Fordham -How effective decision-making is within the IT department - Analysis...
El Khereiji Corporation for Trading & Marketing Company Profile
1. ELKHEREIJI CORPORATION 2011
E KHE E I COR AION
L R IJ POR T
COM NYPR IL
PA OF E
T
Tel. : +966 2 2610245 Fax : +966 2 2610247
Cover page
www.ekc-ma.com E-mail info@ekc-ma.com
3. ELKHEREIJI CORPORATION 2011
COMPANY PROFILE
ELKHEREIJI CORPORATION FOR TRADING & MARKETING has been in operation in the
Kingdom since late 1989, under the presidency of Sheikh Mohammed S. Elkhereiji.
Corporation has chosen air-conditioning as the main line of its operation at it’s inception but
afterward it had to go into all types of Electro-mechanical executions as a result of demand
from its customers.
In 1989, upon re-construction of the number of companies within the Group, Project
Development Corporation was acquired by ELKHEREIJI CORPORATION and started operating
under the name of ELKHEREIJI CORPORATION FOR TRADING & MARKETING and entered in
to execute A/C and Electro-mechanical Projects.
ELKHEREIJI CORPORATION specializes in customer satisfaction with constant improvement in
Technology and adoption of this technology of the A/C Systems in the Kingdom. There is no
difference between a Big Project as Jeddah Intercontinental Hotel, Le meridian Hotel Jeddah
and small villa or even a Single Machinery Installation.
Following pages are the references of the jobs completed
by ELKHEREIJI CORPORATION for your information.
Elkhereiji Corp. for Trdg. & Mrktg.
Mohamed S. Elkhereiji Mehmet
Aydin
Owner Executive Manager
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS 3
4. ELKHEREIJI CORPORATION 2011
INTRODUCTION
Elkhereiji Corporation specialized in Electro-Mechanical Installation and O/M Services focused on
serving commercial, industrial and institutional projects in the Kingdom of Saudi Arabia
Our approach to the construction market place assures that we serve customers by completing
work on time with high quality workmanship in the field of HVAC, Refrigeration, Plumbing, Piping
electrical and their associated controls such as Building Management Systems.
Our company is a full service electro-mechanical contractor. We perform work in plumbing,
heating, ventilation, air conditioning, refrigeration, and engineering. If you are a business owner
looking to service, build, or upgrade your facility, you have found and electro-mechanical
company ready to take on jobs of all sizes and specification. If you are a general contractor
looking for a design/build or plan/spec subcontractor, Elkhereiji corporation is the contractor you
seek.
HVAC
Our expertise includes the installation, service and repair of all makes and models of HVAC
equipment.
District Cooling using large scale centrifugal chillers
Rooftop Package units
Split System Air Conditioning / Heat pump Systems
Computer Room Air Conditioning
Water Source Heat Pumps
Packaged Terminal Air Conditioning (PTAC) units
Central Air Handling Stations
Exhaust / Make-up Air / Outside Air Systems
Variable Air Volume (VAV) Systems
Hot Water / Steam Boilers
Tube and Shell Heat Exchangers
Plate and Frame Heat Exchangers
Refrigeration systems
Mechanical Equipment Control Systems
Energy Management Systems
Fiber Optic Cabling
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS 4
5. ELKHEREIJI CORPORATION 2011
PLUMBING
District Cooling using large scale centrifugal chillers,
Residential, commercial, industrial build / repair
New construction, remodel, room additions, specialty custom plumbing
Water service, sewer replacements
PIPING SYSTEMS
Industrial and Process Piping
All pressure grades up to schedule 160 pipe
Black steel, stainless steel (304L, 316L and 321L) and Alloy Steel
TIG Welding
Cryogenic and high temperature application
Fire fighting Systems, Sprinkler
Storage Systems
Insulation
INDUSTRIAL SYSTEMS
Power Plants up to 50MW
Boilers (Steam/Hot Water)
Installation of rotary equipment (Pumps, compressors etc.)
Water treatment plants
Consultancy
OPERATION AND MAINTENANCE
Full scale residential complexes
Power Plants
Large scale chiller plants
Boilers and rotating equipment
Water treatment plants
ELECTRICAL WORK
Power system
Main panels, distribution panel, MCC panel, DDCP panel , ATS panel
Building, commercial center, residential complexes, Industrial factory
CCTV system, LAN System, fire alarm system, Data system
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS 5
11. ELKHEREIJI CORPORATION 2011
COMPLETED PROJECTS ( ELECTRO-MECHANICAL)
3. KING KHALED HOSPITAL - JEDDAH / KSA.
CLIENT NAME : M/S AMUDI CONSTRUCTION CO.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN AND EXECUTION OF A/C SYSTEM ( PACKAGE UNITS. )
CAPACITY : 380 TON.
2. GHAMHORIA HOSPITAL - ADEN / YEMEN
CLIENT NAME : M/S SAEED AL HUBAISHI & SONS.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN AND EXECUTION OF A/C SYSTEM ( CHILLER SYSTEM )
CAPACTIY : 6x175 TON. CENTRAL CHILLER SYSTEM
3. KING ABDULAZIZ CANCER HOSPITAL – JEDDAH / KSA.
CLIENT NAME : M/S ABDULAZIZI HANEFI CONTRACTING CO.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN AND EXECUTION OF A/C SYSTEM ( PAKAGE UNITS )
CAPACTIY : 260 TON.
4. KING ABDULAZIZ CANCER HOSPITAL X-RAY ROOM – JEDDAH / KSA.
CLIENT NAME : M/S ABDULAZIZI HANEFI CONTRACTING CO.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN AND EXECUTION OF A/C SYSTEM ( CHILLER SYSTEM )
CAPACTIY : 2x25 TON. CHILLER SYSTEM
5. NEW JEDDAH CLINIC HOSPITAL – JEDDAH / KSA.
CLIENT NAME : M/S NEW JEDDAH CLINIC.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN AND EXECUTION OF A/C SYSTEM ( CHILLER SYSTEM )
CAPACTIY : 3x225 TON. CHILLER SYSTEM
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS 11
12. ELKHEREIJI CORPORATION 2011
COMPLETED PROJECTS ( ELECTRO-MECHANICAL)
6. NEW JEDDAH CLINIC HOSPITAL – JEDDAH / KSA.
CLIENT NAME : M/S NEW JEDDAH CLINIC.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : BOILER SYSTEM
CAPACITY : 450 GPM.
