Outline
1. Overview

2. What is mine closure

3. Traditional mining approaches

4. Why we do it differently

5. How we do it

6. What makes for good practice

7. Recent example

8. Further reading

9. Questions
1. Overview
• Mines only have a limited lifespan.


• Upon end of life, operations must be
  consolidated and closed.


• Includes all matters regarding structures, waste,
  residue deposits, water management,
  community relations etc.


• The physical activities that are needed to close
  down a mine are relatively straightforward -
  Greater challenge today involves leaving a
  social and environmental legacy
2. What is mine closure?

Two aspects:

 • Actions and measures “to leave a mine site in a condition which is safe and
   stable, limiting further environmental impact” after the end of the operations
   (whatever the causes of that end: natural depletion, sudden interruption due to
   economic reasons, etc.)


 • Land reclamation: to restore or rehabilitate the land “…affected by mining for
   further economic use…”
                                                                (see Hoskin, 2005)
3. Traditional mining practice

• Traditionally only two principal phases recognised in the typical mine
  project life cycle
   • exploration
   • construction & operation


• Focus on the immediate requirements of the stage that was active at
  any particular time


• Mining: precedence over other land uses
   • Abandoning the mine as soon as it ended its productive cycle
   • Closing remote mining towns together with the mines – ghost towns
4. Why we do it differently
•Mining industry has embraced the concept of sustainable
development

•Growth of environmental awareness – peer review, NGO’s, society

•Governments have also tended to impose stricter requirements on
industry – not only environmental but also economic reasons (Equator
Principles)

•Spate of new mining developments in developing countries – learn
from past mistakes

•Closure ties in with CSR and community responsibility
4. Why we do it differently (2)
Concept of ‘design-for-closure’


• Relatively recent development


• In 1983, the proposed Cinola Gold Mine located on the Queen Charlotte Islands off
  the coast of northern British Columbia was one of the first mine projects to be
  conceived using a ‘design-for-closure’ concept
 http://www.carc.org/pdfs/NMPWorkingPaper1BowmanandBaker.pdf
 http://www.anthonyhodge.ca/publications/Post_Mining_Regeneration.pdf


• Now, good practice requires that the planning time-horizon be extended to
  encompass “design-, build-, and operate- for- closure.”
 http://www.icmm.com/page/9566
5. How we do it
Various concerns involved in the closure of mining, across the broad
spectrum of sustainable development elements.
• Visual and Aesthetics
• Environmental
• Financial
• Social
• Employment / labour


Above concerns addressed in mine closure plans:
• Conceptual closure plan: development of a target closure outcome and goals –
  ideally developed and used during exploration, pre-feasibility, feasibility/design
  and construction
• Detailed closure plan: milestones, detailed methodologies of achieving these,
  monitoring and validation processes - used continuously during operations &
  incorporated into decision making process
• Decommissioning and post closure plan: Effective transition to closure
5. How we do it (1)
Key Principles of Mine Closure Design

•   Prevention
    • mine closure plans to be approved prior to operations
    • inspection and strict control of measures towards closure throughout all of operative
       cycle,
    • stringent system of enforcement and sanctions,
    • adequate terms of prescription,
    • periodic review of the plan, etc.

•   Mine closure costs internalisation
    • Cradle-to-grave approach
    • Environmental financial assurance measures (EFA) - sureties (fidelity bonds, surety
       bonds, performance bonds and letters of credit); cash deposits
    • Typically guarantees environmental performance after closure

•   Reclamation & Rehabilitation
Exploration
                                                                                         Conceptual closure
                                                                                             planning
                                                                                                                                   Pre-feasibility



                                                                                                                                   Feasibility

                                                                                                                                    Construction

                                                                                               Increasing                          Operations
                                                                                                  detail                           (Concurrent rehab)



                                                                                            Detailed closure
                                                                                               planning
                                                                                                                 Mine life cycle




                                                                                                                                   Decommissioning




                                                                     Stakeholder input
Reproduced from ICMM: Planning for Integrated Mine Closure Toolkit
                                                                                         Transition to closure

                                                                                                                                    Closure




                                                                                                                                    Post-closure




                                                                                                                                   Relinquishment
5. How we do it (3)
Preparation for practical closure




  Care &                            Reclamation /       Closure /      Post
maintenance   Decommissioning
                                    Rehabilitation   Relinquishment   Closure
5. How we do it (4)
• Design-for-closure
• At early stages of mine development – pre-feasibility, feasibility and during
  assessment process (EIA and SIA):
   • initial post-closure concepts should be developed and estimates of post-
      closure costs made
   • financial instruments must then be identified
• In construction and operation: these framework closure plans should
  progressively be reviewed and refined to produce detailed practical
  documents
• In operation: progressive closure is also implemented where feasible
• Decommissioning and active rehabilitation:
   • Nature of the long-term legacy is finally established
• Post-closure phase: long-term management and monitoring of the property
  (passive care)
   • Final disposal of the site or ‘walk-away scenario’ or
   • Passive care in perpetuity
6. What makes good practice
Main elements of good practice in mine closure

• Mine closure plan as a condition to start mining operations. Stress on pollution
  prevention

• Inspection and control. Periodic review of the plan

• Financial guarantees – or alternative mechanisms. Essential to achieve
  internalisation of closure costs

• Sanction regime. Efficient enforcement and liability measures

• Public participation at all stages of the development

• Provisions on mine closure of small-scale mines

• Provisions on abandoned mines. Distinction between mine closure and mine
  abandonment. Main policy to ensure mine closing (not abandoning)

• Post-closure social and economic policies
7. Recent example(s)
Scotsgold Resources, October 2011


• Mining production of commercial gold and silver due to start in 2013
• Loch Lomond National Park – major tourist attraction
• Park authority’s board - opportunities for new jobs and economic
  growth outweigh concerns about the environment
• Company should ensure long-term environmental impact will be
  minimised
• Company intends restoration of landscape at end of 10-year licence


• Company undertaken to provide a financial guarantee/restoration
  bond by means of Cash Collateral Account.
Country study - South Africa
• Constitutional supremacy.

