Van Nuys Bl Rapidway
Community Meetings – October 2011
Overview

 •   Measure R Transit Program
 •   Project History
 •   Study Area
 •   Project Development Process
 •   Purpose and Need
 •   Alternatives Under Consideration
 •   Alternatives Screening Criteria
 •   Upcoming Activities
Measure R Transit Program
 Paragraph of copy. Paragraph of regular Rapidway
                                Van Nuys Bl copy.
 Not bulleted. Paragraph of regular copy. Project


                    Will insert Measure R map
Project History – East San Fernando
Valley North-South Rapidways
 • July 2000 – Traffic Congestion Relief Program (TCRP) earmark of
               $100 million
 • May 2003 – Regionally Significant Transportation Investment
               Study (RSTIS)
             Recommended four corridors for transit
                  improvements:
                       o Reseda
                       o Sepulveda
                       o Van Nuys
                       o Lankershim/San Fernando

 •   March 2007 – City of Los Angeles initiated study
Project History Continued
• November 2008 – Measure R approved; included $68.5 million

• April 2010 – City approved potential near, medium and long-term
  improvements for further consideration

• May 2010 – Metro Board concurred

  Four corridor projects will be carried forward in separate environmental process:
            Van Nuys Boulevard Rapidway Corridor
            Reseda, Sepulveda, and Lankershim/San Fernando Corridors
Purpose and Need
Study Area
• Ventura Blvd. to I-210 Freeway,
. approximately 10.2 miles
• Corridor Transit Services:
     Metro Orange Line
     Metro Local and Rapid
     LADOT DASH
     Metrolink
     Amtrak
 Second only to the Metro
. Orange Line for SFV boardings
Project Development Process
                                                            Revenue Transit
 Five phases of project development
                                                                Service
                                                 Construction
                                   Engineering
                                      And
               Environmental         Design
             Studies (EIS/EIR)
            and      Conceptual
  Alternatives      Engineering
     Analysis
                      Additional
 Approximately         12 to 24
                       months                                               a ti o n
   8 months                                                  Pa   r ti c i p
                                                     Pu blic
                                             n   g
Where We Are Now                       O ngoi
Alternatives Under Consideration
                                     No Build
          •   Represents Study Area in 2035, if no project built
          •   Includes all existing highway and transit services and
              facilities, and committed projects.




                   Transportation System Management (TSM)
          • Implements lower cost capital improvements to increase
              transportation system efficiencies

                  Intersection widenings and signal timing
                  Increase bus service
Alternatives Under Consideration


                         Bus Rapid Transit (BRT)
                 • Exclusive Right of Way, but can operate in
                  .mixed-flow traffic
                 • Clean fuel (CNG) power
                 • Up to 100 passengers per bus
                 • Can share existing maintenance facilities
                 • Similar to Metro Orange and Silver Lines
Alternatives Under Consideration

                           Light Rail Transit (LRT)
               •   Exclusive Right of Way
               •   Overhead electrical power
               •   Up to 335 passengers per two car train set
               •   Typically one mile station spacing
               •   Would require a new maintenance facility
               •   Similar to Metro Blue, Green, and Gold Lines
Alternatives Under Consideration


                                   Street Car
                 •   Typically Exclusive Right of Way
                 •   Overhead electrical power
                 •   Up to 140 passengers per car
                 •   Station stops generally more frequent
                 •   Would require a new maintenance facility
                 •   Similar to Portland, Oregon
Alternatives Screening Criteria
Next Steps
How to Stay Involved
       Please submit comments before November 30, 2011
• By mail:                         • Web:
  Walt Davis, Project Manager        www.metro.net/vannuys
  One Gateway Plaza – MS 99-22-3
  Los Angeles, CA 90012            • Facebook:
                                     Metrovannuys
• By phone:
  (818) 276-3233                   • Twitter:
                                     @metrovannuys
• By e-mail:
  vannuys@metro.net                • Text “MetroVanNuys” to
                                     25827 for updates
Questions and Discussion

