Distribution Related Engineering Asset Management System
(DREAMS)
P. Mukherjee
Dy. General Manager
IT - New Initiatives
7th October, 2013
CESC – Electricity Generation & Distribution Company

Serving Calcutta & its adjoining areas since 1897.

The electrification of Calcutta took place 17 years
after New York & 11 years after London.
The Calcutta Tramways switched to electricity
from horse drawn carriages in 1902.
CESC now belongs to the youngest & one of the most
vibrant industrial houses – RP - Sanjiv Goenka
Group since 2011.
CESC – Electricity Generation & Distribution Company

Licensed Area of 567 sq. km.
Total Generating Capacity : 1225 MW
Peak Demand : 1900 MW
Average Demand : 1600-1700 MW
Total Low Tension Consumer Base : 27.20 Lacs
Total High Tension Consumer Base : 1726
CESC’s Experience
Earlier Scenario :
Unstructured and non uniform practices followed in
maintaining records of Asset and their up-keep.
CM & CBM were mostly not supported.
Leading to disproportionately
more
maintenance than planned maintenance .

unplanned

Difficulty in estimating maintenance cost and analyzing
maintenance performance.
Solution : CESC’s Asset Management Software.

Distribution Related Engineering Asset Management System
(DREAMS)
 Features and Functionalities of DREAMS
Integrated Asset Register of major electrical plant and equipment in use
including allied assets such as Substations building, premises and yards.
Maintenance Management functionalities encompassing
Preventive Maintenance(PM)
Status & Condition Monitoring (SM&CM)
Condition Based Maintenance (CBM)
Repair/Breakdown Maintenance (BM)
Abnormal Observation (AO)
Carrying out all maintenance activities as per SM,CM,PM regimes
stored in the system.
Analyze, interpret and maintain the transformers with the help of the
Dissolve Gas Analysis (DGA) Dash-Board tool integrated with the system.

Handing Over Taking Over (HOTO) Module for managing assets during
creation, installation and commissioning before handing over to
Operations & Maintenance (O/M) group.
DREAMS
ASSETS CONSIDERED
 Power Transformer

 33/0.4 kV Earthing Transformer
 33/0.4 kV Auxiliary Transformer
 Indoor Switchboard
 Outdoor Circuit Breaker
 Outdoor Isolator
 Outdoor CT
 Outdoor VT

 Distribution Transformer

 Outdoor Lightning Arrester
 Ring Main Unit (RMU)
 Premises
 Neutral Earthing Switch
 Outdoor Cable Sealing End
 Battery
 Battery Charger
 Capacitor Bank

Total No. of Assets as on date : 24578
DREAMS
 CODIFICATION OF ASSETS
 An algorithm was formulated to assign an 8 character unique code to all assets
 The left most character signifies the Super Category like Power Transformer etc.
 The next left most character denotes the Primary Voltage like 220KV etc.
 The next five digits from left is a unique serial number
 The right most character is used to differentiate amongst assets of same primary
voltage but with different secondary voltage.
 Super Category : Power Transformer

 Super Category : Distribution Transformer

220/132/33 KV Power Transformer

A7*****O

11/0.4 KV Distribution Transformer

B3*****A

132/33 KV Power Transformer

A6*****O

11/6-0.4 KV Distribution Transformer

B3*****B

33/20 KV Power Transformer

A5*****A

6/0.4 KV Distribution Transformer

B2*****O

33/11 KV Power Transformer

A5*****B

33/11-6 KV Power Transformer

A5*****C

33/6 KV Power Transformer

A5*****D

20/6 KV Power Transformer

A4*****O

11/6 KV Power Transformer

A3*****O

6/3.3 KV Power Transformer

A2*****O
DREAMS
 Asset Searching



 ASSET REGISTER

Assets searched using different criteria such as category/location/make/name/Asset No.
All criteria appear on the upper part of left pane of the screen.

 General Tab


The list of assets based on the selected searching criteria appears on the right pane.



All the attributes displayed alongside the asset no. with a scrolling facility.
DREAMS
 Asset Sorting & Filtering

 ASSET REGISTER



Sorting of Assets based on the values of any attribute in ascending/descending
order.



Application of Filter on the values of any attribute of Assets.
DREAMS
 Health Tab


 ASSET REGISTER

Indication of health of any asset through color codes based on the last observations from
SM/CM/AO.

‘RED’ -> URGENT

’BLUE’ -> IMPORTANT
DREAMS
 ASSET REGISTER
 Maintenance Tab


Display of schedule for forthcoming maintenance activity (SM/CM/PM) as on date

through color codes based on the periodicity as mentioned in the maintenance Regime.
‘RED’ -> OVERDUE
’BLUE’ -> scheduled within one month.
DREAMS
 MAINTENANCE FUNCTIONS
 Status Monitoring (SM)


Monitoring of assets through visual inspection.




