SlideShare a Scribd company logo
1 of 12
Download to read offline
DIPECHO Newsletter
NEPAL                                                                         Issue 9, July 2010


Promoting Early Warning: Reducing Risk

   IN THIS ISSUE

 Page 2 Community based
 flood early warning sys-
                                  e      ditorial
                                  Keeping in line with the international framework for disaster risk
                                  reduction, Hyogo Framework for Action (HFA) 2005-2015,
 tem in Nepal by Dr. Dilip        DIPECHO partners in Nepal are formulating ideas and resources
 K. Gautam                        to contribute towards the second priority action of HFA - Risk
                                  identification, assessment, monitoring and enhancing early warn-
 Page 3 - Action aid -            ing. DIPECHO partners have incorporated several early warning
 Early warning: saving            components and activities in their project components to help
 lives                            communities at risk to be well prepared and act on time to prevent
                                  the loss of life and property.
 Page 4 - CARE -
 Integrating early warning        DIPECHO partners have emphasised all four elements of EWS -
 communication in flood           risk knowledge, monitoring and warning services, dissemination
 risk reduction                   and communication, and response capabilities. EWS is considered
                                  a crucial mechanism to raise awareness on flood risk among the
 Page 5 - Danish Red              vulnerable communities. EWS warns the people prior to flood
 Cross -                          and is a reliable mechanism to increase the response capacity of the
 Efficient information            communities.
 dissemination for
                                  This edition illustrates few initiatives and actions undertaken by
 better readiness                 DIPECHO partners under DIPECHO V with special focus on
 Page 5 - Mission East -          Promoting Early Warning: Reducing Risk.
 Early Warning
 Page 7 - Handicap                To build the capacity of
 International -                  Department of Hydrology
                                  and Meteorology staff, two of      Early Warning System Users
 For an early warning                                                workshop will be held from
 system that does not             its senior technical members
                                  were sent to PAGASA,               6th - 8th August in Nepalgunj
 discriminate                                                        where different stakeholders
                                  Philippines for training on
 Page 8 - Mercy Corps -           Flood Early Warning by             from community level to
 Increasing knowledge and         Practical Action and Mercy         district and national level will
 warning measures                 Corps.                             be participating.
 Page 9 - Oxfam -
 Linking Community to                                                Training manual on Commu-
 Community                        Practical Action and Mercy         nity Based Early Warning
                                  Corps together in collabora-       System is being prepared
 Page 11 - Practical Action                                          jointly by Practical Action and
                                  tion with Department of
 - Preparedness with                                                 Mercy Corps. The training
                                  Hydrology and Meteorology
 early warning system in                                             manual will be available to the
                                  and Ministry of Home Affairs
 place...                                                            DRR practitioners and actors
                                  are currently drafting National
                                  Strategy for Early warning of      by September 2010.
                                  Natural Disasters in Nepal.

 DIPECHO Newsletter Issue 9, July 2010                                                                 1
Community based flood early
warning system in Nepal

Dr. Dilip K. Gautam
Chief, Flood Forecasting Section,
Department of Hydrology and Meteorology, Nepal


The Community Based Flood Early Warning                 stations at
System (CBFEWS) is a “people centered” flood            Bhairahawa,
warning system that empowers individuals and            Bagasoti,
communities threatened by flood hazards to act          Kusum and
on time to reduce the possibility of personal           Nepalgunj.
injury, loss of life, damage to property, and loss of   These stations are equipped with VHF wireless
livelihood.                                             set and PSTN/mobile phone for data transmis-
                                                        sion. The forecasting stations at Kusum and
Several factors must be considered before estab-        Devghat collaborate with the local communities,
lishing a CBFEWS, such as hydrologic character-         media and district disaster relief committee to
istics of the area, frequency of flooding,              share flood level data and information of those
community’s interest and awareness, flood loss          stations.
potential, warning time versus benefits and cost
of EWS system and community’s capacity to               The Flood Forecasting Project of DHM located at
respond. Once the Local Government Unit (LGU)           Babarmahal, Kathmandu is the central point to
and the community establish CBFEWS, technical           collect, analyse and disseminate flood related
issues have to be settled such as the desired           data and information. The water level and
accuracy, warning lead time, cost of operations         rainfall data from stations with telemetry are
and sustainability and reliability of the system.       obtained in real time through web based data
                                                        server www.hydrology.gov.np.
In Nepal, the Department of Hydrology and
Meteorology (DHM) is maintaining a network of           CBFEWS in West Rapti and Narayani River is
17 hydrological stations and 28 meteorological          successful in developing linkages of upstream
stations for the purpose of flood forecasting and       flood forecasting station with downstream
warning. Real time telemetry system has been            communities. The efficient information dissemi-
installed in 3 hydrological and 10 rainfall stations    nation channel has increased the response time
in the Narayani basin. Such type of telemetry           by several hours and increased the potential of
system utilises CDMA modem for data transmis-           EWS to reduce the impacts of flood.
sion over the internet. The system will be ex-
panded in West Rapti, Babai, Bagmati and                DHM collaborated with Practical Action and
Karnali basins in the coming years.                     ActionAid to establish CBFEWS in Koshi and
                                                        Sunsari River. As CBFEWS will be expanded to
With the objective of establishing CBFEWS in            other rivers in the coming years, the
Banke, Bardiya, Nawalparasi, Chitwan and                sustainability aspect must be considered by
Kailali Districts, DHM has signed a memoran-            everyone involved. To sustain and grow the
dum of understanding (MOU) with Practical               number of CBFEWS in other flood prone areas,
Action and Mercy Corps. Within the framework            community organisations must approach local
of this MOU, DHM is providing water level and           and central government agencies to allocate fund.
rainfall data which is being used for CBFEWS in
these districts.

The flood monitoring devices and instruments
used in DHM stations include water level and
rainfall monitoring devices. Narayani basin has 3          PROMOTING EARLY WARNING:
hydrological stations and 10 rainfall stations with
telemetry. There are two hydrological sites on             REDUCING RISK
West Rapti Basin under Flood Forecasting Project
of DHM, one at Bagasoti and the other at Kusum.
West Rapti Basin has 4 rainfall monitoring


DIPECHO Newsletter Issue 9, July 2010
 DIPECHO Newsletter Issue 9, July 2010                                                                    22
Early warning: saving lives

ActionAid Nepal has been promoting to set up            mikes. The knowledge of local people in estab-
community based early warning system                    lishing EWS is explored through interaction and
(CBEWS) for flood in its project areas-Sunsari          visit, and duly incorporated while establishing
and Banke districts. CBEWS is "people-centered"         new gauges and other systems. Hence, the
system that empowers individuals and communi- information channel between upstream and the
ties threatened by flood to act in sufficient time      community is established.
and in an appropriate manner so as to reduce the
possibility of personal injury, loss of life, damage    CBEWS provides the disaster management
to property, environment and loss of livelihood.        committee, task forces, volunteers and other
The initiatives are carried out in close collabora-     community people with advance information on
tion with the community,                                                             the flood risks that
District Development          "Because of our community based EWS, we are can be readily
Committee, District                                                                  translated to disas-
Administration Office,
                              safer from the flood. We came to know the              ter prevention,
Police and Department         flood information six hours before from Kusum preparedness and
of Hydrology & Metrol-        hence we had enough time to evacuate to safe           response actions.
ogy. Practical Action is      shelter. EWS will certainly reduce the possibil-       CBEWS also helps
the technical partner of      ity of loss of lives and properties." - Mr. Kamata reduce economic
ActionAid Nepal in            Prasad Morya, Coordinator, Early warning task losses by allowing
establishing EWS.                                                                    people to better
                              force, Gangapur 4/5 Banke during Contingency protect their assets
Under the project, early      Planning Meet in July 7, 2010.                         and livelihood.
warning task force is
formed in all the project areas constituting five       The project integrated EWS in local level contin-
people. There are 19 such task forces. Meetings         gency plan which strengthened the capacity of
are organised with the community people at              the communities. The EWS integration will
district level to establish and institutionalise        greatly mitigate the flood impact of these com-
CBEWS. EWS task forces are trained in CBEWS,            munities. The partnership between the local
and are familiarised with the process of gauge          disaster management committee and the local
reading and information flow at the upstream            government will certainly help to institutionalise
level. The community people are also equipped           the process.
with early warning apparatus like siren and hand

