SlideShare une entreprise Scribd logo
1  sur  16
Wind Loads Calculation (ASCE 7)
          Henry Kurniadi
Structure Loads

• Dead Loads: from the weight of the structure
  itself.
• Wind Loads: could be determined based on
  ASCE 7 (US Standard), Eurocode 1 (EU Code),
  Wind Code 2004 (Hong Kong Code), GB 50009
  (China PR Standard), AS/NZS 1170.2
  (Australia/NZ Standard) or other
  national/international standards/codes.
WIND LOADS
Wind Loads According to ASCE 7
• Wind loads are randomly
  applied dynamic loads.
• They are depend on the
  wind speed, shape, height
  and topographic location
  of the structure.
• Calculations using US
  customary units (Metric
  units also available in
  ASCE 7-05).
Wind Speed Curve in Different Region




    Sea-side   Open area   Built-up area Big city (Currently not used)
Surface Roughness and Exposure
   Surface                  Definitions                     Examples
Roughness and
  Exposure
     B              Urban and suburban areas,
                           wooded areas,
                  or other terrain with numerous
                    closely spaced obstructions
                  having the size of single-family
                        dwellings or larger.
     C          Open terrain with scattered obstructions
                 having heights generally less than 30 ft
                         (9.1 m). This category
                 includes flat open country, grasslands,
                        and all water surfaces in
                        hurricane prone regions.

     D          Flat, unobstructed areas and water
                              surfaces
                 outside hurricane prone regions.
                       This category includes
                  smooth mud flats, salt flats, and
                           unbroken ice.
Basic Wind Speed, V
• Basic wind speed, V, based
  on 3-second gusts, 33 ft (10
  m) above ground in a
  Ground Roughness
  Exposure C (defined in mph
  or m/s).
• Some regions, such as:
  Taiwan, coastal China,
  coastal USA and Japan have
  very high wind speed;
  others such as: Indonesia,
  India and inland USA have
  lower wind speed.
Air Flow




• The more the air is streamed, the less the reaction
  force exerted by the structure.
• Wind force highly depends on the shape of the
  structure.
Wind Directionality Factor, Kd
               • Wind Directionality
                 Factor, Kd shall be
                 determined from Table
                 6-4.
               • This factor to
                 accommodate the
                 cross-sectional shape of
                 the structure.
Importance Factor, I
• An importance
  factor, I, for the building
  or other structure shall
  be determined from
  Table 6-1 based on
  building and structure
  categories listed in
  Table 1-1.
• This factor to
  accommodate the
  importance of the
  structure.
Velocity Pressure Coefficient Kz
• Velocity pressure exponent,
  Kz, depends on the site
  relative height to the
  ground, z.
• This means for rooftop
  structure, z, would be the
  total height of the
  component and the building
  its installed.
• This factor to accommodate
  the absolute height of the
  structure from ground level.
Topographic Factor, Kzt
•   Local abrupt topography affects wind near the ground.
•   Wind speed depends on shape of hill, location of building, and height above ground.
•   The value of Kzt was taken as 1 with assumption flat region environment.
•   This factor to accommodate the topographic area of the structure location.
Force Coefficient, Cf
                            For chimneys, tanks &
• Force coefficient, Cf     other similar structures:
  determined based on
  the shape of the
  structure.
• This factor to
  accommodate the
  wind-facing area of the
                            For trussed towers:
  structure.
Velocity Pressure, qz
• From Bernoulli’s equation of flow, the wind
  pressure:                  (q in psf, V in mph)



• The velocity pressure, qz, evaluated at height z
  shall be calculated by:
Gust Effect Factor, G
•   Factor accounting for:
     – Gustiness and turbulence
     – Gust frequency
     – Gust size
     – Frequency of structure
     – Structural damping
     – Aerodynamic admittance
     – Gust correlation
•   Gust effect factor, G, could be calculated by




•   In general, gust more likely to occur at lower altitude.
Wind Loads According to ASCE 7
          FWT
                                       • Design wind force for
                                         each component shall
                                         be determined by:
                                   d
    FSP         FCT   FL


e
          FAC
                               c
                                       • Moment because of
                                         wind force calculated
                           b
          FBF                            as:
                      a                M   FSF a FBF b FAC c   FSP   FCT   FL d   FWT e
          FSF