Urgent/Important observations posted in the system.
Job Allocation & Attending to the job by O&M engineers.
DREAMS
 MAINTENANCE FUNCTIONS

 Condition Monitoring (CM)


Monitoring of assets by measurements through Intrusive & Non-Intrusive activities.




Non-Intrusive CM (e.g. Thermo-graphic Scanning etc.) measurements posted in the system.




Non-Intrusive CM Re-measurement done again.
Intrusive CM measurements (e.g. IR & PI Values etc.) are taken & posted by O&M
departments.

Job Allocation & Attending to the job by O&M engineers.

 Non-Intrusive CM
DREAMS
 MAINTENANCE FUNCTIONS

 Preventive Maintenance (PM)


The Preventive Maintenance (PM) done by O&M departments as per the schedule
mentioned in the PM Regime.
DREAMS
 MAINTENANCE FUNCTIONS

 Maintenance Regime


The SM/CM/PM Regime for different categories of assets are stored in the system.
DREAMS
 MAINTENANCE FUNCTIONS

 Queries & Reports


There are a host of queries & reports which caters to the diverse requirements across all
user departments.
DREAMS
 MAINTENANCE FUNCTIONS

 Dissolve Gas Analysis (DGA) Dash Board



The results of gases (CH4,C2H2,C2H4 etc.) from oil samples of Power Transformer posted
inside the DGA Dash Board.
Six different interpretation methods such as :- IEC Reference, ROGER’s Ratio, DORNENBERG’s
Ratio, Key Gas Method, Combustible Gas Method, Permissible Concentration Gas Method
used to interpret the health of the transformer.
DREAMS
 MAINTENANCE FUNCTIONS

 Dissolve Gas Analysis (DGA) Dash Board



The results of gases CH4,C2H2,C2H4 can also be plotted on Duval Triangle .
Trend Analysis of dissolved gases through Line & Bar Chart is also possible.
DREAMS
 HARDWARE PLATFORM
CENTRALISED ARCHITECTURE
SUN
M4000
(App)

SUN
M4000
(DB)

4 Ultra
Sparc VII+

E

4 Ultra Sparc VII+

128 GB

C

128 GB

S

C

ONLINE
ACCESS

SUN Storage
Tek 6580 (16 TB)

DATA CENTRE

CENTRAL SERVER REGIONAL SERVICES

N
E

T

PCs at User End
DREAMS
SOFTWARE PLATFORM
State of the Art Technology
 O/S

: Sun Solaris 10

 Database

: Oracle 10g Enterprise Edition

 Application tier : J2EE (Glassfish)
 Front end

: Web browser (Internet Explorer)

 Architecture : 3-Tier
Browser - Application Server - Database Server
DREAMS
ENGINEERING EXCELLENCE
 Pioneering effort in conceptualization, design, development and
implementation of a state-of-the-art IT application for Engineering
Asset Management, developed in-house.

 Multi-faceted Asset Register.
Provides entire Asset database on finger tips.
An innovatively designed single window for viewing all asset
information, health & maintenance schedules together.

 Dissolve Gas Analysis (DGA) Dashboard :
 A perfect analysis tool to identify failure prone Power Transformers
and thereby taking proactive measures to avoid breakdown.
DREAMS
KEY IMPACTS

 Significant reduction in un-planned maintenance.
 Inculcating a new philosophy of planned maintenance through :
 Status Monitoring (SM)
 Condition Monitoring (CM) & Condition Based Maintenance (CBM)
 Preventive Maintenance (PM)

 Resultant Fault Reduction in Switchgears
Till Mar 2013

160

140

2011-12

120

2012-13

136

112

100

81

80

63
60

40

24
20

18

0

11 KV DOWNSTREAM
SWITCHGEAR

6 KV DOWNSTREAM
SWITCHGEAR

TOTAL DOWNSTREAM
SWITCHGEAR
DREAMS
 Financial

KEY IMPACTS

Rupees in Lacs

Till Mar 2013

 Green Initiative
 Paper-less storage of asset information and maintenance records.
 Paper-less communication through system generated emails.
DREAMS
KEY IMPACTS


Tracking of assets throughout its lifecycle.



Planning and allocation of appropriate resources by O&M
Departments well ahead of time.



A host of queries and reports available to monitor the timely
completion of O&M activities, identify performing & non-performing
assets.



Analysis of commissioning and maintenance related data in order to
provide insight into asset performance and planning for its
replacement.
DREAMS
FUTURE READINESS


Having potential to make itself scalable at the
enterprise level by including assets of Generation and
Transmission.



