Purpose

The purpose of this tool is to help you design a Business Case for an investment in a
Marketing Automation solution. A business case is a formal management communication
document to justify and plan a project or investment by providing an opportunity overview,
key success factors, assumptions & decision-making criterion, business impact analysis,
sensitivity analysis, risks, contingency plans, and action-oriented recommendations.


How to Use this Template
Complete the following sections with your project team and/or stakeholders. Cut & paste this
information into a document that reflects your corporate image, and deliver your business
case to senior executives to sponsor the project.
Title Page




              [Insert Company Name or Logo]


                 Business Case – (insert project title)




                       [Insert Completion Date]



             Completed By: [Insert Project Manager Name]
             Completed For: [Insert Project Sponsor Name]
Table of Contents                                                          Page


1. Executive Summary                                                         4

    1.1 What Problem does this Marketing Automation business case solve?

2. Opportunity Overview & Key Success Factors                                5

    2.1 Opportunity Overview
    2.2 Project Purpose
    2.3 Project Scope
    2.4 Project Schedule
    2.5 Key Success Factors

3. Assumptions & Decision-Making Criterion                                  6

    3.1 Assumptions
    3.2 Use-case Scenarios & Options
    3.3 Recommended Decision-Making Criterion
    3.4 Information Sources & Research Methodology

4. Business Impact Analysis                                                 6

    4.1 Cost/Benefit Analysis
    4.3 Qualitative/Intangible Business Benefits
    4.4 Required Resources for Implementation

5. Risks & Contingency Plans                                                8

    5.1 Key Risks to Mitigate
    5.2 Contingency Plans

6. Recommendation                                                           9
    6.1 Action Plan
1. Executive Summary

1.1 What Problem does this Marketing Automation Business Case Solve?
Provide a brief description of the problems that this Marketing Automation business case was
designed to solve. For example: Revenue growth opportunities: sales inability to see
customer engagement makes it difficult to grow revenues (lead nurturing)

      •   Long sales cycle: sales are hindered due to difficulty in collaborating amongst staff
          on deals
      •   Productivity: inside sales reps are unproductive because they are spending too
          much time calling unqualified leads
      •   Communication: lack of communication between sales and marketing is delaying
          the sales process and sharing of lead generation data (Process Improvement)
      •   Database Integrity: data quality issues must be resolved (data collection and
          cleansing)
      •   Performance Measurement: inability to analyze marketing data, metrics and
          generate reports to make budget allocation decisions
      •   Cost-effective marketing: inability to conduct email marketing to targeted customers
          and prospects hindering opportunity for revenue
      •   Customer satisfaction: de-centralized customer information is causing frustration for
          sales staff who do not have visibility into customer service communications upon
          renewal
      •   Time saving: staff is spending time on repetitive, manual tasks that can be
          automated such as email


2. Opportunity Overview & Key Success Factors

2.1 Opportunity Overview & Project Purpose
In this section, put a positive spin on the solution you are recommending. Provide a
description of how this project DIRECTLY relates to business goals and objectives. You need
to obtain buy-in from your project sponsor, and projects that clearly fit organizational goals
are more likely to be supported.
Document the impact your solution will have on the organization. Write from the perspective of
each key stakeholder. For example:

      •   Senior management : better visibility into sales and marketing performance
      •   Sales : higher quality leads and greater ability to forecast sales accurately
      •   Marketing : performance measurement, lead nurturing and report generation
      •   Customer Service : ability to nurture customers & prospects
      •   IT : keep data in-house and integrate it with other applications (CRM, website, etc.)

2.3 Project Scope
Implementing a Marketing Automation software solution is obviously unique to each individual
business. You will need to provide a detailed document outlining the scope of the project. If
you are planning on a phased approach, provide a summary of what each phase will look like
from your perspective. Consider how many departments/stakeholders will be involved and
document them. Also, if you decide to move forward using a phased approach, you will need
to customize the following section accordingly.


For example:


Implementing a Marketing Automation software solution typically involves integrating data
from various sources and formalizing the corresponding processes for staff in sales,
marketing, customer service, and executives. Our project will be implemented in phases, with
staff training included in each phase.

      •   Phase 1: Business Objectives & Marketing Strategy – Document business
          strategy and align corporate objectives with the overall marketing plan & strategy.

      •   Phase 2: Marketing Requirements, Vendor Evaluation & Selection –
          Conduct an audit of current marketing capabilities and complete a GAP analysis of
          current metrics vs. objectives listed in the marketing plan. Analyze GAPs and
          document requirements for the marketing automation software solution. Conduct a
          vendor evaluation using detailed scoring criteria and select the vendor that is the
          best fit.

      •   Phase 3: Systems Integration – Add client data from the CRM System to the
          marketing automation platform and integrate the two systems. Create information
capture standards that will used to handle profile fields, notes, and documents. If
        required, install software and/or 3rd party applications on the appropriate
        computers. Import data from other lead sources and conduct testing. Add code to
        website for tracking prospects

    •   Phase 4: List Building, Lead Scoring and Automation Rules – Build lists,
        set up lead nurturing campaigns, allocate lead scoring criteria and set automation
        rules. –Additionally, set up sales alerts and reporting functionality.