                                                            Upstream visit during CBEWS Training, Banke




DIPECHO Newsletter Issue 9, July 2010
 DIPECHO Newsletter Issue 9, July 2010                                                                    33
Integrating early warning
communication in flood
risk reduction

Kailali District stands 19th in the risk of flood,     to minimise the risk of flood. Red Cross subdivi-
48th in landslide, 24th in fire and 1st in epidemics   sions Lalbhoji is responsible disseminating flood
amongst other districts in Nepal. Thus, in terms       information to the villagers to abide the devastat-
of disaster vulnerability it is considered ex-         ing consequences. Telephone number of various
tremely vulnerable. Kailali has 42 VDCs and 2          actors on early information flow and flood
municipalities among them Lalbhoji VDC is              measurement station was pasted in public places
considered exceptionally vulnerable to flooding.       for easy access by all the community members.
Lalbhoji is bordered by Mohana River to the            The community people have now started to
South and Kandra River to the North and is also        communicate river level readings obtained from
the confluence point of these two rivers.              the gauge reader to the downstream community
                                                       members via telephone.
Considering the flood vulnerability,
SAMADHAN programme was launched in 6                   Recently recorded rainfall reading of 19 and 20
communities of Lalbhoji VDC. Early warning             July were communicated to the villagers via
task forces with 4 - 5 members were formed in          telephone and verbally ensuring prior prepared-
each community. The EWS task forces attended           ness in the community. As mentored during the
three days capacity building training on early         training the EWS task force in the community
warning and visited the flood measurement              had circulated the information to the community
station. The objective of the training was to          members through hand mike. The first level
enhance early warning communication contact            warning was to alert the villagers of the incoming
points and channels for the floods in the area.        flood. Second level warning was for the people to
Task forces were oriented and trained on efficient     act on the first warning and to collect important
information dissemination to the community             document and dry foods. Third level warning
people about the increasing water level. A center      was to get people to safe places in the higher
point was selected to collate information on           grounds with their family members, livestock
increasing flood level in the river. Various stake-    and important belongings. This kind of warning
holders, VDC members and community members             provided the people of Labhoji VDC with mini-
were familiarised with the rain fall measuring         mum 3 – 4 hours of preparedness time saving
gauge and other EWS equipments such as hand            lives and property. Thus, the proper functioning
siren and mike.                                        of EWS task force and timely circulation of flood
                                                       information has resulted in zero human casual-
On the initiation of Red Cross subdivision, a          ties and minimal property loss this year in
VDC level collaborative meeting was conducted          Labhoji VDC.




Efficient information
dissemination for
better readiness

Accurate and timely information saves lives and        "SAFE – Safer Communities through Multi-
community based early warning is an essential          Hazard Risk Reduction" project is implemented
element of disaster risk reduction initiative;         by Nepal Red Cross Society with support from
experienced and accepted worldwide. It helps to        Danish Red Cross and is funded by the European
mitigate loss of life and property and to reduce       Commission through its Humanitarian Aid
the severe impact of hazards. Strengthening early      Department. Communities working with SAFE
warning systems (EWS) ensures the efforts made         project are vulnerable to multiple hazards such as
towards making communities resilient and the           landslide, flash flood and fire due to the geo-
action plans and existing policies are sustainable.    climatic condition and other factors caused by


DIPECHO Newsletter Issue 9, July 2010
 DIPECHO Newsletter Issue 9, July 2010                                                                   44
nature or human error. Experience accentuates
that, after continuous heavy rainfall the sky
might be clear but is followed by other hazards,
such as flash floods and debris flow. Further,
areas recently destroyed by wildfires are particu-
larly susceptible to flash floods during rain-
storms. Communities living without EWS must at
least have an effective information dissemination
mechanism so that relevant messages can be
disseminated on time. People can be alerted by
passing information/warning on the probability
of hazards based on the trigger indicators. In
landslide prone areas the communities take
precautionary measures seeing the triggering
factors of landslides such as;

   Soil moving away from foundations

   Leaning telephone poles, trees, retaining
   walls or fences

   Offset fence lines or retaining walls

   New cracks or unusual bulge in the ground or
   street pavement

   Sticking doors and windows, and visible open
   spaces indicating jambs and frames out of         Map showing hazard prone locations in Bigutar
   plumb                                             community, Okhaldhunga district.

   Tilting or cracking of concrete floors and
   foundations                                       when they receive warning messages. People
                                                     need to be aware of the risk factors and adopt
Hoarding boards are placed in strategic locations    mechanisms to reduce the impact of hazards
in every community showing hazard risks areas,       because early warning alone cannot save lives.
location of vulnerable households and available      They have realized that effective early warning
resources to tap on the onset of disaster. Commu-    systems are the most obvious way to get this
nities are comparatively better aware of the         information to populations at risk. The key to
hazard risks and the action they need to take        their safety is putting people, not just technology,
                                                     at the centre of their warning systems!


                                                                       Community leaders meeting at the
                                                                       Disaster Preparedness unit office in
                                                                       Taluwa community in Okhaldhunga
                                                                       after receiving information on the
                                                                       triggering indicators for possible
                                                                       landslides.




DIPECHO Newsletter Issue 9, July 2010                                                                    5
DIPECHO Newsletter Issue 9, July 2010                                                                    5
Early Warning

Early warning in mountainous
areas must be addressed
differently as the types of
hazards and its threats are
different. For example address-
ing EWS in case of GLOF is
very different compared to
landslide. In case of GLOF, the
scale of destruction is large.
For many years lots of institu-
tions, NGO and government
bodies and in some case,
Monitoring Station and Early
Warning System were set up to
address specific GLOF threat.
Such system requires heavy
investments and single VDC or                                          Risk of destructive landslide in Humla
even a District cannot allocate
required resources.                                     can help measure a landslide risk: slope, vegeta-
                                                        tion and quantity/intensity of rainfall. Devising a
In Humla, where Mission East has started a              simple toolkit for communities to understand the
CBDRM project under DIPECHO funding, GLOF               causes of landslide, measure the risk as per the
is not an issue but landslide is, and it has a major    given indicators (see below box) and to be alert if
impact on the livelihood. But landslides can occur      the risk becomes high. All these indicators could
basically everywhere in mountainous environ-            be an affordable solution which may save house-
ment, and even if some technical solutions exist        holds, human lives and livestock.
for monitoring landslide, it is not realistic to
equip every single hazardous slope with it.
                                                         Main triggers of rainfall induced landslides
                                                         (source ICIMOD)
Moreover, the few EWS that exists for landslide,
such as a cable tight rope between a stable point
                                                         There is a direct correlation between the
and the potentially unstable slope that would
                                                         amount of rainfall and the incidence of
break if land start to move and trigger an alert, is
                                                         landslides:
only recommended for large scale landslide risk.
                                                            Cumulative rainfall between 50-100 mm
In Humla, a landslide will affect mostly the rare
                                                            in one day and daily rainfall exceeding 50
agricultural terraces that provide food to its
                                                            mm can cause small scale and shallow
population, few houses that could be on the way,
                                                            debris landslides - LOW RISK
some livestock and connection path between
                                                            Cumulative two day rainfall of about 150
communities. The cost of a monitoring system is
                                                            mm, and daily rainfall of about 100 mm
not affordable owing the little savings it will
                                                            has a tendency to increase the number of
generate, even if the impact for the affected
                                                            landslides - MEDIUM RISK
population can be huge in terms of crops and
                                                            Cumulative two day rainfall exceeding
livestock loss.
                                                            250 mm, or an average intensity of more
                                                            than 8 mm per hour in one day, rapidly
In such context where communities bear little
                                                            increases the number of large landslides -
resources and where minor but numerous
                                                            HIGH RISK
landslides occur, EWS may not be a viable
solution for remote and isolated locations. Then
                                                         The type of slope and the slope angle have a
what can we do?
                                                         great influence on landslides. Landslides
                                                         rarely occur on slopes less than 25°. The large
Mission East DIPECHO team is currently looking
                                                         majority of landslides occur on slopes with
at turning some basic landslide monitoring
                                                         angles ranging from 30° to 50°. Presence or
principles by training land owner and villagers to
                                                         absence of dense vegetation also determines
assess the level of risk. Basically only 3 indicators