Contenu connexe

Tendances

RV 2015: Art, Community Culture and TOD: Four Stories by Abigail Thorne-Lyman
RV 2015: Art, Community Culture and TOD: Four Stories by Abigail Thorne-LymanRV 2015: Art, Community Culture and TOD: Four Stories by Abigail Thorne-Lyman
RV 2015: Art, Community Culture and TOD: Four Stories by Abigail Thorne-LymanRail~Volution
 
Challenging urban sprawl: public transit access point optimization
Challenging urban sprawl: public transit access point optimizationChallenging urban sprawl: public transit access point optimization
Challenging urban sprawl: public transit access point optimizationJoseph Chow
 
Delivering smarter transport networks for auckland
Delivering smarter transport networks for aucklandDelivering smarter transport networks for auckland
Delivering smarter transport networks for aucklandAuckland Transport
 
Transportation Highlights
Transportation HighlightsTransportation Highlights
Transportation HighlightsJanet Tharp
 
Using spatial presentation of bus GPS data to identify and justify bus priori...
Using spatial presentation of bus GPS data to identify and justify bus priori...Using spatial presentation of bus GPS data to identify and justify bus priori...
Using spatial presentation of bus GPS data to identify and justify bus priori...JumpingJaq
 
Swanston Street Presentation
Swanston Street PresentationSwanston Street Presentation
Swanston Street PresentationLisa
 
Transport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challengesTransport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challengesInstitute for Transport Studies (ITS)
 
Parcel delivery utilizing cargo bike in downtown Brooklyn area
Parcel delivery utilizing cargo bike in downtown Brooklyn areaParcel delivery utilizing cargo bike in downtown Brooklyn area
Parcel delivery utilizing cargo bike in downtown Brooklyn areaJoseph Chow
 
Tac meeting no.13_111313
Tac meeting no.13_111313Tac meeting no.13_111313
Tac meeting no.13_111313peggydrouet
 
East San Fernando Valley Transit Corridor presentation
East San Fernando Valley Transit Corridor presentationEast San Fernando Valley Transit Corridor presentation
East San Fernando Valley Transit Corridor presentationSteven Rosenberg
 
Station Area Planning: The Fundamentals by W. Brian Keith
Station Area Planning: The Fundamentals by W. Brian KeithStation Area Planning: The Fundamentals by W. Brian Keith
Station Area Planning: The Fundamentals by W. Brian KeithRail~Volution
 
7A_2_Preliminary results of a spatial analysis of dublin citys bike rental sc...
7A_2_Preliminary results of a spatial analysis of dublin citys bike rental sc...7A_2_Preliminary results of a spatial analysis of dublin citys bike rental sc...
7A_2_Preliminary results of a spatial analysis of dublin citys bike rental sc...GISRUK conference
 
Urban transportation planning africa
Urban transportation planning  africaUrban transportation planning  africa
Urban transportation planning africaSteven Apell (Ph.D)
 
Towards Simulating Non-lane Based Heterogeneous Road Traffic of Less Develope...
Towards Simulating Non-lane Based Heterogeneous Road Traffic of Less Develope...Towards Simulating Non-lane Based Heterogeneous Road Traffic of Less Develope...
Towards Simulating Non-lane Based Heterogeneous Road Traffic of Less Develope...Tarik Reza Toha
 
RV 2015: Cleaner Transit, Healthier Communities: Climate Change Policies and ...
RV 2015: Cleaner Transit, Healthier Communities: Climate Change Policies and ...RV 2015: Cleaner Transit, Healthier Communities: Climate Change Policies and ...
RV 2015: Cleaner Transit, Healthier Communities: Climate Change Policies and ...Rail~Volution
 
OTSLAB Urban Mobility Projects: transportation planning and modelling. Portfo...
OTSLAB Urban Mobility Projects: transportation planning and modelling. Portfo...OTSLAB Urban Mobility Projects: transportation planning and modelling. Portfo...
OTSLAB Urban Mobility Projects: transportation planning and modelling. Portfo...Timofey Volotskiy
 

Tendances (20)

RV 2015: Art, Community Culture and TOD: Four Stories by Abigail Thorne-Lyman
RV 2015: Art, Community Culture and TOD: Four Stories by Abigail Thorne-LymanRV 2015: Art, Community Culture and TOD: Four Stories by Abigail Thorne-Lyman
RV 2015: Art, Community Culture and TOD: Four Stories by Abigail Thorne-Lyman
 
