PROJECT TOOLS
PLANNING & SCHEDULING MS Project, MS Outlook, MS Excel WBS, Stake Holder Meetings, safety Action Meeting Minutes ACCOUNTING & QUOTATION MS Excel, Intuit Quickbooks, SAP MEETINGS MS Net Meeting, Laser Pointers Projectors, Actions course ENGINEERING 2D & 3D AutoCAD, Laser Measure MathCAD, Design Fabrication DOCUMENTATION MS Word, MS Publisher, HTML PLANNING BOARD
LARGE SIZE CAPITAL PROJECTS
PROJECT Asbury Park Press – Home News SCOPE PURCHASE (6) Printing Presses from the NY Times – Carlstadt Plant. DOCUMENT Photograph, Inventory, Reverse Engineer & Catalog all equipment prior to removal REMOVAL Oversee Removal & transport of equipment to Ohio refurbishment facility. RE-ENGINEER Create 3 larger 11 unit presses and incorporate new stacking unit designs into the  configuration. Integrate design into new printing facility at Asbury Park Press’s newly  renovated print facility in Freehold, NJ. NEW CONFIGURATION 350 Feet Long, 40 Feet High, 33 print units.  (3) 11 unit presses, 78 print couples 3 Stacked units, 12 Color decks, 2 double 3:2 Folders, (30) 3 Spider Arm RTPs INTERFACE with CEO, Plant Manager, Production Manager & Service Manager Building & Foundation Engineers Building Contractors & Building Requirements Associate Sub Vendor Equipment Suppliers Manufacturing & Refurbishment Vendors TIMEFRAME 3 Years from Purchase, Installation to Production Startup COSTS $60+M = Total Facility Project Cost $45M = Press Project Cost to Purchase, Manage, Re-Engineer, Refurbish, Modernization, Installation & Startup of Equipment
200,000 Sq Ft Freehold Facility 1 of 3 Press Configurations
ACCOMPLISHMENTS $13.5M savings over new equipment costs. Modernization of Electronic Controls, Inking Systems, Rollers, etc.  28% Increase in Machine Speed to 55,000 Papers Per Hour from 43,000 Per Hour. Addition of Automatic Guided Vehicle Roll Handling System saving Material Handling Costs 20 year Life Expectancy Extension of Equipment. Largest Used-Refurbished Equipment project of it’s size to date. New facility shortened distance trucks required to deliver newspapers. Project was instrumental in making facility the 2 nd  largest newspaper in New Jersey Updating Newspaper production facility attracted purchase by Gannett for approx. $133M. SPECIFICATIONS 88,000 Square Foot Building Expansion to existing 115,000 Square foot production facility. Specifically planned for installation of new printing press equipment. 350 Foot 5 Ft thick Press Foundation pad poured as one continuous homogenous pour over pilings in sandy soil. Distribution system distributes papers to 70 trucks for delivery to different sectors of the state.  30 station 55 Inch Dia. Roll (AGV) Automatic Guided Vehicle handling system. 600 Employee Facility for the production of Newspapers to Central-Southern New Jersey 233,000 Daily, 312,000 Sunday Circulation when presses were installed to combine Asbury Park Press production with the Home News PROJECT ASSOCIATES Lockwood Greene Western Lithotech BEC – Bergen Engineering Company Quipp Binsky & Snyder Mellon Bank Hall Contracting Phillip J Deleasa, Inc. Heidelberg Finishing Systems MCI Flint Ink
 