7. NEW JEDDAH CLINIC HOSPITAL – JEDDAH / KSA.
CLIENT NAME : M/S NEW JEDDAH CLINIC.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : OVER HAULING OF SIX CHILLER
CAPACITY :
8. GNP CLINIC – JEDDAH / KSA.
CLIENT NAME : M/S GHASSAN PHARON
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM
CAPACITY : 128 TON.
9. H.R.H. PRINCE NAIF PLACE – JEDDAH / KSA.
CLIENT NAME : M/S SAUDI AMOUDI GROUP
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : RENOVATION OF A/C SYSTEM
CAPACITY :
10. H.R.H. ABDULRAHMAN BIN ABDULAZIZ PLACE – TAIF / KSA.
CLIENT NAME : M/S SAUDI AMOUDI GROUP
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : RENOVATION OF A/C SYSTEM
CAPACITY :
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS 12
13. ELKHEREIJI CORPORATION 2011
COMPLETED PROJECTS ( ELECTRO-MECHANICAL)
11. H.R.H. PRINCE SATTAM PLACE – JEDDAH / KSA.
CLIENT NAME : M/S AL MANASA TRADING EST.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( CHILLER SYSTEM )
CAPACITY : 3x150 TON.
12. H.R.H. PRINCE SULTAN MOSQUE – TAIF / KSA.
CLIENT NAME : M/S SAUDI AMOUDI GROUP
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( PAKAGE UNITS)
CAPACITY : 142 TON.
13. CHAMBER OF COMMERCE EXHIBITION HALL - MADINAH / KSA.
CLIENT NAME : M/S SAUDI AMOUDI GROUP
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF ELECTRO-MECHANICAL WORKS
A/C SYSTEM ( PAKAGE UNITS)
CAPACITY : 380 TON.
14. RABIGH STEAM POWER PLANT PHASE-II RABIGH / KSA.
CLIENT NAME : M/S SEA SADELMI ( DALLAH GROUP )
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : SUPPLY & EXECUTION OF HVAC WORKS A/C SYSTEM ( DX UNITS)
CAPACITY : 520 TON.
15. ARAB RADIO & TELEVISION ( ART ) STUDIO JEDDAH / KSA.
CLIENT NAME : M/S DALLAH GROUP
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : SUPPLY & EXECUTION OF HVAC WORKS (CHILLER SYSTEM )
CAPACITY : 300 TON.
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS 13
14. ELKHEREIJI CORPORATION 2011
COMPLETED PROJECTS ( ELECTRO-MECHANICAL)
16. POLICE TRANING CENTER – JEDDAH / KSA.
CLIENT NAME : M/S I.B.S.F.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( DX SYSTEM)
CAPACITY : 220 TON.
17. EL KHEREIJI WEDDING HALL MADINAH / KSA.
CLIENT NAME : M/S EL KHEREIJI FAMILY
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( PAKAGE UNITS)
CAPACITY : 210 TON.
18. YOUSEF EL KHEREIJI BUILDING - MADINAH / KSA.
CLIENT NAME : M/S YOUSEF EL KHEREIJI
CONTRACTOR : EL KHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( DX UNITS)
CAPACITY : 140 TON.
19. SULEIMAN SUBAIE BUILDING - MAKKAH / KSA.
CLIENT NAME : M/S SULEIMAN SUBAIE
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : SUPPLY & EXECUTION PLUMBING SYSTEM
CAPACITY :
20. BINLADEN DOCA PROJECTS - MADINAH / KSA.
CLIENT NAME : M/S BINLADEN GROUP
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : SUPPLY , MANUFACTURING & INSTALLATION OF A/C DUCTS
CAPACITY :
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS 14
15. ELKHEREIJI CORPORATION 2011
COMPLETED PROJECTS ( ELECTRO-MECHANICAL)
21. AL BAIK RESTURANT ( 5 number) – JEDDAH / KSA.
CLIENT NAME : M/S RAMI ABU GHAZALA
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( DX SYSTEM)
CAPACITY : 134 TON.
22. FATIMA BABTAIN BULDING - YANBU / KSA.
CLIENT NAME : M/S BABTAIN FAMILY
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( CHILLER SYSTEM )
CAPACITY : 330 TON.
23. KARITLY COMM’L COMPLEX – MADINAH / KSA.
CLIENT NAME : M/S EL-KHEREIJI CO.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( CHILLER SYSTEM )
CAPACITY : 1200 TON.
24. HAKEEM SHOPPING CENTER - MADINAH / KSA.
CLIENT NAME : M/S ABDULLAH HAKKEM
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : SUPPLY AND INSTALLATION A/C SYSTEM, FIRE FIGHTING SYSTEM,
ELECTRICAL SYSTEM
CAPACITY : 286 TON.
25. AL ANSAR SHOPPING CENTER - MADINAH / KSA.
CLIENT NAME : M/S MADINAH CONTRACTING CO.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : SUPPLY AND INSTALLATION A/C SYSTEM
CAPACITY : 218 TON.
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS 15
16. ELKHEREIJI CORPORATION 2011
COMPLETED PROJECTS ( ELECTRO-MECHANICAL)
26. SALEH KAMEL SUMMER COMPLEX – DURRAT AL ARUS JEDDAH / KSA.
CLIENT NAME : M/S DALLAH TRADING CO.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : EXECUTION OF A/C SYSTEM ( DX SYSTEM)
CAPACITY : 240 TON.
27. ABUBAKIR BABTAIN VILLA – JEDDAH / KSA.
CLIENT NAME : M/S ABU BAKIR BABTAIN
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( DX & PAKAGE SYSTEM )
CAPACITY : 156 TON.