Challenging urban sprawl: public transit access point optimization
Challenging urban sprawl: public transit access point optimizationChallenging urban sprawl: public transit access point optimization
Challenging urban sprawl: public transit access point optimization
 
Delivering smarter transport networks for auckland
Delivering smarter transport networks for aucklandDelivering smarter transport networks for auckland
Delivering smarter transport networks for auckland
 
Transportation Highlights
Transportation HighlightsTransportation Highlights
Transportation Highlights
 
Using spatial presentation of bus GPS data to identify and justify bus priori...
Using spatial presentation of bus GPS data to identify and justify bus priori...Using spatial presentation of bus GPS data to identify and justify bus priori...
Using spatial presentation of bus GPS data to identify and justify bus priori...
 
Swanston Street Presentation
Swanston Street PresentationSwanston Street Presentation
Swanston Street Presentation
 
Miami DDA Board SMART Plan Update presentation
Miami DDA Board SMART Plan Update presentationMiami DDA Board SMART Plan Update presentation
Miami DDA Board SMART Plan Update presentation
 
Transport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challengesTransport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challenges
 
Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19
 
Parcel delivery utilizing cargo bike in downtown Brooklyn area
Parcel delivery utilizing cargo bike in downtown Brooklyn areaParcel delivery utilizing cargo bike in downtown Brooklyn area
Parcel delivery utilizing cargo bike in downtown Brooklyn area
 
Tac meeting no.13_111313
Tac meeting no.13_111313Tac meeting no.13_111313
Tac meeting no.13_111313
 
East San Fernando Valley Transit Corridor presentation
East San Fernando Valley Transit Corridor presentationEast San Fernando Valley Transit Corridor presentation
East San Fernando Valley Transit Corridor presentation
 
Station Area Planning: The Fundamentals by W. Brian Keith
Station Area Planning: The Fundamentals by W. Brian KeithStation Area Planning: The Fundamentals by W. Brian Keith
Station Area Planning: The Fundamentals by W. Brian Keith
 
7A_2_Preliminary results of a spatial analysis of dublin citys bike rental sc...
7A_2_Preliminary results of a spatial analysis of dublin citys bike rental sc...7A_2_Preliminary results of a spatial analysis of dublin citys bike rental sc...
7A_2_Preliminary results of a spatial analysis of dublin citys bike rental sc...
 
Urban transportation planning africa
Urban transportation planning  africaUrban transportation planning  africa
Urban transportation planning africa
 
Greater Miami Chamber of Commerce SMART Plan update presentation.
Greater Miami Chamber of Commerce SMART Plan update presentation.Greater Miami Chamber of Commerce SMART Plan update presentation.
Greater Miami Chamber of Commerce SMART Plan update presentation.
 
Towards Simulating Non-lane Based Heterogeneous Road Traffic of Less Develope...
Towards Simulating Non-lane Based Heterogeneous Road Traffic of Less Develope...Towards Simulating Non-lane Based Heterogeneous Road Traffic of Less Develope...
Towards Simulating Non-lane Based Heterogeneous Road Traffic of Less Develope...
 
RV 2015: Cleaner Transit, Healthier Communities: Climate Change Policies and ...
RV 2015: Cleaner Transit, Healthier Communities: Climate Change Policies and ...RV 2015: Cleaner Transit, Healthier Communities: Climate Change Policies and ...
RV 2015: Cleaner Transit, Healthier Communities: Climate Change Policies and ...
 
OTSLAB Urban Mobility Projects: transportation planning and modelling. Portfo...
OTSLAB Urban Mobility Projects: transportation planning and modelling. Portfo...OTSLAB Urban Mobility Projects: transportation planning and modelling. Portfo...
OTSLAB Urban Mobility Projects: transportation planning and modelling. Portfo...
 