Capable of Integration with Geographical Information
Systems (GIS)



Capable of Integration with ERP for Finance and
Purchase Divisions.
DREAMS

e-mail : partha.mukherjee@rp-sg.in

Contenu connexe

Tendances

Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Gensol Engineering Limited
 
Steam thermal power plant(panki)
Steam thermal power plant(panki)Steam thermal power plant(panki)
Steam thermal power plant(panki)Ranjeet Kumar
 
Suratgarh Super Thermal Power Plant
Suratgarh Super Thermal Power PlantSuratgarh Super Thermal Power Plant
Suratgarh Super Thermal Power PlantHarshit Madaan
 
HYDRAIL: Fuel Cell Solutions for Rail Applications
HYDRAIL: Fuel Cell Solutions for Rail ApplicationsHYDRAIL: Fuel Cell Solutions for Rail Applications
HYDRAIL: Fuel Cell Solutions for Rail ApplicationsBallard Power Systems Inc.
 
kota super thermal Power station training report
kota super thermal Power station training reportkota super thermal Power station training report
kota super thermal Power station training reportEr. Aman Agrawal
 
ETAP - csd - Control System Diagram
ETAP - csd - Control System DiagramETAP - csd - Control System Diagram
ETAP - csd - Control System DiagramHimmelstern
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...haxxo24
 
Dynamic model of pmsm dal y.ohm
Dynamic model of pmsm dal y.ohmDynamic model of pmsm dal y.ohm
Dynamic model of pmsm dal y.ohmwarluck88
 
Compressed Air Energy Storage
Compressed Air Energy StorageCompressed Air Energy Storage
Compressed Air Energy StorageSharathKumar528
 
Workshop on high efficiency and low-cost drivetrains for electric vehicles
Workshop on high efficiency and low-cost drivetrains for electric vehiclesWorkshop on high efficiency and low-cost drivetrains for electric vehicles
Workshop on high efficiency and low-cost drivetrains for electric vehiclesLeonardo ENERGY
 
R01.RDSS-PPT _Ver-1.0 (28.04.23) New (1).pptx
R01.RDSS-PPT _Ver-1.0 (28.04.23) New (1).pptxR01.RDSS-PPT _Ver-1.0 (28.04.23) New (1).pptx
R01.RDSS-PPT _Ver-1.0 (28.04.23) New (1).pptxSudipDutta53
 
Charging Electric Vehicles with Renewables: Emerging Strategies to Meet Custo...
Charging Electric Vehicles with Renewables: Emerging Strategies to Meet Custo...Charging Electric Vehicles with Renewables: Emerging Strategies to Meet Custo...
Charging Electric Vehicles with Renewables: Emerging Strategies to Meet Custo...World Resources Institute (WRI)
 
bidding strategies in indian restructured power market
bidding strategies in indian restructured power marketbidding strategies in indian restructured power market
bidding strategies in indian restructured power marketKomal Nigam
 
electric vehicle infrastructure
electric vehicle infrastructureelectric vehicle infrastructure
electric vehicle infrastructureRajesh Bishnoi
 

Tendances (20)

project report
project reportproject report
project report
 
Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System
 
Steam thermal power plant(panki)
Steam thermal power plant(panki)Steam thermal power plant(panki)
Steam thermal power plant(panki)
 
Suratgarh Super Thermal Power Plant
Suratgarh Super Thermal Power PlantSuratgarh Super Thermal Power Plant
Suratgarh Super Thermal Power Plant
 
CESC PROJECT
CESC PROJECTCESC PROJECT
CESC PROJECT
 
HYDRAIL: Fuel Cell Solutions for Rail Applications
HYDRAIL: Fuel Cell Solutions for Rail ApplicationsHYDRAIL: Fuel Cell Solutions for Rail Applications
HYDRAIL: Fuel Cell Solutions for Rail Applications
 
kota super thermal Power station training report
kota super thermal Power station training reportkota super thermal Power station training report
kota super thermal Power station training report
 
ETAP - csd - Control System Diagram
ETAP - csd - Control System DiagramETAP - csd - Control System Diagram
ETAP - csd - Control System Diagram
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
 
Dynamic model of pmsm dal y.ohm
Dynamic model of pmsm dal y.ohmDynamic model of pmsm dal y.ohm
Dynamic model of pmsm dal y.ohm
 
Compressed Air Energy Storage
Compressed Air Energy StorageCompressed Air Energy Storage
Compressed Air Energy Storage
 
Workshop on high efficiency and low-cost drivetrains for electric vehicles
Workshop on high efficiency and low-cost drivetrains for electric vehiclesWorkshop on high efficiency and low-cost drivetrains for electric vehicles
Workshop on high efficiency and low-cost drivetrains for electric vehicles
 
R01.RDSS-PPT _Ver-1.0 (28.04.23) New (1).pptx
R01.RDSS-PPT _Ver-1.0 (28.04.23) New (1).pptxR01.RDSS-PPT _Ver-1.0 (28.04.23) New (1).pptx
R01.RDSS-PPT _Ver-1.0 (28.04.23) New (1).pptx
 
Charging Electric Vehicles with Renewables: Emerging Strategies to Meet Custo...
Charging Electric Vehicles with Renewables: Emerging Strategies to Meet Custo...Charging Electric Vehicles with Renewables: Emerging Strategies to Meet Custo...
Charging Electric Vehicles with Renewables: Emerging Strategies to Meet Custo...
 
