Yaara Metro ?
Namma Metro - the plan and what we can expect
The plan What we can expect
 Planned for completion in 2011.
 Will have 2 lines – East-West and North-
South- totalling 33 km., with 35 stations.
 27 km. will be above ground, 6 km.
underground.
 Cost Rs. 6400 Cr. - Rs. 150 Cr./km. for the
above ground, Rs. 300 Cr./km. for the
underground portions.
 Planned to carry 10 Lakh people a day.
 Actual completion in 2012 assuming inevitable
time escalation.
 Cost Rs. 12000 Cr. assuming inevitable cost
escalation (already escalated to Rs. 9000 Cr.)
 Will carry 5 Lakh people a day, going by Delhi
and Kolkata metro's ratio of planned vs. actual
traffic.
Bangalore is waiting for the Metro desperately, expecting it to be the solution to all its transport problems . The
Metro is considered to be a 'good idea' because someone in government has seen it working beautifully in some
city in a developed country – maybe London, Paris, New York, Madrid or Tokyo – and thought it can be
transplanted to Bangalore.
We already have a bus system that we think is bad. It however serves 50 % of the city's population very well and
is profitable. The BMTC has 5000 buses and carries 37 Lakh people daily. That's 0.2 % of the city's vehicle
population carrying 50 % of the human population.
Let's do a quick analysis of the possible benefits from the Metro, compare it with Metro systems in other cities,
and compare it with the other mass transport option – a bus system.
Coverage
Bangalore and London have almost the same population.
Greater Bangalore has an area of 741 sq. km. and a population of 72
Lakh. In 2012 it will be 1 Cr.
The Greater London Urban Area has a population of 75 Lakh in an
area of 1500 sq.km.
The London Underground extends over 400 km., with 268 stations.
Bangalore's Metro will extend over 33 km., with 35 stations. We will
have 8 % of London's coverage, 5 years from now, and think it's
going to solve our problem.
BMTC covers the whole of the area
under the Corporation.
Bangalore London Paris
Density of coverage of Metros in various cities.
Accessibility
The Metro will have 2 lines, one going East-West and the other going
North-South. Unless you happen to live within 1 km. of a Metro line,
you will have to take a bus to the nearest station, then take a bus
again at the destination station.
Poor accessibility is why the metros in Delhi and Koltaka carry less
than 50 % of the people that they were designed for, and the bus
systems in Bangkok and Singapore carry more people than the
metros.
Bangkok subway carries 2 Lakh passengers a day, while the bus
system carries 50 Lakh passengers a day.
Singapore Metro carries 12 Lakh passengers a day, while buses
carry 30 Lakh passengers a day.
Bangalore Metro's is planned to carry 10 Lakh passengers a day, but
will most likely carry around 5 Lakh, going by Delhi and Kolkata's
figures.
BMTC's buses already cover the whole
city, and everyone in the city probably
lives within 1 km. of a bus stop. The
BMTC is planning to reduce this distance
to 0.5 km.
1 km. is the maximum distance that people will be willing to walk to / from the Metro. This means you can walk to
a Metro station only if you live within the red bands in the picture. Anyone living outside the bands will have to
cover the extra distance by some other means of transport – car, 2-wheeler, bicycle or bus.
The further away you live from the centre of the city, the longer you have travel to the nearest station. The
longest distance will be approx. 6 km., for example if you live midway between the RV Road and Byappanahalli
stations.
Commute time
The Metro's average speed is 32 kmph. The average is much less
than the maximum of 80 kmph. because of stops at stations and
acceleration and deceleration between them. Yeshwantpur to
Jayanagar will take 28 minutes, Byappanahalli to Mysore Rd. 33
minutes.
Your total commute time does not just depend on the speed of the
train. It is the door-to-door time, from your starting point to your
destination. The last mile connectivity is therefore extremely
important, and the last mile can often take more time than the travel
between stations.
Let's say the nearest Metro station is 4 km. from your home, 3 km.
from your office. You take a bike or car, park it at the station, wait 5
minutes for the train, take the Metro 12 km., then take a bus to the
office. 7 km. by bike + bus will take you 40 minutes (average speed
on the road is now 15 kmph., will be 10 kmph by 2011).
Total 69 minutes.
The further away you are from the centre of the city, the longer your
last mile commute.
If there is widespread usage of buses
and hence far less private vehicles,
average speed on the road will be
approx. 30 kmph. This has been the
experience in cities worldwide with
extensive bus systems, like Curitiba,
Brazil.
The nearest bus stop is typically 1 km.
from any place is the city now (the BMTC
is planning to reduce this to 0.5 km.). If
you walk to and from the stops, it's 20
minutes for the walking, 5 minutes
waiting for the bus, 24 minutes on the
bus.
Total 49 minutes.
Cost
The elevated sections of Bangalore's Metro will cost Rs. 160 Cr. per
km, while the underground sections will cost Rs. 300 Cr. per km.
To build a network equivalent to London's, it is going to cost
Bangalore Rs. 100,000 Cr. assuming an average cost of Rs. 300 Cr.
per km.
A really good bus system might involve
buying 7000 more buses and improving
bus shelters, signage, etc. This would
cost about Rs. 2500 Cr. and take 1 year.
City-wide coverage at a fraction of the
Metro's cost !
Indore's BRT is expected to cost Rs. 870
Cr. for 120 km., about Rs. 7 Cr. / km.,
less than 5 % of Delhi Metro's cost.
Time to build
London's underground started operation in 1863, 145 years ago. It
has evolved over the years into what it is now.
It is going to take Bangalore 50 years to build a network that is
equivalent to London's, assuming that we build 40 km. every 5
years.
Here's when the underground in other cities started operation:
New York - 1904
Paris - 1900
Madrid - 1919
The bus system can be improved to
handle the whole city efficiently in just 1
or 2 years. City-wide coverage in 1/50th
the time of the Metro.
Bogota's bus system took 1.5 years to
complete.
Economic viability
Mr. Chaturvedi, Chief Operations Manager, Kolkata Metro Railway,
said this in 2005:
“Where the gross annual income of the Metro is roughly Rs.48
crores, its maintenance cost is a whopping Rs.125 crores. The Metro