    •   Phase 5: Landing Pages & Testing – Create landing pages & forms (if
        required) and conduct testing on all inbound lead sources. Ensure systems
        integration is working well.

    •   Phase 6: Execution & Launch- The marketing department will now be able to
        profile customers and prospects, create target lists, and use built-in email
        marketing to communicate with customer/prospects. Marketing will determine a
        schedule of communications and promotions per target segment.

    •   Phase 7: Executive dashboards and reports - Reports will be created, based
        on management needs to monitor customers, sales, and staff. Reports/dashboard
        KPIs may include: Opportunity Pipeline, Win/Loss Analysis, Lead status, Email
        Marketing Response, and others.

2.4 Project Schedule
Project Milestones                                 Deadline
   Phase 1 Deployment & Training                      May 1

   Phase 2 Deployment & Training                      June 1

   RFP Question Period Ends                           June 1

   RFP Close Date                                     June 1

   Conduct Vendor Evaluations                         June 5

   Award Contract to Vendor                           June 10

   Phase 3 Deployment & Training                      July 1

   Phase 4 Deployment & Training                      August 1

   Phase 5 Deployment & Training                      August 15

   Phase 6 Deployment & Training                      September 1

   Phase 7 Deployment & Training                      September 15


Following is a sample project schedule that you can customize further:


2.5 Key Success Factors
You must establish Key Success Factors to ensure your project is a success. Examples
include: adequate budget & resources, skill sets, project sponsorship, and time to execute
the project amongst other priorities.
Key Success Factors                           Justification
                                               Budget is required for software, consultation, and
 Budget                                        training to ensure success of the project and staff
                                               take-up
                                               Management buy-in is required to ensure the
 Sales, Marketing, Customer Service            system meets the needs of the department, and
 Management Buy-In                             ensure staff take-up

                                               To ensure system and project is aligned with
 Executive sponsorship                         corporate goals, and to communicate with staff
                                               Time will be required of management for detailed
 Resources                                     business analysis, and sufficient IT resources will
                                               need to be allocated on an ongoing basis to
                                               ensure success



3. Assumptions & Decision-Making Criterion
3.1 Assumptions
List all the assumptions you made when creating this business case. Some examples of
assumptions include: costs, savings, incremental returns, pricing, volume, or resource
requirements such as expected consulting costs.

3.2 Recommended Decision- Making Criterion
This section is useful for proposing the criterion that you believe a senior executive should
consider when making a decision. The idea is to make it very easy for your sponsor to agree
with your proposal, given that you have already completed the majority of the required critical
thinking.

Following is a suggested prioritized list of proposed evaluation criterion:

       1. Revenue and customer benefits
       2. Cost-savings through productivity
       3. Management performance insight
       4. Time to deploy
       5. Cost
       6. Customer SLA from Vendor
7. Integration with Existing systems
      8. Experience with our Industry

3.3 Information Sources
Where did you go to learn more about this opportunity? Are your sources of information
credible? What process did you take to do the research? Some examples include: vendor
discussions, whitepapers, analyst firms, Google searching, conferences, peer-to-peer
networking, and consultants.


4. Business Impact Analysis

This section will outline the costs and benefits of the proposed initiative. Both quantitative
and qualitative (intangible) benefits need to be documented here. Additionally, providing a
“High/Low” adds an element of sensitivity analysis, which provides both a conservative and
optimistic outlook for your proposed initiative.

4.1 Incremental Cost/Benefit Analysis
Determine the projected incremental costs/benefits over a 3-year period. Insert your cost
categories, a description of each, and a high/low estimate for each. Divide total benefits by
total costs and multiply by 100 to obtain a %. Complete this worksheet for each use-case
scenario, and/or project option.

Please note: The following worksheet has been populated with a few general assumptions,
which provides a suitable example for the purpose of this template. That being said, it does
not take some important metrics into consideration. A few examples of such metrics include:

      •   Decrease in sales cycle time
      •   Increase in revenue (increase win ratio)
      •   Increase in deal size, customer lifetime value
      •   Decrease in customer churn (increase in loyalty)
      •   Etc.


