20. Design the right system As proposed by the project sponsor As proposed by the programmers As specified in the project request As designed by the project analyst As installed at the users’ site What the customer really want
32. CMMI Maturity Levels Level Identified as Status 5 optimizing focus on process improvement 4 quantitatively managed process measured and controlled 3 defined process characterized for the organization and is proactive 2 managed process characterized by projects and often reactive 1 initial process uncontrolled poorly managed and reactive
56. Bird and Airplane Functional to Physical architecture mapping Function Airplane Physical Component Bird Physical Component Takeoff and land Wheels, Legs Sense position and velocity Vision or radar Eyes Navigate Brain or computer Brain Produce horizontal thrust Propeller or jet Wings Produce vertical lift Wings Wings