Maximum power point tracking algorithms for wind energy systems
Maximum power point tracking algorithms for wind energy systemsMaximum power point tracking algorithms for wind energy systems
Maximum power point tracking algorithms for wind energy systems
 
Railway Training ppt
Railway Training pptRailway Training ppt
Railway Training ppt
 
introuduction DLW varanaesi
introuduction DLW varanaesiintrouduction DLW varanaesi
introuduction DLW varanaesi
 
Compressed Air Energy Storage CAES
Compressed Air Energy Storage CAESCompressed Air Energy Storage CAES
Compressed Air Energy Storage CAES
 
bidding strategies in indian restructured power market
bidding strategies in indian restructured power marketbidding strategies in indian restructured power market
bidding strategies in indian restructured power market
 
electric vehicle infrastructure
electric vehicle infrastructureelectric vehicle infrastructure
electric vehicle infrastructure
 

En vedette (9)

Cesc
CescCesc
Cesc
 
project
projectproject
project
 
UNMESH 2015 modified Presentation
UNMESH 2015 modified PresentationUNMESH 2015 modified Presentation
UNMESH 2015 modified Presentation
 
Cesc Intro English
Cesc Intro   EnglishCesc Intro   English
Cesc Intro English
 
CESC_cert
CESC_certCESC_cert
CESC_cert
 
CESC LTD PPT ON STRATEGIC MANAGEMENT
CESC LTD PPT ON STRATEGIC MANAGEMENTCESC LTD PPT ON STRATEGIC MANAGEMENT
CESC LTD PPT ON STRATEGIC MANAGEMENT
 
ProjectReport
ProjectReportProjectReport
ProjectReport
 
Training and development ppt
Training and development pptTraining and development ppt
Training and development ppt
 
RECRUITMENT AND SELECTION
RECRUITMENT AND SELECTIONRECRUITMENT AND SELECTION
RECRUITMENT AND SELECTION
 

Similaire à DREAMS: Distribution Related Engineering Asset Management System

IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...IEA DSM Implementing Agreement (IA)
 
Real Time E-metering and Automation of KCT College Campus using an Android Mo...
Real Time E-metering and Automation of KCT College Campus using an Android Mo...Real Time E-metering and Automation of KCT College Campus using an Android Mo...
Real Time E-metering and Automation of KCT College Campus using an Android Mo...Eswar Publications
 
Speed Control of Dc Motor using Adaptive PID with SMC Scheme
Speed Control of Dc Motor using Adaptive PID with SMC SchemeSpeed Control of Dc Motor using Adaptive PID with SMC Scheme
Speed Control of Dc Motor using Adaptive PID with SMC SchemeIRJET Journal
 
Classification of electric motors
Classification of electric motors Classification of electric motors
Classification of electric motors Sudhanshu Tripathi
 
IRJET-IoT based Smart Electricity Meter and Power Theft Detection
IRJET-IoT based Smart Electricity Meter and Power Theft DetectionIRJET-IoT based Smart Electricity Meter and Power Theft Detection
IRJET-IoT based Smart Electricity Meter and Power Theft DetectionIRJET Journal
 
TRANSFORMER FAULT DETECTION AND MONITORING
TRANSFORMER FAULT DETECTION AND MONITORINGTRANSFORMER FAULT DETECTION AND MONITORING
TRANSFORMER FAULT DETECTION AND MONITORINGIRJET Journal
 
Mohamed Saad Resume
Mohamed Saad ResumeMohamed Saad Resume
Mohamed Saad ResumeMohamed Saad
 
GSM Besed prepaid energy meter
GSM Besed prepaid energy meterGSM Besed prepaid energy meter
GSM Besed prepaid energy meterGovil sharma
 
IRJET- Speed Control of BLDC Motor using PID Tuned Fuzzy Controller
IRJET-  	  Speed Control of BLDC Motor using PID Tuned Fuzzy ControllerIRJET-  	  Speed Control of BLDC Motor using PID Tuned Fuzzy Controller
IRJET- Speed Control of BLDC Motor using PID Tuned Fuzzy ControllerIRJET Journal
 
Gsm Based Energy Meter Monitoring and Load Control
Gsm Based Energy Meter Monitoring and Load ControlGsm Based Energy Meter Monitoring and Load Control
Gsm Based Energy Meter Monitoring and Load ControlIRJET Journal
 
Using capacitive switch cum sensor made of reclaimed materials for preventing...
Using capacitive switch cum sensor made of reclaimed materials for preventing...Using capacitive switch cum sensor made of reclaimed materials for preventing...
Using capacitive switch cum sensor made of reclaimed materials for preventing...IRJET Journal
 
A verilog based simulation methodology for estimating statistical test for th...
A verilog based simulation methodology for estimating statistical test for th...A verilog based simulation methodology for estimating statistical test for th...
A verilog based simulation methodology for estimating statistical test for th...ijsrd.com
 