was designed to decongest the city's roads. I am afraid it has not
been able to do that. Even during peak periods, the capacity
utilisation of the trains has been around 70 per cent, and only 40 per
cent in the early mornings. Unfortunately for the Metro, it has to
compete with cheaper modes of public transport such as buses and
trams.“
A commonly repeated claim is that Delhi Metro is one of the handful
of profitable metro systems in the world.
In 2006-7, Delhi Metro's earnings were Rs. 220 Cr. from ticket sales
and advertisement on trains, Rs. 251 Cr. from sale and renting of
land. This means less than half its revenues came from transport
operations.
The metro gets subsidized or free land, gets funding at low interest
rates from the government (meaning us, the taxpayers), and then
makes money mainly from property development. We, the tax
payers, will end up subsidizing the Metro in various ways on a
continuous basis.
Since a bus system costs between 5 and
10 % of a metro system, a reasonably
well run bus system will be profitable on
ticket sales alone, instead of depending
on selling real estate. The BMTC now is
extremely profitable.
Environmental cost
MG Road was one of Bangalore's showpieces - gently sloping down
from the Kasturba Road end, row of shops and restaurants on one
side, bouganvilla border on the other side with a tree-covered
walkway beyond. This is going to be replaced by tons of concrete.
A substantial part of Lal Bagh is going to be eaten up for a station.
Nanda Theatre road at 2.5 km. is the longest tree-covered boulevard
in India. The Metro is going to go down the middle of this road. The
huge, beautiful trees on both sides of the road are going to be
trimmed to 50 % of their coverage area, which means they will fall
down due to gravity shortly thereafter. These are not mentioned in
Namma Metro's Environmetal Impact Report. The report says 412
trees will be cut in total, a serious under-estimate.
Scores of homes and businesses are going to be destroyed.
Most metro systems in the world are underground to prevent this
kind of destruction. In our Metro, however, 27 km. of the tracks are
going to be above ground and 6 km. underground. If we adopt the
same ratio in future for the remaining 400 km., virtually every street
and locality is going to be just a mass of concrete.
Minimal environmental damage. The
current road network is enough to handle
the additional bus numbers. Remember,
we are talking of buses instead of private
vehicles. With some sensible legislation
and planning to promote public transport
and discourage private transport, we can
reduce the number of vehicles to 6 Lakhs
instead of the current 32 Lakhs. This
would mean a drastic reduction in air
pollution too.
MGRd., 2007 MGRd., 2001 – artist's impression. Courtesy – Deccan Herald
Flexibility
A city is dynamic. Population densities can shift as the economics of
the city change. The Metro cannot be rerouted once it is built.
Numerous stations in the London underground are not used any
longer because lines have been rerouted or they are too infrequently
used to to justify keeping them open.
A bus system can grow and change with
the city. The bus system adapts itself to
the city as it evolves, while with the Metro
it is the reverse - the city will have to
adapt itself to the Metro.
One of 42 undergound stations closed in London, because of changes in the city.
In sum
 The Metro will be ready 3 years from now.
 Traffic congestion will remain. The traffic population in 2011 will be 50 % more than what it is now.
 Commute time will not be reduced for most residents of Bangalore. Commuting will be an even worse
nightmare, maybe taking twice as long as it does now, because the number of cars and 2-wheelers will
have hugely increased.
 The city’s aesthetics will be largely ruined. Some of the city's best landmarks are going to vanish.
 Scores of businesses and homes are going to be destroyed.
 Air pollution will be far worse than it is now.
 While the Metro is getting built, some of the key roads are going to be blocked.
 To expand the Metro to an ideal 400 km., there will be continuous construction for the next 50 years.
 Many (most?) of us will suffer the construction, but will not be alive to see its final fruit.
 All this to carry 5 Lakh passengers, 4 % of the population of Greater Bangalore in 2011.
Shouldn't we be thinking of a better option?
The final verdict on the Delhi Metro today is : “It's beautiful, very clean, just like the metros abroad”. Nobody says
”It has reduced the traffic, reduced pollution, reduced commute time and cost for the WHOLE of Delhi.”
Delhi's traffic congestion remains, its pollution levels are increasing, the government is trying out alternatives like
the BRT (Bus Rapid Transport) system.
Trains can be the most efficient way of carrying people around, in terms of space usage, pollution and cost.
However, there are trains and trains, and the big questions are:
1. Can we afford a Metro ?
2. Is it too late to think of a train system now – should we have done this 100 years ago, like London or
Paris ?
3. Is the over-ground system going to destroy the city, should it be underground instead ?
4. Why do richer countries than India think the Metro is unaffordable and opt for bus systems instead?
5. There are close to 100 cities worldwide that have implemented or are implementing bus based systems.
6. Why aren't we thinking holistically of a transport system that is a mix of vehicles instead of just the
Metro, with the rest as an afterthought ? Metro as 'A system' meshing with the rest, rather than 'THE
system' ?
Balancing the pros and the cons, it might even be better to scrap the Metro and get a good bus system instead.
Your response is most probably going to be : "Oh, the arguments are all very convincing, but we have already
spent so much money on the Metro and done so much construction. How can we scrap it all now?".
To which my reply is this. Let's say your doctor tells you today that your lifestyle for the past 20 years was a
mistake, has resulted in high cholesterol, sugar and hypertension, and will surely result in your early death
unless you change it immediately. Which of these would you do?
1. Think that changing your lifestyle now is too much of a disruption, and decide to go on as before.
2. Realize that what you have been doing is wrong, decide to scrap the old lifestyle to avoid destroying yourself.
Let's apply the same decision making process to the Metro.