 
FUNCTIONS - TECHNICAL SALES ASSISTANCE - Site, Equipment & Removal Assessments & Specifications - Provide Sales Drawings & Proposal work to CEO’s, CFO’s, & Plant Managers. - Provide Quotations for Project Engineering Hours - Provide Quotations for Fabrication Costs - Responsible for creating photo libraries, photo inventory, and equipment maps. - PROJECT ENGINEERING MANAGEMENT - Supervise other Engineering Personnel (From MME to Draftsman Level) - Create and Formulate Original Configurations, Designs, & General Arrangements - Plan (WBS) work breakdown schedule - Oversee completion of work - responsible for checking all drawings. - Responsible for Equipment Startup Support. - Interface with Electrical Vendors, Building Engineers, Foundation Engineers,   Building Contractors, Erection Supervisors, Conveyor Vendors,   Customer Maintenance and Production Personnel. - Provide Trucking & Building Clearances - Reverse Engineer New parts as necessary. - OTHER RESPONSIBILITIES - Responsible for Inventory Control, Warehousing Arrangements, Shipping, Receiving - Implement & maintain small computer network - Procurement of Equipment and Electrical solutions, provide purchase orders.  - TRAVEL - Through-out United States & Brazil
 
 
PROJECT Poughkeepsie Journal - Newspaper Printing Press Installation SCOPE OBJECTIVE Lead Design & Customer Engineering on New Printing Press Design.  RESPONSIBILITIES My responsibilities were to Design and integrate all components for a new press  design which involved supervising 4 Designers & Drafters while simultaneously  running other projects with other Designers/Drafters.  Interfacing with design teams of  specific components such as Reel Pasters, Printing Units, Folders, it was my job to  bring all parts together  and design the Substructure, Superstructure, Web Leads,  All Drive Designs, Building Interface Drawings, Manufacturing inspection & approval.  Assist with the Prototype Startup in newly build assembly facility specifically for this  design.  TIMEFRAME 2 Years from Purchase, Installation to Production Startup COSTS $??M = Total Facility Project Cost $28M = Press Project Cost to Purchase, Manage, Engineer, Install & Startup ACCOMPLISHMENTS Machinery was installed and became as quoted by Gannett Newspapers’ as one of their  best running newspapers.  Project was delivered on time and under budget as a first prototype design.
 
MEDIUM SIZE CAPITAL PROJECTS
PROJECT SALE & INSTALLATION AT LARGEST SHEETFED PRINTER IN COUNTRY SCOPE OBJECTIVE Sell and install the first of a new product line; A Large Format Printing Press into the  largest sheet-fed printer in the world.  Doing so would thereby prove the advantages of  the equipment to the marketplace inspiring new sales. PROBLEM The Customer needed to reduced production costs by 13% or they would loose key  account.  Additionally, not cutting costs, Strine would not be able to afford expansion  toward the purchase of newer larger equipment that would open new markets for them;  A larger printed sheet as well as increasing production over a smaller machine by nearly  432% FACILITY PLAN Creating 3 Dimensional AutoCAD Geometry of the customer’s entire production  area.  I sat down with the CEO, Plant Manager, Service Manager and other production  personnel in conference.  Projected 3 Dimensional working drawing on screen  I gave them laser pointers.  Designated facility areas for use, then planned moving  certain production departments, equipment, creating work flow, production Aisles, and  lay down areas in one afternoon. TIMEFRAME 1 Year from Plan to Purchase, Installation and Startup COSTS $5+M = Estimated Total Facility Project Cost $4+M = Press Project Cost to Purchase, Manage, Engineer, Install & Equip. Startup ACCOMPLISHMENTS Incorporating Die Cutting & Folder Operations into the printing facility was successful  Customer accomplished targeted 13% reduction in production costs.  Savings afforded them the financial backing to purchase one of the largest Sheet-fed  Printing Presses in production today and also created new capabilities for them that  increased production abilities over their existing 40” machines by over 400%.
Newly Relocated Die Cutting & Folder Production Area New Sheet-Fed Printing Machine (top) Streamline Folder Packaging Area (reducing necessary manpower) New Equipment Installation (nearing completion)
FOUNDATION DRAWING
 
BUILDING SERVICES INTERFACE DRAWING
 
 
 