Contenu connexe

Tendances

Wind Load of Wind Turbine Tower
Wind Load of Wind Turbine TowerWind Load of Wind Turbine Tower
Wind Load of Wind Turbine TowerHenry Kurniadi
 
Design of two way slab
Design of two way slabDesign of two way slab
Design of two way slabsarani_reza
 
wind load and its types also calculations of wind load and example .....
wind load and its types also calculations of wind load and example ..... wind load and its types also calculations of wind load and example .....
wind load and its types also calculations of wind load and example ..... Mahreen Zamir Abro
 
Moment Resisting Frame.pdf
Moment Resisting Frame.pdfMoment Resisting Frame.pdf
Moment Resisting Frame.pdfZeinab Awada
 
Redistribution of moments-Part-1
Redistribution of moments-Part-1Redistribution of moments-Part-1
Redistribution of moments-Part-1Subhash Patankar
 
Design of Multi-storey car parking
Design of Multi-storey car parkingDesign of Multi-storey car parking
Design of Multi-storey car parkingManoj Navneeth
 
Introduction of Reinforced Concrete Design
Introduction of Reinforced Concrete DesignIntroduction of Reinforced Concrete Design
Introduction of Reinforced Concrete Designmaylene san luis
 
Design of tension members
Design of tension membersDesign of tension members
Design of tension membersSabna Thilakan
 
Calculation of blast loads
Calculation of blast loadsCalculation of blast loads
Calculation of blast loadsjeyanthi4
 
how to calculate wind load on any building
how to calculate wind load on any building how to calculate wind load on any building
how to calculate wind load on any building Mahreen Zamir Abro
 
37467305 torsion-design-of-beam
37467305 torsion-design-of-beam37467305 torsion-design-of-beam
37467305 torsion-design-of-beamSopheak Thap
 
Design of Concrete Structure 1
Design of Concrete Structure 1Design of Concrete Structure 1
Design of Concrete Structure 1SHARIQUE AHMAD
 
Seismic Analysis
Seismic AnalysisSeismic Analysis
Seismic AnalysisKrishnagnr
 
Lacing, battening
Lacing, battening Lacing, battening
Lacing, battening Yash Patel
 
Fundamentals of structural analysis
Fundamentals of structural analysisFundamentals of structural analysis
Fundamentals of structural analysisKathan Sindhvad
 

Tendances (20)

Wind Load of Wind Turbine Tower
Wind Load of Wind Turbine TowerWind Load of Wind Turbine Tower
Wind Load of Wind Turbine Tower
 
Wind loading
Wind loadingWind loading
Wind loading
 
Design of two way slab
Design of two way slabDesign of two way slab
Design of two way slab
 
wind load and its types also calculations of wind load and example .....
wind load and its types also calculations of wind load and example ..... wind load and its types also calculations of wind load and example .....
wind load and its types also calculations of wind load and example .....
 
Moment Resisting Frame.pdf
Moment Resisting Frame.pdfMoment Resisting Frame.pdf
Moment Resisting Frame.pdf
 
Redistribution of moments-Part-1
Redistribution of moments-Part-1Redistribution of moments-Part-1
Redistribution of moments-Part-1
 
Design of Multi-storey car parking
Design of Multi-storey car parkingDesign of Multi-storey car parking
Design of Multi-storey car parking
 
Introduction of Reinforced Concrete Design
Introduction of Reinforced Concrete DesignIntroduction of Reinforced Concrete Design
Introduction of Reinforced Concrete Design
 
Design of tension members
Design of tension membersDesign of tension members
Design of tension members
 
Design of beams
Design of beamsDesign of beams
Design of beams
 
Shear wall and its design guidelines
Shear wall and its design guidelinesShear wall and its design guidelines
Shear wall and its design guidelines
 
Design of footing as per IS 456-2000
Design of footing as per IS 456-2000Design of footing as per IS 456-2000
Design of footing as per IS 456-2000
 
Calculation of blast loads
Calculation of blast loadsCalculation of blast loads
Calculation of blast loads
 
how to calculate wind load on any building
how to calculate wind load on any building how to calculate wind load on any building
how to calculate wind load on any building
 
Lecture 1 design loads
Lecture 1   design loadsLecture 1   design loads
Lecture 1 design loads
 