• Myriad of legislation and regulations affecting mine closure.
  • Constitution of South Africa
  • National Environmental Management Act coupled with sectoral legislation
  • NEM: Integrated Waste Management Act
  • NEM: Protected Areas Act
  • Mineral and Petroleum Resource Development Act
  • Mine Health and Safety Act
  • National Water Act
  • Minerals Act

• Standards for mine closure derives mainly from environmental prescriptions.

• Large number of South African mines have reached maturity and is looking
  towards closure.
Constitution of the Republic of
South Africa 1996




Section 24(a): “...everyone has the right to an environment that which is not
harmful to his or her health and well-being”.
National Environmental Management
Act, 1998
• Section 2: “The costs of remedying pollution, environmental degradation and
  consequent adverse health effects and of preventing, controlling or minimising
  further pollution, environmental damage or adverse health effects must be paid
  for by those responsible for harming the environment”.



• Section 28: Every person* who causes, has caused or may cause significant
  pollution or degradation of the environment must take reasonable measures to
  prevent such pollution or degradation from occurring, continuing or recurring, or,
  in so far as such harm to the environment is authorised by law or cannot
  reasonably be avoided or stopped, to minimise and rectify such pollution or
  degradation of the environment.


   * (includes an owner of land or premises, a person in control of land or
   premises or a person who has a right to use the land)
National Environmental Management
Act, 1998
• Sections 32: “...Any person or group of persons may seek appropriate relief in
  respect of any breach or threatened breach of any provision of this Act...”.


• Section 33: Private prosecution in the public interest; or in the interest of the
  protection of the environment.



Environmental Impact Assessment
Regulations Listing Notice 1 of 2010
• Regulation 27(iv): “...activities, where the facility or the land on which it is
  located is contaminated...”.
Mineral and Petroleum Development
Act, 2002
• Provides a holistic cradle-to-grave approach to prospecting and mining.
• Makes provision for economic, social and environmental costs to achieve sustainable
  development of SA mineral resources.

• Section 38: Provides for the application of integrated environmental management and
  the responsibility to remedy.
• Section 38(2): Makes provision to keep directors of companies or members of closed
  corporations liable for any damage, degradation or pollution caused by the company or
  closed corporation which they represent or represented.
• Section 41: Makes financial provision for the remediation of environmental damage.
• Section 42: Makes provision for the management of residue stockpiles and deposits.
• Section 43: Provides for the issuing of a closure certificate.
• Section 44: Provides for the retainment or removal of buildings and structures.
• Sections 45: Provides for the Minister to take urgent remedial action pertaining to
  environmental degradation and pollution and to recover costs in this regard.
• Section 46: Provides for the Minister to rehabilitate abandoned and ownerless
  mines/dumps and to register such sites in the title deeds of land and to transfer the
  liability for maintaining the rehabilitation work being undertaken to the responsible
  landowner.
Mineral and Petroleum Development
Act, 2002
The MPRDA, 2002 also provides for the implementation of a social and labour
 plan. The purpose and objectives of such plans are to:


• Integrate and manage the social, economic and environmental impacts of mining
  within all the phases of a mine, until closure
• Avoid job losses and mitigate social and economic impacts on individuals should
  a mine close prematurely or at the closure of mines
• Avoid the establishment of settlements, which cannot be sustained after the
  closure of mines.
When things go wrong.. Flooding
in KOSH
•Four separate mines in close proximity
in Klerksdorp, Orkney, Stilfontein and
Hartebeesfontein (KOSH area).



•Dispute arose over responsibility for
pumping of underground water after
mine closure.
Flooding in KOSH (continued)
• Prior to closure, dewatering of mines conducted by each mining company at their
  own mine shafts.
 • Pumping is necessary to prevent the flow of underground water from mines at
   a higher location within the mining area to lower-lying mines.


• On whose shoulders should the pumping responsibility lie when one mine closes
  down?


• All mining companies and stakeholders agreed on the establishment of a water
  company.


