Special thanks to all the S.I.T. members that attended our last meeting. If you missed the meeting, please feel free to view the concept and comment here.
2. Schedule
Design Submissions
• Concept Design
• Schematic Design
• Early Release Packages
• Design Development/GMP
• Construction Documents
October 16, 2013
December 20, 2013
December 20, 2013
March 3, 2014
June 2014
Construction Milestones
• Abatment
• Demolition
• Substantial Completion
• School starts
November 1, 2013 - December 31, 2013
January 1, 2014 - March 15, 2014
July 15, 2015
August 2015
Student Involvement
• Bi-weekly meetings
with design/build team
Starting in November 2013
SCHEDULE
Roosevelt High School Moderniza on
Concept Design
October 2013
6. Issues and Opportuni es
Arrival/Iden ty
• School
Students
Teachers
Parents
• STAY
Students
Teachers
• Community
Gym
Pool
Health Clinic
Auditorium
Access/Security
• School
Students
Teachers
Parents
• STAY
Students
Teachers
• Community
Gym
Pool
Health Clinic
Auditorium
ISSUES AND OPPORTUNITIES
Roosevelt High School Moderniza on
Concept Design
October 2013
7. Campus Plan
Allison Street NW
“The Terrace”
ve
aA
Iow
“The Waterworks”
13th Street NW
“The Gallery”
“The Heart”
“The Outdoor
Classroom”
“The Pavilion”
a Ave
Georgi
“The School
Garden”
Upshur Street
CAMPUS PLAN
Roosevelt High School Moderniza on
Concept Design
October 2013
8. “The Terrace”
• Visibility
• Iden ty
• Access
“THE TERRACE”
Roosevelt High School Moderniza on
Concept Design
October 2013
10. “The Pavilion”
• Community entrance
• STAY entrance
• Iden ty
“THE PAVILION”
Roosevelt High School Moderniza on
Concept Design
October 2013
11. “The Outdoor Classroom” and “The Pavilion”
“THE OUTDOOR CLASSROOM” AND “THE PAVILION”
Roosevelt High School Moderniza on
Concept Design
October 2013
13. STAY/COMMUNITY ENTRY
ACADEMICS
ADMIN
ATHLETICS/PHYSICAL EDUCATION
MEDIA CENTER
VISUAL & PERFORMING ARTS
AUDITORIUM & SUPPORT
HEALTH CLINIC
FAMILY SUPPORT
FOOD SERVICES
STAY
CTE
ARTS
RHS ENTRY
FIRST FLOOR
0’
AUDITORIUM
ACADEMICS
10’
20’
30’
50’
ATHLETICS
BUILDING ORGANIZATION
Roosevelt High School Moderniza on
Concept Design
October 2013
14. “The Heart”
ACADEMICS
ADMIN
ATHLETICS/PHYSICAL EDUCATION
MEDIA CENTER
VISUAL & PERFORMING ARTS
AUDITORIUM & SUPPORT
HEALTH CLINIC
FAMILY SUPPORT
FOOD SERVICES
STAY
CTE
MECHANICAL/SUPPORT
CIRCULATION
0’
10’
20’
30’
40’
OVERALL PLAN LOWER LEVEL
Roosevelt High School Moderniza on
Concept Design
October 2013
15. “The Heart”
“Outdoor
Classroom”
Media
Center C o s m e Cafeteria
tology
Culinary
Arts
“The
Heart”
Career
Center
“The
Steps”
“The
Terrace”
13th Street
“THE HEART”
Roosevelt High School Moderniza on
Concept Design
October 2013
19. Media Center
ACADEMICS
ADMIN
ATHLETICS/PHYSICAL EDUCATION
MEDIA CENTER
VISUAL & PERFORMING ARTS
AUDITORIUM & SUPPORT
HEALTH CLINIC
FAMILY SUPPORT
FOOD SERVICES
STAY
CTE
MECHANICAL/SUPPORT
CIRCULATION
0’
10’
20’
30’
40’
OVERALL PLAN LOWER LEVEL
