4. Trevi
• Fontana di Trevi (Italian)
Laureano Family
• Joint-venture
Developer
•HDC/ Vista Residences, Inc.
Property Management
•Global Land
5. PROJECT CONCEPT
A mix-use development in Makati with complete features
and amenities offered at affordable prices.
MAIN FEATURES
Three residential towers on top of a five-level commercial
structure
• 5-level parking complex
• 5-level mall and shopping center
• 5,000 sqm state-of-the art Amenities & Garden
Complex
6. Masterplanned by the world renowned design firm: PALAFOX ASSOCIATES
•ISO 9001 AND ISO 14001 Certified
•TUV (Germany) Certified
•Awardee, BD Magazine Top 200 Architectural
Firms in the World
7. LOCATION MAP
•From EDSA
•From SLEX
•From …
North – Manila
East – Makati
West – Pasay
South -
Parañaque
35. UNIT DELIVERABLES
Kitchen
Floor Vinyl flooring w/ base strip
Wall Plastered semi-gloss painted finish
Counter Granite counter top
Sink Stainless sink w/ faucet
Cabinet Base modular cabinet
Ceiling Gypsum board painted finish
Range/Cook Top Provision for counter top only
37. UNIT DELIVERABLES
Bedroom
Floor Vinyl flooring w/ base strip
Wall Plastered semi-gloss painted finish
Ceiling Exposed slab, rubbed concrete
painted finish
Closet N/A
Door Flush door and sliding wooden
door w/ glass strip
38. UNIT DELIVERABLES
Living / Dining
Floor Vinyl flooring w/ base strip
Wall Plastered semi-gloss painted
finish
Ceiling
Exposed slab, rubbed concrete
painted finish
Main Door Solid Wood Framed Door
40. FREQUENTLY ASKED QUESTIONS
What kind of materials is used for the walls in between
rooms and in between units?
CHB between units,
Dry wall w/in unit
41. FREQUENTLY ASKED QUESTIONS
Does a unit comes with air-conditioning units?
No provision only.
Covered with Ficemboard
window type
42. FREQUENTLY ASKED QUESTIONS
Is there a power backup?
Yes, generator will be utilized as a standby power
source. Common areas have 100% power while each
residential unit will provide limited power for basic
appliances.
Where will be the water tank located?
Located at the roof deck of every building
43. FREQUENTLY ASKED QUESTIONS
What are the safety features of the building?
Fire Detection & Alarm System
Fire Escape Stairs
Fire Rated Residential Floors
Sprinkler System at common areas
44. FREQUENTLY ASKED QUESTIONS
When is the completion of the project?
1st Half 2014-Tower 2
1st Half 2014-Tower 3