28. KHALEDD ALA AMOUDI 8 VILLAS – JEDDAH / KSA.
CLIENT NAME : M/S AMOUDI BROS. CO.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( DX & PAKAGE SYSTEM )
ELECTRO-MECHANICAL WORK
CAPACITY : 376 TON.
29. DR. NAJI M. NAZER VILLA – JEDDAH / KSA.
CLIENT NAME : M/S NAJI M. NAZER
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( DX & PAKAGE SYSTEM )
CAPACITY : 48 TON.
30. AHMED KHALAWI 3 VILLAS – JEDDAH / KSA.
CLIENT NAME : M/S SH. AHMED KHALAWI
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( DX & PAKAGE SYSTEM )
CAPACITY : 132 TON.
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS 16
17. ELKHEREIJI CORPORATION 2011
COMPLETED PROJECTS ( ELECTRO-MECHANICAL)
31. SALEH KAMEL PLACE JEDDAH / KSA.
CLIENT NAME : M/S SHK. SALEH KHAMEL
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( CHILLER SYSTEM
CAPACITY : 160 TON.
32. ABDULLAH KAMEL VILLA – JEDDAH / KSA.
CLIENT NAME : M/S SHK. ABDULLAH KAMEL
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( DX & PAKAGE SYSTEM )
CAPACITY : 112 TON.
33. ADEL BATTERJEE VILLA – JEDDAH / KSA.
CLIENT NAME : M/S SHK. ADEL BATTERJEE
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( DX & PAKAGE SYSTEM )
CAPACITY : 82 TON.
34. ADLY KHASOGJI VILLA – JEDDAH / KSA.
CLIENT NAME : M/S MR. ADLY KHASHOGJI
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( DX & PAKAGE SYSTEM )
CAPACITY : 56 TON.
35. JAMEEL HASAN ZAINY VILLA – JEDDAH / KSA.
CLIENT NAME : M/S MR. JAMEEL ZAINY
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( DX & PAKAGE SYSTEM )
CAPACITY : 98 TON.
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS 17
18. ELKHEREIJI CORPORATION 2011
COMPLETED PROJECTS ( ELECTRO-MECHANICAL)
36. DR. HISHAM JAMJOOM VILLA - TAIF/ KSA.
CLIENT NAME : M/S DR. HISHAM JAMJOOM
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( CHILLER SYSTEM
CAPACITY : 68 TON.
37. MUSTAFA HARIRI VILLA – JEDDAH / KSA.
CLIENT NAME : M/S MR. MUSTAFA HARIRI
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( DX & PAKAGE SYSTEM )
CAPACITY : 124 TON.
38. JILIDAN FAMILY VILLAS – JEDDAH / KSA.
CLIENT NAME : M/S MEDINAH CONTRACTING CO.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( DX & PAKAGE SYSTEM )
CAPACITY : 176 TON.
39. HISHAM KAKI VILLA – JEDDAH / KSA.
CLIENT NAME : M/S MR. HISHAM KAKI
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( DX & PAKAGE SYSTEM )
CAPACITY : 56 TON.
40. IBRAHIM JILIDAN VILLA – JEDDAH / KSA.
CLIENT NAME : M/S MEDINAH CONTRACTING CO.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( DX & PAKAGE SYSTEM )
CAPACITY : 34 TON.
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS 18
19. ELKHEREIJI CORPORATION 2011
COMPLETED PROJECTS ( ELECTRO-MECHANICAL)
41. NUGAYMISH AL AHMEDI TOWER HOTEL – MADINAH / KSA.
CLIENT NAME : M/S AL MARASEM CO.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( CHILLER SYSTEM )
CAPACITY : 360 TON.
42. REEM SOFITEL – MADINAH / KSA.
CLIENT NAME : M/S MEDINAH CONTRACTING CO.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( CHILLER SYSTEM )
CAPACITY : 525 TON.
43. SAGGAF HOTEL – MAKKAH / KSA.
CLIENT NAME : M/S ZEKAI EST.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( DX & PAKAGE SYSTEM )
CAPACITY : 176 TON.
44. ATTASAN HOTEL - MAKKAH / KSA.
CLIENT NAME : M/S UNITED CONST. CO. LTD. ( UCTC)
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( DX & PAKAGE SYSTEM )
PLUMBING SYSTEM
CAPACITY : 56 TON.
45. AL-SANIE HOTEL – MADINAH / KSA.
CLIENT NAME : M/S MEDINAH CONTRACTING CO.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( DX & PAKAGE SYSTEM )
CAPACITY : 146 TON.
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS 19
20. ELKHEREIJI CORPORATION 2011
COMPLETED PROJECTS ( ELECTRO-MECHANICAL)
46. HABIB ( HARAM ) HOTEL – MADINAH / KSA.
CLIENT NAME : M/S MEDINAH CONTRACTING CO.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( CHILLER SYSTEM )
FIRE FIGHTING SYSTEM
CAPACITY : 218 TON.
47. SADAQA KHASHOGJI HOTEL – MADINAH / KSA.
CLIENT NAME : M/S MEDINAH CONTRACTING CO.
CONTRACTOR : EL KHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF A/C SYSTEM ( CHILLER SYSTEM )
CAPACITY : 256 TON.
48 BASHANFER COFFE FACTORY – JEDDAH / KSA.
CLIENT NAME : M/S SHK. ALI BASHANFER
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN & EXECUTION OF HVAC SYSTEM ( PAKAGE SYSTEM )
CAPACITY : 170 TON.
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS 20
21. ELKHEREIJI CORPORATION 2011
H.R.H. PRINCE KHALED BIN FAYSAL
PRINCE BANDER BIN KHALED
GRAND OPENING CERANOMY
AL WATAN NEWS PAPER PRINTING PRESS DHAH’BAN / JEDDAH K.S.A.
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
Split System Air Conditioning / Heat pump System 21
22. ELKHEREIJI CORPORATION 2011
CLIENT : ASSIR EST. FOR PRESS & PUBLISHING
MAIN CONTRACTOR : ALI SHAR CO.
SUBCONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : AL WATAN PRINTING PRESS DHAH’BAN / JEDDAH
CAPACITY : 4 x 257 TON ( CHILLER SYSTEM )
SCOPE OF WORK : HVAC, LPG, COMPR. AIR, HEAT EXCH., DIESEL LINE, F.W.SYS.
YEAR : 2007 > 2008
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
22
Rooftop package units
23. ELKHEREIJI CORPORATION 2011
CLIENT : ASSIR EST. FOR PRESS & PUBLISHING
MAIN CONTRACTOR : ALI SHAR CO.
SUBCONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : AL WATAN PRINTING PRESS DHAH’BAN / JEDDAH
CAPACITY : 4 x 257 TON ( CHILLER SYSTEM )
SCOPE OF WORK : HVAC, LPG, COMPR. AIR, HEAT EXCH., DIESEL LINE, F.W.SYS.
YEAR : 2007 > 2008
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
23
Computer Room Air Conditioning
24. ELKHEREIJI CORPORATION 2011
CLIENT : ASSIR EST. FOR PRESS & PUBLISHING
MAIN CONTRACTOR : ALI SHAR CO.
SUBCONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : AL WATAN PRINTING PRESS DHAH’BAN / JEDDAH
CAPACITY : 4 x 257 TON ( CHILLER SYSTEM )
SCOPE OF WORK : HVAC, LPG, COMPR. AIR, HEAT EXCH., DIESEL LINE, F.W.SYS.
YEAR : 2007 > 2008
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
Water Source Heat Pumps 24
25. ELKHEREIJI CORPORATION 2011
CLIENT : ASSIR EST. FOR PRESS & PUBLISHING
MAIN CONTRACTOR : ALI SHAR CO.
SUBCONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : AL WATAN PRINTING PRESS DHAH’BAN / JEDDAH
CAPACITY : 4 x 257 TON ( CHILLER SYSTEM )
SCOPE OF WORK : CHILLED WATER SYSTEM, HEAT EXCHANGER SYSTEM
LPG. SYSTEM, COMPRESSED AIR SYSTEM, DIESEL GENT. INST.
FRESH WATER SYSTEM, CHIMNEY DUCT, BMS SYSTEM,
FIRE FIGHTING ZONE CONTROL SYSTEM
YEAR : 2007 > 2008
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
Package Terminal Air Conditioning ( PTAC ) Units 25
26. ELKHEREIJI CORPORATION 2011
CLIENT : ASSIR EST. FOR PRESS & PUBLISHING
MAIN CONTRACTOR : ALI SHAR CO.
SUBCONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : AL WATAN PRINTING PRESS DHAH’BAN / JEDDAH
CAPACITY : 4 x 257 TON ( CHILLER SYSTEM )
SCOPE OF WORK : CHILLED WATER SYSTEM, HEAT EXCHANGER SYSTEM
LPG. SYSTEM, COMPRESSED AIR SYSTEM, DIESEL GENT. INST.
FRESH WATER SYSTEM, CHIMNEY DUCT, BMS SYSTEM,
FIRE FIGHTING ZONE CONTROL SYSTEM
YEAR : 2007 > 2008
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
Central Air Handling Stations 26
27. ELKHEREIJI CORPORATION 2011
CLIENT : ASSIR EST. FOR PRESS & PUBLISHING
MAIN CONTRACTOR : ALI SHAR CO.
SUBCONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : AL WATAN PRINTING PRESS DHAH’BAN / JEDDAH
CAPACITY : 4 x 257 TON ( CHILLER SYSTEM )
SCOPE OF WORK : CHILLED WATER SYSTEM, HEAT EXCHANGER SYSTEM
LPG. SYSTEM, COMPRESSED AIR SYSTEM, DIESEL GENT. INST.
FRESH WATER SYSTEM, CHIMNEY DUCT, BMS SYSTEM,
FIRE FIGHTING ZONE CONTROL SYSTEM
YEAR : 2007 > 2008
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
Exhaust / Make-up Air / Outside Air System 27
28. ELKHEREIJI CORPORATION 2011
CLIENT : ASSIR EST. FOR PRESS & PUBLISHING
MAIN CONTRACTOR : ALI SHAR CO.
SUBCONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : AL WATAN PRINTING PRESS DHAH’BAN / JEDDAH
CAPACITY : 4 x 257 TON ( CHILLER SYSTEM )
SCOPE OF WORK : CHILLED WATER SYSTEM, HEAT EXCHANGER SYSTEM
LPG. SYSTEM, COMPRESSED AIR SYSTEM, DIESEL GENT. INST.
FRESH WATER SYSTEM, CHIMNEY DUCT, BMS SYSTEM,
FIRE FIGHTING ZONE CONTROL SYSTEM
YEAR : 2007 > 2008
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
Variable Air Volume ( VAV ) System 28
29. ELKHEREIJI CORPORATION 2011
CLIENT : ASSIR EST. FOR PRESS & PUBLISHING
MAIN CONTRACTOR : ALI SHAR CO.
SUBCONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : AL WATAN PRINTING PRESS DHAH’BAN / JEDDAH
CAPACITY : 4 x 257 TON ( CHILLER SYSTEM )
SCOPE OF WORK : CHILLED WATER SYSTEM, HEAT EXCHANGER SYSTEM
LPG. SYSTEM, COMPRESSED AIR SYSTEM, DIESEL GENT. INST.
FRESH WATER SYSTEM, CHIMNEY DUCT, BMS SYSTEM,
FIRE FIGHTING ZONE CONTROL SYSTEM
YEAR : 2007 > 2008
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
Hot Water / Steam Boiler 29
30. ELKHEREIJI CORPORATION 2011
CLIENT : ASSIR EST. FOR PRESS & PUBLISHING
MAIN CONTRACTOR : ALI SHAR CO.
SUBCONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : AL WATAN PRINTING PRESS DHAH’BAN / JEDDAH
CAPACITY : 4 x 257 TON ( CHILLER SYSTEM )
SCOPE OF WORK : CHILLED WATER SYSTEM, HEAT EXCHANGER SYSTEM
LPG. SYSTEM, COMPRESSED AIR SYSTEM, DIESEL GENT. INST.