• Currently water continues to be pumped to the surface at the upper shaft, before
  being piped to the local water service provider – creating subsequent revenue
  stream.
8. Further Reading
• International Council on Mining and Metals (ICMM) – Planning for integrated Mine Closure
  Toolkit
  http://www.icmm.com/page/9568/planning-for-integrated-mine-closure-toolkit


• Financial Assurance for Mine Closure and Reclamation
  www.icmm.com/document/282


• International Institute for Environment and Development (IIED) – Sets out sustainability
  standards, as applicable to mine closure
  http://www.iied.org/


• International Accounting Standards Board (IASB) – Accounting and Disclosure Model for
  Extractive Activities
  http://www.ifrs.org/Current+Projects/IASB+Projects/Extractive+Activities/Summary.htm


• Scottish gold mine receives approval
  http://www.ft.com/cms/s/0/7e722936-ff23-11e0-aa11-00144feabdc0.html#axzz1cLsU2lL5
Trg product, mine closure, cepmlp

Contenu connexe

Tendances

legal aspects of navi mumbai international airport
legal aspects  of navi mumbai international airportlegal aspects  of navi mumbai international airport
legal aspects of navi mumbai international airporttwinkle Chhadwa
 
Eia of Ring road report of Jammu City
Eia of Ring road report of Jammu CityEia of Ring road report of Jammu City
Eia of Ring road report of Jammu CitySaksham Mahajan
 
Benefits of Soil Organic Carbon - an overview
Benefits of Soil Organic Carbon - an overviewBenefits of Soil Organic Carbon - an overview
Benefits of Soil Organic Carbon - an overviewExternalEvents
 
7. MINING LEASE, RECLAMATION PLANNING AND SAFETY ZONE MANAGEMENT PLAN.
7.	MINING LEASE, RECLAMATION PLANNING AND SAFETY ZONE MANAGEMENT PLAN.7.	MINING LEASE, RECLAMATION PLANNING AND SAFETY ZONE MANAGEMENT PLAN.
7. MINING LEASE, RECLAMATION PLANNING AND SAFETY ZONE MANAGEMENT PLAN.RavindraSaksena
 
Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...
Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...
Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...Michael Hewitt, GISP
 
Opencast mining overview
Opencast mining overviewOpencast mining overview
Opencast mining overviewKamleshBepari
 
Moffett RAB Site 25, September 9, 2010
Moffett RAB Site 25, September 9, 2010Moffett RAB Site 25, September 9, 2010
Moffett RAB Site 25, September 9, 2010Steve Williams
 
ICFRE RNS reclamation planning_28.11.2014
ICFRE RNS reclamation planning_28.11.2014ICFRE RNS reclamation planning_28.11.2014
ICFRE RNS reclamation planning_28.11.2014RavindraSaksena
 
IQ Academy Lunch & Learn Webinar | Landscape & Restoration with Simon Higson ...
IQ Academy Lunch & Learn Webinar | Landscape & Restoration with Simon Higson ...IQ Academy Lunch & Learn Webinar | Landscape & Restoration with Simon Higson ...
IQ Academy Lunch & Learn Webinar | Landscape & Restoration with Simon Higson ...IQ_UK
 
Green infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience MekongGreen infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience MekongWater, Land and Ecosystems (WLE)
 
Extractive Energetic - Thesis by Jessica Wolff
Extractive Energetic - Thesis by Jessica WolffExtractive Energetic - Thesis by Jessica Wolff
Extractive Energetic - Thesis by Jessica WolffMichael Hewitt, GISP
 
B2 - FIALE GEOTHERMAL EXPLORATION PROJECT Djibouti
B2 - FIALE GEOTHERMAL EXPLORATION PROJECT DjiboutiB2 - FIALE GEOTHERMAL EXPLORATION PROJECT Djibouti
B2 - FIALE GEOTHERMAL EXPLORATION PROJECT DjiboutiIceland Geothermal
 
High-Resolution 3D Seismic: Coal Mines Fields
High-Resolution 3D Seismic: Coal Mines FieldsHigh-Resolution 3D Seismic: Coal Mines Fields
High-Resolution 3D Seismic: Coal Mines FieldsAli Osman Öncel
 
Indonesia commitment, progress, action plan on peatland protection and manage...
Indonesia commitment, progress, action plan on peatland protection and manage...Indonesia commitment, progress, action plan on peatland protection and manage...
Indonesia commitment, progress, action plan on peatland protection and manage...International Tropical Peatlands Center
 
ANX.2-SLR,GMSLR miigation
ANX.2-SLR,GMSLR miigationANX.2-SLR,GMSLR miigation
ANX.2-SLR,GMSLR miigationRahul Nagpaul
 
Global management of soil organic matter
Global management of soil organic matterGlobal management of soil organic matter
Global management of soil organic matterExternalEvents
 
Rehabilitating the London 2012 Olympic Park site
Rehabilitating the London 2012 Olympic Park siteRehabilitating the London 2012 Olympic Park site
Rehabilitating the London 2012 Olympic Park siteAtkins
 

Tendances (19)

legal aspects of navi mumbai international airport
legal aspects  of navi mumbai international airportlegal aspects  of navi mumbai international airport
legal aspects of navi mumbai international airport
 
Eia of Ring road report of Jammu City
Eia of Ring road report of Jammu CityEia of Ring road report of Jammu City
Eia of Ring road report of Jammu City
 
Benefits of Soil Organic Carbon - an overview
Benefits of Soil Organic Carbon - an overviewBenefits of Soil Organic Carbon - an overview
Benefits of Soil Organic Carbon - an overview
 
7. MINING LEASE, RECLAMATION PLANNING AND SAFETY ZONE MANAGEMENT PLAN.
7.	MINING LEASE, RECLAMATION PLANNING AND SAFETY ZONE MANAGEMENT PLAN.7.	MINING LEASE, RECLAMATION PLANNING AND SAFETY ZONE MANAGEMENT PLAN.
7. MINING LEASE, RECLAMATION PLANNING AND SAFETY ZONE MANAGEMENT PLAN.
 
Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...
Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...
Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...
 