TTG Luncheon 4.6.2016 - OC Streetcar
TTG Luncheon 4.6.2016 - OC StreetcarTTG Luncheon 4.6.2016 - OC Streetcar
TTG Luncheon 4.6.2016 - OC Streetcar
 

En vedette

Century City Station Options - 11-19-11 Metro Board P&P Committee
Century City Station Options - 11-19-11 Metro Board P&P CommitteeCentury City Station Options - 11-19-11 Metro Board P&P Committee
Century City Station Options - 11-19-11 Metro Board P&P CommitteeDavid Murphy
 
Huong dan tra loi van dap van tai logistics(1)
Huong dan tra loi van dap van tai logistics(1)Huong dan tra loi van dap van tai logistics(1)
Huong dan tra loi van dap van tai logistics(1)ti2li119
 
Meet Ray Duffill
Meet Ray DuffillMeet Ray Duffill
Meet Ray DuffillRay Duffill
 
Alpha art tro thanh nguoi dan ong moi phu nu mong uoc
Alpha art tro thanh nguoi dan ong moi phu nu mong uocAlpha art tro thanh nguoi dan ong moi phu nu mong uoc
Alpha art tro thanh nguoi dan ong moi phu nu mong uocti2li119
 
Are chap12
Are chap12Are chap12
Are chap12ti2li119
 
Some Inspiring Hyperlocal Uk Blogs
Some Inspiring Hyperlocal Uk BlogsSome Inspiring Hyperlocal Uk Blogs
Some Inspiring Hyperlocal Uk BlogsRay Duffill
 
Les miserables
Les miserablesLes miserables
Les miserablesti2li119
 
Think Bike LA - Dutch Presentation
Think Bike LA - Dutch PresentationThink Bike LA - Dutch Presentation
Think Bike LA - Dutch PresentationDavid Murphy
 
A handbook of comercial correspondence
A handbook of comercial correspondenceA handbook of comercial correspondence
A handbook of comercial correspondenceti2li119
 
Bo+de+van '+dap-'+vtgn+se+thi+vao+ky+nay`
Bo+de+van '+dap-'+vtgn+se+thi+vao+ky+nay`Bo+de+van '+dap-'+vtgn+se+thi+vao+ky+nay`
Bo+de+van '+dap-'+vtgn+se+thi+vao+ky+nay`ti2li119
 
East Riding Linkshort Tim Horne
East Riding Linkshort Tim HorneEast Riding Linkshort Tim Horne
East Riding Linkshort Tim HorneRay Duffill
 
Bangladesh Presentation
Bangladesh PresentationBangladesh Presentation
Bangladesh Presentationdyernathan
 
I-405 Feb. 2013 Community Meeting
I-405 Feb. 2013 Community MeetingI-405 Feb. 2013 Community Meeting
I-405 Feb. 2013 Community MeetingDavid Murphy
 
Cricket knockout rules
Cricket knockout rulesCricket knockout rules
Cricket knockout rulesRay Duffill
 
Hyperlocal Hedon Blog
Hyperlocal   Hedon BlogHyperlocal   Hedon Blog
Hyperlocal Hedon BlogRay Duffill
 
1001 cau dam thoai tieng anh thong dung nhat
1001 cau dam thoai tieng anh thong dung nhat 1001 cau dam thoai tieng anh thong dung nhat
1001 cau dam thoai tieng anh thong dung nhat ti2li119
 
Bangladesh Presentation
Bangladesh PresentationBangladesh Presentation
Bangladesh Presentationdyernathan
 

En vedette (17)

Century City Station Options - 11-19-11 Metro Board P&P Committee
Century City Station Options - 11-19-11 Metro Board P&P CommitteeCentury City Station Options - 11-19-11 Metro Board P&P Committee
Century City Station Options - 11-19-11 Metro Board P&P Committee
 
Huong dan tra loi van dap van tai logistics(1)
Huong dan tra loi van dap van tai logistics(1)Huong dan tra loi van dap van tai logistics(1)
Huong dan tra loi van dap van tai logistics(1)
 
Meet Ray Duffill
Meet Ray DuffillMeet Ray Duffill
Meet Ray Duffill
 
Alpha art tro thanh nguoi dan ong moi phu nu mong uoc
Alpha art tro thanh nguoi dan ong moi phu nu mong uocAlpha art tro thanh nguoi dan ong moi phu nu mong uoc
Alpha art tro thanh nguoi dan ong moi phu nu mong uoc
 