PROJECT Facility Re-Configuration and Custom Machine Installation SCOPE OBJECTIVE Sell and install UV/IR Process Print machine. PROBLEM Customer needed to expand their printing production.  Finding room to place a new  machine was difficult if not impossible.  New workflow and facility layout would need to  be generated.  Customer lacked expertise, time and resources to complete such a task.  But the purchase of a new machine was highly desired due to the new technology and  quality available. FACILITY PLAN & LOGISTICS Creating 3 Dimensional AutoCAD Geometry of the customer’s entire production  area.  I sat down with Plant Manager, Service Manager and other production  personnel in conference.  Projected 3 Dimensional working drawings on screen  I gave them laser pointers.  We designated facility areas for use and began moving  machines, Production Aisles, Work Flow & lay down areas in a 3D virtual environment  over several visits.  The trade-in, removal, and sale of existing equipment needed to be  part of the overall reconfiguration and plan with production to eliminate interruptions. I also offered and designed a coater pump system for their older existing equipment so  it would operate similar to the new equipment and provide similar performance. TIMEFRAME 1 Year from Purchase, Installation to Production Startup COSTS $4+M = Total Facility Project Cost $3+M = Press Project Cost to Purchase, Manage, Engineer, Install & Equip. Startup ACCOMPLISHMENT Machinery was installed in budget and on time, New and better facility workflow patterns  were established.  Production interruptions were kept to a minimum and a superior print  process was achieved. Coater pump modification were fabricated and delivered superior  performance over the old design allowing less downtime and easier cleanup.
 
 
Project Managed Installation  BEFORE PLANNING AS PLANNED AS INSTALLED Before & After
OTHER DESIGN EXPERIENCE
WFI & DI Validation Clean Room Work cGMP Clarifiers – Thickeners Belt Filters Converting Converting Packaging Equipment
Coal Conveyor Stackers Coal Transport Conveyors Overland Topographic Constraints Conveyor Take-Up Tower Hooded  Conveyor Reclaim Tunnel System Layout
2D DESIGN PORTFOLIO
3D FACILITY PORTFOLIO
3D DESIGN FABRICATION
3D ARCH’L PORTFOLIO
THE END

Contenu connexe

Similaire à Portfolio Project Management

Ramon_Osuna_Resume
Ramon_Osuna_ResumeRamon_Osuna_Resume
Ramon_Osuna_Resume
Ramon Osuna
 
GregorySusa-Portfolio
GregorySusa-PortfolioGregorySusa-Portfolio
GregorySusa-Portfolio
Gregory Susa
 
JimSundinCurrent
JimSundinCurrentJimSundinCurrent
JimSundinCurrent
Jim Sundin
 

Similaire à Portfolio Project Management (20)

Portfolio Large Projects
Portfolio Large ProjectsPortfolio Large Projects
Portfolio Large Projects
 
3 Things You Probably Didn’t Knew About Rapid Prototyping
3 Things You Probably Didn’t Knew About Rapid Prototyping3 Things You Probably Didn’t Knew About Rapid Prototyping
3 Things You Probably Didn’t Knew About Rapid Prototyping
 
Demolition project-management-solution
Demolition project-management-solutionDemolition project-management-solution
Demolition project-management-solution
 
Demolition project-management-solution
Demolition project-management-solutionDemolition project-management-solution
Demolition project-management-solution
 
Introduction to CAD-CAM.pptx
Introduction to CAD-CAM.pptxIntroduction to CAD-CAM.pptx
Introduction to CAD-CAM.pptx
 
Ramon_Osuna_Resume
Ramon_Osuna_ResumeRamon_Osuna_Resume
Ramon_Osuna_Resume
 
Applications 3D Articles
Applications 3D ArticlesApplications 3D Articles
Applications 3D Articles
 
Using Metrology Software to Capture Data for Reverse Engineering
Using Metrology Software to Capture Data for Reverse EngineeringUsing Metrology Software to Capture Data for Reverse Engineering
Using Metrology Software to Capture Data for Reverse Engineering
 