Opencast mining overview
Opencast mining overviewOpencast mining overview
Opencast mining overview
 
Moffett RAB Site 25, September 9, 2010
Moffett RAB Site 25, September 9, 2010Moffett RAB Site 25, September 9, 2010
Moffett RAB Site 25, September 9, 2010
 
ICFRE RNS reclamation planning_28.11.2014
ICFRE RNS reclamation planning_28.11.2014ICFRE RNS reclamation planning_28.11.2014
ICFRE RNS reclamation planning_28.11.2014
 
IQ Academy Lunch & Learn Webinar | Landscape & Restoration with Simon Higson ...
IQ Academy Lunch & Learn Webinar | Landscape & Restoration with Simon Higson ...IQ Academy Lunch & Learn Webinar | Landscape & Restoration with Simon Higson ...
IQ Academy Lunch & Learn Webinar | Landscape & Restoration with Simon Higson ...
 
Green infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience MekongGreen infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience Mekong
 
Extractive Energetic - Thesis by Jessica Wolff
Extractive Energetic - Thesis by Jessica WolffExtractive Energetic - Thesis by Jessica Wolff
Extractive Energetic - Thesis by Jessica Wolff
 
B2 - FIALE GEOTHERMAL EXPLORATION PROJECT Djibouti
B2 - FIALE GEOTHERMAL EXPLORATION PROJECT DjiboutiB2 - FIALE GEOTHERMAL EXPLORATION PROJECT Djibouti
B2 - FIALE GEOTHERMAL EXPLORATION PROJECT Djibouti
 
High-Resolution 3D Seismic: Coal Mines Fields
High-Resolution 3D Seismic: Coal Mines FieldsHigh-Resolution 3D Seismic: Coal Mines Fields
High-Resolution 3D Seismic: Coal Mines Fields
 
Indonesia commitment, progress, action plan on peatland protection and manage...
Indonesia commitment, progress, action plan on peatland protection and manage...Indonesia commitment, progress, action plan on peatland protection and manage...
Indonesia commitment, progress, action plan on peatland protection and manage...
 
ANX.2-SLR,GMSLR miigation
ANX.2-SLR,GMSLR miigationANX.2-SLR,GMSLR miigation
ANX.2-SLR,GMSLR miigation
 
Global management of soil organic matter
Global management of soil organic matterGlobal management of soil organic matter
Global management of soil organic matter
 
Ohio
OhioOhio
Ohio
 
De Survey
De SurveyDe Survey
De Survey
 
Rehabilitating the London 2012 Olympic Park site
Rehabilitating the London 2012 Olympic Park siteRehabilitating the London 2012 Olympic Park site
Rehabilitating the London 2012 Olympic Park site
 

En vedette

Environmental Sustainability
Environmental SustainabilityEnvironmental Sustainability
Environmental Sustainabilityahmad bassiouny
 
Mining and sustainability: the impacts to people - Dr John Clarke, Interim CE...
Mining and sustainability: the impacts to people - Dr John Clarke, Interim CE...Mining and sustainability: the impacts to people - Dr John Clarke, Interim CE...
Mining and sustainability: the impacts to people - Dr John Clarke, Interim CE...Mining On Top
 
Meaning of liquidation
Meaning of liquidationMeaning of liquidation
Meaning of liquidationArshad Islam
 
Sustanable mining
Sustanable miningSustanable mining
Sustanable miningVIJAY KUMAR
 
Insolvency, liquidity and winding up
Insolvency, liquidity and winding upInsolvency, liquidity and winding up
Insolvency, liquidity and winding upSINGHZEE
 
GRADE 10 THE INFORMAL SECTOR
GRADE 10 THE INFORMAL SECTORGRADE 10 THE INFORMAL SECTOR
GRADE 10 THE INFORMAL SECTORJt Engay
 
Aggregate Crushing Equipment
Aggregate Crushing EquipmentAggregate Crushing Equipment
Aggregate Crushing EquipmentArpit Shrivastava
 
Migration 8
Migration 8Migration 8
Migration 8mrscox
 
informal sector
 informal sector informal sector
informal sectormeetmksvs
 
2016 ima europe award applications - category innovation
2016 ima europe award applications - category innovation2016 ima europe award applications - category innovation
2016 ima europe award applications - category innovationAmina Langedijk
 
2016 ima europe award applications - category biodiversity
2016 ima europe award applications - category biodiversity2016 ima europe award applications - category biodiversity
2016 ima europe award applications - category biodiversityAmina Langedijk
 

En vedette (18)

Environmental Sustainability
Environmental SustainabilityEnvironmental Sustainability
Environmental Sustainability
 
Mining and sustainability: the impacts to people - Dr John Clarke, Interim CE...
Mining and sustainability: the impacts to people - Dr John Clarke, Interim CE...Mining and sustainability: the impacts to people - Dr John Clarke, Interim CE...
Mining and sustainability: the impacts to people - Dr John Clarke, Interim CE...
 