DIPECHO Newsletter Issue 9, July 2010
 DIPECHO Newsletter Issue 9, July 2010                                                                     66
the likelihood of landslide.
For an early warning system
that does not discriminate
                                                        will not be heard by somebody who has a total
Under this DIPECHO V Action Plan, Handicap              hearing impairment or who lives in the periphery
International has profited from all opportunities       (as most of Dalit groups do). The meaning of the
brought by Practical Action and Mercy Corps to          noise of a siren may not be understood as a
learn, reflect and bring inputs on Early Warning:       warning by people with intellectual impairment,
during the preparatory work and field testing of        hearing impairment, young children or isolated
the Training Manual, the presentation and               elderly people who have not been involved in
commenting stages of the draft National EWS             awareness sessions.
Strategy and trainings at community level.
                                                        Two simple ways to enable a people-centered
As per mandate and the focus of its DIPECHO V           EWS are: First, participation and involvement of
project, HI inputs for inclusive EWS have been          all segments of the population, including persons
given to EWS designers and implementers to              with disabilities and other vulnerable or disad-
reach all the people at risk. The Hyogo Frame-          vantaged groups (such as women, elderly people,
work for Action invites us to design people             Dalit groups, etc.), from the stage of the design to
centered early warning systems, including all the       implementation. They are capable of advising
members of the community, especially those who          DRR actors as to how they can and should be
are most vulnerable and most at risk of not             reached.
acknowledging the warning. The risk occurs
when only a single means of warning is used and         Secondly, community-based communication
when people do not participate in DRR activities        networks can bring solutions to the challenge of
and trainings because of gender, age, social            reaching ALL. For example, the design of a
considerations, or physical, intellectual or senso-     “notification tree” for individual notification,
rial impairment.                                        based on the community map.
                                                        It is not more difficult to design and implement
A siren that is in place in the centre of the village   an inclusive EWS, but it is more efficient and
                                                        more lives are saved.


                                                          School level awareness programme on inclusiveness




DIPECHO Newsletter Issue 9, July 2010
 DIPECHO Newsletter Issue 9, July 2010                                                                     77
Increasing knowledge and
warning measures

Mercy Corps in collaboration with Nepal Red
Cross Society are implementing the second
Kailali Disaster Risk Reduction Initiatives as part
of DIPECHO Fifth Action Plan. One of the main
components of this project is expansion and
institutionalisation of community based and
district EWS introduced as part of the previous
DIPECHO supported projects.

Kailali District is characterised by many short
rivers originating from the Siwalik Range (please
refer to Map). During monsoon the area experi-
ences heavy localised rain storms. The principal
threat in this area is from flash floods, which
follow intense or prolonged rainfall. These events
are by definition very fast developing, with no
more than 12 hours and sometimes as little as 1.5
hours between the occurrence of precipitation
and the flood. It was therefore decided with
Department of Hydrology and Metrology to pilot
a low tech flash flood forecasting model suitable
for short river systems in Kailali District and for                Map of the River Systems in Kailali district
replication elsewhere. The model uses historical
knowledge to define a set of warning levels
                                                        upstream which indicate a coming flood event
                                                        downstream. The overall idea is to add warning
       Wooden pole used for identification of warning   time for the communities living along the rivers.

                                                        CBEWS is now introduced in 16 communities
                                                        along the Mohana River and its tributaries and is
                                                        replicated in a number of neighboring communi-
                                                        ties. Using a community to community approach,
                                                        early warning committees established under the
                                                        previous project have supported establishment of
                                                        CBEWS in project communities. Upstream
                                                        observers trained with project support take
                                                        readings of water level and rainfall at gauge sites
                                                        along the rivers and relay them to downstream
                                                        communities through agreed communication
                                                        channels. Early warning is build into community
                                                        contingency plans and early warning committees
                                                        in each community are responsible for the day to
                                                        day management of the systems including
                                                        organisation of simulation and equipment such
                                                        as hand operated sirens and megaphones.

                                                        Early warning is of high priority for district and
                                                        VDC stakeholders in Kailali. The Early Warning
                                                        Management Committee has therefore developed
                                                        overall EWS guidelines for Kailali. The guidelines
                                                        include day to day management, financial
                                                        management, emergency telephone numbers,


DIPECHO Newsletter Issue 9, July 2010
 DIPECHO Newsletter Issue 9, July 2010                                                                       88
roles and responsibilities of
various stakeholders and
sustainability. A decision to
pool funds for the EWS proves
the commitment of the DDC
and 32 flood prone VDCs in the
district.

Mercy Corps further seeks to
put EWS high on the national
and district agenda through
various initiatives in collabora-
tion with Practical Action and
DHM.




      EWS Committee testing siren




                                                       Linking Community
                                                                to Community

                                                       When a community knows ahead of time that a
                                                       disaster is about to strike, it will respond more
                                                       effectively and will save lives and livelihoods.
                                                       Under its Risk Reducing programme funded by
                                                       DIPECHO, Oxfam GB and its local partners
                                                       (Center for Disaster Management in
                                                       Nawalparasi, Bagmati Sewa Samaj Nepal in
                                                       Sarlahi and Koshi Victim Society in Saptari) have
                                                       established 12 CBEWs in 28 vulnerable communi-
                                                       ties of 3 tarai districts in Nepal. These 12 EWS
                                                       link communities living on the banks of the
                                                       Jarahi and Lakhandehi rivers.

                                                       The upstream communities observe the water
                                                       level in the rivers using flood markers to deter-
                                                       mine the level of risk. The risk is ranked into 3
                                                       categories: high, medium and low. These catego-
                                                       ries are initially determined through discussions
                                                       between the communities during exchange visits
                                                       and is based on past flood experiences. During
 Early Warning Task Force sounding siren during the    the dry season, the water level is below the low
mock drill in Rampur, Maleniya VDC, Saptari District


DIPECHO Newsletter Issue 9, July 2010
 DIPECHO Newsletter Issue 9, July 2010                                                                 99
With the Establishment of this EWS, we are better
prepared and our losses will be minimised"- Rajendra   Flood marker placed at Rampura VDC,
Mishra, Chairperson of DMC, Khadauna VDC,                               Nawalparasi district
Nawalparasi District



risk level and every subsequent increase is
communicated by phone to the downstream
communities. This information is disseminated
within the communities by Early Warning Task
force communities equipped with sirens, mega-
phones and loudspeakers. A system of colour
coded flags is used to notify the hearing im-
paired.

Oxfam GB and its local partners facilitated
community discussions to establish the EWS. As
a component of the Community Response Plans
the EWS are designed and monitored by the
DMC of the downstream communities. Prior to
the monsoon season, these plans, including the
EWS were tested and practiced through mock
drills in all 12 communities. The performance of
the EWS will be evaluated after the monsoon
season to increase its effectiveness.




DIPECHO Newsletter Issue 9, July 2010
 DIPECHO Newsletter Issue 9, July 2010                                                   10
                                                                                          10
Preparedness with
early warning system in
place...

With the aspiration of doing something for the
community Fulbasiya Tharu, 38 yrs old women
of Padnaha VDC-ward no. 8- Barbatta is being
occupied in social work by getting involved as a
women volunteer. She is also a member of “Babai
Pragatisheel Prokop Byawasthapan Sameete”, a
disaster management committee.

Barbatta community is situated near Babai River.
Hence, the danger of flood every monsoon is a
looming fear in this community.

“In 1995, heavy rain poured for two days con-
tinuously. Around 3 am my house was flooded.
That night, my husband Taratal had been out for
work and could not return because of heavy
rainfall. My children were small so I was baffled.
I had to save my children, store food and other
assets and ultimately save myself. Since I could
not save food we had a big problem. Although I
saved my children during flood I was not sure if I
could save them after the flood for long time”
recalls Fulbasiya with tears.