Automated Wind and Solar Powered Water Drone Monitoring and Controlling System
Automated Wind and Solar Powered Water Drone Monitoring and Controlling SystemAutomated Wind and Solar Powered Water Drone Monitoring and Controlling System
Automated Wind and Solar Powered Water Drone Monitoring and Controlling SystemIRJET Journal
 
Monet, an IoT Energy Management Platform based on MongoDB
Monet, an IoT Energy Management Platform based on MongoDBMonet, an IoT Energy Management Platform based on MongoDB
Monet, an IoT Energy Management Platform based on MongoDBSam_Francis
 
Agent based Load Management for Microgrid
Agent based Load Management for MicrogridAgent based Load Management for Microgrid
Agent based Load Management for MicrogridMohamed Abbas
 
Prepaid energy meter with gsm interface
Prepaid energy meter with gsm interfacePrepaid energy meter with gsm interface
Prepaid energy meter with gsm interfaceEdgefxkits & Solutions
 
IRJET- Automatic Mseb Meter Reading
IRJET- Automatic Mseb Meter ReadingIRJET- Automatic Mseb Meter Reading
IRJET- Automatic Mseb Meter ReadingIRJET Journal
 

Similaire à DREAMS: Distribution Related Engineering Asset Management System (20)

CESC Limited
CESC LimitedCESC Limited
CESC Limited
 
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
 
Real Time E-metering and Automation of KCT College Campus using an Android Mo...
Real Time E-metering and Automation of KCT College Campus using an Android Mo...Real Time E-metering and Automation of KCT College Campus using an Android Mo...
Real Time E-metering and Automation of KCT College Campus using an Android Mo...
 
Speed Control of Dc Motor using Adaptive PID with SMC Scheme
Speed Control of Dc Motor using Adaptive PID with SMC SchemeSpeed Control of Dc Motor using Adaptive PID with SMC Scheme
Speed Control of Dc Motor using Adaptive PID with SMC Scheme
 
Classification of electric motors
Classification of electric motors Classification of electric motors
Classification of electric motors
 
IRJET-IoT based Smart Electricity Meter and Power Theft Detection
IRJET-IoT based Smart Electricity Meter and Power Theft DetectionIRJET-IoT based Smart Electricity Meter and Power Theft Detection
IRJET-IoT based Smart Electricity Meter and Power Theft Detection
 
TRANSFORMER FAULT DETECTION AND MONITORING
TRANSFORMER FAULT DETECTION AND MONITORINGTRANSFORMER FAULT DETECTION AND MONITORING
TRANSFORMER FAULT DETECTION AND MONITORING
 
Mohamed Saad Resume
Mohamed Saad ResumeMohamed Saad Resume
Mohamed Saad Resume
 
1.4
1.41.4
1.4
 
GSM Besed prepaid energy meter
GSM Besed prepaid energy meterGSM Besed prepaid energy meter
GSM Besed prepaid energy meter
 
IRJET- Speed Control of BLDC Motor using PID Tuned Fuzzy Controller
IRJET-  	  Speed Control of BLDC Motor using PID Tuned Fuzzy ControllerIRJET-  	  Speed Control of BLDC Motor using PID Tuned Fuzzy Controller
IRJET- Speed Control of BLDC Motor using PID Tuned Fuzzy Controller
 
Amarjeet Copy
Amarjeet   CopyAmarjeet   Copy
Amarjeet Copy
 
Gsm Based Energy Meter Monitoring and Load Control
Gsm Based Energy Meter Monitoring and Load ControlGsm Based Energy Meter Monitoring and Load Control
Gsm Based Energy Meter Monitoring and Load Control
 
Using capacitive switch cum sensor made of reclaimed materials for preventing...
Using capacitive switch cum sensor made of reclaimed materials for preventing...Using capacitive switch cum sensor made of reclaimed materials for preventing...
Using capacitive switch cum sensor made of reclaimed materials for preventing...
 
A verilog based simulation methodology for estimating statistical test for th...
A verilog based simulation methodology for estimating statistical test for th...A verilog based simulation methodology for estimating statistical test for th...
A verilog based simulation methodology for estimating statistical test for th...
 