FRESH WATER SYSTEM, CHIMNEY DUCT, BMS SYSTEM,
FIRE FIGHTING ZONE CONTROL SYSTEM
YEAR : 2007 > 2008
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
Tube and Shell heat Exchangers 30
31. ELKHEREIJI CORPORATION 2011
CLIENT : ASSIR EST. FOR PRESS & PUBLISHING
MAIN CONTRACTOR : ALI SHAR CO.
SUBCONTRACTOR : ELKHEREJI CORPORATION
PROJECT : AL WATAN PRINTING PRESS DHAH’BAN / JEDDAH
CAPACITY : 4 x 257 TON ( CHILLER SYSTEM )
SCOPE OF WORK : CHILLED WATER SYSTEM, HEAT EXCHANGER SYSTEM
LPG. SYSTEM, COMPRESSED AIR SYSTEM, DIESEL GENT. INST.
FRESH WATER SYSTEM, CHIMNEY DUCT, BMS SYSTEM,
FIRE FIGHTING ZONE CONTROL SYSTEM
YEAR : 2007 > 2008
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
Plate and Frame Heat Exchangers 31
32. ELKHEREIJI CORPORATION 2011
CLIENT : ASSIR EST. FOR PRESS & PUBLISHING
MAIN CONTRACTOR : ALI SHAR CO.
SUBCONTRACTOR : ELKHEREIJI CORPORAION
PROJECT : AL WATAN PRINTING PRESS DHAH’BAN / JEDDAH
CAPACITY : 4 x 257 TON ( CHILLER SYSTEM )
SCOPE OF WORK : CHILLED WATER SYSTEM, HEAT EXCHANGER SYSTEM
LPG. SYSTEM, COMPRESSED AIR SYSTEM, DIESEL GENT. INST.
FRESH WATER SYSTEM, CHIMNEY DUCT, BMS SYSTEM,
FIRE FIGHTING ZONE CONTROL SYSTEM, R.O SYSTEM.
YEAR : 2007 > 2008
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
Refrigeration System 32
33. ELKHEREIJI CORPORATION 2011
CLIENT : ASSIR EST. FOR PRESS & PUBLISHING
MAIN CONTRACTOR : ALI SHAR CO.
SUBCONTRACTOR : ELKHEREIIJ CORPORATION
PROJECT : AL WATAN PRINTING PRESS DHAH’BAN / JEDDAH
CAPACITY : 4 x 257 TON ( CHILLER SYSTEM )
SCOPE OF WORK : CHILLED WATER SYSTEM, HEAT EXCHANGER SYSTEM
LPG. SYSTEM, COMPRESSED AIR SYSTEM, DIESEL GENT. INST.
FRESH WATER SYSTEM, CHIMNEY DUCT, BMS SYSTEM,
FIRE FIGHTING ZONE CONTROL SYSTEM, R.O SYSTEM.
YEAR : 2007 > 2008
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
Mechanical Equipment Control System 33
34. ELKHEREIJI CORPORATION 2011
CLIENT : ASSIR EST. FOR PRESS & PUBLISHING
MAIN CONTRACTOR : ALI SHAR CO.
SUBCONTRACTOR : LKHEREIJI CORPORATION
PROJECT : AL WATAN PRINTING PRESS DHAH’BAN / JEDDAH
CAPACITY : 4 x 257 TON ( CHILLER SYSTEM )
SCOPE OF WORK : CHILLED WATER SYSTEM, HEAT EXCHANGER SYSTEM
LPG. SYSTEM, COMPRESSED AIR SYSTEM, DIESEL GENT. INST.
FRESH WATER SYSTEM, CHIMNEY DUCT, BMS SYSTEM,
FIRE FIGHTING ZONE CONTROL SYSTEM, R.O SYSTEM.
YEAR : 2007 > 2008
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
Energy Management System 34
35. ELKHEREIJI CORPORATION 2011
CLIENT : SHK. ABDULLAH NAMLE
MAIN CONTRACTOR :
SUBCONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : PRIVATE APERTMENT / JEDDAH
CAPACITY : 8 x 12.5 TON ( PAKAGE UNITS )
SCOPE OF WORK : DESIGN & EXECUTION HVAC WORK
YEAR : 2004
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
Fiber Optic Cabling 35
36. ELKHEREIJI CORPORATION 2011
CLIENT : BINLADEN GROUP
MAIN CONTRACTOR : AL MARASEM CO.
SUBCONTRACTOR : ELKHEREIJI CORPORATIN
PROJECT : HARAM QURAN & CARPET STORE ( QUDEY ) / MAKKAH
CAPACITY : 420 TON ( PAKAGE UNITS )
SCOPE OF WORK : DESIGN & EXECUTION F.FIGHTING SYSTEM ( HVAC DESIGN )
YEAR : 2005
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
Water Service, Sewer replacements. 36
37. ELKHEREIJI CORPORATION 2011
CLIENT : BINLADEN GROUP
MAIN CONTRACTOR : AL MARASEM CO.
SUBCONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : EMAAR JEDDAH GATE SALES OFFICE / JEDDAH
CAPACITY : 2X110 TON ( CHILLER SYSTEM )
SCOPE OF WORK : DESIGN & EXECUTION CHILLED WATER & F.FIGHTING SYSTEM
YEAR : 2006
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
37
PIPING SYSTEM: All pressure grades up to schedule 160 pipe
38. ELKHEREIJI CORPORATION 2011
CLIENT : SHK. ADEL A. BATTERJEE
MAIN CONTRACTOR : AL MIBARRAH
SUBCONTRACTOR : ELKHEREIJI CORPORTION
PROJECT : DAR AL ZEQER SCHOOL / JEDDAH
CAPACITY : 140 TON ( PAKAGE UNITS )
SCOPE OF WORK : DESIGN & EXECUTION HVAC WORK
YEAR : 2004
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
Residential, Commercial, Industrial building plumbing net work 38
39. ELKHEREIJI CORPORATION 2011
CLIENT :
MAIN CONTRACTOR : SAUDI BADAWI GROUP
SUBCONTRACTOR : EKHEREIJI CORPORATION
PROJECT : AL MESOUD WEDDING HALL / JEDDAH
CAPACITY : 252 TON ( PAKAGE UNITS )
SCOPE OF WORK : DESIGN & EXECUTION HVAC WORK
YEAR : 2004
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
39
New Construction, Specialty custom plumbing net work
40. ELKHEREIJI CORPORATION 2011
CLIENT : DELTA GROUP
MAIN CONTRACTOR : ANAQEED CO.
SUBCONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : ADIDAS SHOWROOM / JEDDAH
CAPACITY : 26 TON ( DX UNITS )
SCOPE OF WORK : DESIGN & EXECUTION HVAC & ELECTRICAL WORK
YEAR : 2006
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
PIPING SYSTEM: Industrial and Process piping 40
41. ELKHEREIJI CORPORATION 2011
CLIENT : ANAQEED CO.
MAIN CONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : SHOWROOM & WORKSHOP / JEDDAH
CAPACITY : 116 TON ( PACKAGE & DX UNITS )
SCOPE OF WORK : DESIGN & EXECUTION HVAC & ELECTRICAL WORK
YEAR : 2005
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
PIPING SYSTEM: Black steel, stainless steel (304L,316L,321L and alloy stl. 41
42. ELKHEREIJI CORPORATION 2011
CLIENT : SAAD TRADING & CONTRACTING CO.
MAIN CONTRACTOR : ELKHERIJI CORPORATION
PROJECT : KAAU PLOT 2610 PENTHOUSE / JEDDAH
CAPACITY : 420 TON ( CHILLED WATER SYSTEM )
SCOPE OF WORK : DESIGN & EXECUTION HVAC WORK
YEAR : 2007
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
42
PIPING SYSTEM: Tig Welding
43. ELKHEREIJI CORPORATION 2011
CLIENT : SAAD TRADING & CONTRACTING CO.
MAIN CONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : KAAU PLOT 2610 PENTHOUSE / JEDDAH
CAPACITY : 420 TON ( CHILLED WATER SYSTEM )
SCOPE OF WORK : DESIGN & EXECUTION HVAC WORK
YEAR : 2007
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
PIPING SYSTEM: Cryogenic and high temperature application 43
44. ELKHEREIJI CORPORATION 2011
CLIENT : SHK. MANSOUR A. BIN SAID MAKKAH / KSA.
MAIN CONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : MAABDA , DARNAJD & ROMANCE HOTEL
CAPACITY : 2x175 TON 2x80 TON 4x 150 TON CHILLER SYSTEM
SCOPE OF WORK : DESIGN AND EXECUTION HVAC WORK
YEAR : 2004 > 2005
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
PIPING SYSTEM: Storage system 44
45. ELKHEREIJI CORPORATION 2011
CLIENT : SHK. MANSOUR A. BIN SAID MAKKAH / KSA.
MAIN CONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : MAABDA , DARNAJD & ROMANCE HOTEL
CAPACITY : 2x175 TON 2x80 TON 4x 150 TON CHILLER SYSTEM
SCOPE OF WORK : DESIGN AND EXECUTION HVAC WORK
YEAR : 2004 > 2005
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
45
PIPING SYSTEM: Insulation & jacketing
46. ELKHEREIJI CORPORATION 2011
CLIENT : M/S MOHAMMED A.O. AL AMOUDI
MAIN CONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : UNITED DOCTORS HOSPITAL ( UDH ) / JEDDAH
CAPACITY : ( CHILLED WATER SYSTEM )
SCOPE OF WORK : SURVEY & UPGRADE THE A/C, CHILLED WATER SYSTEM
YEAR : 1996
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
PIPING SYSTEM: Fire Fighting system, FM 200 46
47. ELKHEREIJI CORPORATION 2011
CLIENT : M/S MOHAMMED A.O. AL AMOUDI
MAIN CONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : INTER-CONTINENTAL HOTEL / JEDDAH
CAPACITY : ( CHILLED WATER SYSTEM )
SCOPE OF WORK : DESIGN & EXECUTION OF HVAC SYSTEM
YEAR : 1992
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
47
INDUSTRAIL SYSTEM: Water treatment plants
48. ELKHEREIJI CORPORATION 2011
CLIENT : M/S MOHAMMED A.O. AL AMOUDI
MAIN CONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : INTER-CONTINENTAL HOTEL / JEDDAH
CAPACITY : ( CHILLED WATER SYSTEM )
SCOPE OF WORK : DESIGN & EXECUTION OF HVAC SYSTEM & BOILER
YEAR : 1992
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
48
INDUSTRAIL SYSTEM: Water treatment plants
49. ELKHEREIJI CORPORATION 2011
CLIENT : M/S MOHAMMED A.O. AL AMOUDI
MAIN CONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : INTER-CONTINENTAL HOTEL / JEDDAH
CAPACITY : ( CHILLED WATER SYSTEM )
SCOPE OF WORK : DESIGN & EXECUTION BMS SYSTEM
YEAR : 1992
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
49
INDUSTRAIL SYSTEM: Water treatment plants
50. ELKHEREIJI CORPORATION 2011
CLIENT : SH. ABDULELAH MAGHRABI
CONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : MERIIDIEN HOTEL JEDDAH / KSA.
CAPACITY : 18 x 200 TONS TRANE ( WITH MARKET )
SCOPE OF WORK : DESIGN, INSTALLATION & COMMISSIONING
YEAR : 1997 > 1999
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
INDUSTRAIL SYSTEM: Boilers ( Steam / Hot water ) 50
51. ELKHEREIJI CORPORATION 2011
CLIENT : SH. ABDULELAH MAGHRABI
CONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : MERIIDIEN HOTEL JEDDAH / KSA.
