
• Recycling pays off
• Optimizing logistics matters
• With equal distances for primary and secondary
aggregates, handling proves to be discriminating
(quarry vs. on-site or off-site recycling)
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
LCA related
lessons/limitations
• Always look at more than 1 indicator ,
not just energy(trade-offs)
• Do not forget we did not look at all life cycle stages
(trade-offs)
• Always look for sensitivity analyses to test the
robustness of certain parameters or assumptions
• We need more US based data
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
Next steps
• Develop a framework
• Expand on current efforts to make a concrete and
cement US database
• Feed with primary data
• Perform case studies
UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013
Environmental benefits
of two-lift pavement
A quantitative perspective based on life cycle
assessment (LCA)
Joep Meijer
President of theRightenvironment

More Related Content

Viewers also liked

ROAD REPAIR WORK PRESENTATION SIX MONTHS TRAINING
ROAD REPAIR WORK PRESENTATION SIX MONTHS TRAININGROAD REPAIR WORK PRESENTATION SIX MONTHS TRAINING
ROAD REPAIR WORK PRESENTATION SIX MONTHS TRAININGRanBir ShaRma
 
Lecture01 140412064456-phpapp02 - copy
Lecture01 140412064456-phpapp02 - copyLecture01 140412064456-phpapp02 - copy
Lecture01 140412064456-phpapp02 - copytaye2020
 
road widening
road wideningroad widening
road wideningSanjay Ps
 
Expansion of state highway 1
Expansion of state highway 1Expansion of state highway 1
Expansion of state highway 1Sneha Kaira
 
Rmc plant
Rmc plantRmc plant
Rmc plantKp Ahm
 
Horizontal curves pdf
Horizontal curves pdfHorizontal curves pdf
Horizontal curves pdfKaila Turla
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement designRohit Ranjan
 
Ready mix concrete project ppt
Ready mix concrete project pptReady mix concrete project ppt
Ready mix concrete project pptKailash Hagawane
 
Construction of roads presentations
Construction of roads presentationsConstruction of roads presentations
Construction of roads presentationsIjaz Hassan Khan
 
A POWERPOINT PRESENTAION ON READY-MIX CONCRETE
A POWERPOINT PRESENTAION ON READY-MIX CONCRETEA POWERPOINT PRESENTAION ON READY-MIX CONCRETE
A POWERPOINT PRESENTAION ON READY-MIX CONCRETEkuntansourav
 
Road Construction
Road ConstructionRoad Construction
Road ConstructionDanish Mohd
 
Ready mix concrete batching plant - business plan
Ready mix concrete batching plant - business planReady mix concrete batching plant - business plan
Ready mix concrete batching plant - business planRami Taleb
 

Viewers also liked (19)

ROAD REPAIR WORK PRESENTATION SIX MONTHS TRAINING
ROAD REPAIR WORK PRESENTATION SIX MONTHS TRAININGROAD REPAIR WORK PRESENTATION SIX MONTHS TRAINING
ROAD REPAIR WORK PRESENTATION SIX MONTHS TRAINING
 
Narrow Pavement Widening - Enhancing Performance with Interlayers
Narrow Pavement Widening - Enhancing Performance with InterlayersNarrow Pavement Widening - Enhancing Performance with Interlayers
Narrow Pavement Widening - Enhancing Performance with Interlayers
 
Lecture01 140412064456-phpapp02 - copy
Lecture01 140412064456-phpapp02 - copyLecture01 140412064456-phpapp02 - copy
Lecture01 140412064456-phpapp02 - copy
 
road widening
road wideningroad widening
road widening
 
Mehrauli mahipalpur road widening project
Mehrauli mahipalpur road widening projectMehrauli mahipalpur road widening project
Mehrauli mahipalpur road widening project
 
Expansion of state highway 1
Expansion of state highway 1Expansion of state highway 1
Expansion of state highway 1
 
PWD, national highway
PWD, national highwayPWD, national highway
PWD, national highway
 