Meaning of liquidation
Meaning of liquidationMeaning of liquidation
Meaning of liquidation
 
Informal Sector
Informal SectorInformal Sector
Informal Sector
 
Sustanable mining
Sustanable miningSustanable mining
Sustanable mining
 
Insolvency, liquidity and winding up
Insolvency, liquidity and winding upInsolvency, liquidity and winding up
Insolvency, liquidity and winding up
 
An Introduction to Agglomeration
An Introduction to AgglomerationAn Introduction to Agglomeration
An Introduction to Agglomeration
 
CSR and CR 2016
CSR and CR 2016CSR and CR 2016
CSR and CR 2016
 
GRADE 10 THE INFORMAL SECTOR
GRADE 10 THE INFORMAL SECTORGRADE 10 THE INFORMAL SECTOR
GRADE 10 THE INFORMAL SECTOR
 
Aggregate Crushing Equipment
Aggregate Crushing EquipmentAggregate Crushing Equipment
Aggregate Crushing Equipment
 
Migration 8
Migration 8Migration 8
Migration 8
 
informal sector
 informal sector informal sector
informal sector
 
Liquidation
LiquidationLiquidation
Liquidation
 
Migration
MigrationMigration
Migration
 
Topic 5: Mining Methods-Part I-Surface mining
Topic 5: Mining Methods-Part I-Surface mining Topic 5: Mining Methods-Part I-Surface mining
Topic 5: Mining Methods-Part I-Surface mining
 
2016 ima europe award applications - category innovation
2016 ima europe award applications - category innovation2016 ima europe award applications - category innovation
2016 ima europe award applications - category innovation
 
2016 ima europe award applications - category biodiversity
2016 ima europe award applications - category biodiversity2016 ima europe award applications - category biodiversity
2016 ima europe award applications - category biodiversity
 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare ppt
 

Similaire à Trg product, mine closure, cepmlp

Longwall Improvement at Kestrel Mine
Longwall Improvement at Kestrel MineLongwall Improvement at Kestrel Mine
Longwall Improvement at Kestrel MineJohn Coughlan
 
Advanced Open Pit Planning And Design 2014 For NICICo FinalDraft
Advanced Open Pit Planning And Design 2014 For NICICo FinalDraftAdvanced Open Pit Planning And Design 2014 For NICICo FinalDraft
Advanced Open Pit Planning And Design 2014 For NICICo FinalDraftJustin Knight
 
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...Global CCS Institute
 
Designing management of change procedure to act as barriers to major offshore...
Designing management of change procedure to act as barriers to major offshore...Designing management of change procedure to act as barriers to major offshore...
Designing management of change procedure to act as barriers to major offshore...Jon Skogdalen
 
Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Paul Allen
 
Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Paul Allen
 
Safety for offshore structure
Safety for offshore structureSafety for offshore structure
Safety for offshore structureOFFSHORE VN
 
The role and importance of geotechnical engineering for a mining operation (1)
The role and importance of geotechnical engineering for a mining operation (1)The role and importance of geotechnical engineering for a mining operation (1)
The role and importance of geotechnical engineering for a mining operation (1)Dr. Alex Vyazmensky
 
1.-Landfill-basics.pdf
1.-Landfill-basics.pdf1.-Landfill-basics.pdf
1.-Landfill-basics.pdfMartinP31
 
Unit 4 Example Case Study
Unit 4 Example Case Study Unit 4 Example Case Study
Unit 4 Example Case Study mattbentley34
 

Similaire à Trg product, mine closure, cepmlp (13)

111
111111
111
 
Longwall Improvement at Kestrel Mine
Longwall Improvement at Kestrel MineLongwall Improvement at Kestrel Mine
Longwall Improvement at Kestrel Mine
 
Advanced Open Pit Planning And Design 2014 For NICICo FinalDraft
Advanced Open Pit Planning And Design 2014 For NICICo FinalDraftAdvanced Open Pit Planning And Design 2014 For NICICo FinalDraft
Advanced Open Pit Planning And Design 2014 For NICICo FinalDraft
 
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
 
NAVFAC Conference Briefing
NAVFAC Conference BriefingNAVFAC Conference Briefing
NAVFAC Conference Briefing
 
Designing management of change procedure to act as barriers to major offshore...
Designing management of change procedure to act as barriers to major offshore...Designing management of change procedure to act as barriers to major offshore...
Designing management of change procedure to act as barriers to major offshore...
 
Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011
 
Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011
 
Safety for offshore structure
Safety for offshore structureSafety for offshore structure
Safety for offshore structure
 
The role and importance of geotechnical engineering for a mining operation (1)
The role and importance of geotechnical engineering for a mining operation (1)The role and importance of geotechnical engineering for a mining operation (1)
The role and importance of geotechnical engineering for a mining operation (1)
 
1.-Landfill-basics.pdf
1.-Landfill-basics.pdf1.-Landfill-basics.pdf
1.-Landfill-basics.pdf
 
The risk management cycle
The risk management cycleThe risk management cycle
The risk management cycle
 
Unit 4 Example Case Study
Unit 4 Example Case Study Unit 4 Example Case Study
Unit 4 Example Case Study
 

Plus de daniel edwin

What lessons can be learned, onshore wind and fracking
What lessons can be learned, onshore wind and frackingWhat lessons can be learned, onshore wind and fracking
What lessons can be learned, onshore wind and frackingdaniel edwin
 
Artisanal mining and rural livelihoods in africa, change, challenges and poli...
Artisanal mining and rural livelihoods in africa, change, challenges and poli...Artisanal mining and rural livelihoods in africa, change, challenges and poli...
Artisanal mining and rural livelihoods in africa, change, challenges and poli...daniel edwin
 
Uganda upstream petroleum sector, implementation of the national oil & gas po...
Uganda upstream petroleum sector, implementation of the national oil & gas po...Uganda upstream petroleum sector, implementation of the national oil & gas po...
Uganda upstream petroleum sector, implementation of the national oil & gas po...daniel edwin
 