                            Cost/Benefit Analysis Worksheet
Project Costs
Costs                                                              High               Low
        Monthly Software Fee                                      $5000               $500
        Consultation & Implementation (One-Time)                 $50000              $10000
        Monthly Maintenance Fee                                   $1000                $0
        Training                                                 $10000              $10000
        Enter Other Costs Here
        Enter Other Costs Here
                                        Total Costs/Year         $132000             $26000

Project Benefits
        Benefits                                                   High                Low
        Time saved on administrative duties (# hours)*            $15600              $1560

        Increased sales staff productivity (# hours)**           $156000             $15600

        Reduction in direct marketing expenditures               $100000             $30000
        Enter Other Benefits Here
        Enter Other Benefits Here
                                       Total Benefits/Year       $271600             $47160
                                           % Benefits/Costs       206%                181%


* Assumption: administrative duties cost $15/hour (ex. High: 2 admin @ 10
hours/week*$15/hour*52 weeks)
**Assumption: Average Staff Salary is $30/hour (ex. High: 10 Sales Reps @ 10
hours/week*$30/hour*52 weeks)

4.2 Qualitative/Intangible Business Benefits
What are the qualitative or intangible benefits that were not captured in the cost/benefit
analysis worksheet?

        1. Improved customer & prospect communications (personalization)

        2. Time saved and greater visibility for all staff with closed-loop relationships and
           centralized information for sales, marketing, customer service
        3. Greater management visibility into operations & performance
        4. Enhanced flexibility for marketing which means faster reaction time to changing
           market conditions
        5. Insert Qualitative Benefit #5

4.3 Required Resources for Implementation
What are the required resources in terms of budget, staffing, consulting, or other
expenditures related to moving forward with this business case?


For example:

      •   Budget, per section 4.1
      •   Staff Resources: IT administrator & marketing analyst – X hours/week
      •   Management in Sales, Marketing, Customer Service: commitment to cooperate with
          IT on business requirements, training, roll-out to their staff


5. Risks & Contingency Plans

This section will outline the key risks that need to be mitigated and provide contingency plans
for each identified risk. Risks include: lack of end-user adoption, project over-time/over-
budget, technical risk, and senior management commitment.

5.1 Key Risks to Mitigate
For example:

          •    Lack of management commitment
          •    Lack of end-user adoption
          •    Technical risk

5.2 Contingency Plans
What is the contingency plan for each of the preceding risks?

For example:

To ensure commitment of managers in sales, marketing, and customer service departments,
there will be a virtual committee/team formed for the Marketing Automation project. This team
will be lead by X, and their job will be to identify specific business requirements for the
system, ensure two-way communication with staff, identify training requirements, and
measure benefits gained.


To ensure buy-in from staff, the committee will be responsible for establishing a
communication and change plan with a phased implementation. Management will also
communicate upcoming changes with staff, highlighting the benefits of the system to staff
and customers. After each phase of implementation, the group will gather feedback from the
staff to incorporate updates or changes in the next phase.


Technical risks will be mitigated by ensuring our current IT infrastructure is compatible with
the system, including email, mobile devices, and back-end systems.


6. Recommendation

What is your proposed course of action? Insert your recommendations here.

6.1 Action Plan

      1. Approve budget
      2. Approve staff resource allocation to project
      3. Approve formation of Marketing Automation management committee to proceed
          with managing and reporting on the progress of the project

Contenu connexe

Tendances

Sales Cloud Battle Card
Sales Cloud Battle CardSales Cloud Battle Card
Sales Cloud Battle Card
Ramez ElHallak
 
How To Get Clients & Sell Without Selling (Social Selling)
How To Get Clients & Sell Without Selling (Social Selling)How To Get Clients & Sell Without Selling (Social Selling)
How To Get Clients & Sell Without Selling (Social Selling)
Jane Frankland
 

Tendances (20)

Pitching for Digital Marketing Projects
Pitching for Digital Marketing ProjectsPitching for Digital Marketing Projects
Pitching for Digital Marketing Projects
 
Measuring Performance - Quantifying the Work of a Scrum Master
Measuring Performance - Quantifying the Work of a Scrum MasterMeasuring Performance - Quantifying the Work of a Scrum Master
Measuring Performance - Quantifying the Work of a Scrum Master
 
Digital PR on International Market
Digital PR on International MarketDigital PR on International Market
Digital PR on International Market
 
Productivity Facts Every Employee Should Know
Productivity Facts Every Employee Should KnowProductivity Facts Every Employee Should Know
Productivity Facts Every Employee Should Know
 
Lead Generation Framework
Lead Generation FrameworkLead Generation Framework
Lead Generation Framework
 
Sales Cloud Battle Card
Sales Cloud Battle CardSales Cloud Battle Card
Sales Cloud Battle Card
 
How To Get Clients & Sell Without Selling (Social Selling)
How To Get Clients & Sell Without Selling (Social Selling)How To Get Clients & Sell Without Selling (Social Selling)
How To Get Clients & Sell Without Selling (Social Selling)
 
Product management
Product management  Product management
Product management
 
24 Design Tips from Real Designers
24 Design Tips from Real Designers24 Design Tips from Real Designers
24 Design Tips from Real Designers
 
Event Marketing Framework
Event Marketing FrameworkEvent Marketing Framework
Event Marketing Framework
 
Buying Process Playbook
Buying Process PlaybookBuying Process Playbook
Buying Process Playbook
 