Highway Project
Highway ProjectHighway Project
Highway Project
 
RMC plant layout
RMC plant layoutRMC plant layout
RMC plant layout
 
Widening of curve
Widening of curveWidening of curve
Widening of curve
 
Rmc plant
Rmc plantRmc plant
Rmc plant
 
Ready Mix Concrete
Ready Mix ConcreteReady Mix Concrete
Ready Mix Concrete
 
Horizontal curves pdf
Horizontal curves pdfHorizontal curves pdf
Horizontal curves pdf
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement design
 
Ready mix concrete project ppt
Ready mix concrete project pptReady mix concrete project ppt
Ready mix concrete project ppt
 
Construction of roads presentations
Construction of roads presentationsConstruction of roads presentations
Construction of roads presentations
 
A POWERPOINT PRESENTAION ON READY-MIX CONCRETE
A POWERPOINT PRESENTAION ON READY-MIX CONCRETEA POWERPOINT PRESENTAION ON READY-MIX CONCRETE
A POWERPOINT PRESENTAION ON READY-MIX CONCRETE
 
Road Construction
Road ConstructionRoad Construction
Road Construction
 
Ready mix concrete batching plant - business plan
Ready mix concrete batching plant - business planReady mix concrete batching plant - business plan
Ready mix concrete batching plant - business plan
 

Similar to Two-Lift Paving - Environmental Performance

Materials Matter - Construction Materials and their Environmental Costs
Materials Matter - Construction Materials and their Environmental CostsMaterials Matter - Construction Materials and their Environmental Costs
Materials Matter - Construction Materials and their Environmental CostsThink Wood
 
Understanding the Validity of a LCA
Understanding the Validity of a LCAUnderstanding the Validity of a LCA
Understanding the Validity of a LCALaurel McEwen
 
Diapositivas de la conferencia de Gül Kremer
Diapositivas de la conferencia de Gül KremerDiapositivas de la conferencia de Gül Kremer
Diapositivas de la conferencia de Gül Kremerlideresacademicos
 
Life cycle assessment and simulation enablers of sustainable product design
Life cycle assessment and simulation enablers of sustainable product designLife cycle assessment and simulation enablers of sustainable product design
Life cycle assessment and simulation enablers of sustainable product designeSAT Publishing House
 
Life cycle assessment and simulation enablers of sustainable product design
Life cycle assessment and simulation enablers of sustainable product designLife cycle assessment and simulation enablers of sustainable product design
Life cycle assessment and simulation enablers of sustainable product designeSAT Publishing House
 
Building materials and environmental impact
Building materials and environmental impactBuilding materials and environmental impact
Building materials and environmental impactadi5686
 
5th International Conference : Workshop - Energy
5th International Conference : Workshop - Energy5th International Conference : Workshop - Energy
5th International Conference : Workshop - Energyicarb
 
Life cycle assessment of construction materials using eio lca
Life cycle assessment of construction materials using eio lcaLife cycle assessment of construction materials using eio lca
Life cycle assessment of construction materials using eio lcaeSAT Journals
 
Life Cycle Assessment Of Polymers And Compounds
Life Cycle Assessment Of Polymers And CompoundsLife Cycle Assessment Of Polymers And Compounds
Life Cycle Assessment Of Polymers And Compoundsharidoss
 
Wood and Sustainable Building - Lunch & Learn
Wood and Sustainable Building - Lunch & LearnWood and Sustainable Building - Lunch & Learn
Wood and Sustainable Building - Lunch & LearnFWPA
 
Life Cycle Assessment (LCA) del progetto Green Site
Life Cycle Assessment (LCA) del progetto Green SiteLife Cycle Assessment (LCA) del progetto Green Site
Life Cycle Assessment (LCA) del progetto Green SiteeAmbiente
 
Susan tighe green_roads-the_sustainable_road_ahead-ppt
Susan tighe green_roads-the_sustainable_road_ahead-pptSusan tighe green_roads-the_sustainable_road_ahead-ppt
Susan tighe green_roads-the_sustainable_road_ahead-pptSARFARAZ24
 
Susan tighe green_roads-the_sustainable_road_ahead-ppt
Susan tighe green_roads-the_sustainable_road_ahead-pptSusan tighe green_roads-the_sustainable_road_ahead-ppt
Susan tighe green_roads-the_sustainable_road_ahead-pptSARFARAZ24
 
Pre-defense communication check
Pre-defense communication checkPre-defense communication check
Pre-defense communication checkFrancisco
 