When asked what she knew about preparedness
                                                                                     Fulbasiya with siren
for flood she said, “Deep down I always thought
that we should have been prepared but the
prediction we made by observing the river and
clouds often went in despair and we always
suffered. She further adds, “When I heard about      “We will have at least 5 - 6 hours for preparation.
SEWIN project which came with the aim of             Everyone will have ample time to collect food,
raising awareness on preparedness through flood      important documents and help each other to get
early warning system, I felt like this program was   to the shelter. We have contributed our time and
meant for our community. I felt like I should be a   labor for construction of shelter, machan, cul-
part of it to help the entire community be pre-      verts, and toilets,” explains Fulbasiya.
pared so that they will not have to lose their
loved ones and their belongings.”                    Like Fulbasiya there are other women volunteers
                                                     who visit people in their houses and explain to
Fulbasiya is responsible for ringing the hand        them the benefits of EWS and the danger associ-
siren to warn the community after receiving          ated with flood. These volunteers also inform
information on the water level from the up-          community people on EWS activities that raise
stream. She has participated in several trainings    awareness on floods through street drama, song
and has also visited Chepang the upstream flood      competition, trainings and rallies.
monitoring station to see the devices that mea-
sure the water level. She has access to telephone    “I am very happy to be a part of this programme.
numbers of the gauge reader, local police station    Even though this program ends the knowledge
and other stakeholders whom she can call if she      that we have will always remain with us. Know-
feels that there is a danger of flooding. When       ing that there is early warning system in place I
they confirm that water level is high in the         feel safe and I no longer have to worry about
upstream, she will ring the siren to warn the        flood” she adds with full confidence.
community of the impeding flood.


DIPECHO Newsletter Issue 9, July 2010
 DIPECHO Newsletter Issue 9, July 2010                                                                11
                                                                                                       11
Communities and district stakeholders learning about upstream river station. Practical Action SEWIN


  Early Warning for all from all




This thematic newsletter has been produced by DIPECHO projects in Nepal with support from the
European Commission through its Humanitarian Aid department. The contents and information has
been provided by the DIPECHO partners - Action Aid, CARE, Danish Red cross, Handicap Interna-
tional, Mercy Corps, Mission East Nepal, Oxfam GB, and Practical Action. This issue is edited and
circulated by Practical Action on behalf of DIPECHO partners in Nepal.

To know more about DIPECHO projects, please contact Luc Verna for DG ECHO/DIPECHO at
hoo@echo-kathmandu.org and respective project Managers at Krishnan.pv@actionaid.org (Action
Aid), rajesh@carenepal.org (CARE), drcdp@mos.com.np (Danish Red Cross), dppm@hi nepal.org
(Handicap International), udons@np.mercycorps.org (mercy Corps),
cristophe.belperron@miseast.org (Mission East Nepal), svanleuffel@oxfam.org.uk (Oxfam GB) and
deb.bej@practicalaction.org.np (Practical Action).


DIPECHO Newsletter Issue 9, July 2010
 DIPECHO Newsletter Issue 9, July 2010                                                                  12
                                                                                                         12

More Related Content

Viewers also liked

Final nepal rllw presentation
Final nepal rllw presentationFinal nepal rllw presentation
Final nepal rllw presentationDIPECHO Nepal
 
Aan dipecho5 dp net nepal calendar 2010
Aan dipecho5 dp net nepal calendar 2010Aan dipecho5 dp net nepal calendar 2010
Aan dipecho5 dp net nepal calendar 2010DIPECHO Nepal
 
Nepal national hfa progress 2009 11
Nepal national hfa progress 2009 11Nepal national hfa progress 2009 11
Nepal national hfa progress 2009 11DIPECHO Nepal
 
Dipecho4 newsletter6th dec08
Dipecho4 newsletter6th dec08Dipecho4 newsletter6th dec08
Dipecho4 newsletter6th dec08DIPECHO Nepal
 
Dipecho4 project summary
Dipecho4 project summaryDipecho4 project summary
Dipecho4 project summaryDIPECHO Nepal
 
Omair school slide show
Omair school slide showOmair school slide show
Omair school slide showannesloan70
 
Constitution of national plaform on drr english
Constitution of national plaform on drr englishConstitution of national plaform on drr english
Constitution of national plaform on drr englishDIPECHO Nepal
 
11 children and drr april 2010 english
11  children and drr april 2010 english11  children and drr april 2010 english
11 children and drr april 2010 englishDIPECHO Nepal
 

Viewers also liked (8)

Final nepal rllw presentation
Final nepal rllw presentationFinal nepal rllw presentation
Final nepal rllw presentation
 
Aan dipecho5 dp net nepal calendar 2010
Aan dipecho5 dp net nepal calendar 2010Aan dipecho5 dp net nepal calendar 2010
Aan dipecho5 dp net nepal calendar 2010
 
Nepal national hfa progress 2009 11
Nepal national hfa progress 2009 11Nepal national hfa progress 2009 11
Nepal national hfa progress 2009 11
 
Dipecho4 newsletter6th dec08
Dipecho4 newsletter6th dec08Dipecho4 newsletter6th dec08
Dipecho4 newsletter6th dec08
 
Dipecho4 project summary
Dipecho4 project summaryDipecho4 project summary
Dipecho4 project summary
 
Omair school slide show
Omair school slide showOmair school slide show
Omair school slide show
 
Constitution of national plaform on drr english
Constitution of national plaform on drr englishConstitution of national plaform on drr english
Constitution of national plaform on drr english
 
11 children and drr april 2010 english
11  children and drr april 2010 english11  children and drr april 2010 english
11 children and drr april 2010 english
 

Similar to Dipecho nepal newsletter issue 9 july 2010

Improved Governance Structures and Commitment for Disaster Risk Reduction and...
Improved Governance Structures and Commitment for Disaster Risk Reduction and...Improved Governance Structures and Commitment for Disaster Risk Reduction and...
Improved Governance Structures and Commitment for Disaster Risk Reduction and...Global Risk Forum GRFDavos
 
Nuclear radiation health_effects_article_3
Nuclear radiation health_effects_article_3Nuclear radiation health_effects_article_3
Nuclear radiation health_effects_article_3s1180193
 
Dipecho4 newsletter2nd june08
Dipecho4 newsletter2nd june08Dipecho4 newsletter2nd june08
Dipecho4 newsletter2nd june08DIPECHO Nepal
 
“Smallholder farmers and other stakeholders along the food systems value chai...
“Smallholder farmers and other stakeholders along the food systems value chai...“Smallholder farmers and other stakeholders along the food systems value chai...
“Smallholder farmers and other stakeholders along the food systems value chai...Bibhuti Bhusan Gadanayak
 
Development of Flood Warning System
Development of Flood Warning SystemDevelopment of Flood Warning System
Development of Flood Warning SystemIJERA Editor
 
Development of Flood Warning System
Development of Flood Warning SystemDevelopment of Flood Warning System
Development of Flood Warning SystemIJERA Editor
 
Flood Management in Pakistan final
Flood Management in Pakistan finalFlood Management in Pakistan final
Flood Management in Pakistan finalkashif81
 
Fascilitating strategic linkages of DRR and CCA - unescap
Fascilitating strategic linkages of DRR and CCA - unescapFascilitating strategic linkages of DRR and CCA - unescap
Fascilitating strategic linkages of DRR and CCA - unescapStrengthening Climate Resilience
 
The Total Flood Warning System: a review of the concept
The Total Flood Warning System: a review of the conceptThe Total Flood Warning System: a review of the concept
The Total Flood Warning System: a review of the conceptNeil Dufty
 
Climate Change Knowledge Management (CCKM)
Climate Change Knowledge Management (CCKM)�Climate Change Knowledge Management (CCKM)�
Climate Change Knowledge Management (CCKM)Oxfam in Bangladesh
 
Timely warnings on shocks using better data and mobile technology
Timely warnings on shocks using  better data and mobile technologyTimely warnings on shocks using  better data and mobile technology
Timely warnings on shocks using better data and mobile technologyBibhuti Bhusan Gadanayak
 
Dipecho in eu nepal newsletter_jul-sep09_jan-march2010
Dipecho in eu nepal newsletter_jul-sep09_jan-march2010Dipecho in eu nepal newsletter_jul-sep09_jan-march2010
Dipecho in eu nepal newsletter_jul-sep09_jan-march2010DIPECHO Nepal
 
UNICEF-FN-Pacific-DWSP-Lowres-DRAFT
UNICEF-FN-Pacific-DWSP-Lowres-DRAFTUNICEF-FN-Pacific-DWSP-Lowres-DRAFT
UNICEF-FN-Pacific-DWSP-Lowres-DRAFTRoger Singleton
 
Nepal disaster risk_case_study
Nepal disaster risk_case_studyNepal disaster risk_case_study
Nepal disaster risk_case_studyDIPECHO Nepal
 

Similar to Dipecho nepal newsletter issue 9 july 2010 (20)

Improved Governance Structures and Commitment for Disaster Risk Reduction and...
Improved Governance Structures and Commitment for Disaster Risk Reduction and...Improved Governance Structures and Commitment for Disaster Risk Reduction and...
Improved Governance Structures and Commitment for Disaster Risk Reduction and...
 