Scrum Master Roles and Responsibilities | Scrum Master Tutorial | Edureka
Scrum Master Roles and Responsibilities | Scrum Master Tutorial | EdurekaScrum Master Roles and Responsibilities | Scrum Master Tutorial | Edureka
Scrum Master Roles and Responsibilities | Scrum Master Tutorial | Edureka
 
Innovations Accelerated - Design Sprint
Innovations Accelerated - Design SprintInnovations Accelerated - Design Sprint
Innovations Accelerated - Design Sprint
 
Lightning Talk: Meaningfully Reframing PI Planning
Lightning Talk: Meaningfully Reframing PI PlanningLightning Talk: Meaningfully Reframing PI Planning
Lightning Talk: Meaningfully Reframing PI Planning
 
How to growth hack my startup idea tommaso di bartolo slideshare
How to growth hack my startup idea  tommaso di bartolo slideshareHow to growth hack my startup idea  tommaso di bartolo slideshare
How to growth hack my startup idea tommaso di bartolo slideshare
 
Marketing Strategy Playbook
Marketing Strategy PlaybookMarketing Strategy Playbook
Marketing Strategy Playbook
 
Lightning Talk #9: How UX and Data Storytelling Can Shape Policy by Mika Aldaba
Lightning Talk #9: How UX and Data Storytelling Can Shape Policy by Mika AldabaLightning Talk #9: How UX and Data Storytelling Can Shape Policy by Mika Aldaba
Lightning Talk #9: How UX and Data Storytelling Can Shape Policy by Mika Aldaba
 
Demand Metric - Playbooks
Demand Metric - PlaybooksDemand Metric - Playbooks
Demand Metric - Playbooks
 
How I got 2.5 Million views on Slideshare (by @nickdemey - Board of Innovation)
How I got 2.5 Million views on Slideshare (by @nickdemey - Board of Innovation)How I got 2.5 Million views on Slideshare (by @nickdemey - Board of Innovation)
How I got 2.5 Million views on Slideshare (by @nickdemey - Board of Innovation)
 
The Art of the Presentation
The Art of the PresentationThe Art of the Presentation
The Art of the Presentation
 

Similaire à Marketing Automation Business Case

20151209 BPR Workshhop
20151209 BPR Workshhop20151209 BPR Workshhop
20151209 BPR Workshhop
Rick VARGAS
 
Legrand crm diagnostics readout v25
Legrand crm diagnostics readout  v25Legrand crm diagnostics readout  v25
Legrand crm diagnostics readout v25
Ankit Mune
 

Similaire à Marketing Automation Business Case (20)

CRM Business Case Template
CRM Business Case Template CRM Business Case Template
CRM Business Case Template
 
Webinar program business case template
Webinar program business case templateWebinar program business case template
Webinar program business case template
 
Mobile Marketing Business Case
Mobile Marketing Business CaseMobile Marketing Business Case
Mobile Marketing Business Case
 
Social Media Business Case
Social Media Business Case Social Media Business Case
Social Media Business Case
 
Business Case Template
Business Case TemplateBusiness Case Template
Business Case Template
 
How We Reorganized Our Entire Post-Sales Organization
How We Reorganized Our Entire Post-Sales OrganizationHow We Reorganized Our Entire Post-Sales Organization
How We Reorganized Our Entire Post-Sales Organization
 
Product Business Case Template
Product Business Case TemplateProduct Business Case Template
Product Business Case Template
 
Inside Gainsight’s New Post-Sales Structure: Reorganizing the Team to Drive C...
Inside Gainsight’s New Post-Sales Structure: Reorganizing the Team to Drive C...Inside Gainsight’s New Post-Sales Structure: Reorganizing the Team to Drive C...
Inside Gainsight’s New Post-Sales Structure: Reorganizing the Team to Drive C...
 
Sales operations
Sales operationsSales operations
Sales operations
 
Strategic Planning_DF13_Final
Strategic Planning_DF13_FinalStrategic Planning_DF13_Final
Strategic Planning_DF13_Final
 
Iiba cbap
Iiba cbapIiba cbap
Iiba cbap
 
Steps to blueprint successful erp projects immortal
Steps to blueprint successful erp projects immortalSteps to blueprint successful erp projects immortal
Steps to blueprint successful erp projects immortal
 
Marketing Plan Presentation Template 2018
Marketing Plan Presentation Template 2018Marketing Plan Presentation Template 2018
Marketing Plan Presentation Template 2018
 
20151209 BPR Workshhop
20151209 BPR Workshhop20151209 BPR Workshhop
20151209 BPR Workshhop
 
Building AI strategy in organizations
Building AI strategy in organizationsBuilding AI strategy in organizations
Building AI strategy in organizations
 
Legrand crm diagnostics readout v25
Legrand crm diagnostics readout  v25Legrand crm diagnostics readout  v25
Legrand crm diagnostics readout v25
 
Legrand CRM diagnostics_Readout_ v25.pptx
Legrand CRM diagnostics_Readout_ v25.pptxLegrand CRM diagnostics_Readout_ v25.pptx
Legrand CRM diagnostics_Readout_ v25.pptx
 