37467305 torsion-design-of-beam
37467305 torsion-design-of-beam37467305 torsion-design-of-beam
37467305 torsion-design-of-beam
 
Design of Concrete Structure 1
Design of Concrete Structure 1Design of Concrete Structure 1
Design of Concrete Structure 1
 
Seismic Analysis
Seismic AnalysisSeismic Analysis
Seismic Analysis
 
Lacing, battening
Lacing, battening Lacing, battening
Lacing, battening
 
Fundamentals of structural analysis
Fundamentals of structural analysisFundamentals of structural analysis
Fundamentals of structural analysis
 

Similaire à Wind loads calculation

391239247-FEM-PPT.ppt
391239247-FEM-PPT.ppt391239247-FEM-PPT.ppt
391239247-FEM-PPT.pptAshokPanda19
 
CHAPTER 3 (part 1) Wind Load and procedure.pptx
CHAPTER 3 (part 1) Wind Load and procedure.pptxCHAPTER 3 (part 1) Wind Load and procedure.pptx
CHAPTER 3 (part 1) Wind Load and procedure.pptxMamushLeta
 
1 a. Design of hording structures.pptx
1 a. Design of hording structures.pptx1 a. Design of hording structures.pptx
1 a. Design of hording structures.pptxNayanDhake4
 
Ycef presentaion derivation of wind loading upload
Ycef presentaion derivation of wind loading uploadYcef presentaion derivation of wind loading upload
Ycef presentaion derivation of wind loading uploadVictor Omotoriogun
 
Chimney design &engg code
Chimney design &engg codeChimney design &engg code
Chimney design &engg codeVarun Nath
 
Bearing capacity_of_soil
 Bearing capacity_of_soil Bearing capacity_of_soil
Bearing capacity_of_soilShivarajteggi
 
offshore structural design detailed engineering fixed plate form
offshore structural design detailed engineering fixed plate formoffshore structural design detailed engineering fixed plate form
offshore structural design detailed engineering fixed plate formkhalidsiddig8
 
Design of lifts & escalators
Design of lifts & escalatorsDesign of lifts & escalators
Design of lifts & escalatorsShubham Arora
 
Bearing-Capacity-part
Bearing-Capacity-partBearing-Capacity-part
Bearing-Capacity-partAwaisArshad48
 
Chapter-2- part I- ES EN 1991-Section 4, Wind load.pptx
Chapter-2- part I- ES EN 1991-Section 4, Wind load.pptxChapter-2- part I- ES EN 1991-Section 4, Wind load.pptx
Chapter-2- part I- ES EN 1991-Section 4, Wind load.pptxssuserb4074f
 
BEARING CAPASITY OFSOIL.pptx
BEARING CAPASITY OFSOIL.pptxBEARING CAPASITY OFSOIL.pptx
BEARING CAPASITY OFSOIL.pptxAnuragDavesar
 
Parametric Study for Wind Design of Vertical Pressure Vessel as per Indian St...
Parametric Study for Wind Design of Vertical Pressure Vessel as per Indian St...Parametric Study for Wind Design of Vertical Pressure Vessel as per Indian St...
Parametric Study for Wind Design of Vertical Pressure Vessel as per Indian St...IJMER
 
BEARING CAPASITY OFSOIL.ppt
BEARING CAPASITY OFSOIL.pptBEARING CAPASITY OFSOIL.ppt
BEARING CAPASITY OFSOIL.pptSamuelGetiye
 
BEARING CAPASITY OFSOIL.ppt
BEARING CAPASITY OFSOIL.pptBEARING CAPASITY OFSOIL.ppt
BEARING CAPASITY OFSOIL.pptsjshukla
 
BEARING CAPASITY OFSOIL.ppt
BEARING CAPASITY OFSOIL.pptBEARING CAPASITY OFSOIL.ppt
BEARING CAPASITY OFSOIL.pptjamvantsolanki
 
Geoscience in Offshore Renewables
Geoscience in Offshore RenewablesGeoscience in Offshore Renewables
Geoscience in Offshore RenewablesFarida Ismayilova
 
Bearing Capacity of Shallow Foundation
Bearing Capacity of Shallow FoundationBearing Capacity of Shallow Foundation
Bearing Capacity of Shallow FoundationArbaz Kazi
 