Contenu connexe

Tendances

Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase IKaran Shah
 
Metro And Bangalore
Metro And BangaloreMetro And Bangalore
Metro And BangaloreDasarathi GV
 
KA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport ReportKA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport Reportarmada7000
 
Mass transit system
Mass transit systemMass transit system
Mass transit systemAsjad Khuram
 
What is Lahore Metro Train Project - Overview
What is Lahore Metro Train Project - OverviewWhat is Lahore Metro Train Project - Overview
What is Lahore Metro Train Project - Overviewuvahidy
 
Rail rapid transit system (india)
Rail rapid transit system (india)Rail rapid transit system (india)
Rail rapid transit system (india)Sourabh Jain
 
BRT Chennai
BRT ChennaiBRT Chennai
BRT Chennaiedsley
 
Glance Over Orange Line Metro Train (OLMT)
Glance Over Orange Line Metro Train (OLMT) Glance Over Orange Line Metro Train (OLMT)
Glance Over Orange Line Metro Train (OLMT) MalihaIshfaq
 
Trasnportation system of mumbai
Trasnportation system of  mumbaiTrasnportation system of  mumbai
Trasnportation system of mumbaiYash Kotgirwar
 
Ahmedabad BRTS Overview
Ahmedabad BRTS OverviewAhmedabad BRTS Overview
Ahmedabad BRTS OverviewNishit kadia
 
Pune transport problems
Pune transport problemsPune transport problems
Pune transport problemsPriya Raj
 
World Class Bus Rapid Transit System (BRTS) for Bangalore
World Class Bus Rapid Transit System (BRTS) for BangaloreWorld Class Bus Rapid Transit System (BRTS) for Bangalore
World Class Bus Rapid Transit System (BRTS) for BangaloreKiran Shaw
 

Tendances (20)

Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
 
Metro And Bangalore
Metro And BangaloreMetro And Bangalore
Metro And Bangalore
 
KA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport ReportKA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport Report
 
Mass transit system
Mass transit systemMass transit system
Mass transit system
 
2011 City of Buenos Aires Achievements: Sustainable Mobility Plan
2011 City of Buenos Aires Achievements: Sustainable Mobility Plan2011 City of Buenos Aires Achievements: Sustainable Mobility Plan
2011 City of Buenos Aires Achievements: Sustainable Mobility Plan
 
What is Lahore Metro Train Project - Overview
What is Lahore Metro Train Project - OverviewWhat is Lahore Metro Train Project - Overview
What is Lahore Metro Train Project - Overview
 
TRAINING ON METRO TRAIN
TRAINING ON METRO TRAINTRAINING ON METRO TRAIN
TRAINING ON METRO TRAIN
 
Metro bus project
Metro bus projectMetro bus project
Metro bus project
 
Cmrl ppt
Cmrl pptCmrl ppt
Cmrl ppt
 
Rapid transit system
Rapid transit systemRapid transit system
Rapid transit system
 
Bangalore Metro Project
Bangalore Metro ProjectBangalore Metro Project
Bangalore Metro Project
 
Brts
BrtsBrts
Brts
 
Rail rapid transit system (india)
Rail rapid transit system (india)Rail rapid transit system (india)
Rail rapid transit system (india)
 
BRT Chennai
BRT ChennaiBRT Chennai
BRT Chennai
 
Glance Over Orange Line Metro Train (OLMT)
Glance Over Orange Line Metro Train (OLMT) Glance Over Orange Line Metro Train (OLMT)
Glance Over Orange Line Metro Train (OLMT)
 
Trasnportation system of mumbai
Trasnportation system of  mumbaiTrasnportation system of  mumbai
Trasnportation system of mumbai
 
ahmedabad BRTS study
ahmedabad BRTS studyahmedabad BRTS study
ahmedabad BRTS study
 
Ahmedabad BRTS Overview
Ahmedabad BRTS OverviewAhmedabad BRTS Overview
Ahmedabad BRTS Overview
 
Pune transport problems
Pune transport problemsPune transport problems
Pune transport problems
 
World Class Bus Rapid Transit System (BRTS) for Bangalore
World Class Bus Rapid Transit System (BRTS) for BangaloreWorld Class Bus Rapid Transit System (BRTS) for Bangalore
World Class Bus Rapid Transit System (BRTS) for Bangalore
 