How to Build Good Products Well: The Product Management Manual
How to Build Good Products Well: The Product Management ManualHow to Build Good Products Well: The Product Management Manual
How to Build Good Products Well: The Product Management Manual
 
Continuous improvement for small businesses - software-as-a-service
Continuous improvement for small businesses  - software-as-a-serviceContinuous improvement for small businesses  - software-as-a-service
Continuous improvement for small businesses - software-as-a-service
 
Mit Great
Mit GreatMit Great
Mit Great
 

Plus de Demand Metric

SEO Technology Overview
SEO Technology OverviewSEO Technology Overview
SEO Technology Overview
Demand Metric
 
Entering the European Market Successfully How-To Guide
Entering the European Market Successfully How-To GuideEntering the European Market Successfully How-To Guide
Entering the European Market Successfully How-To Guide
Demand Metric
 
Driving SEO with Press Releases How-To Guide
Driving SEO with Press Releases How-To GuideDriving SEO with Press Releases How-To Guide
Driving SEO with Press Releases How-To Guide
Demand Metric
 
Calculating Customer Lifetime Value How-To Guide
Calculating Customer Lifetime Value How-To GuideCalculating Customer Lifetime Value How-To Guide
Calculating Customer Lifetime Value How-To Guide
Demand Metric
 
Marketing Resource Management How-To Guide
Marketing Resource Management How-To GuideMarketing Resource Management How-To Guide
Marketing Resource Management How-To Guide
Demand Metric
 

Plus de Demand Metric (20)

The Impact of COVID-19 in B2B Marketing
The Impact of COVID-19 in B2B MarketingThe Impact of COVID-19 in B2B Marketing
The Impact of COVID-19 in B2B Marketing
 
Infographic Return Path Email Engagement
Infographic Return Path Email EngagementInfographic Return Path Email Engagement
Infographic Return Path Email Engagement
 
Infographic Vidyard Video Marketing 2018
Infographic Vidyard Video Marketing 2018Infographic Vidyard Video Marketing 2018
Infographic Vidyard Video Marketing 2018
 
Digital Marketing Best Practices Guide
Digital Marketing Best Practices GuideDigital Marketing Best Practices Guide
Digital Marketing Best Practices Guide
 
Content Marketing Solution Study
Content Marketing Solution StudyContent Marketing Solution Study
Content Marketing Solution Study
 
SEO Technology Overview
SEO Technology OverviewSEO Technology Overview
SEO Technology Overview
 
State of Video Marketing 2017
State of Video Marketing 2017State of Video Marketing 2017
State of Video Marketing 2017
 
Sales Enablement Maturity Model
Sales Enablement Maturity ModelSales Enablement Maturity Model
Sales Enablement Maturity Model
 
Public Relations Maturity Model
Public Relations Maturity ModelPublic Relations Maturity Model
Public Relations Maturity Model
 
Email Marketing Maturity Model
Email Marketing Maturity ModelEmail Marketing Maturity Model
Email Marketing Maturity Model
 
Customer Engagement Maturity Model
Customer Engagement Maturity ModelCustomer Engagement Maturity Model
Customer Engagement Maturity Model
 
Formalizing the Sales Support Function How-To Guide
Formalizing the Sales Support Function How-To GuideFormalizing the Sales Support Function How-To Guide
Formalizing the Sales Support Function How-To Guide
 
How to Launch a Mobile App Guide How-To Guide
How to Launch a Mobile App Guide How-To GuideHow to Launch a Mobile App Guide How-To Guide
How to Launch a Mobile App Guide How-To Guide
 
Getting Started with Agile Marketing How-To Guide
Getting Started with Agile Marketing How-To GuideGetting Started with Agile Marketing How-To Guide
Getting Started with Agile Marketing How-To Guide
 
Entering the European Market Successfully How-To Guide
Entering the European Market Successfully How-To GuideEntering the European Market Successfully How-To Guide
Entering the European Market Successfully How-To Guide
 
Driving SEO with Press Releases How-To Guide
Driving SEO with Press Releases How-To GuideDriving SEO with Press Releases How-To Guide
Driving SEO with Press Releases How-To Guide
 
Calculating Customer Lifetime Value How-To Guide
Calculating Customer Lifetime Value How-To GuideCalculating Customer Lifetime Value How-To Guide
Calculating Customer Lifetime Value How-To Guide
 
Lead Scoring: Five Steps to Getting Started How-To Guide
Lead Scoring: Five Steps to Getting Started How-To GuideLead Scoring: Five Steps to Getting Started How-To Guide
Lead Scoring: Five Steps to Getting Started How-To Guide
 
Social CRM Best Practices How-To Guide
Social CRM Best Practices How-To GuideSocial CRM Best Practices How-To Guide
Social CRM Best Practices How-To Guide
 
Marketing Resource Management How-To Guide
Marketing Resource Management How-To GuideMarketing Resource Management How-To Guide
Marketing Resource Management How-To Guide
 

Dernier

call Now 9811711561 Cash Payment乂 Call Girls in Dwarka Mor
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka Morcall Now 9811711561 Cash Payment乂 Call Girls in Dwarka Mor
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka Mor
vikas rana
 

Dernier (15)

9892124323, Call Girls in mumbai, Vashi Call Girls , Kurla Call girls
9892124323, Call Girls in mumbai, Vashi Call Girls , Kurla Call girls9892124323, Call Girls in mumbai, Vashi Call Girls , Kurla Call girls
9892124323, Call Girls in mumbai, Vashi Call Girls , Kurla Call girls
 
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...
 