CAPACITY : 18 x 200 TONS TRANE ( WITH MARKET )
SCOPE OF WORK : DESIGN, INSTALLATION & COMMISSIONING
YEAR : 1997 > 1999
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
51
INDUSTRAIL SYSTEM: Boilers ( Steam / Hot water )
52. ELKHEREIJI CORPORATION 2011
CLIENT : SH. ABDULELAH MAGHRABI
CONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : MERIIDIEN HOTEL JEDDAH / KSA.
CAPACITY : 18 x 200 TONS TRANE ( WITH MARKET )
SCOPE OF WORK : LAN SYSTEM, BMS SYSTEM, CCTV SYSTEM
YEAR : 1997 > 1999
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
INDUSTRAIL SYSTEM: Boilers ( Steam / Hot water ) 52
53. ELKHEREIJI CORPORATION 2011
CLIENT : SH. ABDULELAH MAGHRABI
CONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : MERIIDIEN HOTEL JEDDAH / KSA.
CAPACITY : 18 x 200 TONS TRANE ( WITH MARKET )
SCOPE OF WORK : DESIGN, INSTALLATION & COMMISSIONING
HVAC, Plumbing. F. Fighting, Electrical, Kitchen, LPG, Diesel, Laundry,
Steam Boiler, BMS, LAN, Paging, Telephone, system
YEAR : 1997 > 1999
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
INDUSTRAIL SYSTEM: Installation of Rotary equipment (pumps, compr.) 53
54. ELKHEREIJI CORPORATION 2011
CLIENT : SH. ABDULELAH MAGHRABI
CONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : MERIIDIEN HOTEL JEDDAH / KSA.
CAPACITY : 18 x 200 TONS TRANE ( WITH MARKET )
SCOPE OF WORK : DESIGN, INSTALLATION & COMMISSIONING
HVAC, Plumbing. F. Fighting, Electrical, Kitchen, LPG, Diesel, Laundry,
Steam Boiler, BMS, LAN, Paging, Telephone, system
YEAR : 1997 > 1999
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
INDUSTRAIL SYSTEM: Power Plants up to ( 50 MW ) 54
55. ELKHEREIJI CORPORATION 2011
CLIENT : SH. ABDULELAH MAGHRABI
CONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : MERIIDIEN HOTEL JEDDAH / KSA.
CAPACITY : 18 x 200 TONS TRANE ( WITH MARKET )
SCOPE OF WORK : DESIGN, INSTALLATION & COMMISSIONING
HVAC, Plumbing. F. Fighting, Electrical, Kitchen, LPG, Diesel, Laundry,
Steam Boiler, BMS, LAN, Paging, Telephone, system
YEAR : 1997 > 1999
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
INDUSTRAIL SYSTEM: Consultancy 55
56. ELKHEREIJI CORPORATION 2011
CLIENT : SHK. ADEEL A. BATTERJEE. JEDDAH / KSA.
CONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : SONDUS HOTEL JEDDAH & MEDINAH
CAPACITY : 6x200 TON 3x250 TON CHILLER SYSTEM
SCOPE OF WORK : DESIGN AND EXECUTION HVAC WORK
YEAR : 1996 > 1997
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
OPERATION & MAINTENANCE: Full scale Residential complex 56
57. ELKHEREIJI CORPORATION 2011
CLIENT : SHK. ADEEL A. BATTERJEE. JEDDAH / KSA.
CONTRACTOR : ELKHEREIJI CORPORATION
PROJECT : SONDUS HOTEL JEDDAH & MEDINAH
CAPACITY : 6x200 TON 3x250 TON CHILLER SYSTEM
SCOPE OF WORK : DESIGN AND EXECUTION HVAC WORK
YEAR : 1996 > 1997
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
OPERATION & MAINTENANCE: Full scale Residential complex 57
58. ELKHEREIJI CORPORATION 2011
CLIENT : KING FAHD HOSPITAL EXTANSION / JEDDAH-KSA
MAIN CONTRACTOR : BIN SAMMAR CO.
SUBCONTACTOR : ELKHEREIJI CORPORATION
PROJECT : KING FAHD HOSPITAL EXTANSION / MEDICAL TOWER
CAPACITY : 1600 TR / CHILLED WATER SYSTEM
SCOPE OF WORK :HVAC., FIRE FIGHTING AND PLUMBING SYSTEM INSTALLATION &
COMMISSIONING
YEAR : 2010
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
58
INDUSTRAIL SYSTEM: Power Plants up to ( 50 MW )
59. ELKHEREIJI CORPORATION 2011
CLIENT : KING FAHD HOSPITAL EXTANSION / JEDDAH-KSA
MAIN CONTRACTOR : BIN SAMMAR CO.
SUBCONTACTOR : ELKHEREIJI CORPORATION
PROJECT : KING FAHD HOSPITAL EXTANSION / MEDICAL TOWER
CAPACITY : 1600 TR / CHILLED WATER SYSTEM
SCOPE OF WORK :HVAC., FIRE FIGHTING AND PLUMBING SYSTEM INSTALLATION &
COMMISSIONING
YEAR : 2010
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
59
OPERATION & MAINTENANCE: Full scale Residential complex
60. ELKHEREIJI CORPORATION 2011
CLIENT : KING FAHD HOSPITAL EXTANSION / JEDDAH-KSA
MAIN CONTRACTOR : BIN SAMMAR CO.
SUBCONTACTOR : ELKHEREIJI CORPORATION
PROJECT : KING FAHD HOSPITAL EXTANSION / MEDICAL TOWER
CAPACITY : 1600 TR / CHILLED WATER SYSTEM
SCOPE OF WORK :HVAC., FIRE FIGHTING AND PLUMBING SYSTEM INSTALLATION &
COMMISSIONING
YEAR : 2010
Tel. : +966 2 2610245 Fax : +966 2 2610247
60
www.ekc-ma.com E-mail info@ekc-ma.com
69. ELKHEREIJI CORPORATION 2011
CLIENT : SHK. EHSAN A.S. QURASHI MAKKAH -KSA
MAIN CONTRACTOR : ANAQEED CO.