Similar to Two-Lift Paving - Environmental Performance (20)

Materials Matter - Construction Materials and their Environmental Costs
Materials Matter - Construction Materials and their Environmental CostsMaterials Matter - Construction Materials and their Environmental Costs
Materials Matter - Construction Materials and their Environmental Costs
 
Fw2410681072
Fw2410681072Fw2410681072
Fw2410681072
 
Understanding the Validity of a LCA
Understanding the Validity of a LCAUnderstanding the Validity of a LCA
Understanding the Validity of a LCA
 
Diapositivas de la conferencia de Gül Kremer
Diapositivas de la conferencia de Gül KremerDiapositivas de la conferencia de Gül Kremer
Diapositivas de la conferencia de Gül Kremer
 
Life cycle assessment and simulation enablers of sustainable product design
Life cycle assessment and simulation enablers of sustainable product designLife cycle assessment and simulation enablers of sustainable product design
Life cycle assessment and simulation enablers of sustainable product design
 
Life cycle assessment and simulation enablers of sustainable product design
Life cycle assessment and simulation enablers of sustainable product designLife cycle assessment and simulation enablers of sustainable product design
Life cycle assessment and simulation enablers of sustainable product design
 
Building materials and environmental impact
Building materials and environmental impactBuilding materials and environmental impact
Building materials and environmental impact
 
5th International Conference : Workshop - Energy
5th International Conference : Workshop - Energy5th International Conference : Workshop - Energy
5th International Conference : Workshop - Energy
 
Life cycle assessment of construction materials using eio lca
Life cycle assessment of construction materials using eio lcaLife cycle assessment of construction materials using eio lca
Life cycle assessment of construction materials using eio lca
 
Fine pack
Fine packFine pack
Fine pack
 
Life cycle assessment
Life cycle assessmentLife cycle assessment
Life cycle assessment
 
Life Cycle Assessment Of Polymers And Compounds
Life Cycle Assessment Of Polymers And CompoundsLife Cycle Assessment Of Polymers And Compounds
Life Cycle Assessment Of Polymers And Compounds
 
Wood and Sustainable Building - Lunch & Learn
Wood and Sustainable Building - Lunch & LearnWood and Sustainable Building - Lunch & Learn
Wood and Sustainable Building - Lunch & Learn
 
Stockton Deliverable 4 - Final Design (Presentation)
Stockton Deliverable 4 - Final Design (Presentation)Stockton Deliverable 4 - Final Design (Presentation)
Stockton Deliverable 4 - Final Design (Presentation)
 
Final presentation (1)
Final presentation (1)Final presentation (1)
Final presentation (1)
 
Polymer and Environment -LCA (Group 6)
Polymer and Environment -LCA (Group 6)Polymer and Environment -LCA (Group 6)
Polymer and Environment -LCA (Group 6)
 
Life Cycle Assessment (LCA) del progetto Green Site
Life Cycle Assessment (LCA) del progetto Green SiteLife Cycle Assessment (LCA) del progetto Green Site
Life Cycle Assessment (LCA) del progetto Green Site
 
Susan tighe green_roads-the_sustainable_road_ahead-ppt
Susan tighe green_roads-the_sustainable_road_ahead-pptSusan tighe green_roads-the_sustainable_road_ahead-ppt
Susan tighe green_roads-the_sustainable_road_ahead-ppt
 
Susan tighe green_roads-the_sustainable_road_ahead-ppt
Susan tighe green_roads-the_sustainable_road_ahead-pptSusan tighe green_roads-the_sustainable_road_ahead-ppt
Susan tighe green_roads-the_sustainable_road_ahead-ppt
 
Pre-defense communication check
Pre-defense communication checkPre-defense communication check
Pre-defense communication check
 

More from Center for Transportation Research - UT Austin

More from Center for Transportation Research - UT Austin (20)

Flying with SAVES
Flying with SAVESFlying with SAVES
Flying with SAVES
 
Regret of Queueing Bandits
Regret of Queueing BanditsRegret of Queueing Bandits
Regret of Queueing Bandits
 
Advances in Millimeter Wave for V2X
Advances in Millimeter Wave for V2XAdvances in Millimeter Wave for V2X
Advances in Millimeter Wave for V2X
 