Nuclear radiation health_effects_article_3
Nuclear radiation health_effects_article_3Nuclear radiation health_effects_article_3
Nuclear radiation health_effects_article_3
 
Dipecho4 newsletter2nd june08
Dipecho4 newsletter2nd june08Dipecho4 newsletter2nd june08
Dipecho4 newsletter2nd june08
 
Factsheet_Nobo-Jibon-project
Factsheet_Nobo-Jibon-projectFactsheet_Nobo-Jibon-project
Factsheet_Nobo-Jibon-project
 
“Smallholder farmers and other stakeholders along the food systems value chai...
“Smallholder farmers and other stakeholders along the food systems value chai...“Smallholder farmers and other stakeholders along the food systems value chai...
“Smallholder farmers and other stakeholders along the food systems value chai...
 
Community-based early warning system
Community-based early warning system Community-based early warning system
Community-based early warning system
 
Development of Flood Warning System
Development of Flood Warning SystemDevelopment of Flood Warning System
Development of Flood Warning System
 
Development of Flood Warning System
Development of Flood Warning SystemDevelopment of Flood Warning System
Development of Flood Warning System
 
Flood Management in Pakistan final
Flood Management in Pakistan finalFlood Management in Pakistan final
Flood Management in Pakistan final
 
Flood risk reduction adpc - cambodia
Flood risk reduction adpc - cambodiaFlood risk reduction adpc - cambodia
Flood risk reduction adpc - cambodia
 
Fascilitating strategic linkages of DRR and CCA - unescap
Fascilitating strategic linkages of DRR and CCA - unescapFascilitating strategic linkages of DRR and CCA - unescap
Fascilitating strategic linkages of DRR and CCA - unescap
 
The Total Flood Warning System: a review of the concept
The Total Flood Warning System: a review of the conceptThe Total Flood Warning System: a review of the concept
The Total Flood Warning System: a review of the concept
 
Climate Change Knowledge Management (CCKM)
Climate Change Knowledge Management (CCKM)�Climate Change Knowledge Management (CCKM)�
Climate Change Knowledge Management (CCKM)
 
Timely warnings on shocks using better data and mobile technology
Timely warnings on shocks using  better data and mobile technologyTimely warnings on shocks using  better data and mobile technology
Timely warnings on shocks using better data and mobile technology
 
Dipecho in eu nepal newsletter_jul-sep09_jan-march2010
Dipecho in eu nepal newsletter_jul-sep09_jan-march2010Dipecho in eu nepal newsletter_jul-sep09_jan-march2010
Dipecho in eu nepal newsletter_jul-sep09_jan-march2010
 
UNICEF-FN-Pacific-DWSP-Lowres-DRAFT
UNICEF-FN-Pacific-DWSP-Lowres-DRAFTUNICEF-FN-Pacific-DWSP-Lowres-DRAFT
UNICEF-FN-Pacific-DWSP-Lowres-DRAFT
 
UNESCAP_Galle_Report
UNESCAP_Galle_ReportUNESCAP_Galle_Report
UNESCAP_Galle_Report
 
Regional Newsletter 1-2/2009
Regional Newsletter 1-2/2009 Regional Newsletter 1-2/2009
Regional Newsletter 1-2/2009
 
Nepal disaster risk_case_study
Nepal disaster risk_case_studyNepal disaster risk_case_study
Nepal disaster risk_case_study
 
C3112838.pdf
C3112838.pdfC3112838.pdf
C3112838.pdf
 

More from DIPECHO Nepal

0.1 disaster development
0.1 disaster development0.1 disaster development
0.1 disaster developmentDIPECHO Nepal
 
0.01 concept of dm may 2011
0.01 concept of dm may 20110.01 concept of dm may 2011
0.01 concept of dm may 2011DIPECHO Nepal
 
0.0 dev and drr
0.0 dev and drr0.0 dev and drr
0.0 dev and drrDIPECHO Nepal
 
South asia women speak out on cca
South asia women speak out on ccaSouth asia women speak out on cca
South asia women speak out on ccaDIPECHO Nepal
 
Ids child no bleed nepali
Ids child no bleed nepaliIds child no bleed nepali
Ids child no bleed nepaliDIPECHO Nepal
 
Final report acorab drr programme
Final report  acorab drr programmeFinal report  acorab drr programme
Final report acorab drr programmeDIPECHO Nepal
 
School renovation
School renovationSchool renovation
School renovationDIPECHO Nepal
 
Small scale mitigation report
Small scale mitigation reportSmall scale mitigation report
Small scale mitigation reportDIPECHO Nepal
 
Early warning system
Early warning systemEarly warning system
Early warning systemDIPECHO Nepal
 
Communication channel
Communication channelCommunication channel
Communication channelDIPECHO Nepal
 
Case study dipecho v upca
Case study dipecho v upcaCase study dipecho v upca
Case study dipecho v upcaDIPECHO Nepal
 
Mason ort report
Mason ort reportMason ort report
Mason ort reportDIPECHO Nepal
 
Mercy corps mc-cba-report-final-2010
Mercy corps mc-cba-report-final-2010Mercy corps mc-cba-report-final-2010
Mercy corps mc-cba-report-final-2010DIPECHO Nepal
 
Understanding disaster-management-in-practice
Understanding disaster-management-in-practiceUnderstanding disaster-management-in-practice
Understanding disaster-management-in-practiceDIPECHO Nepal
 
National platform on drr bidhan 2065 52
National platform on drr bidhan 2065 52National platform on drr bidhan 2065 52
National platform on drr bidhan 2065 52DIPECHO Nepal
 
Drr focal person workshop completion report
Drr focal person workshop completion reportDrr focal person workshop completion report
Drr focal person workshop completion reportDIPECHO Nepal
 
Dipecho iii final evaluation bcrd report june 09
Dipecho iii final evaluation bcrd report june 09Dipecho iii final evaluation bcrd report june 09
Dipecho iii final evaluation bcrd report june 09DIPECHO Nepal
 

More from DIPECHO Nepal (20)

0.1 disaster development
0.1 disaster development0.1 disaster development
0.1 disaster development
 
0.01 concept of dm may 2011
0.01 concept of dm may 20110.01 concept of dm may 2011
0.01 concept of dm may 2011
 
0.0 dev and drr
0.0 dev and drr0.0 dev and drr
0.0 dev and drr
 
South asia women speak out on cca
South asia women speak out on ccaSouth asia women speak out on cca
South asia women speak out on cca
 
Ids child no bleed nepali
Ids child no bleed nepaliIds child no bleed nepali
Ids child no bleed nepali
 
Final report acorab drr programme
Final report  acorab drr programmeFinal report  acorab drr programme
Final report acorab drr programme
 
School renovation
School renovationSchool renovation
School renovation
 
Small scale mitigation report
Small scale mitigation reportSmall scale mitigation report
Small scale mitigation report
 
Rambati case
Rambati caseRambati case
Rambati case
 
Early warning system
Early warning systemEarly warning system
Early warning system
 
Communication channel
Communication channelCommunication channel
Communication channel
 
Case study dipecho v upca
Case study dipecho v upcaCase study dipecho v upca
Case study dipecho v upca
 
Biodyke
BiodykeBiodyke
Biodyke
 
Mason ort report
Mason ort reportMason ort report
Mason ort report
 
Inee nepal
Inee nepalInee nepal
Inee nepal
 
Mercy corps mc-cba-report-final-2010
Mercy corps mc-cba-report-final-2010Mercy corps mc-cba-report-final-2010
Mercy corps mc-cba-report-final-2010
 
Understanding disaster-management-in-practice
Understanding disaster-management-in-practiceUnderstanding disaster-management-in-practice
Understanding disaster-management-in-practice
 
National platform on drr bidhan 2065 52
National platform on drr bidhan 2065 52National platform on drr bidhan 2065 52
National platform on drr bidhan 2065 52
 