Top Rated Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
8377087607 Full Enjoy @24/7-CLEAN-Call Girls In Chhatarpur,
8377087607 Full Enjoy @24/7-CLEAN-Call Girls In Chhatarpur,8377087607 Full Enjoy @24/7-CLEAN-Call Girls In Chhatarpur,
8377087607 Full Enjoy @24/7-CLEAN-Call Girls In Chhatarpur,
 
LC_YouSaidYes_NewBelieverBookletDone.pdf
LC_YouSaidYes_NewBelieverBookletDone.pdfLC_YouSaidYes_NewBelieverBookletDone.pdf
LC_YouSaidYes_NewBelieverBookletDone.pdf
 
Pokemon Go... Unraveling the Conspiracy Theory
Pokemon Go... Unraveling the Conspiracy TheoryPokemon Go... Unraveling the Conspiracy Theory
Pokemon Go... Unraveling the Conspiracy Theory
 
(Anamika) VIP Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts ...
(Anamika) VIP Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts ...(Anamika) VIP Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts ...
(Anamika) VIP Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts ...
 
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka Mor
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka Morcall Now 9811711561 Cash Payment乂 Call Girls in Dwarka Mor
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka Mor
 
2k Shots ≽ 9205541914 ≼ Call Girls In Palam (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Palam (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Palam (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Palam (Delhi)
 
(Aarini) Russian Call Girls Surat Call Now 8250077686 Surat Escorts 24x7
(Aarini) Russian Call Girls Surat Call Now 8250077686 Surat Escorts 24x7(Aarini) Russian Call Girls Surat Call Now 8250077686 Surat Escorts 24x7
(Aarini) Russian Call Girls Surat Call Now 8250077686 Surat Escorts 24x7
 
WOMEN EMPOWERMENT women empowerment.pptx
WOMEN EMPOWERMENT women empowerment.pptxWOMEN EMPOWERMENT women empowerment.pptx
WOMEN EMPOWERMENT women empowerment.pptx
 
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)
 
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)
 
The Selfspace Journal Preview by Mindbrush
The Selfspace Journal Preview by MindbrushThe Selfspace Journal Preview by Mindbrush
The Selfspace Journal Preview by Mindbrush
 
2k Shots ≽ 9205541914 ≼ Call Girls In Jasola (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Jasola (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Jasola (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Jasola (Delhi)
 