Collaborative Sensing and Heterogeneous Networking Leveraging Vehicular Fleets
Collaborative Sensing and Heterogeneous Networking Leveraging Vehicular FleetsCollaborative Sensing and Heterogeneous Networking Leveraging Vehicular Fleets
Collaborative Sensing and Heterogeneous Networking Leveraging Vehicular Fleets
 
Collaborative Sensing for Automated Vehicles
Collaborative Sensing for Automated VehiclesCollaborative Sensing for Automated Vehicles
Collaborative Sensing for Automated Vehicles
 
Statistical Inference Using Stochastic Gradient Descent
Statistical Inference Using Stochastic Gradient DescentStatistical Inference Using Stochastic Gradient Descent
Statistical Inference Using Stochastic Gradient Descent
 
CAV/Mixed Transportation Modeling
CAV/Mixed Transportation ModelingCAV/Mixed Transportation Modeling
CAV/Mixed Transportation Modeling
 
Real-time Signal Control and Traffic Stability / Improved Models for Managed ...
Real-time Signal Control and Traffic Stability / Improved Models for Managed ...Real-time Signal Control and Traffic Stability / Improved Models for Managed ...
Real-time Signal Control and Traffic Stability / Improved Models for Managed ...
 
Sharing Novel Data Sources to Promote Innovation Through Collaboration: Case ...
Sharing Novel Data Sources to Promote Innovation Through Collaboration: Case ...Sharing Novel Data Sources to Promote Innovation Through Collaboration: Case ...
Sharing Novel Data Sources to Promote Innovation Through Collaboration: Case ...
 
UT SAVES: Situation Aware Vehicular Engineering Systems
UT SAVES: Situation Aware Vehicular Engineering SystemsUT SAVES: Situation Aware Vehicular Engineering Systems
UT SAVES: Situation Aware Vehicular Engineering Systems
 
Regret of Queueing Bandits
Regret of Queueing BanditsRegret of Queueing Bandits
Regret of Queueing Bandits
 
Sharing Novel Data Sources to Promote Innovation through Collaboration: Case ...
Sharing Novel Data Sources to Promote Innovation through Collaboration: Case ...Sharing Novel Data Sources to Promote Innovation through Collaboration: Case ...
Sharing Novel Data Sources to Promote Innovation through Collaboration: Case ...
 
CAV/Mixed Transportation Modeling
CAV/Mixed Transportation ModelingCAV/Mixed Transportation Modeling
CAV/Mixed Transportation Modeling
 
Collaborative Sensing for Automated Vehicles
Collaborative Sensing for Automated VehiclesCollaborative Sensing for Automated Vehicles
Collaborative Sensing for Automated Vehicles
 
Advances in Millimeter Wave for V2X
Advances in Millimeter Wave for V2XAdvances in Millimeter Wave for V2X
Advances in Millimeter Wave for V2X
 
Statistical Inference Using Stochastic Gradient Descent
Statistical Inference Using Stochastic Gradient DescentStatistical Inference Using Stochastic Gradient Descent
Statistical Inference Using Stochastic Gradient Descent
 
Status of two projects: Real-time Signal Control and Traffic Stability; Impro...
Status of two projects: Real-time Signal Control and Traffic Stability; Impro...Status of two projects: Real-time Signal Control and Traffic Stability; Impro...
Status of two projects: Real-time Signal Control and Traffic Stability; Impro...
 
SAVES general overview
SAVES general overviewSAVES general overview
SAVES general overview
 
D-STOP Overview April 2018
D-STOP Overview April 2018D-STOP Overview April 2018
D-STOP Overview April 2018
 
Managing Mobility during Design-Build Highway Construction: Successes and Les...
Managing Mobility during Design-Build Highway Construction: Successes and Les...Managing Mobility during Design-Build Highway Construction: Successes and Les...
Managing Mobility during Design-Build Highway Construction: Successes and Les...
 