Drr focal person workshop completion report
Drr focal person workshop completion reportDrr focal person workshop completion report
Drr focal person workshop completion report
 
Dipecho iii final evaluation bcrd report june 09
Dipecho iii final evaluation bcrd report june 09Dipecho iii final evaluation bcrd report june 09
Dipecho iii final evaluation bcrd report june 09
 

Recently uploaded

Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 

Recently uploaded (20)

Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
CĂłdigo Creativo y Arte de Software | Unidad 1
CĂłdigo Creativo y Arte de Software | Unidad 1CĂłdigo Creativo y Arte de Software | Unidad 1
CĂłdigo Creativo y Arte de Software | Unidad 1
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 

Dipecho nepal newsletter issue 9 july 2010

  • 1. DIPECHO Newsletter NEPAL Issue 9, July 2010 Promoting Early Warning: Reducing Risk IN THIS ISSUE Page 2 Community based flood early warning sys- e ditorial Keeping in line with the international framework for disaster risk reduction, Hyogo Framework for Action (HFA) 2005-2015, tem in Nepal by Dr. Dilip DIPECHO partners in Nepal are formulating ideas and resources K. Gautam to contribute towards the second priority action of HFA - Risk identification, assessment, monitoring and enhancing early warn- Page 3 - Action aid - ing. DIPECHO partners have incorporated several early warning Early warning: saving components and activities in their project components to help lives communities at risk to be well prepared and act on time to prevent the loss of life and property. Page 4 - CARE - Integrating early warning DIPECHO partners have emphasised all four elements of EWS - communication in flood risk knowledge, monitoring and warning services, dissemination risk reduction and communication, and response capabilities. EWS is considered a crucial mechanism to raise awareness on flood risk among the Page 5 - Danish Red vulnerable communities. EWS warns the people prior to flood Cross - and is a reliable mechanism to increase the response capacity of the Efficient information communities. dissemination for This edition illustrates few initiatives and actions undertaken by better readiness DIPECHO partners under DIPECHO V with special focus on Page 5 - Mission East - Promoting Early Warning: Reducing Risk. Early Warning Page 7 - Handicap To build the capacity of International - Department of Hydrology and Meteorology staff, two of Early Warning System Users For an early warning workshop will be held from system that does not its senior technical members were sent to PAGASA, 6th - 8th August in Nepalgunj discriminate where different stakeholders Philippines for training on Page 8 - Mercy Corps - Flood Early Warning by from community level to Increasing knowledge and Practical Action and Mercy district and national level will warning measures Corps. be participating. Page 9 - Oxfam - Linking Community to Training manual on Commu- Community Practical Action and Mercy nity Based Early Warning Corps together in collabora- System is being prepared Page 11 - Practical Action jointly by Practical Action and tion with Department of - Preparedness with Mercy Corps. The training Hydrology and Meteorology early warning system in manual will be available to the and Ministry of Home Affairs place... DRR practitioners and actors are currently drafting National Strategy for Early warning of by September 2010. Natural Disasters in Nepal. DIPECHO Newsletter Issue 9, July 2010 1
  • 2. Community based flood early warning system in Nepal Dr. Dilip K. Gautam Chief, Flood Forecasting Section, Department of Hydrology and Meteorology, Nepal The Community Based Flood Early Warning stations at System (CBFEWS) is a “people centered” flood Bhairahawa, warning system that empowers individuals and Bagasoti, communities threatened by flood hazards to act Kusum and on time to reduce the possibility of personal Nepalgunj. injury, loss of life, damage to property, and loss of These stations are equipped with VHF wireless livelihood. set and PSTN/mobile phone for data transmis- sion. The forecasting stations at Kusum and Several factors must be considered before estab- Devghat collaborate with the local communities, lishing a CBFEWS, such as hydrologic character- media and district disaster relief committee to istics of the area, frequency of flooding, share flood level data and information of those community’s interest and awareness, flood loss stations. potential, warning time versus benefits and cost of EWS system and community’s capacity to The Flood Forecasting Project of DHM located at respond. Once the Local Government Unit (LGU) Babarmahal, Kathmandu is the central point to and the community establish CBFEWS, technical collect, analyse and disseminate flood related issues have to be settled such as the desired data and information. The water level and accuracy, warning lead time, cost of operations rainfall data from stations with telemetry are and sustainability and reliability of the system. obtained in real time through web based data server www.hydrology.gov.np. In Nepal, the Department of Hydrology and Meteorology (DHM) is maintaining a network of CBFEWS in West Rapti and Narayani River is 17 hydrological stations and 28 meteorological successful in developing linkages of upstream stations for the purpose of flood forecasting and flood forecasting station with downstream warning. Real time telemetry system has been communities. The efficient information dissemi- installed in 3 hydrological and 10 rainfall stations nation channel has increased the response time in the Narayani basin. Such type of telemetry by several hours and increased the potential of system utilises CDMA modem for data transmis- EWS to reduce the impacts of flood. sion over the internet. The system will be ex- panded in West Rapti, Babai, Bagmati and DHM collaborated with Practical Action and Karnali basins in the coming years. ActionAid to establish CBFEWS in Koshi and Sunsari River. As CBFEWS will be expanded to With the objective of establishing CBFEWS in other rivers in the coming years, the Banke, Bardiya, Nawalparasi, Chitwan and sustainability aspect must be considered by Kailali Districts, DHM has signed a memoran- everyone involved. To sustain and grow the dum of understanding (MOU) with Practical number of CBFEWS in other flood prone areas, Action and Mercy Corps. Within the framework community organisations must approach local of this MOU, DHM is providing water level and and central government agencies to allocate fund. rainfall data which is being used for CBFEWS in these districts. The flood monitoring devices and instruments used in DHM stations include water level and rainfall monitoring devices. Narayani basin has 3 PROMOTING EARLY WARNING: hydrological stations and 10 rainfall stations with telemetry. There are two hydrological sites on REDUCING RISK West Rapti Basin under Flood Forecasting Project of DHM, one at Bagasoti and the other at Kusum. West Rapti Basin has 4 rainfall monitoring DIPECHO Newsletter Issue 9, July 2010 DIPECHO Newsletter Issue 9, July 2010 22
  • 3. Early warning: saving lives ActionAid Nepal has been promoting to set up mikes. The knowledge of local people in estab- community based early warning system lishing EWS is explored through interaction and (CBEWS) for flood in its project areas-Sunsari visit, and duly incorporated while establishing and Banke districts. CBEWS is "people-centered" new gauges and other systems. Hence, the system that empowers individuals and communi- information channel between upstream and the ties threatened by flood to act in sufficient time community is established. and in an appropriate manner so as to reduce the possibility of personal injury, loss of life, damage CBEWS provides the disaster management to property, environment and loss of livelihood. committee, task forces, volunteers and other The initiatives are carried out in close collabora- community people with advance information on tion with the community, the flood risks that District Development "Because of our community based EWS, we are can be readily Committee, District translated to disas- Administration Office, safer from the flood. We came to know the ter prevention, Police and Department flood information six hours before from Kusum preparedness and of Hydrology & Metrol- hence we had enough time to evacuate to safe response actions. ogy. Practical Action is shelter. EWS will certainly reduce the possibil- CBEWS also helps the technical partner of ity of loss of lives and properties." - Mr. Kamata reduce economic ActionAid Nepal in Prasad Morya, Coordinator, Early warning task losses by allowing establishing EWS. people to better force, Gangapur 4/5 Banke during Contingency protect their assets Under the project, early Planning Meet in July 7, 2010. and livelihood. warning task force is formed in all the project areas constituting five The project integrated EWS in local level contin- people. There are 19 such task forces. Meetings gency plan which strengthened the capacity of are organised with the community people at the communities. The EWS integration will district level to establish and institutionalise greatly mitigate the flood impact of these com- CBEWS. EWS task forces are trained in CBEWS, munities. The partnership between the local and are familiarised with the process of gauge disaster management committee and the local reading and information flow at the upstream government will certainly help to institutionalise level. The community people are also equipped the process. with early warning apparatus like siren and hand Upstream visit during CBEWS Training, Banke DIPECHO Newsletter Issue 9, July 2010 DIPECHO Newsletter Issue 9, July 2010 33