Roosevelt High School Moderniza on
Concept Design
October 2013
23. “The Gallery”
ACADEMICS
ADMIN
ATHLETICS/PHYSICAL EDUCATION
MEDIA CENTER
VISUAL & PERFORMING ARTS
AUDITORIUM & SUPPORT
HEALTH CLINIC
FAMILY SUPPORT
FOOD SERVICES
STAY
CTE
MECHANICAL/SUPPORT
CIRCULATION
FIRST FLOOR
0’
10’
20’
30’
50’
OVERALL PLAN FIRST FLOOR
Roosevelt High School Moderniza on
Concept Design
October 2013
25. “The Pavilion”
ACADEMICS
ADMIN
ATHLETICS/PHYSICAL EDUCATION
MEDIA CENTER
VISUAL & PERFORMING ARTS
AUDITORIUM & SUPPORT
HEALTH CLINIC
FAMILY SUPPORT
FOOD SERVICES
STAY
CTE
MECHANICAL/SUPPORT
CIRCULATION
FIRST FLOOR
0’
10’
20’
30’
50’
OVERALL PLAN FIRST FLOOR
Roosevelt High School Moderniza on
Concept Design
October 2013
27. ACADEMICS
ADMIN
ATHLETICS/PHYSICAL EDUCATION
MEDIA CENTER
VISUAL & PERFORMING ARTS
AUDITORIUM & SUPPORT
HEALTH CLINIC
FAMILY SUPPORT
FOOD SERVICES
STAY
CTE
MECHANICAL/SUPPORT
CIRCULATION
“The School Garden”
FIRST FLOOR
0’
10’
20’
30’
50’
OVERALL PLAN FIRST FLOOR
Roosevelt High School Moderniza on
Concept Design
October 2013
28. “The School Garden”
“THE SCHOOL GARDEN”
Roosevelt High School Moderniza on
Concept Design
October 2013
29. ACADEMICS
ADMIN
ATHLETICS/PHYSICAL EDUCATION
MEDIA CENTER
VISUAL & PERFORMING ARTS
AUDITORIUM & SUPPORT
HEALTH CLINIC
FAMILY SUPPORT
FOOD SERVICES
STAY
CTE
MECHANICAL/SUPPORT
CIRCULATION
Gym
FIRST FLOOR
0’
10’
20’
30’
50’
OVERALL PLAN FIRST FLOOR
Roosevelt High School Moderniza on
Concept Design
October 2013
30. Gym Sec on
Proposed bleacher capacity: +/- 1,000
GYM SECTION
Roosevelt High School Moderniza on
Concept Design
October 2013
31. GROUND FLOOR
•
•
•
Cafeteria
Culinary Arts
Media Center
•
•
Career Center
STAY Classrooms
FIRST FLOOR
•
•
•
RHS Administration
STAY Administration
Family Support Center
SHARED SPACES
Roosevelt High School Moderniza on
Concept Design
October 2013
32. FIRST FLOOR
•
•
•
10th Grade Academy
RISE Academy
Autism Academy
SECOND FLOOR
•
•
9th Grade Academy
ESL Academy (9th +10th)
THIRD FLOOR
•
•
•
11th Grade Academy
12th Grade Academy
Elite Academy
ACADEMY ORGANIZATION
Roosevelt High School Moderniza on
Concept Design
October 2013
34. ACADEMY ADMINISTRATION
•
•
Staff Office or Workroom
Stairs and Restroom
ACADEMY ADMINISTRATION
Roosevelt High School Moderniza on
Concept Design
October 2013
35. Landscape
Front Entrance Preliminary Landscape Planting Concept:
Preliminary Plant Palette:
Trees / Shrubs
Stabilize embankment /
Provide emphasis to front entrance
Foundation Planting Example
LANDSCAPE
Roosevelt High School Moderniza on
Concept Design
October 2013
36. Proposed Drop-off Along 13th Street
Arts Wing
Auditorium
Visitor parking
(22 spaces)
Bus Loop
Path
ble
essi
Acc
DROP OFF
Roosevelt High School Moderniza on
Concept Design
October 2013
37. LEED for Schools 2009
80 13 6 11 Total Proposed Project Score
Certified 40 to 49 points
19 2 3
Y M+ MY
Y
1
4
1
4
1
2
2
1
1
1
1
1
1
1
Silver 50 to 59 points
LEED Scorecard
Pts.