Brazilian pre salt unitization
Brazilian pre salt unitizationBrazilian pre salt unitization
Brazilian pre salt unitizationdaniel edwin
 
Brazil natural gas industry regulation, market & investment
Brazil natural gas industry regulation, market & investmentBrazil natural gas industry regulation, market & investment
Brazil natural gas industry regulation, market & investmentdaniel edwin
 
Russia projects-ihe-hse-presentation
Russia projects-ihe-hse-presentationRussia projects-ihe-hse-presentation
Russia projects-ihe-hse-presentationdaniel edwin
 
Guinea resource corridors snapshot
Guinea resource corridors snapshotGuinea resource corridors snapshot
Guinea resource corridors snapshotdaniel edwin
 
Can the oil and gas industry become a green economy leader
Can the oil and gas industry become a green economy leaderCan the oil and gas industry become a green economy leader
Can the oil and gas industry become a green economy leaderdaniel edwin
 
Natural resource taxation, challenges in africa
Natural resource taxation, challenges in africaNatural resource taxation, challenges in africa
Natural resource taxation, challenges in africadaniel edwin
 
Credimi @ EI Source Book
Credimi @ EI Source BookCredimi @ EI Source Book
Credimi @ EI Source Bookdaniel edwin
 
DfID, extractives and development, focus on africa
DfID, extractives and development, focus on africaDfID, extractives and development, focus on africa
DfID, extractives and development, focus on africadaniel edwin
 
Pwyp dundee university
Pwyp dundee universityPwyp dundee university
Pwyp dundee universitydaniel edwin
 
Scoping the capital budgeting implications of local content development legis...
Scoping the capital budgeting implications of local content development legis...Scoping the capital budgeting implications of local content development legis...
Scoping the capital budgeting implications of local content development legis...daniel edwin
 
Trg product, asm presentation, cepmlp
Trg product, asm presentation, cepmlpTrg product, asm presentation, cepmlp
Trg product, asm presentation, cepmlpdaniel edwin
 
No more enclaves, aynak in afghanistan
No more enclaves, aynak in afghanistanNo more enclaves, aynak in afghanistan
No more enclaves, aynak in afghanistandaniel edwin
 
The stakes for Africa in Mineral Resources Development
The stakes for Africa in Mineral Resources DevelopmentThe stakes for Africa in Mineral Resources Development
The stakes for Africa in Mineral Resources Developmentdaniel edwin
 

Plus de daniel edwin (20)

What lessons can be learned, onshore wind and fracking
What lessons can be learned, onshore wind and frackingWhat lessons can be learned, onshore wind and fracking
What lessons can be learned, onshore wind and fracking
 
Artisanal mining and rural livelihoods in africa, change, challenges and poli...
Artisanal mining and rural livelihoods in africa, change, challenges and poli...Artisanal mining and rural livelihoods in africa, change, challenges and poli...
Artisanal mining and rural livelihoods in africa, change, challenges and poli...
 
Uganda upstream petroleum sector, implementation of the national oil & gas po...
Uganda upstream petroleum sector, implementation of the national oil & gas po...Uganda upstream petroleum sector, implementation of the national oil & gas po...
Uganda upstream petroleum sector, implementation of the national oil & gas po...
 
Brazilian pre salt unitization
Brazilian pre salt unitizationBrazilian pre salt unitization
Brazilian pre salt unitization
 
MMDA presentation
MMDA presentationMMDA presentation
MMDA presentation
 
Igf presentation
Igf presentationIgf presentation
Igf presentation
 
Brazil natural gas industry regulation, market & investment
Brazil natural gas industry regulation, market & investmentBrazil natural gas industry regulation, market & investment
Brazil natural gas industry regulation, market & investment
 
Russia projects-ihe-hse-presentation
Russia projects-ihe-hse-presentationRussia projects-ihe-hse-presentation
Russia projects-ihe-hse-presentation
 
Guinea resource corridors snapshot
Guinea resource corridors snapshotGuinea resource corridors snapshot
Guinea resource corridors snapshot
 
Can the oil and gas industry become a green economy leader
Can the oil and gas industry become a green economy leaderCan the oil and gas industry become a green economy leader
Can the oil and gas industry become a green economy leader
 
Natural resource taxation, challenges in africa
Natural resource taxation, challenges in africaNatural resource taxation, challenges in africa
Natural resource taxation, challenges in africa
 
Credimi @ EI Source Book
Credimi @ EI Source BookCredimi @ EI Source Book
Credimi @ EI Source Book
 
Phil Newman
Phil NewmanPhil Newman
Phil Newman
 
DfID, extractives and development, focus on africa
DfID, extractives and development, focus on africaDfID, extractives and development, focus on africa
DfID, extractives and development, focus on africa
 
Pwyp dundee university
Pwyp dundee universityPwyp dundee university
Pwyp dundee university
 
Asi presentation
Asi presentationAsi presentation
Asi presentation
 
Scoping the capital budgeting implications of local content development legis...
Scoping the capital budgeting implications of local content development legis...Scoping the capital budgeting implications of local content development legis...
Scoping the capital budgeting implications of local content development legis...
 
