3. Al Qasr Shopping Centre
Lead Architect: Albert Speer & Partners
Lead Consultant: Saudi Diyar
Main Contractor: Saudi Constructioneers
67,500 m² Land Area
215,000 m² of BUA
76,489.6 m² of Leasable Area
368 Shop/Store
1756 Parking Capacity
Construction Start: May 2008
Expected completion: 31st Jan 2012
4. Current Status of Packages
Pkg 6A: SAUDICO- Structural Works
Work In Place 100%
Forecast Completion Date 17-Dec-09
Pkg 6B: SAUDICO- Finishes & MEP Works
Work In Place 98.8%
Forecast Completion Date 15-Feb-12
Pkg 6C: Al Ojaimi- Substation & Cable Works
Work In Place 100%
Forecast Completion Date 30-Oct-11
Project Total of completion all packages: 99.6%
5. Critical Milestones to Achieve
Completion Date
All Construction Works Completed on or before- 15 Feb 2012
Energize Transformer Rooms- 30 Oct 2011 ( Done)
Telephone Cables and Cabinet- all material delivered & partially installed.
Way finding mock up approval : 04.01.12, 45days for installation after
releasing LOI.
Balance of the interior design packages in Process
Electrical Panel Boards Delivery- 100 % delivered.
Execution of the STC Contract Agreement- awaiting Signature
Finalizing Al Shaya requirements
Finalizing the A/C requirements for the Stores
Finalizing The Food Court Requirement (GAS)
Epoxy Paint- Ground Floor painting
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17. PROJECT: AL QASR MALL
LIST OF POTENTIAL ADDITIONAL WORKS
SN Description Rough Estimated Cost Duration Remarks
1 Fun Zone (Part A) - Waterproofing Awaiting SCE Cost
Awaiting SCE Cost from conceptual drawing
2 Drop Off area provided by SDC
3 Additional Parking Areas (at North East) Awaiting SCE Cost
SR 649,982 - cost from Supplier/contractor
(AL ROWAFED Est), Excluding Civil works
4 LPG Central Tank & Services 649,982.00 2 months which still awaiting from SCE
5 Additional HVAC works for Tenant (AL SHAYAH) 6,000,000.00 9 months As proposed by SCE
6 Water and Drainage for 17 shops 590,150.00 10 weeks (2.5 month) As proposed by SCE
* includes 1month design period of SDC
* SDC awaiting DAAR's instruction to provide
7 Additional 4 nos. Panoramic Elevator 12 Months the design.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61. Tenant Submitted
Handed
Handed Over to Fit Out Design
Total HO To Over to Fit-Out
In Process of DAAR-PM with Drawings
Total DAAR-PM (or Tenant with Works
Floor Handing Over No for DAAR Approval
(1) skipped) No Further Started
(2) Tenant Action but Did Not Start Fit-
(3) Action (7)
(4) Out Works
(5)
(6)
Ground Floor 54 2 52 44 2 1 5
First Floor 79 2 77 22 8 0 47
Second Floor 91 1 90 66 4 0 20
Third Floor 140 84 56 38 8 1 9
TOTAL 364 89 275 170 22 2 81
Area of Fit out on board
Total Leasable Area M2 Percentage achieved
M2
33793 76489.6 44.18%