En vedette

Trek au Népal à travers l'oeil de nos enfants
Trek au Népal à travers l'oeil de nos enfantsTrek au Népal à travers l'oeil de nos enfants
Trek au Népal à travers l'oeil de nos enfantsYves Finas
 
The Current Transport Policy Environment
The Current Transport Policy Environment The Current Transport Policy Environment
The Current Transport Policy Environment Bakhtiar Zein
 
Leisure marketing: Transportation
Leisure marketing: TransportationLeisure marketing: Transportation
Leisure marketing: Transportationnatashabonu
 
Ganga Sagar Mela
Ganga Sagar MelaGanga Sagar Mela
Ganga Sagar Melabidhan
 
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements   Sbs Transist Vs SmrtAfa Interpretation Of Financial Statements   Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrtruoting
 
Urban mobility, livelihoods and transport in Dar Es Salaam City: exploring ch...
Urban mobility, livelihoods and transport in Dar Es Salaam City: exploring ch...Urban mobility, livelihoods and transport in Dar Es Salaam City: exploring ch...
Urban mobility, livelihoods and transport in Dar Es Salaam City: exploring ch...Institute for Transport Studies (ITS)
 
Etude IFOP "Mobilités des français : pratiques et prespectives"
Etude IFOP "Mobilités des français : pratiques et prespectives"Etude IFOP "Mobilités des français : pratiques et prespectives"
Etude IFOP "Mobilités des français : pratiques et prespectives"Ghislain Delabie
 
OUR WONDERFUL WORLD/ CONTENT 2 Means of-transport
OUR WONDERFUL WORLD/ CONTENT 2 Means of-transportOUR WONDERFUL WORLD/ CONTENT 2 Means of-transport
OUR WONDERFUL WORLD/ CONTENT 2 Means of-transportHasan Kahraman
 
Andréa
AndréaAndréa
Andréasyljl
 
9j2 Lesson 1 Transport
9j2 Lesson 1 Transport9j2 Lesson 1 Transport
9j2 Lesson 1 TransportPGCEMaster
 
Means of transport vocabulary
Means of transport vocabularyMeans of transport vocabulary
Means of transport vocabularyDavid Santos
 
Les Transports
Les TransportsLes Transports
Les TransportsNina Tanti
 
Carte postale de vacances
Carte postale de vacancesCarte postale de vacances
Carte postale de vacancesannapasilva
 

En vedette (20)

Trek au Népal à travers l'oeil de nos enfants
Trek au Népal à travers l'oeil de nos enfantsTrek au Népal à travers l'oeil de nos enfants
Trek au Népal à travers l'oeil de nos enfants
 
The Current Transport Policy Environment
The Current Transport Policy Environment The Current Transport Policy Environment
The Current Transport Policy Environment
 
Leisure marketing: Transportation
Leisure marketing: TransportationLeisure marketing: Transportation
Leisure marketing: Transportation
 
SA Taxi market context
SA Taxi market contextSA Taxi market context
SA Taxi market context
 
Ganga Sagar Mela
Ganga Sagar MelaGanga Sagar Mela
Ganga Sagar Mela
 
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements   Sbs Transist Vs SmrtAfa Interpretation Of Financial Statements   Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
 
Urban mobility, livelihoods and transport in Dar Es Salaam City: exploring ch...
Urban mobility, livelihoods and transport in Dar Es Salaam City: exploring ch...Urban mobility, livelihoods and transport in Dar Es Salaam City: exploring ch...
Urban mobility, livelihoods and transport in Dar Es Salaam City: exploring ch...
 
Etude IFOP "Mobilités des français : pratiques et prespectives"
Etude IFOP "Mobilités des français : pratiques et prespectives"Etude IFOP "Mobilités des français : pratiques et prespectives"
Etude IFOP "Mobilités des français : pratiques et prespectives"
 
Means Of Transport
Means Of TransportMeans Of Transport
Means Of Transport
 
Bus Rapid Transit (BRT) in Gauteng, S.A.
Bus Rapid Transit (BRT) in Gauteng, S.A.Bus Rapid Transit (BRT) in Gauteng, S.A.
Bus Rapid Transit (BRT) in Gauteng, S.A.
 
Transport Or Transportation
Transport Or TransportationTransport Or Transportation
Transport Or Transportation
 
OUR WONDERFUL WORLD/ CONTENT 2 Means of-transport
OUR WONDERFUL WORLD/ CONTENT 2 Means of-transportOUR WONDERFUL WORLD/ CONTENT 2 Means of-transport
OUR WONDERFUL WORLD/ CONTENT 2 Means of-transport
 
Muet Workshop Writing
Muet   Workshop WritingMuet   Workshop Writing
Muet Workshop Writing
 
The importance of Value of Time studies - a Dutch perspective
The importance of Value of Time studies - a Dutch perspectiveThe importance of Value of Time studies - a Dutch perspective
The importance of Value of Time studies - a Dutch perspective
 
Andréa
AndréaAndréa
Andréa
 
9j2 Lesson 1 Transport
9j2 Lesson 1 Transport9j2 Lesson 1 Transport
9j2 Lesson 1 Transport
 
Means of transport vocabulary
Means of transport vocabularyMeans of transport vocabulary
Means of transport vocabulary
 
Les Transports
Les TransportsLes Transports
Les Transports
 
Singapore MRT
Singapore MRTSingapore MRT
Singapore MRT
 
Carte postale de vacances
Carte postale de vacancesCarte postale de vacances
Carte postale de vacances
 