GregorySusa-Portfolio
GregorySusa-PortfolioGregorySusa-Portfolio
GregorySusa-Portfolio
 
CADCAM CAE Notes
CADCAM CAE NotesCADCAM CAE Notes
CADCAM CAE Notes
 
DESIGN & MFG AUTOMATION - GAIN PRODUCTIVITY
DESIGN & MFG AUTOMATION - GAIN PRODUCTIVITYDESIGN & MFG AUTOMATION - GAIN PRODUCTIVITY
DESIGN & MFG AUTOMATION - GAIN PRODUCTIVITY
 
Smart plant 3d_flier
Smart plant 3d_flierSmart plant 3d_flier
Smart plant 3d_flier
 
Project Planning Organising Tracking Construction
Project Planning Organising Tracking  ConstructionProject Planning Organising Tracking  Construction
Project Planning Organising Tracking Construction
 
Difference between cad &cam
Difference between cad &camDifference between cad &cam
Difference between cad &cam
 
Reverse engineering for mechanical
Reverse engineering for mechanicalReverse engineering for mechanical
Reverse engineering for mechanical
 
Use of ict in organisation Methods of production
Use of ict in organisation Methods of production Use of ict in organisation Methods of production
Use of ict in organisation Methods of production
 
Thomson CV
Thomson CVThomson CV
Thomson CV
 
Streamlining the Design of Industrial Machinery and Heavy Equipment
Streamlining the Design of Industrial Machinery and Heavy EquipmentStreamlining the Design of Industrial Machinery and Heavy Equipment
Streamlining the Design of Industrial Machinery and Heavy Equipment
 
JimSundinCurrent
JimSundinCurrentJimSundinCurrent
JimSundinCurrent
 
Project Technical Solutions - NBD
Project Technical Solutions - NBDProject Technical Solutions - NBD
Project Technical Solutions - NBD
 

Dernier

Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
amitlee9823
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Dernier (20)