SUBCONTACTOR : ELKHEREIJI CORPORATION
PROJECT : QURASHI FAMILY PALACE
CAPACITY : 650 TR.HVAC. SYSTEM INSTALLATION & COMMISSIONING
SCOPE OF WORK : HVAC.,DECORATIVE STEEL WORK, PAINT, GYBSUM AND Consultancy
YEAR : 2010 -2011
Tel. : +966 2 2610245 Fax : +966 2 2610247
69
www.ekc-ma.com E-mail info@ekc-ma.com
70. ELKHEREIJI CORPORATION 2011
CLIENT : SHK. EHSAN A.S. QURASHI MAKKAH -KSA
MAIN CONTRACTOR : ANAQEED CO.
SUBCONTACTOR : ELKHEREIJI CORPORATION
PROJECT : QURASHI FAMILY PALACE
CAPACITY : 650 TR.HVAC. SYSTEM INSTALLATION & COMMISSIONING
SCOPE OF WORK : HVAC.,DECORATIVE STEEL WORK, PAINT, GYBSUM AND Consultancy
YEAR : 2010 -2011
Tel. : +966 2 2610245 Fax : +966 2 2610247
70
www.ekc-ma.com E-mail info@ekc-ma.com
71. ELKHEREIJI CORPORATION 2011
WORK’S IN PROGRESS ( ELECTRO-MECHANICAL)
3. QUALITY CONTROL LABORATORY BUILDING ISLAMIC SEAPORT- JED./KSA
CLIENT NAME : NAIF ABO RIYASH CO.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN AND EXECUTION OF A/C SYSTEM (CHILLED WATER SYSTEM )
MEDICAL GAS SYSTEM, LPG SYSTEM, FIRE FIGHTING SYTEM,
R.O SYSTEM, MCC & DCCP SYSTEM
CAPACITY : 1625 TON.
2. HUTA-HEGER FELD SAUDIA LTD – JEDDAH / KSA.
CLIENT NAME : JOHNSON CONTROLS ( YORK )
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : INSTALLATION DX UNITS
CAPACTIY : 24 TON
3. INTERNCONTENANTAEL HOTEL – JEDDAH / KSA.
CLIENT NAME : JOHNSON CONROLS ( YORK )
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : REPLACEMENT CHILLED WATER CIRCULATION PUMPS
CAPACTIY : 1260 GPM
4. ABDUL SAMAD QURASHI THE HOUSE OF OUD,AMBER & PARFUMES– JEDDAH / KSA.
CLIENT NAME : ABDUL SAMAD QURASHI ( ANDULUS MALL )
MAIN CONRACTOR : ANAQEED CO.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : A/C SYSTEM
CAPACTIY : 10 TR.
5. ABDUL SAMAD QURASHI THE HOUSE OF OUD,AMBER & PARFUMES– JEDDAH / KSA.
CLIENT NAME : ABDUL SAMAD QURASHI ( TAHLIA ROAD )
MAIN CONRACTOR : ANAQEED CO.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : A/C SYSTEM
CAPACTIY : 10 TR.
OUR EXPERTISE, FULL SERVICE ELECTRO-MECHANICAL WORKS
71
72. ELKHEREIJI CORPORATION 2011
WORK’S IN PROGRESS ( ELECTRO-MECHANICAL)
6. KING FAHD HOSPITAL EXTANSION- JEDDAH/KSA
CLIENT NAME : BIN SAMMAR CO.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN AND EXECUTION OF HVAC (CHILLED WATER SYSTEM )
PLUMBING AND FIRE FIGHTING SYTEM.
CAPACITY : 1600 TON.
7. THAGER HOSPITAL – JEDDAH / KSA.
CLIENT NAME : RABYA CO
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN AND EXECUTION OF HVAC AND FIRE FIGHTING SYSTEM
CAPACTIY : 445 TON DX SYSTEM
8. SHARBATLY SUPERMARKET – JEDDAH / KSA.
CLIENT NAME : RABYA CO.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN AND EXECUTION OF HVAC AND FIRE FIGHTING SYSTEM
CAPACTIY : 100 TON PACKAGE SYSTEM
9. EHSAN & MOHAMMED QURASHI PALACE’S MAKKAH / KSA
CLIENT NAME : QURASHI FAMILY
MAIN CONRACTOR : ANAQEED CO.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN AND EXECUTION HVAC & ELECTRO-MECHANICAL SYSTEM
CAPACTIY : 350 TR.
10. NORTHERN DRAINAGE CHANNEL JEDDAH / KSA
CLIENT NAME : JEDDAH MUNICIPALITY
MAIN CONRACTOR : STFA & ELWAN J.W.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : VENTILATION SYSTEM
CAPACTIY : 975,000 CFM
Tel. : +966 2 261 0245 / 261 0246, Fax : +966 2 261 0247 72
73. ELKHEREIJI CORPORATION 2011
WORK’S IN PROGRESS ( ELECTRO-MECHANICAL)
11. ABDUL MUNEIM VILLA- JEDDAH/KSA
CLIENT NAME : ABDUL MUNEIM SHEIK
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN AND EXECUTION OF HVAC
CAPACITY : 58 TON.
12 KING FAISAL HOSPITAL – MAKKAH / KSA.
CLIENT NAME : BIN SAMMAR CO.
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN AND EXECUTION OF HVAC,PLUMBING, LPG, BOILER, WATER
TREATMENT AND FIRE FIGHTING SYSTEM
CAPACTIY : 2500 TON COOILING ( CHILLED WATER SYSTEM )
13 DR. SAMEER ABBAS HOSPITAL – JEDDAH / KSA.
CLIENT NAME : DR. SAMEER ABBAS
CONTRACTOR : ELKHEREIJI CORPORATION
SCOPE OF WORK : DESIGN AND EXECUTION OF HVAC,PLUMBING, LPG, BOILER, WATER
TREATMENT AND FIRE FIGHTING SYSTEM, ELECTRIC, BMS. CCTV.
NURSE CALL, MASTER CLOCK, DATA, TELEPHONE SYSTEM
CAPACTIY : 2000 TON COOILING ( CHILLED WATER SYSTEM )
Tel. : +966 2 261 0245 / 261 0246, Fax : +966 2 261 0247