Bearing capasity ofsoil vandana miss
Bearing capasity ofsoil vandana missBearing capasity ofsoil vandana miss
Bearing capasity ofsoil vandana missSHAMJITH KM
 
lecturenote_1463116827CHAPTER-II-BEARING CAPACITY OF FOUNDATION SOIL.pdf
lecturenote_1463116827CHAPTER-II-BEARING CAPACITY OF FOUNDATION SOIL.pdflecturenote_1463116827CHAPTER-II-BEARING CAPACITY OF FOUNDATION SOIL.pdf
lecturenote_1463116827CHAPTER-II-BEARING CAPACITY OF FOUNDATION SOIL.pdf2cd
 

Similaire à Wind loads calculation (20)

391239247-FEM-PPT.ppt
391239247-FEM-PPT.ppt391239247-FEM-PPT.ppt
391239247-FEM-PPT.ppt
 
CHAPTER 3 (part 1) Wind Load and procedure.pptx
CHAPTER 3 (part 1) Wind Load and procedure.pptxCHAPTER 3 (part 1) Wind Load and procedure.pptx
CHAPTER 3 (part 1) Wind Load and procedure.pptx
 
1 a. Design of hording structures.pptx
1 a. Design of hording structures.pptx1 a. Design of hording structures.pptx
1 a. Design of hording structures.pptx
 
Ycef presentaion derivation of wind loading upload
Ycef presentaion derivation of wind loading uploadYcef presentaion derivation of wind loading upload
Ycef presentaion derivation of wind loading upload
 
Chimney design &engg code
Chimney design &engg codeChimney design &engg code
Chimney design &engg code
 
Bearing capacity_of_soil
 Bearing capacity_of_soil Bearing capacity_of_soil
Bearing capacity_of_soil
 
offshore structural design detailed engineering fixed plate form
offshore structural design detailed engineering fixed plate formoffshore structural design detailed engineering fixed plate form
offshore structural design detailed engineering fixed plate form
 
Foundation Engineering
Foundation EngineeringFoundation Engineering
Foundation Engineering
 
Design of lifts & escalators
Design of lifts & escalatorsDesign of lifts & escalators
Design of lifts & escalators
 
Bearing-Capacity-part
Bearing-Capacity-partBearing-Capacity-part
Bearing-Capacity-part
 
Chapter-2- part I- ES EN 1991-Section 4, Wind load.pptx
Chapter-2- part I- ES EN 1991-Section 4, Wind load.pptxChapter-2- part I- ES EN 1991-Section 4, Wind load.pptx
Chapter-2- part I- ES EN 1991-Section 4, Wind load.pptx
 
BEARING CAPASITY OFSOIL.pptx
BEARING CAPASITY OFSOIL.pptxBEARING CAPASITY OFSOIL.pptx
BEARING CAPASITY OFSOIL.pptx
 
Parametric Study for Wind Design of Vertical Pressure Vessel as per Indian St...
Parametric Study for Wind Design of Vertical Pressure Vessel as per Indian St...Parametric Study for Wind Design of Vertical Pressure Vessel as per Indian St...
Parametric Study for Wind Design of Vertical Pressure Vessel as per Indian St...
 
BEARING CAPASITY OFSOIL.ppt
BEARING CAPASITY OFSOIL.pptBEARING CAPASITY OFSOIL.ppt
BEARING CAPASITY OFSOIL.ppt
 
BEARING CAPASITY OFSOIL.ppt
BEARING CAPASITY OFSOIL.pptBEARING CAPASITY OFSOIL.ppt
BEARING CAPASITY OFSOIL.ppt
 
BEARING CAPASITY OFSOIL.ppt
BEARING CAPASITY OFSOIL.pptBEARING CAPASITY OFSOIL.ppt
BEARING CAPASITY OFSOIL.ppt
 
Geoscience in Offshore Renewables
Geoscience in Offshore RenewablesGeoscience in Offshore Renewables
Geoscience in Offshore Renewables
 
Bearing Capacity of Shallow Foundation
Bearing Capacity of Shallow FoundationBearing Capacity of Shallow Foundation
Bearing Capacity of Shallow Foundation
 