  • 4. Integrating early warning communication in flood risk reduction Kailali District stands 19th in the risk of flood, to minimise the risk of flood. Red Cross subdivi- 48th in landslide, 24th in fire and 1st in epidemics sions Lalbhoji is responsible disseminating flood amongst other districts in Nepal. Thus, in terms information to the villagers to abide the devastat- of disaster vulnerability it is considered ex- ing consequences. Telephone number of various tremely vulnerable. Kailali has 42 VDCs and 2 actors on early information flow and flood municipalities among them Lalbhoji VDC is measurement station was pasted in public places considered exceptionally vulnerable to flooding. for easy access by all the community members. Lalbhoji is bordered by Mohana River to the The community people have now started to South and Kandra River to the North and is also communicate river level readings obtained from the confluence point of these two rivers. the gauge reader to the downstream community members via telephone. Considering the flood vulnerability, SAMADHAN programme was launched in 6 Recently recorded rainfall reading of 19 and 20 communities of Lalbhoji VDC. Early warning July were communicated to the villagers via task forces with 4 - 5 members were formed in telephone and verbally ensuring prior prepared- each community. The EWS task forces attended ness in the community. As mentored during the three days capacity building training on early training the EWS task force in the community warning and visited the flood measurement had circulated the information to the community station. The objective of the training was to members through hand mike. The first level enhance early warning communication contact warning was to alert the villagers of the incoming points and channels for the floods in the area. flood. Second level warning was for the people to Task forces were oriented and trained on efficient act on the first warning and to collect important information dissemination to the community document and dry foods. Third level warning people about the increasing water level. A center was to get people to safe places in the higher point was selected to collate information on grounds with their family members, livestock increasing flood level in the river. Various stake- and important belongings. This kind of warning holders, VDC members and community members provided the people of Labhoji VDC with mini- were familiarised with the rain fall measuring mum 3 – 4 hours of preparedness time saving gauge and other EWS equipments such as hand lives and property. Thus, the proper functioning siren and mike. of EWS task force and timely circulation of flood information has resulted in zero human casual- On the initiation of Red Cross subdivision, a ties and minimal property loss this year in VDC level collaborative meeting was conducted Labhoji VDC. Efficient information dissemination for better readiness Accurate and timely information saves lives and "SAFE – Safer Communities through Multi- community based early warning is an essential Hazard Risk Reduction" project is implemented element of disaster risk reduction initiative; by Nepal Red Cross Society with support from experienced and accepted worldwide. It helps to Danish Red Cross and is funded by the European mitigate loss of life and property and to reduce Commission through its Humanitarian Aid the severe impact of hazards. Strengthening early Department. Communities working with SAFE warning systems (EWS) ensures the efforts made project are vulnerable to multiple hazards such as towards making communities resilient and the landslide, flash flood and fire due to the geo- action plans and existing policies are sustainable. climatic condition and other factors caused by DIPECHO Newsletter Issue 9, July 2010 DIPECHO Newsletter Issue 9, July 2010 44
  • 5. nature or human error. Experience accentuates that, after continuous heavy rainfall the sky might be clear but is followed by other hazards, such as flash floods and debris flow. Further, areas recently destroyed by wildfires are particu- larly susceptible to flash floods during rain- storms. Communities living without EWS must at least have an effective information dissemination mechanism so that relevant messages can be disseminated on time. People can be alerted by passing information/warning on the probability of hazards based on the trigger indicators. In landslide prone areas the communities take precautionary measures seeing the triggering factors of landslides such as; Soil moving away from foundations Leaning telephone poles, trees, retaining walls or fences Offset fence lines or retaining walls New cracks or unusual bulge in the ground or street pavement Sticking doors and windows, and visible open spaces indicating jambs and frames out of Map showing hazard prone locations in Bigutar plumb community, Okhaldhunga district. Tilting or cracking of concrete floors and foundations when they receive warning messages. People need to be aware of the risk factors and adopt Hoarding boards are placed in strategic locations mechanisms to reduce the impact of hazards in every community showing hazard risks areas, because early warning alone cannot save lives. location of vulnerable households and available They have realized that effective early warning resources to tap on the onset of disaster. Commu- systems are the most obvious way to get this nities are comparatively better aware of the information to populations at risk. The key to hazard risks and the action they need to take their safety is putting people, not just technology, at the centre of their warning systems! Community leaders meeting at the Disaster Preparedness unit office in Taluwa community in Okhaldhunga after receiving information on the triggering indicators for possible landslides. DIPECHO Newsletter Issue 9, July 2010 5 DIPECHO Newsletter Issue 9, July 2010 5
  • 6. Early Warning Early warning in mountainous areas must be addressed differently as the types of hazards and its threats are different. For example address- ing EWS in case of GLOF is very different compared to landslide. In case of GLOF, the scale of destruction is large. For many years lots of institu- tions, NGO and government bodies and in some case, Monitoring Station and Early Warning System were set up to address specific GLOF threat. Such system requires heavy investments and single VDC or Risk of destructive landslide in Humla even a District cannot allocate required resources. can help measure a landslide risk: slope, vegeta- tion and quantity/intensity of rainfall. Devising a In Humla, where Mission East has started a simple toolkit for communities to understand the CBDRM project under DIPECHO funding, GLOF causes of landslide, measure the risk as per the is not an issue but landslide is, and it has a major given indicators (see below box) and to be alert if impact on the livelihood. But landslides can occur the risk becomes high. All these indicators could basically everywhere in mountainous environ- be an affordable solution which may save house- ment, and even if some technical solutions exist holds, human lives and livestock. for monitoring landslide, it is not realistic to equip every single hazardous slope with it. Main triggers of rainfall induced landslides (source ICIMOD) Moreover, the few EWS that exists for landslide, such as a cable tight rope between a stable point There is a direct correlation between the and the potentially unstable slope that would amount of rainfall and the incidence of break if land start to move and trigger an alert, is landslides: only recommended for large scale landslide risk. Cumulative rainfall between 50-100 mm In Humla, a landslide will affect mostly the rare in one day and daily rainfall exceeding 50 agricultural terraces that provide food to its mm can cause small scale and shallow population, few houses that could be on the way, debris landslides - LOW RISK some livestock and connection path between Cumulative two day rainfall of about 150 communities. The cost of a monitoring system is mm, and daily rainfall of about 100 mm not affordable owing the little savings it will has a tendency to increase the number of generate, even if the impact for the affected landslides - MEDIUM RISK population can be huge in terms of crops and Cumulative two day rainfall exceeding livestock loss. 250 mm, or an average intensity of more than 8 mm per hour in one day, rapidly In such context where communities bear little increases the number of large landslides - resources and where minor but numerous HIGH RISK landslides occur, EWS may not be a viable solution for remote and isolated locations. Then The type of slope and the slope angle have a what can we do? great influence on landslides. Landslides rarely occur on slopes less than 25°. The large Mission East DIPECHO team is currently looking majority of landslides occur on slopes with at turning some basic landslide monitoring angles ranging from 30° to 50°. Presence or principles by training land owner and villagers to absence of dense vegetation also determines assess the level of risk. Basically only 3 indicators DIPECHO Newsletter Issue 9, July 2010 DIPECHO Newsletter Issue 9, July 2010 66
  • 7. the likelihood of landslide. For an early warning system that does not discriminate will not be heard by somebody who has a total Under this DIPECHO V Action Plan, Handicap hearing impairment or who lives in the periphery International has profited from all opportunities (as most of Dalit groups do). The meaning of the brought by Practical Action and Mercy Corps to noise of a siren may not be understood as a learn, reflect and bring inputs on Early Warning: warning by people with intellectual impairment, during the preparatory work and field testing of hearing impairment, young children or isolated the Training Manual, the presentation and elderly people who have not been involved in commenting stages of the draft National EWS awareness sessions. Strategy and trainings at community level. Two simple ways to enable a people-centered As per mandate and the focus of its DIPECHO V EWS are: First, participation and involvement of project, HI inputs for inclusive EWS have been all segments of the population, including persons given to EWS designers and implementers to with disabilities and other vulnerable or disad- reach all the people at risk. The Hyogo Frame- vantaged groups (such as women, elderly people, work for Action invites us to design people Dalit groups, etc.), from the stage of the design to centered early warning systems, including all the implementation. They are capable of advising members of the community, especially those who DRR actors as to how they can and should be are most vulnerable and most at risk of not reached. acknowledging the warning. The risk occurs when only a single means of warning is used and Secondly, community-based communication when people do not participate in DRR activities networks can bring solutions to the challenge of and trainings because of gender, age, social reaching ALL. For example, the design of a considerations, or physical, intellectual or senso- “notification tree” for individual notification, rial impairment. based on the community map. It is not more difficult to design and implement A siren that is in place in the centre of the village an inclusive EWS, but it is more efficient and more lives are saved. School level awareness programme on inclusiveness DIPECHO Newsletter Issue 9, July 2010 DIPECHO Newsletter Issue 9, July 2010 77