Similaire à Bangalore - Metro is not the solution

Metro vs. Bus - which is better ?
Metro vs. Bus - which is better ?Metro vs. Bus - which is better ?
Metro vs. Bus - which is better ?Dasarathi GV
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in indiaSourav Paul
 
Bangalore traffic - Solution
Bangalore traffic - SolutionBangalore traffic - Solution
Bangalore traffic - SolutionDasarathi GV
 
Public Transport For Smart Cities
Public Transport For Smart CitiesPublic Transport For Smart Cities
Public Transport For Smart CitiesIPPAI
 
Commuter Rail System
Commuter Rail SystemCommuter Rail System
Commuter Rail SystemAminima12
 
Bangalore - the Bus as a solution.
Bangalore - the Bus as a solution.Bangalore - the Bus as a solution.
Bangalore - the Bus as a solution.Dasarathi GV
 
Monorail Presentation
Monorail PresentationMonorail Presentation
Monorail PresentationEshu Kumar
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India pptNikita James
 
Metro and monorail infrastructure development in india
Metro and monorail infrastructure development in indiaMetro and monorail infrastructure development in india
Metro and monorail infrastructure development in indiaBhavya Jaiswal
 
A Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and MumbaiA Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and MumbaiIJSRD
 
Introduction to metro system (1).pptx
Introduction to metro system (1).pptxIntroduction to metro system (1).pptx
Introduction to metro system (1).pptxBalpreetSingh47890
 
Public transport will save Bangalore
Public transport will save BangalorePublic transport will save Bangalore
Public transport will save Bangaloreguest0591bc
 
MRT REPORT TPT 250
MRT REPORT TPT 250MRT REPORT TPT 250
MRT REPORT TPT 250Shadina Shah
 
China’s brt development in the last decade
China’s brt development in the last decadeChina’s brt development in the last decade
China’s brt development in the last decadeBRTCoE
 
Straddlingbusbyrk 150515005107-lva1-app6892
Straddlingbusbyrk 150515005107-lva1-app6892Straddlingbusbyrk 150515005107-lva1-app6892
Straddlingbusbyrk 150515005107-lva1-app6892Juan Leyva Dominguez
 

Similaire à Bangalore - Metro is not the solution (20)

Metro vs. Bus - which is better ?
Metro vs. Bus - which is better ?Metro vs. Bus - which is better ?
Metro vs. Bus - which is better ?
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in india
 
Bangalore traffic - Solution
Bangalore traffic - SolutionBangalore traffic - Solution
Bangalore traffic - Solution
 
Public Transport For Smart Cities
Public Transport For Smart CitiesPublic Transport For Smart Cities
Public Transport For Smart Cities
 
Metro Rail and the City
Metro Rail and the CityMetro Rail and the City
Metro Rail and the City
 
Commuter Rail System
Commuter Rail SystemCommuter Rail System
Commuter Rail System
 
Dhaka metro rail
Dhaka metro railDhaka metro rail
Dhaka metro rail
 
Bangalore - the Bus as a solution.
Bangalore - the Bus as a solution.Bangalore - the Bus as a solution.
Bangalore - the Bus as a solution.
 
Monorail Presentation
Monorail PresentationMonorail Presentation
Monorail Presentation
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
 
Metro and monorail infrastructure development in india
Metro and monorail infrastructure development in indiaMetro and monorail infrastructure development in india
Metro and monorail infrastructure development in india
 
A Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and MumbaiA Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and Mumbai
 
Introduction to metro system (1).pptx
Introduction to metro system (1).pptxIntroduction to metro system (1).pptx
Introduction to metro system (1).pptx
 
Metro project
Metro project Metro project
Metro project
 
Public transport will save Bangalore
Public transport will save BangalorePublic transport will save Bangalore
Public transport will save Bangalore
 
MRT REPORT TPT 250
MRT REPORT TPT 250MRT REPORT TPT 250
MRT REPORT TPT 250
 
China’s brt development in the last decade
China’s brt development in the last decadeChina’s brt development in the last decade
China’s brt development in the last decade
 
Straddling bus presented by RK
Straddling bus presented by RKStraddling bus presented by RK
Straddling bus presented by RK
 
Straddlingbusbyrk 150515005107-lva1-app6892
Straddlingbusbyrk 150515005107-lva1-app6892Straddlingbusbyrk 150515005107-lva1-app6892
Straddlingbusbyrk 150515005107-lva1-app6892
 

Plus de Dasarathi GV

Software development and Sambar - what's the connection ?
Software development and Sambar - what's the connection ?Software development and Sambar - what's the connection ?
Software development and Sambar - what's the connection ?Dasarathi GV
 
Making your hotel eco-friendly
Making your hotel eco-friendlyMaking your hotel eco-friendly
Making your hotel eco-friendlyDasarathi GV
 
Killing for relative reasons
Killing for relative reasonsKilling for relative reasons
Killing for relative reasonsDasarathi GV
 
Stop killing your child - What next
Stop killing your child - What nextStop killing your child - What next
Stop killing your child - What nextDasarathi GV
 
Stop killing your child
Stop killing your childStop killing your child
Stop killing your childDasarathi GV
 
Vote against-corruption
Vote against-corruptionVote against-corruption
Vote against-corruptionDasarathi GV
 