Automated Wind and Solar Powered Water Drone Monitoring and Controlling System
Automated Wind and Solar Powered Water Drone Monitoring and Controlling SystemAutomated Wind and Solar Powered Water Drone Monitoring and Controlling System
Automated Wind and Solar Powered Water Drone Monitoring and Controlling System
 
Monet, an IoT Energy Management Platform based on MongoDB
Monet, an IoT Energy Management Platform based on MongoDBMonet, an IoT Energy Management Platform based on MongoDB
Monet, an IoT Energy Management Platform based on MongoDB
 
Agent based Load Management for Microgrid
Agent based Load Management for MicrogridAgent based Load Management for Microgrid
Agent based Load Management for Microgrid
 
Prepaid energy meter with gsm interface
Prepaid energy meter with gsm interfacePrepaid energy meter with gsm interface
Prepaid energy meter with gsm interface
 
IRJET- Automatic Mseb Meter Reading
IRJET- Automatic Mseb Meter ReadingIRJET- Automatic Mseb Meter Reading
IRJET- Automatic Mseb Meter Reading
 

Plus de engineeringwatch

Engineering Watch Fellowship Portfolio
Engineering Watch Fellowship PortfolioEngineering Watch Fellowship Portfolio
Engineering Watch Fellowship Portfolioengineeringwatch
 
Engineering Watch Fellowship Questionnaire Booklet
Engineering Watch Fellowship Questionnaire BookletEngineering Watch Fellowship Questionnaire Booklet
Engineering Watch Fellowship Questionnaire Bookletengineeringwatch
 
Presentation :: Curtain Raiser :: Re-Engineering India 2014
Presentation :: Curtain Raiser :: Re-Engineering India 2014 Presentation :: Curtain Raiser :: Re-Engineering India 2014
Presentation :: Curtain Raiser :: Re-Engineering India 2014 engineeringwatch
 
A novel drip irrigation system
A novel drip irrigation systemA novel drip irrigation system
A novel drip irrigation systemengineeringwatch
 
Wankhede nomination 31-08-2013
Wankhede nomination   31-08-2013Wankhede nomination   31-08-2013
Wankhede nomination 31-08-2013engineeringwatch
 
The capital nomination 31-08-2013
The capital nomination   31-08-2013The capital nomination   31-08-2013
The capital nomination 31-08-2013engineeringwatch
 
Ongc tripura power company limited
Ongc tripura power company limitedOngc tripura power company limited
Ongc tripura power company limitedengineeringwatch
 
Bharatiya nabhikiya vidyut nigam limited (bhavini)
Bharatiya nabhikiya vidyut nigam limited (bhavini)Bharatiya nabhikiya vidyut nigam limited (bhavini)
Bharatiya nabhikiya vidyut nigam limited (bhavini)engineeringwatch
 
Larsen & toubro constructions
Larsen & toubro constructionsLarsen & toubro constructions
Larsen & toubro constructionsengineeringwatch
 
Airports authority of india,kolkata
Airports authority of india,kolkataAirports authority of india,kolkata
Airports authority of india,kolkataengineeringwatch
 

Plus de engineeringwatch (20)

Eduindia UPTU Portfolio
Eduindia UPTU PortfolioEduindia UPTU Portfolio
Eduindia UPTU Portfolio
 
Engineering Watch Fellowship Portfolio
Engineering Watch Fellowship PortfolioEngineering Watch Fellowship Portfolio
Engineering Watch Fellowship Portfolio
 
Eduindia Portfolio
Eduindia PortfolioEduindia Portfolio
Eduindia Portfolio
 
Engineering Watch Fellowship Questionnaire Booklet
Engineering Watch Fellowship Questionnaire BookletEngineering Watch Fellowship Questionnaire Booklet
Engineering Watch Fellowship Questionnaire Booklet
 
Edu india presentation
Edu india presentationEdu india presentation
Edu india presentation
 
Presentation :: Curtain Raiser :: Re-Engineering India 2014
Presentation :: Curtain Raiser :: Re-Engineering India 2014 Presentation :: Curtain Raiser :: Re-Engineering India 2014
Presentation :: Curtain Raiser :: Re-Engineering India 2014
 
A novel drip irrigation system
A novel drip irrigation systemA novel drip irrigation system
A novel drip irrigation system
 
Wankhede nomination 31-08-2013
Wankhede nomination   31-08-2013Wankhede nomination   31-08-2013
Wankhede nomination 31-08-2013
 
The capital nomination 31-08-2013
The capital nomination   31-08-2013The capital nomination   31-08-2013
The capital nomination 31-08-2013
 
Globus infocom limited
Globus infocom limitedGlobus infocom limited
Globus infocom limited
 
Ongc tripura power company limited
Ongc tripura power company limitedOngc tripura power company limited
Ongc tripura power company limited
 
Bharatiya nabhikiya vidyut nigam limited (bhavini)
Bharatiya nabhikiya vidyut nigam limited (bhavini)Bharatiya nabhikiya vidyut nigam limited (bhavini)
Bharatiya nabhikiya vidyut nigam limited (bhavini)
 
Hll lifecare ltd.
Hll lifecare ltd.Hll lifecare ltd.
Hll lifecare ltd.
 
Csir cftri
Csir cftriCsir cftri
Csir cftri
 
Hll lifecare ltd.
Hll lifecare ltd.Hll lifecare ltd.
Hll lifecare ltd.
 