Are chap12
Are chap12Are chap12
Are chap12
 
Some Inspiring Hyperlocal Uk Blogs
Some Inspiring Hyperlocal Uk BlogsSome Inspiring Hyperlocal Uk Blogs
Some Inspiring Hyperlocal Uk Blogs
 
Les miserables
Les miserablesLes miserables
Les miserables
 
Think Bike LA - Dutch Presentation
Think Bike LA - Dutch PresentationThink Bike LA - Dutch Presentation
Think Bike LA - Dutch Presentation
 
A handbook of comercial correspondence
A handbook of comercial correspondenceA handbook of comercial correspondence
A handbook of comercial correspondence
 
Bo+de+van '+dap-'+vtgn+se+thi+vao+ky+nay`
Bo+de+van '+dap-'+vtgn+se+thi+vao+ky+nay`Bo+de+van '+dap-'+vtgn+se+thi+vao+ky+nay`
Bo+de+van '+dap-'+vtgn+se+thi+vao+ky+nay`
 
East Riding Linkshort Tim Horne
East Riding Linkshort Tim HorneEast Riding Linkshort Tim Horne
East Riding Linkshort Tim Horne
 
Bangladesh Presentation
Bangladesh PresentationBangladesh Presentation
Bangladesh Presentation
 
I-405 Feb. 2013 Community Meeting
I-405 Feb. 2013 Community MeetingI-405 Feb. 2013 Community Meeting
I-405 Feb. 2013 Community Meeting
 
Cricket knockout rules
Cricket knockout rulesCricket knockout rules
Cricket knockout rules
 
Hyperlocal Hedon Blog
Hyperlocal   Hedon BlogHyperlocal   Hedon Blog
Hyperlocal Hedon Blog
 
1001 cau dam thoai tieng anh thong dung nhat
1001 cau dam thoai tieng anh thong dung nhat 1001 cau dam thoai tieng anh thong dung nhat
1001 cau dam thoai tieng anh thong dung nhat
 
Bangladesh Presentation
Bangladesh PresentationBangladesh Presentation
Bangladesh Presentation
 

Similaire à Van Nuys Corridor Rapidway (Oct 2011 PowerPoint)

Transbay presentation-2-14-13
Transbay presentation-2-14-13Transbay presentation-2-14-13
Transbay presentation-2-14-13Adina Levin
 
Savannah Powerpoint
Savannah PowerpointSavannah Powerpoint
Savannah Powerpointjameswford
 
Webinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and ElsewhereWebinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and ElsewhereBRTCoE
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...Rail~Volution
 
Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015Barry Scott
 
Paul Fisher Future transport needs of perth
Paul Fisher   Future transport needs of perthPaul Fisher   Future transport needs of perth
Paul Fisher Future transport needs of perthJumpingJaq
 
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Toronto Public Consultation Unit
 
COTA NE AA Public Meeting Presentation
COTA NE AA Public Meeting PresentationCOTA NE AA Public Meeting Presentation
COTA NE AA Public Meeting PresentationCOTA BUS
 
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project JumpingJaq
 
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27Roland_Nikles
 
I-66 Corridor Improvements Outside the Beltway
I-66 Corridor Improvements Outside the BeltwayI-66 Corridor Improvements Outside the Beltway
I-66 Corridor Improvements Outside the BeltwayFairfax County
 
Caltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanesCaltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanesAdina Levin
 
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...Fairfax County
 
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...Fairfax County
 

Similaire à Van Nuys Corridor Rapidway (Oct 2011 PowerPoint) (20)

Transbay presentation-2-14-13
Transbay presentation-2-14-13Transbay presentation-2-14-13
Transbay presentation-2-14-13
 
Savannah Powerpoint
Savannah PowerpointSavannah Powerpoint
Savannah Powerpoint
 
Webinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and ElsewhereWebinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and Elsewhere
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
 
Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015
 
SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015
 
2015 06-15 relief line presentation
2015 06-15 relief line presentation2015 06-15 relief line presentation
2015 06-15 relief line presentation
 
Paul Fisher Future transport needs of perth
Paul Fisher   Future transport needs of perthPaul Fisher   Future transport needs of perth
Paul Fisher Future transport needs of perth
 
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...
 