Marketing Automation Business Case

  • 1. Marketing Automation Business Case Purpose The purpose of this tool is to help you design a Business Case for an investment in a Marketing Automation solution. A business case is a formal management communication document to justify and plan a project or investment by providing an opportunity overview, key success factors, assumptions & decision-making criterion, business impact analysis, sensitivity analysis, risks, contingency plans, and action-oriented recommendations. How to Use this Template Complete the following sections with your project team and/or stakeholders. Cut & paste this information into a document that reflects your corporate image, and deliver your business case to senior executives to sponsor the project.
  • 2. Title Page [Insert Company Name or Logo] Business Case – (insert project title) [Insert Completion Date] Completed By: [Insert Project Manager Name] Completed For: [Insert Project Sponsor Name]
  • 3. Table of Contents Page 1. Executive Summary 4 1.1 What Problem does this Marketing Automation business case solve? 2. Opportunity Overview & Key Success Factors 5 2.1 Opportunity Overview 2.2 Project Purpose 2.3 Project Scope 2.4 Project Schedule 2.5 Key Success Factors 3. Assumptions & Decision-Making Criterion 6 3.1 Assumptions 3.2 Use-case Scenarios & Options 3.3 Recommended Decision-Making Criterion 3.4 Information Sources & Research Methodology 4. Business Impact Analysis 6 4.1 Cost/Benefit Analysis 4.3 Qualitative/Intangible Business Benefits 4.4 Required Resources for Implementation 5. Risks & Contingency Plans 8 5.1 Key Risks to Mitigate 5.2 Contingency Plans 6. Recommendation 9 6.1 Action Plan
  • 4. 1. Executive Summary 1.1 What Problem does this Marketing Automation Business Case Solve? Provide a brief description of the problems that this Marketing Automation business case was designed to solve. For example: Revenue growth opportunities: sales inability to see customer engagement makes it difficult to grow revenues (lead nurturing) • Long sales cycle: sales are hindered due to difficulty in collaborating amongst staff on deals • Productivity: inside sales reps are unproductive because they are spending too much time calling unqualified leads • Communication: lack of communication between sales and marketing is delaying the sales process and sharing of lead generation data (Process Improvement) • Database Integrity: data quality issues must be resolved (data collection and cleansing) • Performance Measurement: inability to analyze marketing data, metrics and generate reports to make budget allocation decisions • Cost-effective marketing: inability to conduct email marketing to targeted customers and prospects hindering opportunity for revenue • Customer satisfaction: de-centralized customer information is causing frustration for sales staff who do not have visibility into customer service communications upon renewal • Time saving: staff is spending time on repetitive, manual tasks that can be automated such as email 2. Opportunity Overview & Key Success Factors 2.1 Opportunity Overview & Project Purpose In this section, put a positive spin on the solution you are recommending. Provide a description of how this project DIRECTLY relates to business goals and objectives. You need to obtain buy-in from your project sponsor, and projects that clearly fit organizational goals
  • 5. are more likely to be supported. Document the impact your solution will have on the organization. Write from the perspective of each key stakeholder. For example: • Senior management : better visibility into sales and marketing performance • Sales : higher quality leads and greater ability to forecast sales accurately • Marketing : performance measurement, lead nurturing and report generation • Customer Service : ability to nurture customers & prospects • IT : keep data in-house and integrate it with other applications (CRM, website, etc.) 2.3 Project Scope Implementing a Marketing Automation software solution is obviously unique to each individual business. You will need to provide a detailed document outlining the scope of the project. If you are planning on a phased approach, provide a summary of what each phase will look like from your perspective. Consider how many departments/stakeholders will be involved and document them. Also, if you decide to move forward using a phased approach, you will need to customize the following section accordingly. For example: Implementing a Marketing Automation software solution typically involves integrating data from various sources and formalizing the corresponding processes for staff in sales, marketing, customer service, and executives. Our project will be implemented in phases, with staff training included in each phase. • Phase 1: Business Objectives & Marketing Strategy – Document business strategy and align corporate objectives with the overall marketing plan & strategy. • Phase 2: Marketing Requirements, Vendor Evaluation & Selection – Conduct an audit of current marketing capabilities and complete a GAP analysis of current metrics vs. objectives listed in the marketing plan. Analyze GAPs and document requirements for the marketing automation software solution. Conduct a vendor evaluation using detailed scoring criteria and select the vendor that is the best fit. • Phase 3: Systems Integration – Add client data from the CRM System to the marketing automation platform and integrate the two systems. Create information
  • 6. capture standards that will used to handle profile fields, notes, and documents. If required, install software and/or 3rd party applications on the appropriate computers. Import data from other lead sources and conduct testing. Add code to website for tracking prospects • Phase 4: List Building, Lead Scoring and Automation Rules – Build lists, set up lead nurturing campaigns, allocate lead scoring criteria and set automation rules. –Additionally, set up sales alerts and reporting functionality. • Phase 5: Landing Pages & Testing – Create landing pages & forms (if required) and conduct testing on all inbound lead sources. Ensure systems integration is working well. • Phase 6: Execution & Launch- The marketing department will now be able to profile customers and prospects, create target lists, and use built-in email marketing to communicate with customer/prospects. Marketing will determine a schedule of communications and promotions per target segment. • Phase 7: Executive dashboards and reports - Reports will be created, based on management needs to monitor customers, sales, and staff. Reports/dashboard KPIs may include: Opportunity Pipeline, Win/Loss Analysis, Lead status, Email Marketing Response, and others. 2.4 Project Schedule