Trg product, asm presentation, cepmlp
Trg product, asm presentation, cepmlpTrg product, asm presentation, cepmlp
Trg product, asm presentation, cepmlp
 
No more enclaves, aynak in afghanistan
No more enclaves, aynak in afghanistanNo more enclaves, aynak in afghanistan
No more enclaves, aynak in afghanistan
 
The stakes for Africa in Mineral Resources Development
The stakes for Africa in Mineral Resources DevelopmentThe stakes for Africa in Mineral Resources Development
The stakes for Africa in Mineral Resources Development
 

Dernier

unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxBkGupta21
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 

Dernier (20)

unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptx
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 

Trg product, mine closure, cepmlp

  • 1. Leon Gerber Rio Tinto Research Fellow CEPMLP, University of Dundee
  • 2. Outline 1. Overview 2. What is mine closure 3. Traditional mining approaches 4. Why we do it differently 5. How we do it 6. What makes for good practice 7. Recent example 8. Further reading 9. Questions
  • 3. 1. Overview • Mines only have a limited lifespan. • Upon end of life, operations must be consolidated and closed. • Includes all matters regarding structures, waste, residue deposits, water management, community relations etc. • The physical activities that are needed to close down a mine are relatively straightforward - Greater challenge today involves leaving a social and environmental legacy
  • 4. 2. What is mine closure? Two aspects: • Actions and measures “to leave a mine site in a condition which is safe and stable, limiting further environmental impact” after the end of the operations (whatever the causes of that end: natural depletion, sudden interruption due to economic reasons, etc.) • Land reclamation: to restore or rehabilitate the land “…affected by mining for further economic use…” (see Hoskin, 2005)
  • 5. 3. Traditional mining practice • Traditionally only two principal phases recognised in the typical mine project life cycle • exploration • construction & operation • Focus on the immediate requirements of the stage that was active at any particular time • Mining: precedence over other land uses • Abandoning the mine as soon as it ended its productive cycle • Closing remote mining towns together with the mines – ghost towns
  • 6. 4. Why we do it differently •Mining industry has embraced the concept of sustainable development •Growth of environmental awareness – peer review, NGO’s, society •Governments have also tended to impose stricter requirements on industry – not only environmental but also economic reasons (Equator Principles) •Spate of new mining developments in developing countries – learn from past mistakes •Closure ties in with CSR and community responsibility
  • 7. 4. Why we do it differently (2) Concept of ‘design-for-closure’ • Relatively recent development • In 1983, the proposed Cinola Gold Mine located on the Queen Charlotte Islands off the coast of northern British Columbia was one of the first mine projects to be conceived using a ‘design-for-closure’ concept http://www.carc.org/pdfs/NMPWorkingPaper1BowmanandBaker.pdf http://www.anthonyhodge.ca/publications/Post_Mining_Regeneration.pdf • Now, good practice requires that the planning time-horizon be extended to encompass “design-, build-, and operate- for- closure.” http://www.icmm.com/page/9566
  • 8. 5. How we do it Various concerns involved in the closure of mining, across the broad spectrum of sustainable development elements. • Visual and Aesthetics • Environmental • Financial • Social • Employment / labour Above concerns addressed in mine closure plans: • Conceptual closure plan: development of a target closure outcome and goals – ideally developed and used during exploration, pre-feasibility, feasibility/design and construction • Detailed closure plan: milestones, detailed methodologies of achieving these, monitoring and validation processes - used continuously during operations & incorporated into decision making process • Decommissioning and post closure plan: Effective transition to closure
  • 9. 5. How we do it (1) Key Principles of Mine Closure Design • Prevention • mine closure plans to be approved prior to operations • inspection and strict control of measures towards closure throughout all of operative cycle, • stringent system of enforcement and sanctions, • adequate terms of prescription, • periodic review of the plan, etc. • Mine closure costs internalisation • Cradle-to-grave approach • Environmental financial assurance measures (EFA) - sureties (fidelity bonds, surety bonds, performance bonds and letters of credit); cash deposits • Typically guarantees environmental performance after closure • Reclamation & Rehabilitation
  • 10. Exploration Conceptual closure planning Pre-feasibility Feasibility Construction Increasing Operations detail (Concurrent rehab) Detailed closure planning Mine life cycle Decommissioning Stakeholder input Reproduced from ICMM: Planning for Integrated Mine Closure Toolkit Transition to closure Closure Post-closure Relinquishment
  • 11. 5. How we do it (3) Preparation for practical closure Care & Reclamation / Closure / Post maintenance Decommissioning Rehabilitation Relinquishment Closure
  • 12. 5. How we do it (4) • Design-for-closure • At early stages of mine development – pre-feasibility, feasibility and during assessment process (EIA and SIA): • initial post-closure concepts should be developed and estimates of post- closure costs made • financial instruments must then be identified • In construction and operation: these framework closure plans should progressively be reviewed and refined to produce detailed practical documents • In operation: progressive closure is also implemented where feasible • Decommissioning and active rehabilitation: • Nature of the long-term legacy is finally established • Post-closure phase: long-term management and monitoring of the property (passive care) • Final disposal of the site or ‘walk-away scenario’ or • Passive care in perpetuity
  • 13. 6. What makes good practice Main elements of good practice in mine closure • Mine closure plan as a condition to start mining operations. Stress on pollution prevention • Inspection and control. Periodic review of the plan • Financial guarantees – or alternative mechanisms. Essential to achieve internalisation of closure costs • Sanction regime. Efficient enforcement and liability measures • Public participation at all stages of the development • Provisions on mine closure of small-scale mines • Provisions on abandoned mines. Distinction between mine closure and mine abandonment. Main policy to ensure mine closing (not abandoning) • Post-closure social and economic policies