Bangalore zerowaste-vs-wte
Bangalore zerowaste-vs-wteBangalore zerowaste-vs-wte
Bangalore zerowaste-vs-wteDasarathi GV
 
Sustainable transport-das
Sustainable transport-dasSustainable transport-das
Sustainable transport-dasDasarathi GV
 
Environment friendly construction
Environment friendly constructionEnvironment friendly construction
Environment friendly constructionDasarathi GV
 
Traffic and-you-sadashivanagar
Traffic and-you-sadashivanagarTraffic and-you-sadashivanagar
Traffic and-you-sadashivanagarDasarathi GV
 
Sankey road widening - why it's stupid
Sankey road widening - why it's stupidSankey road widening - why it's stupid
Sankey road widening - why it's stupidDasarathi GV
 
Stupidity of road widening - long article
Stupidity of road widening - long articleStupidity of road widening - long article
Stupidity of road widening - long articleDasarathi GV
 
Bangalore - world class infrastructure ? Ha !
Bangalore - world class infrastructure ? Ha !Bangalore - world class infrastructure ? Ha !
Bangalore - world class infrastructure ? Ha !Dasarathi GV
 
'Pedestrian only' Commercial St. - makes sense ?
'Pedestrian only' Commercial St. - makes sense ?'Pedestrian only' Commercial St. - makes sense ?
'Pedestrian only' Commercial St. - makes sense ?Dasarathi GV
 
Why ruin, then again restore ?
Why ruin, then again restore ?Why ruin, then again restore ?
Why ruin, then again restore ?Dasarathi GV
 
Stupidity of road widening - short article
Stupidity of road widening - short articleStupidity of road widening - short article
Stupidity of road widening - short articleDasarathi GV
 
Commercial St. survey report
Commercial St. survey reportCommercial St. survey report
Commercial St. survey reportDasarathi GV
 

Plus de Dasarathi GV (17)

Software development and Sambar - what's the connection ?
Software development and Sambar - what's the connection ?Software development and Sambar - what's the connection ?
Software development and Sambar - what's the connection ?
 
Making your hotel eco-friendly
Making your hotel eco-friendlyMaking your hotel eco-friendly
Making your hotel eco-friendly
 
Killing for relative reasons
Killing for relative reasonsKilling for relative reasons
Killing for relative reasons
 
Stop killing your child - What next
Stop killing your child - What nextStop killing your child - What next
Stop killing your child - What next
 
Stop killing your child
Stop killing your childStop killing your child
Stop killing your child
 
Vote against-corruption
Vote against-corruptionVote against-corruption
Vote against-corruption
 
Bangalore zerowaste-vs-wte
Bangalore zerowaste-vs-wteBangalore zerowaste-vs-wte
Bangalore zerowaste-vs-wte
 
Sustainable transport-das
Sustainable transport-dasSustainable transport-das
Sustainable transport-das
 
Environment friendly construction
Environment friendly constructionEnvironment friendly construction
Environment friendly construction
 
Traffic and-you-sadashivanagar
Traffic and-you-sadashivanagarTraffic and-you-sadashivanagar
Traffic and-you-sadashivanagar
 
Sankey road widening - why it's stupid
Sankey road widening - why it's stupidSankey road widening - why it's stupid
Sankey road widening - why it's stupid
 
Stupidity of road widening - long article
Stupidity of road widening - long articleStupidity of road widening - long article
Stupidity of road widening - long article
 
Bangalore - world class infrastructure ? Ha !
Bangalore - world class infrastructure ? Ha !Bangalore - world class infrastructure ? Ha !
Bangalore - world class infrastructure ? Ha !
 
'Pedestrian only' Commercial St. - makes sense ?
'Pedestrian only' Commercial St. - makes sense ?'Pedestrian only' Commercial St. - makes sense ?
'Pedestrian only' Commercial St. - makes sense ?
 
Why ruin, then again restore ?
Why ruin, then again restore ?Why ruin, then again restore ?
Why ruin, then again restore ?
 
Stupidity of road widening - short article
Stupidity of road widening - short articleStupidity of road widening - short article
Stupidity of road widening - short article
 
Commercial St. survey report
Commercial St. survey reportCommercial St. survey report
Commercial St. survey report
 

Dernier

Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Mark Goldstein
 
React Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkReact Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkPixlogix Infotech
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
QCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesQCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesBernd Ruecker
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Farhan Tariq
 
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...itnewsafrica
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfNeo4j
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesKari Kakkonen
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPathCommunity
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxGenerative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxfnnc6jmgwh
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Strongerpanagenda
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observabilityitnewsafrica
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 

Dernier (20)

Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
 
React Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkReact Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App Framework
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
QCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesQCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architectures
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...
 