  • 8. Increasing knowledge and warning measures Mercy Corps in collaboration with Nepal Red Cross Society are implementing the second Kailali Disaster Risk Reduction Initiatives as part of DIPECHO Fifth Action Plan. One of the main components of this project is expansion and institutionalisation of community based and district EWS introduced as part of the previous DIPECHO supported projects. Kailali District is characterised by many short rivers originating from the Siwalik Range (please refer to Map). During monsoon the area experi- ences heavy localised rain storms. The principal threat in this area is from flash floods, which follow intense or prolonged rainfall. These events are by definition very fast developing, with no more than 12 hours and sometimes as little as 1.5 hours between the occurrence of precipitation and the flood. It was therefore decided with Department of Hydrology and Metrology to pilot a low tech flash flood forecasting model suitable for short river systems in Kailali District and for Map of the River Systems in Kailali district replication elsewhere. The model uses historical knowledge to define a set of warning levels upstream which indicate a coming flood event downstream. The overall idea is to add warning Wooden pole used for identification of warning time for the communities living along the rivers. CBEWS is now introduced in 16 communities along the Mohana River and its tributaries and is replicated in a number of neighboring communi- ties. Using a community to community approach, early warning committees established under the previous project have supported establishment of CBEWS in project communities. Upstream observers trained with project support take readings of water level and rainfall at gauge sites along the rivers and relay them to downstream communities through agreed communication channels. Early warning is build into community contingency plans and early warning committees in each community are responsible for the day to day management of the systems including organisation of simulation and equipment such as hand operated sirens and megaphones. Early warning is of high priority for district and VDC stakeholders in Kailali. The Early Warning Management Committee has therefore developed overall EWS guidelines for Kailali. The guidelines include day to day management, financial management, emergency telephone numbers, DIPECHO Newsletter Issue 9, July 2010 DIPECHO Newsletter Issue 9, July 2010 88
  • 9. roles and responsibilities of various stakeholders and sustainability. A decision to pool funds for the EWS proves the commitment of the DDC and 32 flood prone VDCs in the district. Mercy Corps further seeks to put EWS high on the national and district agenda through various initiatives in collabora- tion with Practical Action and DHM. EWS Committee testing siren Linking Community to Community When a community knows ahead of time that a disaster is about to strike, it will respond more effectively and will save lives and livelihoods. Under its Risk Reducing programme funded by DIPECHO, Oxfam GB and its local partners (Center for Disaster Management in Nawalparasi, Bagmati Sewa Samaj Nepal in Sarlahi and Koshi Victim Society in Saptari) have established 12 CBEWs in 28 vulnerable communi- ties of 3 tarai districts in Nepal. These 12 EWS link communities living on the banks of the Jarahi and Lakhandehi rivers. The upstream communities observe the water level in the rivers using flood markers to deter- mine the level of risk. The risk is ranked into 3 categories: high, medium and low. These catego- ries are initially determined through discussions between the communities during exchange visits and is based on past flood experiences. During Early Warning Task Force sounding siren during the the dry season, the water level is below the low mock drill in Rampur, Maleniya VDC, Saptari District DIPECHO Newsletter Issue 9, July 2010 DIPECHO Newsletter Issue 9, July 2010 99
  • 10. With the Establishment of this EWS, we are better prepared and our losses will be minimised"- Rajendra Flood marker placed at Rampura VDC, Mishra, Chairperson of DMC, Khadauna VDC, Nawalparasi district Nawalparasi District risk level and every subsequent increase is communicated by phone to the downstream communities. This information is disseminated within the communities by Early Warning Task force communities equipped with sirens, mega- phones and loudspeakers. A system of colour coded flags is used to notify the hearing im- paired. Oxfam GB and its local partners facilitated community discussions to establish the EWS. As a component of the Community Response Plans the EWS are designed and monitored by the DMC of the downstream communities. Prior to the monsoon season, these plans, including the EWS were tested and practiced through mock drills in all 12 communities. The performance of the EWS will be evaluated after the monsoon season to increase its effectiveness. DIPECHO Newsletter Issue 9, July 2010 DIPECHO Newsletter Issue 9, July 2010 10 10
  • 11. Preparedness with early warning system in place... With the aspiration of doing something for the community Fulbasiya Tharu, 38 yrs old women of Padnaha VDC-ward no. 8- Barbatta is being occupied in social work by getting involved as a women volunteer. She is also a member of “Babai Pragatisheel Prokop Byawasthapan Sameete”, a disaster management committee. Barbatta community is situated near Babai River. Hence, the danger of flood every monsoon is a looming fear in this community. “In 1995, heavy rain poured for two days con- tinuously. Around 3 am my house was flooded. That night, my husband Taratal had been out for work and could not return because of heavy rainfall. My children were small so I was baffled. I had to save my children, store food and other assets and ultimately save myself. Since I could not save food we had a big problem. Although I saved my children during flood I was not sure if I could save them after the flood for long time” recalls Fulbasiya with tears. When asked what she knew about preparedness Fulbasiya with siren for flood she said, “Deep down I always thought that we should have been prepared but the prediction we made by observing the river and clouds often went in despair and we always suffered. She further adds, “When I heard about “We will have at least 5 - 6 hours for preparation. SEWIN project which came with the aim of Everyone will have ample time to collect food, raising awareness on preparedness through flood important documents and help each other to get early warning system, I felt like this program was to the shelter. We have contributed our time and meant for our community. I felt like I should be a labor for construction of shelter, machan, cul- part of it to help the entire community be pre- verts, and toilets,” explains Fulbasiya. pared so that they will not have to lose their loved ones and their belongings.” Like Fulbasiya there are other women volunteers who visit people in their houses and explain to Fulbasiya is responsible for ringing the hand them the benefits of EWS and the danger associ- siren to warn the community after receiving ated with flood. These volunteers also inform information on the water level from the up- community people on EWS activities that raise stream. She has participated in several trainings awareness on floods through street drama, song and has also visited Chepang the upstream flood competition, trainings and rallies. monitoring station to see the devices that mea- sure the water level. She has access to telephone “I am very happy to be a part of this programme. numbers of the gauge reader, local police station Even though this program ends the knowledge and other stakeholders whom she can call if she that we have will always remain with us. Know- feels that there is a danger of flooding. When ing that there is early warning system in place I they confirm that water level is high in the feel safe and I no longer have to worry about upstream, she will ring the siren to warn the flood” she adds with full confidence. community of the impeding flood. DIPECHO Newsletter Issue 9, July 2010 DIPECHO Newsletter Issue 9, July 2010 11 11
  • 12. Communities and district stakeholders learning about upstream river station. Practical Action SEWIN Early Warning for all from all This thematic newsletter has been produced by DIPECHO projects in Nepal with support from the European Commission through its Humanitarian Aid department. The contents and information has been provided by the DIPECHO partners - Action Aid, CARE, Danish Red cross, Handicap Interna- tional, Mercy Corps, Mission East Nepal, Oxfam GB, and Practical Action. This issue is edited and circulated by Practical Action on behalf of DIPECHO partners in Nepal. To know more about DIPECHO projects, please contact Luc Verna for DG ECHO/DIPECHO at hoo@echo-kathmandu.org and respective project Managers at Krishnan.pv@actionaid.org (Action Aid), rajesh@carenepal.org (CARE), drcdp@mos.com.np (Danish Red Cross), dppm@hi nepal.org (Handicap International), udons@np.mercycorps.org (mercy Corps), cristophe.belperron@miseast.org (Mission East Nepal), svanleuffel@oxfam.org.uk (Oxfam GB) and deb.bej@practicalaction.org.np (Practical Action). DIPECHO Newsletter Issue 9, July 2010 DIPECHO Newsletter Issue 9, July 2010 12 12