  • 14. 7. Recent example(s) Scotsgold Resources, October 2011 • Mining production of commercial gold and silver due to start in 2013 • Loch Lomond National Park – major tourist attraction • Park authority’s board - opportunities for new jobs and economic growth outweigh concerns about the environment • Company should ensure long-term environmental impact will be minimised • Company intends restoration of landscape at end of 10-year licence • Company undertaken to provide a financial guarantee/restoration bond by means of Cash Collateral Account.
  • 15. Country study - South Africa • Constitutional supremacy. • Myriad of legislation and regulations affecting mine closure. • Constitution of South Africa • National Environmental Management Act coupled with sectoral legislation • NEM: Integrated Waste Management Act • NEM: Protected Areas Act • Mineral and Petroleum Resource Development Act • Mine Health and Safety Act • National Water Act • Minerals Act • Standards for mine closure derives mainly from environmental prescriptions. • Large number of South African mines have reached maturity and is looking towards closure.
  • 16. Constitution of the Republic of South Africa 1996 Section 24(a): “...everyone has the right to an environment that which is not harmful to his or her health and well-being”.
  • 17. National Environmental Management Act, 1998 • Section 2: “The costs of remedying pollution, environmental degradation and consequent adverse health effects and of preventing, controlling or minimising further pollution, environmental damage or adverse health effects must be paid for by those responsible for harming the environment”. • Section 28: Every person* who causes, has caused or may cause significant pollution or degradation of the environment must take reasonable measures to prevent such pollution or degradation from occurring, continuing or recurring, or, in so far as such harm to the environment is authorised by law or cannot reasonably be avoided or stopped, to minimise and rectify such pollution or degradation of the environment. * (includes an owner of land or premises, a person in control of land or premises or a person who has a right to use the land)
  • 18. National Environmental Management Act, 1998 • Sections 32: “...Any person or group of persons may seek appropriate relief in respect of any breach or threatened breach of any provision of this Act...”. • Section 33: Private prosecution in the public interest; or in the interest of the protection of the environment. Environmental Impact Assessment Regulations Listing Notice 1 of 2010 • Regulation 27(iv): “...activities, where the facility or the land on which it is located is contaminated...”.
  • 19. Mineral and Petroleum Development Act, 2002 • Provides a holistic cradle-to-grave approach to prospecting and mining. • Makes provision for economic, social and environmental costs to achieve sustainable development of SA mineral resources. • Section 38: Provides for the application of integrated environmental management and the responsibility to remedy. • Section 38(2): Makes provision to keep directors of companies or members of closed corporations liable for any damage, degradation or pollution caused by the company or closed corporation which they represent or represented. • Section 41: Makes financial provision for the remediation of environmental damage. • Section 42: Makes provision for the management of residue stockpiles and deposits. • Section 43: Provides for the issuing of a closure certificate. • Section 44: Provides for the retainment or removal of buildings and structures. • Sections 45: Provides for the Minister to take urgent remedial action pertaining to environmental degradation and pollution and to recover costs in this regard. • Section 46: Provides for the Minister to rehabilitate abandoned and ownerless mines/dumps and to register such sites in the title deeds of land and to transfer the liability for maintaining the rehabilitation work being undertaken to the responsible landowner.
  • 20. Mineral and Petroleum Development Act, 2002 The MPRDA, 2002 also provides for the implementation of a social and labour plan. The purpose and objectives of such plans are to: • Integrate and manage the social, economic and environmental impacts of mining within all the phases of a mine, until closure • Avoid job losses and mitigate social and economic impacts on individuals should a mine close prematurely or at the closure of mines • Avoid the establishment of settlements, which cannot be sustained after the closure of mines.
  • 21. When things go wrong.. Flooding in KOSH •Four separate mines in close proximity in Klerksdorp, Orkney, Stilfontein and Hartebeesfontein (KOSH area). •Dispute arose over responsibility for pumping of underground water after mine closure.
  • 22. Flooding in KOSH (continued) • Prior to closure, dewatering of mines conducted by each mining company at their own mine shafts. • Pumping is necessary to prevent the flow of underground water from mines at a higher location within the mining area to lower-lying mines. • On whose shoulders should the pumping responsibility lie when one mine closes down? • All mining companies and stakeholders agreed on the establishment of a water company. • Currently water continues to be pumped to the surface at the upper shaft, before being piped to the local water service provider – creating subsequent revenue stream.
  • 23. 8. Further Reading • International Council on Mining and Metals (ICMM) – Planning for integrated Mine Closure Toolkit http://www.icmm.com/page/9568/planning-for-integrated-mine-closure-toolkit • Financial Assurance for Mine Closure and Reclamation www.icmm.com/document/282 • International Institute for Environment and Development (IIED) – Sets out sustainability standards, as applicable to mine closure http://www.iied.org/ • International Accounting Standards Board (IASB) – Accounting and Disclosure Model for Extractive Activities http://www.ifrs.org/Current+Projects/IASB+Projects/Extractive+Activities/Summary.htm • Scottish gold mine receives approval http://www.ft.com/cms/s/0/7e722936-ff23-11e0-aa11-00144feabdc0.html#axzz1cLsU2lL5