Recently uploaded

Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationRosabel UA
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 

Recently uploaded (20)

Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translation
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 

Two-Lift Paving - Environmental Performance

  • 1. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 Environmental benefits of two-lift pavement A quantitative perspective based on life cycle assessment (LCA) Joep Meijer President of theRightenvironment In collaboration with the CP Tech Center
  • 2. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 Topics 1. What is LCA? 2. Our experience 3. Two-lift case 4. What’s next
  • 3. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 Life cycle assessment (LCA) LCA is a powerful tool for assessing the environmental performance of products, services or scenarios It is based on material and energy flows for processes and materials that together form a life cycle Resource A Resource B Production Assembly Use Maintenance Recycling
  • 4. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 Life cycle assessment (LCA) We use world-leading software and databases and apply ISO standards - ISO 14041 Goal and Scope Definition - ISO 14042 Inventory Analysis - ISO 14043 Interpretation - ISO 14044 Guidelines and principles - ISO 14025 Type III environmental declarations
  • 5. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 Goal and Scope Functional unit: what is to be assessed in terms of: - Amount - Unit - Functions - Requirements - Geographical considerations - Timeframe
  • 6. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 Inventory
  • 7. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 Impact Assessment A range of impact categories • global warming (CO2-eq) • depletion of non-renewables (Sb-eq) • depletion of the ozone layer (CFC-11-eq) • Acidification (SO2-eq) • Eutrophication (PO4 3--eq) • Summersmog (Ethylene-eq) • aquatic ecotoxicity (CTUea) • terrrestrial ecotoxicity (CTUet) • human toxicity (CUTh) • Energy (MJ) • non-hazardous waste (kg) • hazardous waste (kg) • …
  • 8. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 Impact Assessment The result is an Environmental profile
  • 9. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 Interpretation Major contributions give options for improvements
  • 10. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 Two-lift Kansas Comparison of: 1. Traditional 2. Two-lift 3. Optimized two-lift Together with Tom Van Dam, APTech Gary Fick, Trinity Construction Management Peter Taylor, CP Tech Center
  • 11. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 Two-lift Kansas Functional unit The material acquisition and construction of 1 km of a two lane highway with a total width of 7.4 m according to KDOT requirements in Kansas
  • 12. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 Two-lift Kansas 3.7 m 3.7 m Conventional concrete with a thickness of 340 mm 150 mm Cement Treated Base Traditional 3.7 m 3.7 m Tie bar: deformed No. 5 reinforcing bar (Grade 30), 915 mm long, spaced every 760 mm across the longitudinal contraction joint, formed by saw cutting D/3 Lower-lift of concrete with a thickness of 300 mm 150 mm Cement Treated Base Top-lift of concrete with a thickness of 40 Two-lift
  • 13. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 System boundaries
  • 14. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 Two-lift Kansas Key differences 1. Traditional • Primary aggregate from OK for PCC • Portland cement 2. Two-lift (same plus) • CTB secondary aggregates on-site crusher • Part fly ash in CTB and top lift 3. Optimized two-lift (same plus) • CTB and bottom lift on-site crusher • Fly ash in bottom lift
  • 15. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 Two-lift Kansas Limitations • Average European data for materials, processes, allocation parameters • “just” material acquisition and construction Look for relative differences not numbers
  • 16. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 Comparison Significant 1. Traditional 2. Two-lift 3. Optimized
  • 17. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 All recycling off-site, no on-site recycling Sensitivity analysis Significant
  • 18. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 Comparison Significant 1. Traditional 2. Two-lift 3. Optimized
  • 19. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 Sensitivity analysis All primary aggregates local, no recycled aggregate Significant
  • 20. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 Conclusions • Two-lift shows great potential • Reducing clinker content is a sound strategy • Recycling pays off • Optimizing logistics matters • With equal distances for primary and secondary aggregates, handling proves to be discriminating (quarry vs. on-site or off-site recycling)
  • 21. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 LCA related lessons/limitations • Always look at more than 1 indicator , not just energy(trade-offs) • Do not forget we did not look at all life cycle stages (trade-offs) • Always look for sensitivity analyses to test the robustness of certain parameters or assumptions • We need more US based data
  • 22. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 Next steps • Develop a framework • Expand on current efforts to make a concrete and cement US database • Feed with primary data • Perform case studies
  • 23. UT - Two-Life Pavement workshop, Environmental benefits, Austin TX 05-2013 Environmental benefits of two-lift pavement A quantitative perspective based on life cycle assessment (LCA) Joep Meijer President of theRightenvironment