Beml limited
Beml limitedBeml limited
Beml limited
 
Beml limited
Beml limitedBeml limited
Beml limited
 
Larsen & toubro constructions
Larsen & toubro constructionsLarsen & toubro constructions
Larsen & toubro constructions
 
Hscc (india) ltd
Hscc (india) ltdHscc (india) ltd
Hscc (india) ltd
 
Airports authority of india,kolkata
Airports authority of india,kolkataAirports authority of india,kolkata
Airports authority of india,kolkata
 

Dernier

Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 

Dernier (20)

Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 

DREAMS: Distribution Related Engineering Asset Management System

  • 1. Distribution Related Engineering Asset Management System (DREAMS) P. Mukherjee Dy. General Manager IT - New Initiatives 7th October, 2013
  • 2. CESC – Electricity Generation & Distribution Company Serving Calcutta & its adjoining areas since 1897. The electrification of Calcutta took place 17 years after New York & 11 years after London. The Calcutta Tramways switched to electricity from horse drawn carriages in 1902. CESC now belongs to the youngest & one of the most vibrant industrial houses – RP - Sanjiv Goenka Group since 2011.
  • 3. CESC – Electricity Generation & Distribution Company Licensed Area of 567 sq. km. Total Generating Capacity : 1225 MW Peak Demand : 1900 MW Average Demand : 1600-1700 MW Total Low Tension Consumer Base : 27.20 Lacs Total High Tension Consumer Base : 1726
  • 4. CESC’s Experience Earlier Scenario : Unstructured and non uniform practices followed in maintaining records of Asset and their up-keep. CM & CBM were mostly not supported. Leading to disproportionately more maintenance than planned maintenance . unplanned Difficulty in estimating maintenance cost and analyzing maintenance performance. Solution : CESC’s Asset Management Software. Distribution Related Engineering Asset Management System (DREAMS)
  • 5.  Features and Functionalities of DREAMS Integrated Asset Register of major electrical plant and equipment in use including allied assets such as Substations building, premises and yards. Maintenance Management functionalities encompassing Preventive Maintenance(PM) Status & Condition Monitoring (SM&CM) Condition Based Maintenance (CBM) Repair/Breakdown Maintenance (BM) Abnormal Observation (AO) Carrying out all maintenance activities as per SM,CM,PM regimes stored in the system. Analyze, interpret and maintain the transformers with the help of the Dissolve Gas Analysis (DGA) Dash-Board tool integrated with the system. Handing Over Taking Over (HOTO) Module for managing assets during creation, installation and commissioning before handing over to Operations & Maintenance (O/M) group.
  • 6. DREAMS ASSETS CONSIDERED  Power Transformer  33/0.4 kV Earthing Transformer  33/0.4 kV Auxiliary Transformer  Indoor Switchboard  Outdoor Circuit Breaker  Outdoor Isolator  Outdoor CT  Outdoor VT  Distribution Transformer  Outdoor Lightning Arrester  Ring Main Unit (RMU)  Premises  Neutral Earthing Switch  Outdoor Cable Sealing End  Battery  Battery Charger  Capacitor Bank Total No. of Assets as on date : 24578
  • 7. DREAMS  CODIFICATION OF ASSETS  An algorithm was formulated to assign an 8 character unique code to all assets  The left most character signifies the Super Category like Power Transformer etc.  The next left most character denotes the Primary Voltage like 220KV etc.  The next five digits from left is a unique serial number  The right most character is used to differentiate amongst assets of same primary voltage but with different secondary voltage.  Super Category : Power Transformer  Super Category : Distribution Transformer 220/132/33 KV Power Transformer A7*****O 11/0.4 KV Distribution Transformer B3*****A 132/33 KV Power Transformer A6*****O 11/6-0.4 KV Distribution Transformer B3*****B 33/20 KV Power Transformer A5*****A 6/0.4 KV Distribution Transformer B2*****O 33/11 KV Power Transformer A5*****B 33/11-6 KV Power Transformer A5*****C 33/6 KV Power Transformer A5*****D 20/6 KV Power Transformer A4*****O 11/6 KV Power Transformer A3*****O 6/3.3 KV Power Transformer A2*****O
  • 8. DREAMS  Asset Searching    ASSET REGISTER Assets searched using different criteria such as category/location/make/name/Asset No. All criteria appear on the upper part of left pane of the screen.  General Tab  The list of assets based on the selected searching criteria appears on the right pane.  All the attributes displayed alongside the asset no. with a scrolling facility.
  • 9. DREAMS  Asset Sorting & Filtering  ASSET REGISTER  Sorting of Assets based on the values of any attribute in ascending/descending order.  Application of Filter on the values of any attribute of Assets.