COTA NE AA Public Meeting Presentation
COTA NE AA Public Meeting PresentationCOTA NE AA Public Meeting Presentation
COTA NE AA Public Meeting Presentation
 
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
 
GoTriangle Update on DOLRT Project
GoTriangle Update on DOLRT ProjectGoTriangle Update on DOLRT Project
GoTriangle Update on DOLRT Project
 
Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
 
15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation
 
June Relief Line Update
June Relief Line UpdateJune Relief Line Update
June Relief Line Update
 
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
 
I-66 Corridor Improvements Outside the Beltway
I-66 Corridor Improvements Outside the BeltwayI-66 Corridor Improvements Outside the Beltway
I-66 Corridor Improvements Outside the Beltway
 
Caltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanesCaltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanes
 
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
 
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
 

Dernier

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 

Dernier (20)

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 

Van Nuys Corridor Rapidway (Oct 2011 PowerPoint)

  • 1. Van Nuys Bl Rapidway Community Meetings – October 2011
  • 2. Overview • Measure R Transit Program • Project History • Study Area • Project Development Process • Purpose and Need • Alternatives Under Consideration • Alternatives Screening Criteria • Upcoming Activities
  • 3. Measure R Transit Program Paragraph of copy. Paragraph of regular Rapidway Van Nuys Bl copy. Not bulleted. Paragraph of regular copy. Project Will insert Measure R map
  • 4. Project History – East San Fernando Valley North-South Rapidways • July 2000 – Traffic Congestion Relief Program (TCRP) earmark of $100 million • May 2003 – Regionally Significant Transportation Investment Study (RSTIS)  Recommended four corridors for transit improvements: o Reseda o Sepulveda o Van Nuys o Lankershim/San Fernando • March 2007 – City of Los Angeles initiated study
  • 5. Project History Continued • November 2008 – Measure R approved; included $68.5 million • April 2010 – City approved potential near, medium and long-term improvements for further consideration • May 2010 – Metro Board concurred Four corridor projects will be carried forward in separate environmental process: Van Nuys Boulevard Rapidway Corridor Reseda, Sepulveda, and Lankershim/San Fernando Corridors
  • 7. Study Area • Ventura Blvd. to I-210 Freeway, . approximately 10.2 miles • Corridor Transit Services:  Metro Orange Line  Metro Local and Rapid  LADOT DASH  Metrolink  Amtrak  Second only to the Metro . Orange Line for SFV boardings
  • 8. Project Development Process Revenue Transit Five phases of project development Service Construction Engineering And Environmental Design Studies (EIS/EIR) and Conceptual Alternatives Engineering Analysis Additional Approximately 12 to 24 months a ti o n 8 months Pa r ti c i p Pu blic n g Where We Are Now O ngoi
  • 9. Alternatives Under Consideration No Build • Represents Study Area in 2035, if no project built • Includes all existing highway and transit services and facilities, and committed projects. Transportation System Management (TSM) • Implements lower cost capital improvements to increase transportation system efficiencies  Intersection widenings and signal timing  Increase bus service
  • 10. Alternatives Under Consideration Bus Rapid Transit (BRT) • Exclusive Right of Way, but can operate in .mixed-flow traffic • Clean fuel (CNG) power • Up to 100 passengers per bus • Can share existing maintenance facilities • Similar to Metro Orange and Silver Lines
  • 11. Alternatives Under Consideration Light Rail Transit (LRT) • Exclusive Right of Way • Overhead electrical power • Up to 335 passengers per two car train set • Typically one mile station spacing • Would require a new maintenance facility • Similar to Metro Blue, Green, and Gold Lines
  • 12. Alternatives Under Consideration Street Car • Typically Exclusive Right of Way • Overhead electrical power • Up to 140 passengers per car • Station stops generally more frequent • Would require a new maintenance facility • Similar to Portland, Oregon
  • 15. How to Stay Involved Please submit comments before November 30, 2011 • By mail: • Web: Walt Davis, Project Manager www.metro.net/vannuys One Gateway Plaza – MS 99-22-3 Los Angeles, CA 90012 • Facebook: Metrovannuys • By phone: (818) 276-3233 • Twitter: @metrovannuys • By e-mail: vannuys@metro.net • Text “MetroVanNuys” to 25827 for updates