A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 

Portfolio Project Management

  • 1. PROJECT MANAGEMENT FACILITY PLANNING MACHINE DESIGN AUTOCAD 3D PORTFOLIO - David Lukas
  • 3. PLANNING & SCHEDULING MS Project, MS Outlook, MS Excel WBS, Stake Holder Meetings, safety Action Meeting Minutes ACCOUNTING & QUOTATION MS Excel, Intuit Quickbooks, SAP MEETINGS MS Net Meeting, Laser Pointers Projectors, Actions course ENGINEERING 2D & 3D AutoCAD, Laser Measure MathCAD, Design Fabrication DOCUMENTATION MS Word, MS Publisher, HTML PLANNING BOARD
  • 5. PROJECT Asbury Park Press – Home News SCOPE PURCHASE (6) Printing Presses from the NY Times – Carlstadt Plant. DOCUMENT Photograph, Inventory, Reverse Engineer & Catalog all equipment prior to removal REMOVAL Oversee Removal & transport of equipment to Ohio refurbishment facility. RE-ENGINEER Create 3 larger 11 unit presses and incorporate new stacking unit designs into the configuration. Integrate design into new printing facility at Asbury Park Press’s newly renovated print facility in Freehold, NJ. NEW CONFIGURATION 350 Feet Long, 40 Feet High, 33 print units. (3) 11 unit presses, 78 print couples 3 Stacked units, 12 Color decks, 2 double 3:2 Folders, (30) 3 Spider Arm RTPs INTERFACE with CEO, Plant Manager, Production Manager & Service Manager Building & Foundation Engineers Building Contractors & Building Requirements Associate Sub Vendor Equipment Suppliers Manufacturing & Refurbishment Vendors TIMEFRAME 3 Years from Purchase, Installation to Production Startup COSTS $60+M = Total Facility Project Cost $45M = Press Project Cost to Purchase, Manage, Re-Engineer, Refurbish, Modernization, Installation & Startup of Equipment
  • 6. 200,000 Sq Ft Freehold Facility 1 of 3 Press Configurations
  • 7. ACCOMPLISHMENTS $13.5M savings over new equipment costs. Modernization of Electronic Controls, Inking Systems, Rollers, etc. 28% Increase in Machine Speed to 55,000 Papers Per Hour from 43,000 Per Hour. Addition of Automatic Guided Vehicle Roll Handling System saving Material Handling Costs 20 year Life Expectancy Extension of Equipment. Largest Used-Refurbished Equipment project of it’s size to date. New facility shortened distance trucks required to deliver newspapers. Project was instrumental in making facility the 2 nd largest newspaper in New Jersey Updating Newspaper production facility attracted purchase by Gannett for approx. $133M. SPECIFICATIONS 88,000 Square Foot Building Expansion to existing 115,000 Square foot production facility. Specifically planned for installation of new printing press equipment. 350 Foot 5 Ft thick Press Foundation pad poured as one continuous homogenous pour over pilings in sandy soil. Distribution system distributes papers to 70 trucks for delivery to different sectors of the state. 30 station 55 Inch Dia. Roll (AGV) Automatic Guided Vehicle handling system. 600 Employee Facility for the production of Newspapers to Central-Southern New Jersey 233,000 Daily, 312,000 Sunday Circulation when presses were installed to combine Asbury Park Press production with the Home News PROJECT ASSOCIATES Lockwood Greene Western Lithotech BEC – Bergen Engineering Company Quipp Binsky & Snyder Mellon Bank Hall Contracting Phillip J Deleasa, Inc. Heidelberg Finishing Systems MCI Flint Ink
  • 8.  
  • 9.  
  • 10. FUNCTIONS - TECHNICAL SALES ASSISTANCE - Site, Equipment & Removal Assessments & Specifications - Provide Sales Drawings & Proposal work to CEO’s, CFO’s, & Plant Managers. - Provide Quotations for Project Engineering Hours - Provide Quotations for Fabrication Costs - Responsible for creating photo libraries, photo inventory, and equipment maps. - PROJECT ENGINEERING MANAGEMENT - Supervise other Engineering Personnel (From MME to Draftsman Level) - Create and Formulate Original Configurations, Designs, & General Arrangements - Plan (WBS) work breakdown schedule - Oversee completion of work - responsible for checking all drawings. - Responsible for Equipment Startup Support. - Interface with Electrical Vendors, Building Engineers, Foundation Engineers, Building Contractors, Erection Supervisors, Conveyor Vendors, Customer Maintenance and Production Personnel. - Provide Trucking & Building Clearances - Reverse Engineer New parts as necessary. - OTHER RESPONSIBILITIES - Responsible for Inventory Control, Warehousing Arrangements, Shipping, Receiving - Implement & maintain small computer network - Procurement of Equipment and Electrical solutions, provide purchase orders. - TRAVEL - Through-out United States & Brazil
  • 11.  
  • 12.  