Bearing capasity ofsoil vandana miss
Bearing capasity ofsoil vandana missBearing capasity ofsoil vandana miss
Bearing capasity ofsoil vandana miss
 
lecturenote_1463116827CHAPTER-II-BEARING CAPACITY OF FOUNDATION SOIL.pdf
lecturenote_1463116827CHAPTER-II-BEARING CAPACITY OF FOUNDATION SOIL.pdflecturenote_1463116827CHAPTER-II-BEARING CAPACITY OF FOUNDATION SOIL.pdf
lecturenote_1463116827CHAPTER-II-BEARING CAPACITY OF FOUNDATION SOIL.pdf
 

Dernier

IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 

Dernier (20)

IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 

Wind loads calculation

  • 1. Wind Loads Calculation (ASCE 7) Henry Kurniadi
  • 2. Structure Loads • Dead Loads: from the weight of the structure itself. • Wind Loads: could be determined based on ASCE 7 (US Standard), Eurocode 1 (EU Code), Wind Code 2004 (Hong Kong Code), GB 50009 (China PR Standard), AS/NZS 1170.2 (Australia/NZ Standard) or other national/international standards/codes.
  • 4. Wind Loads According to ASCE 7 • Wind loads are randomly applied dynamic loads. • They are depend on the wind speed, shape, height and topographic location of the structure. • Calculations using US customary units (Metric units also available in ASCE 7-05).
  • 5. Wind Speed Curve in Different Region Sea-side Open area Built-up area Big city (Currently not used)
  • 6. Surface Roughness and Exposure Surface Definitions Examples Roughness and Exposure B Urban and suburban areas, wooded areas, or other terrain with numerous closely spaced obstructions having the size of single-family dwellings or larger. C Open terrain with scattered obstructions having heights generally less than 30 ft (9.1 m). This category includes flat open country, grasslands, and all water surfaces in hurricane prone regions. D Flat, unobstructed areas and water surfaces outside hurricane prone regions. This category includes smooth mud flats, salt flats, and unbroken ice.
  • 7. Basic Wind Speed, V • Basic wind speed, V, based on 3-second gusts, 33 ft (10 m) above ground in a Ground Roughness Exposure C (defined in mph or m/s). • Some regions, such as: Taiwan, coastal China, coastal USA and Japan have very high wind speed; others such as: Indonesia, India and inland USA have lower wind speed.
  • 8. Air Flow • The more the air is streamed, the less the reaction force exerted by the structure. • Wind force highly depends on the shape of the structure.
  • 9. Wind Directionality Factor, Kd • Wind Directionality Factor, Kd shall be determined from Table 6-4. • This factor to accommodate the cross-sectional shape of the structure.
  • 10. Importance Factor, I • An importance factor, I, for the building or other structure shall be determined from Table 6-1 based on building and structure categories listed in Table 1-1. • This factor to accommodate the importance of the structure.
  • 11. Velocity Pressure Coefficient Kz • Velocity pressure exponent, Kz, depends on the site relative height to the ground, z. • This means for rooftop structure, z, would be the total height of the component and the building its installed. • This factor to accommodate the absolute height of the structure from ground level.
  • 12. Topographic Factor, Kzt • Local abrupt topography affects wind near the ground. • Wind speed depends on shape of hill, location of building, and height above ground. • The value of Kzt was taken as 1 with assumption flat region environment. • This factor to accommodate the topographic area of the structure location.
  • 13. Force Coefficient, Cf For chimneys, tanks & • Force coefficient, Cf other similar structures: determined based on the shape of the structure. • This factor to accommodate the wind-facing area of the For trussed towers: structure.
  • 14. Velocity Pressure, qz • From Bernoulli’s equation of flow, the wind pressure: (q in psf, V in mph) • The velocity pressure, qz, evaluated at height z shall be calculated by:
  • 15. Gust Effect Factor, G • Factor accounting for: – Gustiness and turbulence – Gust frequency – Gust size – Frequency of structure – Structural damping – Aerodynamic admittance – Gust correlation • Gust effect factor, G, could be calculated by • In general, gust more likely to occur at lower altitude.
  • 16. Wind Loads According to ASCE 7 FWT • Design wind force for each component shall be determined by: d FSP FCT FL e FAC c • Moment because of wind force calculated b FBF as: a M FSF a FBF b FAC c FSP FCT FL d FWT e FSF