  • 10. DREAMS  Health Tab   ASSET REGISTER Indication of health of any asset through color codes based on the last observations from SM/CM/AO. ‘RED’ -> URGENT ’BLUE’ -> IMPORTANT
  • 11. DREAMS  ASSET REGISTER  Maintenance Tab  Display of schedule for forthcoming maintenance activity (SM/CM/PM) as on date through color codes based on the periodicity as mentioned in the maintenance Regime. ‘RED’ -> OVERDUE ’BLUE’ -> scheduled within one month.
  • 12. DREAMS  MAINTENANCE FUNCTIONS  Status Monitoring (SM)  Monitoring of assets through visual inspection.   Urgent/Important observations posted in the system. Job Allocation & Attending to the job by O&M engineers.
  • 13. DREAMS  MAINTENANCE FUNCTIONS  Condition Monitoring (CM)  Monitoring of assets by measurements through Intrusive & Non-Intrusive activities.   Non-Intrusive CM (e.g. Thermo-graphic Scanning etc.) measurements posted in the system.   Non-Intrusive CM Re-measurement done again. Intrusive CM measurements (e.g. IR & PI Values etc.) are taken & posted by O&M departments. Job Allocation & Attending to the job by O&M engineers.  Non-Intrusive CM
  • 14. DREAMS  MAINTENANCE FUNCTIONS  Preventive Maintenance (PM)  The Preventive Maintenance (PM) done by O&M departments as per the schedule mentioned in the PM Regime.
  • 15. DREAMS  MAINTENANCE FUNCTIONS  Maintenance Regime  The SM/CM/PM Regime for different categories of assets are stored in the system.
  • 16. DREAMS  MAINTENANCE FUNCTIONS  Queries & Reports  There are a host of queries & reports which caters to the diverse requirements across all user departments.
  • 17. DREAMS  MAINTENANCE FUNCTIONS  Dissolve Gas Analysis (DGA) Dash Board   The results of gases (CH4,C2H2,C2H4 etc.) from oil samples of Power Transformer posted inside the DGA Dash Board. Six different interpretation methods such as :- IEC Reference, ROGER’s Ratio, DORNENBERG’s Ratio, Key Gas Method, Combustible Gas Method, Permissible Concentration Gas Method used to interpret the health of the transformer.
  • 18. DREAMS  MAINTENANCE FUNCTIONS  Dissolve Gas Analysis (DGA) Dash Board   The results of gases CH4,C2H2,C2H4 can also be plotted on Duval Triangle . Trend Analysis of dissolved gases through Line & Bar Chart is also possible.
  • 19. DREAMS  HARDWARE PLATFORM CENTRALISED ARCHITECTURE SUN M4000 (App) SUN M4000 (DB) 4 Ultra Sparc VII+ E 4 Ultra Sparc VII+ 128 GB C 128 GB S C ONLINE ACCESS SUN Storage Tek 6580 (16 TB) DATA CENTRE CENTRAL SERVER REGIONAL SERVICES N E T PCs at User End
  • 20. DREAMS SOFTWARE PLATFORM State of the Art Technology  O/S : Sun Solaris 10  Database : Oracle 10g Enterprise Edition  Application tier : J2EE (Glassfish)  Front end : Web browser (Internet Explorer)  Architecture : 3-Tier Browser - Application Server - Database Server
  • 21. DREAMS ENGINEERING EXCELLENCE  Pioneering effort in conceptualization, design, development and implementation of a state-of-the-art IT application for Engineering Asset Management, developed in-house.  Multi-faceted Asset Register. Provides entire Asset database on finger tips. An innovatively designed single window for viewing all asset information, health & maintenance schedules together.  Dissolve Gas Analysis (DGA) Dashboard :  A perfect analysis tool to identify failure prone Power Transformers and thereby taking proactive measures to avoid breakdown.
  • 22. DREAMS KEY IMPACTS  Significant reduction in un-planned maintenance.  Inculcating a new philosophy of planned maintenance through :  Status Monitoring (SM)  Condition Monitoring (CM) & Condition Based Maintenance (CBM)  Preventive Maintenance (PM)  Resultant Fault Reduction in Switchgears Till Mar 2013 160 140 2011-12 120 2012-13 136 112 100 81 80 63 60 40 24 20 18 0 11 KV DOWNSTREAM SWITCHGEAR 6 KV DOWNSTREAM SWITCHGEAR TOTAL DOWNSTREAM SWITCHGEAR
  • 23. DREAMS  Financial KEY IMPACTS Rupees in Lacs Till Mar 2013  Green Initiative  Paper-less storage of asset information and maintenance records.  Paper-less communication through system generated emails.
  • 24. DREAMS KEY IMPACTS  Tracking of assets throughout its lifecycle.  Planning and allocation of appropriate resources by O&M Departments well ahead of time.  A host of queries and reports available to monitor the timely completion of O&M activities, identify performing & non-performing assets.  Analysis of commissioning and maintenance related data in order to provide insight into asset performance and planning for its replacement.
  • 25. DREAMS FUTURE READINESS  Having potential to make itself scalable at the enterprise level by including assets of Generation and Transmission.  Capable of Integration with Geographical Information Systems (GIS)  Capable of Integration with ERP for Finance and Purchase Divisions.