  • 13. PROJECT Poughkeepsie Journal - Newspaper Printing Press Installation SCOPE OBJECTIVE Lead Design & Customer Engineering on New Printing Press Design. RESPONSIBILITIES My responsibilities were to Design and integrate all components for a new press design which involved supervising 4 Designers & Drafters while simultaneously running other projects with other Designers/Drafters. Interfacing with design teams of specific components such as Reel Pasters, Printing Units, Folders, it was my job to bring all parts together and design the Substructure, Superstructure, Web Leads, All Drive Designs, Building Interface Drawings, Manufacturing inspection & approval. Assist with the Prototype Startup in newly build assembly facility specifically for this design. TIMEFRAME 2 Years from Purchase, Installation to Production Startup COSTS $??M = Total Facility Project Cost $28M = Press Project Cost to Purchase, Manage, Engineer, Install & Startup ACCOMPLISHMENTS Machinery was installed and became as quoted by Gannett Newspapers’ as one of their best running newspapers. Project was delivered on time and under budget as a first prototype design.
  • 14.  
  • 16. PROJECT SALE & INSTALLATION AT LARGEST SHEETFED PRINTER IN COUNTRY SCOPE OBJECTIVE Sell and install the first of a new product line; A Large Format Printing Press into the largest sheet-fed printer in the world. Doing so would thereby prove the advantages of the equipment to the marketplace inspiring new sales. PROBLEM The Customer needed to reduced production costs by 13% or they would loose key account. Additionally, not cutting costs, Strine would not be able to afford expansion toward the purchase of newer larger equipment that would open new markets for them; A larger printed sheet as well as increasing production over a smaller machine by nearly 432% FACILITY PLAN Creating 3 Dimensional AutoCAD Geometry of the customer’s entire production area. I sat down with the CEO, Plant Manager, Service Manager and other production personnel in conference. Projected 3 Dimensional working drawing on screen I gave them laser pointers. Designated facility areas for use, then planned moving certain production departments, equipment, creating work flow, production Aisles, and lay down areas in one afternoon. TIMEFRAME 1 Year from Plan to Purchase, Installation and Startup COSTS $5+M = Estimated Total Facility Project Cost $4+M = Press Project Cost to Purchase, Manage, Engineer, Install & Equip. Startup ACCOMPLISHMENTS Incorporating Die Cutting & Folder Operations into the printing facility was successful Customer accomplished targeted 13% reduction in production costs. Savings afforded them the financial backing to purchase one of the largest Sheet-fed Printing Presses in production today and also created new capabilities for them that increased production abilities over their existing 40” machines by over 400%.
  • 17. Newly Relocated Die Cutting & Folder Production Area New Sheet-Fed Printing Machine (top) Streamline Folder Packaging Area (reducing necessary manpower) New Equipment Installation (nearing completion)
  • 19.  
  • 21.  
  • 22.  
  • 23.  
  • 24. PROJECT Facility Re-Configuration and Custom Machine Installation SCOPE OBJECTIVE Sell and install UV/IR Process Print machine. PROBLEM Customer needed to expand their printing production. Finding room to place a new machine was difficult if not impossible. New workflow and facility layout would need to be generated. Customer lacked expertise, time and resources to complete such a task. But the purchase of a new machine was highly desired due to the new technology and quality available. FACILITY PLAN & LOGISTICS Creating 3 Dimensional AutoCAD Geometry of the customer’s entire production area. I sat down with Plant Manager, Service Manager and other production personnel in conference. Projected 3 Dimensional working drawings on screen I gave them laser pointers. We designated facility areas for use and began moving machines, Production Aisles, Work Flow & lay down areas in a 3D virtual environment over several visits. The trade-in, removal, and sale of existing equipment needed to be part of the overall reconfiguration and plan with production to eliminate interruptions. I also offered and designed a coater pump system for their older existing equipment so it would operate similar to the new equipment and provide similar performance. TIMEFRAME 1 Year from Purchase, Installation to Production Startup COSTS $4+M = Total Facility Project Cost $3+M = Press Project Cost to Purchase, Manage, Engineer, Install & Equip. Startup ACCOMPLISHMENT Machinery was installed in budget and on time, New and better facility workflow patterns were established. Production interruptions were kept to a minimum and a superior print process was achieved. Coater pump modification were fabricated and delivered superior performance over the old design allowing less downtime and easier cleanup.
  • 25.  
  • 26.  
  • 27. Project Managed Installation BEFORE PLANNING AS PLANNED AS INSTALLED Before & After
  • 29. WFI & DI Validation Clean Room Work cGMP Clarifiers – Thickeners Belt Filters Converting Converting Packaging Equipment
  • 30. Coal Conveyor Stackers Coal Transport Conveyors Overland Topographic Constraints Conveyor Take-Up Tower Hooded Conveyor Reclaim Tunnel System Layout