110
Gold 60 to 79 points
0 Sustainable Sites
N
SSp1
Construction Activity Pollution Prevention
SSp2
Environmental Site Assessment
SS1
Site Selection
SS2
Dev. Density & Community Connectivity
SS3
Brownfield Redevelopment
SS4.1
Alt. Transportation - Public Transport
SS4.2
Alt. Transportation - Bicycle Storage
SS4.3
Alt. Transportation - LEV Vehicles
Pla
24
0
0
1
4
1
4
1
2
SS4.4
SS5.1
SS5 1
SS5.2
SS6.1
SS6.2
SS7.1
Alt. Transportation - Parking Capacity
Site Development - Protect or Restore Habitat
Site Development - Maximize Open Space
Stormwater Design - Quantity Control
Stormwater Design - Quality Control
Heat Island Effect - Non-Roof
2
1
1
1
1
1
SS7.2
SS8
Heat Island Effect - Roof
Light Pollution Reduction
1
1
8 1 0
Y M+ MY
1 1
2
2
2
1
14 1 2
Y M+ MY
Y
Y
1
1
1
1
1
1
1
10 0 0
Y M+ MY
4
2
4
20 8 1
Y M+ MY
Y
Y
10 5 1
5
2
Site Master Plan
Joint Use of Facilities
1
1
1 Water Efficiency
N
WEp1
Water Use Reduction
WE1
Water Efficient Landscaping
11
WE2
Innovative Wastewater Technologies
WE3
Water Use Reduction, 30%, 35%, 40%
1 WE4
Process Water Use Reduction, 20%
4 Energy & Atmosphere
N
EAp1
Fundamental Commissioning
EAp2
Min. Energy Performance (ASHRAE 90.1 - 2007)
EAp3
Fundamental Refrigerant Management
3 EA1
Optimize Energy Performance
2
4
1
2
EA2
1
EA3
1 EA4
EA5
2
1
SS9
SS10
EA6
0
4
33
0
0
0
19
On-Site Renewable Energy
7
Enhanced Commissioning
Enhanced Refrigerant Management
Measurement & Verification
2
1
1
1
6 0 0
Y M+ M1
1
1
1
2
1
2
Green Power, 35% for 2 years
1
1
Y
1
Y
1
1
1
1
1
1
1
1
,
y
4 Materials & Resources
N
MRp1
Storage & Collection of Recyclables
MR1.1
Bldg. Reuse - Exist. Walls/ Floors/ Roof 75/95%
1 MR1.2
Bldg. Reuse - Interior Non-Struc. Elements,50%
MR2
Construction Waste Management, 50/ 75%
2 MR3
Materials Reuse 5%
MR4
Recycled Content 10%, 20%
MR5
Regional Materials 10%, 20%
1 MR6
Rapidly Renewable Materials 2.5%
MR7
Certified Wood
2 Indoor Environmental Quality
N
IEQp1
Minimum IAQ Performance
IEQp2
Environmental Tobacco Smoke (ETS) Control
IEQp3
Minimum Acoustical Performance
IEQ1
Outdoor Air Delivery Monitoring
IEQ2
Increased Ventilation
IEQ3.1
Const. IAQ Management Plan - During Const.
IEQ3.2
Const. IAQ Management Plan - Pre Occupancy
IEQ4
Low-Emitting Materials (Choose for upto 4 points)
IEQ4.1
Adhesives and Sealants
IEQ4.2
Paints & Coatings
IEQ4.3
Flooring Systems
IEQ4.4
Composite Wood & Agrifiber
IEQ4.5
Furniture & Furnishings
IEQ4.6
Ceiling and Wall Systems
IEQ5
Indoor Chemical & Pollutant Source Control
IEQ6.1
Controllability of Systems - Lighting
IEQ6.2
Controllability of Systems - Thermal Comfort
IEQ7.1
Thermal Comfort - Design
IEQ7.2
Thermal Comfort - Verification
IEQ8.1
Daylight 75/90% classrm/ 75% reg. occupied
1 IEQ8.2
Views 90%
IEQ9
Enhanced Acoustical Performance
1 IEQ10
Mold Prevention
0 Innovation in Design
N
ID1.1
Innovation in Design: Education/ Outreach
ID1.2
Innovation in Design: Green Cleaning
ID1.3
Pilot Credit SSpc82: Local Food Production
ID1.4
Exemplary Performance: Green Power - 70%
Backup Innovation in Design: SSc4.1
Backup Innovation in Design: Low Mercury Lighting
Backup Exemplary Performance: MRc2 95%
ID2
LEED™ Accredited Professional
ID3
The School as a Teaching Tool
13
0
2
1
2
2
2
2
1
1
3 1 0
Y M+ MM1
1
M+
1
1
g
0 Regional Priority
N
Up to 4 points awarded in this category
RP1.1
Regional Priority: SSc5.1
RP1.2
Regional Priority: SSc6.1
RP1.3
Regional Priority: WEc2
RP1.4
Regional Priority: EAc1 (40%/36%)
RP1.5
Regional Priority: EAc2 (1%)
RP1.6
Regional Priority: MRc1.1 (75%)
4
1
1
1
1
1
1
19
0
0
0
1
1
1
1
4
1
1
1
1
1
1
1
1
1
1
1
3
1
1
1
6
1
1
1
1
0
0
1
1
LEED SCORECARD
Roosevelt High School Moderniza on
Concept Design
October 2013
38. Windows
•
•
•
•
Restora on
+
Maintain profiles
Rou ne maintenance
$$$$
Poor thermal performance
without added storm
New Wood Windows
+
Match profiles
Rou ne maintenance
$$$
Moderate thermal performance
Metal Clad Wood Windows
+/- Tradi onal appearance
+
Be er thermal performance
+
Less maintenance
+
$$
Metal Windows
+/- Tradi onal appearance
+
Be er thermal performance
+
Least maintenance
+
$$
WINDOWS
Roosevelt High School Moderniza on
Concept Design
October 2013