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdf
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examples
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to Hero
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxGenerative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 

Bangalore - Metro is not the solution

  • 1. Yaara Metro ? Namma Metro - the plan and what we can expect The plan What we can expect  Planned for completion in 2011.  Will have 2 lines – East-West and North- South- totalling 33 km., with 35 stations.  27 km. will be above ground, 6 km. underground.  Cost Rs. 6400 Cr. - Rs. 150 Cr./km. for the above ground, Rs. 300 Cr./km. for the underground portions.  Planned to carry 10 Lakh people a day.  Actual completion in 2012 assuming inevitable time escalation.  Cost Rs. 12000 Cr. assuming inevitable cost escalation (already escalated to Rs. 9000 Cr.)  Will carry 5 Lakh people a day, going by Delhi and Kolkata metro's ratio of planned vs. actual traffic. Bangalore is waiting for the Metro desperately, expecting it to be the solution to all its transport problems . The Metro is considered to be a 'good idea' because someone in government has seen it working beautifully in some city in a developed country – maybe London, Paris, New York, Madrid or Tokyo – and thought it can be transplanted to Bangalore. We already have a bus system that we think is bad. It however serves 50 % of the city's population very well and is profitable. The BMTC has 5000 buses and carries 37 Lakh people daily. That's 0.2 % of the city's vehicle population carrying 50 % of the human population. Let's do a quick analysis of the possible benefits from the Metro, compare it with Metro systems in other cities, and compare it with the other mass transport option – a bus system. Coverage Bangalore and London have almost the same population. Greater Bangalore has an area of 741 sq. km. and a population of 72 Lakh. In 2012 it will be 1 Cr. The Greater London Urban Area has a population of 75 Lakh in an area of 1500 sq.km. The London Underground extends over 400 km., with 268 stations. Bangalore's Metro will extend over 33 km., with 35 stations. We will have 8 % of London's coverage, 5 years from now, and think it's going to solve our problem. BMTC covers the whole of the area under the Corporation.
  • 2. Bangalore London Paris Density of coverage of Metros in various cities. Accessibility The Metro will have 2 lines, one going East-West and the other going North-South. Unless you happen to live within 1 km. of a Metro line, you will have to take a bus to the nearest station, then take a bus again at the destination station. Poor accessibility is why the metros in Delhi and Koltaka carry less than 50 % of the people that they were designed for, and the bus systems in Bangkok and Singapore carry more people than the metros. Bangkok subway carries 2 Lakh passengers a day, while the bus system carries 50 Lakh passengers a day. Singapore Metro carries 12 Lakh passengers a day, while buses carry 30 Lakh passengers a day. Bangalore Metro's is planned to carry 10 Lakh passengers a day, but will most likely carry around 5 Lakh, going by Delhi and Kolkata's figures. BMTC's buses already cover the whole city, and everyone in the city probably lives within 1 km. of a bus stop. The BMTC is planning to reduce this distance to 0.5 km.
  • 3. 1 km. is the maximum distance that people will be willing to walk to / from the Metro. This means you can walk to a Metro station only if you live within the red bands in the picture. Anyone living outside the bands will have to cover the extra distance by some other means of transport – car, 2-wheeler, bicycle or bus. The further away you live from the centre of the city, the longer you have travel to the nearest station. The longest distance will be approx. 6 km., for example if you live midway between the RV Road and Byappanahalli stations.
  • 4. Commute time The Metro's average speed is 32 kmph. The average is much less than the maximum of 80 kmph. because of stops at stations and acceleration and deceleration between them. Yeshwantpur to Jayanagar will take 28 minutes, Byappanahalli to Mysore Rd. 33 minutes. Your total commute time does not just depend on the speed of the train. It is the door-to-door time, from your starting point to your destination. The last mile connectivity is therefore extremely important, and the last mile can often take more time than the travel between stations. Let's say the nearest Metro station is 4 km. from your home, 3 km. from your office. You take a bike or car, park it at the station, wait 5 minutes for the train, take the Metro 12 km., then take a bus to the office. 7 km. by bike + bus will take you 40 minutes (average speed on the road is now 15 kmph., will be 10 kmph by 2011). Total 69 minutes. The further away you are from the centre of the city, the longer your last mile commute. If there is widespread usage of buses and hence far less private vehicles, average speed on the road will be approx. 30 kmph. This has been the experience in cities worldwide with extensive bus systems, like Curitiba, Brazil. The nearest bus stop is typically 1 km. from any place is the city now (the BMTC is planning to reduce this to 0.5 km.). If you walk to and from the stops, it's 20 minutes for the walking, 5 minutes waiting for the bus, 24 minutes on the bus. Total 49 minutes. Cost The elevated sections of Bangalore's Metro will cost Rs. 160 Cr. per km, while the underground sections will cost Rs. 300 Cr. per km. To build a network equivalent to London's, it is going to cost Bangalore Rs. 100,000 Cr. assuming an average cost of Rs. 300 Cr. per km. A really good bus system might involve buying 7000 more buses and improving bus shelters, signage, etc. This would cost about Rs. 2500 Cr. and take 1 year. City-wide coverage at a fraction of the Metro's cost ! Indore's BRT is expected to cost Rs. 870 Cr. for 120 km., about Rs. 7 Cr. / km., less than 5 % of Delhi Metro's cost.