  • 7. Project Milestones Deadline Phase 1 Deployment & Training May 1 Phase 2 Deployment & Training June 1 RFP Question Period Ends June 1 RFP Close Date June 1 Conduct Vendor Evaluations June 5 Award Contract to Vendor June 10 Phase 3 Deployment & Training July 1 Phase 4 Deployment & Training August 1 Phase 5 Deployment & Training August 15 Phase 6 Deployment & Training September 1 Phase 7 Deployment & Training September 15 Following is a sample project schedule that you can customize further: 2.5 Key Success Factors You must establish Key Success Factors to ensure your project is a success. Examples include: adequate budget & resources, skill sets, project sponsorship, and time to execute the project amongst other priorities.
  • 8. Key Success Factors Justification Budget is required for software, consultation, and Budget training to ensure success of the project and staff take-up Management buy-in is required to ensure the Sales, Marketing, Customer Service system meets the needs of the department, and Management Buy-In ensure staff take-up To ensure system and project is aligned with Executive sponsorship corporate goals, and to communicate with staff Time will be required of management for detailed Resources business analysis, and sufficient IT resources will need to be allocated on an ongoing basis to ensure success 3. Assumptions & Decision-Making Criterion 3.1 Assumptions List all the assumptions you made when creating this business case. Some examples of assumptions include: costs, savings, incremental returns, pricing, volume, or resource requirements such as expected consulting costs. 3.2 Recommended Decision- Making Criterion This section is useful for proposing the criterion that you believe a senior executive should consider when making a decision. The idea is to make it very easy for your sponsor to agree with your proposal, given that you have already completed the majority of the required critical thinking. Following is a suggested prioritized list of proposed evaluation criterion: 1. Revenue and customer benefits 2. Cost-savings through productivity 3. Management performance insight 4. Time to deploy 5. Cost 6. Customer SLA from Vendor
  • 9. 7. Integration with Existing systems 8. Experience with our Industry 3.3 Information Sources Where did you go to learn more about this opportunity? Are your sources of information credible? What process did you take to do the research? Some examples include: vendor discussions, whitepapers, analyst firms, Google searching, conferences, peer-to-peer networking, and consultants. 4. Business Impact Analysis This section will outline the costs and benefits of the proposed initiative. Both quantitative and qualitative (intangible) benefits need to be documented here. Additionally, providing a “High/Low” adds an element of sensitivity analysis, which provides both a conservative and optimistic outlook for your proposed initiative. 4.1 Incremental Cost/Benefit Analysis Determine the projected incremental costs/benefits over a 3-year period. Insert your cost categories, a description of each, and a high/low estimate for each. Divide total benefits by total costs and multiply by 100 to obtain a %. Complete this worksheet for each use-case scenario, and/or project option. Please note: The following worksheet has been populated with a few general assumptions, which provides a suitable example for the purpose of this template. That being said, it does not take some important metrics into consideration. A few examples of such metrics include: • Decrease in sales cycle time • Increase in revenue (increase win ratio) • Increase in deal size, customer lifetime value • Decrease in customer churn (increase in loyalty) • Etc. Cost/Benefit Analysis Worksheet Project Costs
  • 10. Costs High Low Monthly Software Fee $5000 $500 Consultation & Implementation (One-Time) $50000 $10000 Monthly Maintenance Fee $1000 $0 Training $10000 $10000 Enter Other Costs Here Enter Other Costs Here Total Costs/Year $132000 $26000 Project Benefits Benefits High Low Time saved on administrative duties (# hours)* $15600 $1560 Increased sales staff productivity (# hours)** $156000 $15600 Reduction in direct marketing expenditures $100000 $30000 Enter Other Benefits Here Enter Other Benefits Here Total Benefits/Year $271600 $47160 % Benefits/Costs 206% 181% * Assumption: administrative duties cost $15/hour (ex. High: 2 admin @ 10 hours/week*$15/hour*52 weeks) **Assumption: Average Staff Salary is $30/hour (ex. High: 10 Sales Reps @ 10 hours/week*$30/hour*52 weeks) 4.2 Qualitative/Intangible Business Benefits What are the qualitative or intangible benefits that were not captured in the cost/benefit analysis worksheet? 1. Improved customer & prospect communications (personalization) 2. Time saved and greater visibility for all staff with closed-loop relationships and centralized information for sales, marketing, customer service 3. Greater management visibility into operations & performance 4. Enhanced flexibility for marketing which means faster reaction time to changing market conditions 5. Insert Qualitative Benefit #5 4.3 Required Resources for Implementation
  • 11. What are the required resources in terms of budget, staffing, consulting, or other expenditures related to moving forward with this business case? For example: • Budget, per section 4.1 • Staff Resources: IT administrator & marketing analyst – X hours/week • Management in Sales, Marketing, Customer Service: commitment to cooperate with IT on business requirements, training, roll-out to their staff 5. Risks & Contingency Plans This section will outline the key risks that need to be mitigated and provide contingency plans for each identified risk. Risks include: lack of end-user adoption, project over-time/over- budget, technical risk, and senior management commitment. 5.1 Key Risks to Mitigate For example: • Lack of management commitment • Lack of end-user adoption • Technical risk 5.2 Contingency Plans What is the contingency plan for each of the preceding risks? For example: To ensure commitment of managers in sales, marketing, and customer service departments, there will be a virtual committee/team formed for the Marketing Automation project. This team will be lead by X, and their job will be to identify specific business requirements for the system, ensure two-way communication with staff, identify training requirements, and measure benefits gained. To ensure buy-in from staff, the committee will be responsible for establishing a
  • 12. communication and change plan with a phased implementation. Management will also communicate upcoming changes with staff, highlighting the benefits of the system to staff and customers. After each phase of implementation, the group will gather feedback from the staff to incorporate updates or changes in the next phase. Technical risks will be mitigated by ensuring our current IT infrastructure is compatible with the system, including email, mobile devices, and back-end systems. 6. Recommendation What is your proposed course of action? Insert your recommendations here. 6.1 Action Plan 1. Approve budget 2. Approve staff resource allocation to project 3. Approve formation of Marketing Automation management committee to proceed with managing and reporting on the progress of the project