Ten Organizational Design Models to align structure and operations to busines...
Senior project work log
1. Product Work Log
Name Emma Driggs Date 9/13/11
Product Original Song
18 hours 45 minutes
Date/Time:
9/14/11 (1 hour) Activity: Came up with title and
meaning of the song I wanted to make.
9/18/11 (1 hour 30 Activity: Had a guitar lesson with my
min) teacher who is also my project
facilitator. He helped with coming up
with chords to my song.
9/28/11 (45 min) Activity: Continued to work on lyrics.
10/15/11 (2 hours) Activity: Had a lesson with facilitator
then came home and continued
working on different chords and
melodies.
10/30/11 (2 hours 30 Activity: Worked on finishing up the
minutes) first verse and part of the chorus.
11/3/11 (1 hour 15 Activity: Came up with chords for the
min) chorus.
11/18/11 (2 hours) Activity: Finished working on chorus
and began writing the second verse.
11/24/11 (1 hour 45 Activity: Continued working on second
min) verse and melody.
12/22/11 (1 hour 15 Activity: Struggled with finding perfect
min) melody for second verse.
2. 1/3/12 (1 hour) Activity: Continued working on second
verse.
1/15/12 (45 min) Activity: Worked on second verse.
2/17/12 (1 hour 45 Activity: Finished second verse, started
min) working on the bridge.
3/7/12 (1 hour 30 Activity: Worked on chords for bridge.
min)
3/12/12 (2 hours 15 Activity: Worked on lyrics for bridge.
min)
Activity: Finished up the bridge.
3/18/12 (1 hour 30)
Activity: Had a lesson with my project
3/22/12 (1 hour 45 facilitator, finished up the song.
min)
4/12/12 (2 hours 45 Activity: Recorded the song and
min) burned it to a cd.