  • 5. Time to build London's underground started operation in 1863, 145 years ago. It has evolved over the years into what it is now. It is going to take Bangalore 50 years to build a network that is equivalent to London's, assuming that we build 40 km. every 5 years. Here's when the underground in other cities started operation: New York - 1904 Paris - 1900 Madrid - 1919 The bus system can be improved to handle the whole city efficiently in just 1 or 2 years. City-wide coverage in 1/50th the time of the Metro. Bogota's bus system took 1.5 years to complete. Economic viability Mr. Chaturvedi, Chief Operations Manager, Kolkata Metro Railway, said this in 2005: “Where the gross annual income of the Metro is roughly Rs.48 crores, its maintenance cost is a whopping Rs.125 crores. The Metro was designed to decongest the city's roads. I am afraid it has not been able to do that. Even during peak periods, the capacity utilisation of the trains has been around 70 per cent, and only 40 per cent in the early mornings. Unfortunately for the Metro, it has to compete with cheaper modes of public transport such as buses and trams.“ A commonly repeated claim is that Delhi Metro is one of the handful of profitable metro systems in the world. In 2006-7, Delhi Metro's earnings were Rs. 220 Cr. from ticket sales and advertisement on trains, Rs. 251 Cr. from sale and renting of land. This means less than half its revenues came from transport operations. The metro gets subsidized or free land, gets funding at low interest rates from the government (meaning us, the taxpayers), and then makes money mainly from property development. We, the tax payers, will end up subsidizing the Metro in various ways on a continuous basis. Since a bus system costs between 5 and 10 % of a metro system, a reasonably well run bus system will be profitable on ticket sales alone, instead of depending on selling real estate. The BMTC now is extremely profitable.
  • 6. Environmental cost MG Road was one of Bangalore's showpieces - gently sloping down from the Kasturba Road end, row of shops and restaurants on one side, bouganvilla border on the other side with a tree-covered walkway beyond. This is going to be replaced by tons of concrete. A substantial part of Lal Bagh is going to be eaten up for a station. Nanda Theatre road at 2.5 km. is the longest tree-covered boulevard in India. The Metro is going to go down the middle of this road. The huge, beautiful trees on both sides of the road are going to be trimmed to 50 % of their coverage area, which means they will fall down due to gravity shortly thereafter. These are not mentioned in Namma Metro's Environmetal Impact Report. The report says 412 trees will be cut in total, a serious under-estimate. Scores of homes and businesses are going to be destroyed. Most metro systems in the world are underground to prevent this kind of destruction. In our Metro, however, 27 km. of the tracks are going to be above ground and 6 km. underground. If we adopt the same ratio in future for the remaining 400 km., virtually every street and locality is going to be just a mass of concrete. Minimal environmental damage. The current road network is enough to handle the additional bus numbers. Remember, we are talking of buses instead of private vehicles. With some sensible legislation and planning to promote public transport and discourage private transport, we can reduce the number of vehicles to 6 Lakhs instead of the current 32 Lakhs. This would mean a drastic reduction in air pollution too. MGRd., 2007 MGRd., 2001 – artist's impression. Courtesy – Deccan Herald
  • 7. Flexibility A city is dynamic. Population densities can shift as the economics of the city change. The Metro cannot be rerouted once it is built. Numerous stations in the London underground are not used any longer because lines have been rerouted or they are too infrequently used to to justify keeping them open. A bus system can grow and change with the city. The bus system adapts itself to the city as it evolves, while with the Metro it is the reverse - the city will have to adapt itself to the Metro. One of 42 undergound stations closed in London, because of changes in the city. In sum  The Metro will be ready 3 years from now.  Traffic congestion will remain. The traffic population in 2011 will be 50 % more than what it is now.  Commute time will not be reduced for most residents of Bangalore. Commuting will be an even worse nightmare, maybe taking twice as long as it does now, because the number of cars and 2-wheelers will have hugely increased.  The city’s aesthetics will be largely ruined. Some of the city's best landmarks are going to vanish.  Scores of businesses and homes are going to be destroyed.  Air pollution will be far worse than it is now.  While the Metro is getting built, some of the key roads are going to be blocked.  To expand the Metro to an ideal 400 km., there will be continuous construction for the next 50 years.  Many (most?) of us will suffer the construction, but will not be alive to see its final fruit.  All this to carry 5 Lakh passengers, 4 % of the population of Greater Bangalore in 2011. Shouldn't we be thinking of a better option? The final verdict on the Delhi Metro today is : “It's beautiful, very clean, just like the metros abroad”. Nobody says ”It has reduced the traffic, reduced pollution, reduced commute time and cost for the WHOLE of Delhi.” Delhi's traffic congestion remains, its pollution levels are increasing, the government is trying out alternatives like
  • 8. the BRT (Bus Rapid Transport) system. Trains can be the most efficient way of carrying people around, in terms of space usage, pollution and cost. However, there are trains and trains, and the big questions are: 1. Can we afford a Metro ? 2. Is it too late to think of a train system now – should we have done this 100 years ago, like London or Paris ? 3. Is the over-ground system going to destroy the city, should it be underground instead ? 4. Why do richer countries than India think the Metro is unaffordable and opt for bus systems instead? 5. There are close to 100 cities worldwide that have implemented or are implementing bus based systems. 6. Why aren't we thinking holistically of a transport system that is a mix of vehicles instead of just the Metro, with the rest as an afterthought ? Metro as 'A system' meshing with the rest, rather than 'THE system' ? Balancing the pros and the cons, it might even be better to scrap the Metro and get a good bus system instead. Your response is most probably going to be : "Oh, the arguments are all very convincing, but we have already spent so much money on the Metro and done so much construction. How can we scrap it all now?". To which my reply is this. Let's say your doctor tells you today that your lifestyle for the past 20 years was a mistake, has resulted in high cholesterol, sugar and hypertension, and will surely result in your early death unless you change it immediately. Which of these would you do? 1. Think that changing your lifestyle now is too much of a disruption, and decide to go on as before. 2. Realize that what you have been doing is wrong, decide to scrap the old lifestyle to avoid destroying yourself. Let's apply the same decision making process to the Metro.