Stanford Cath Labs 7, 9, & 10
Numeric results of CAD vs. BIM to 2” vs.
full BIM



Jason          David           Eric Peabody
Holbrook       Denysenko
7




9



10
Experimental Controls


Experimental Variables
                         BIM Use                                 Area*      Start**   Architect

Cath Lab 7               CAD                               720 SF           2006

Cath Lab 9               2”                            1,173 SF             2009
                         Standard
Cath Lab                 Everything                    1,060 SF             2010
10
*Results expressed per SF to normalize this variable
**Cost values escalated to 2010 relative value to normalize this variable
What’s supposedly in it for me?
Save up to 23% on project costs
Complete project 35% faster
Drop change order rate to <0.1%
44% fewer RFIs




The Design Partnership LLP 
Architects + Planners
What’s supposedly in it for me?

23% less $
Complete project 35% faster
Drop change order rate to <0.1%
44% fewer RFIs




The Design Partnership LLP 
Architects + Planners
What’s supposedly in it for me?
Save up to 23% on project costs

35% faster
Drop change order rate to <0.1%
44% fewer RFIs



The Design Partnership LLP 
Architects + Planners
What’s supposedly in it for me?
Save up to 23% on project costs
Complete project 35% faster

Changes to <0.1%
44% fewer RFIs



The Design Partnership LLP 
Architects + Planners
What’s supposedly in it for me?
Save up to 23% on project costs
Complete project 35% faster
Drop change order rate to <0.1%

44% fewer RFIs

The Design Partnership LLP 
Architects + Planners
Cath Lab 7
CAD Only




The Design Partnership LLP 
Architects + Planners
7
Cath Lab 7: Siemens Biplane Cath Lab
    Project Area: 720 Gross Square Feet   Construction Start: 2006
Procedure Room: 600 Net Square Feet                BIM Use: None
(E) CAD                        V.I.F.   (N) CAD   Construction




The Design Partnership LLP 
Architects + Planners
(E) CAD                        V.I.F.   (N) CAD   Construction




The Design Partnership LLP 
Architects + Planners
(E) CAD                        V.I.F.   (N) CAD   Construction




The Design Partnership LLP 
Architects + Planners
(E) CAD                        V.I.F.   (N) CAD   Construction




The Design Partnership LLP 
Architects + Planners
The delay was caused…by the
          over-head structural and M/E/P/FP
          not being coordinated. The
          majority of the overhead had to be
          re-designed.              DPR
                                   Construction




The Design Partnership LLP 
Architects + Planners
Cath Lab 9
BIM to 2”




The Design Partnership LLP 
Architects + Planners
9
Cath Lab 9: Siemens Biplane Hybrid OR
    Project Area: 1,173 Gross Square Feet   Construction Start: 2009
Procedure Room: 821 Net Square Feet                  BIM Use: Model to 2”
3D Scan                 (E) Model   (N) Model   Construction




The Design Partnership LLP 
Architects + Planners
3D Scan                 (E) Model   (N) Model   Construction




The Design Partnership LLP 
Architects + Planners
3D Scan                 (E) Model   (N) Model   Construction




The Design Partnership LLP 
Architects + Planners
3D Scan                 (E) Model   (N) Model   Construction




The Design Partnership LLP 
Architects + Planners
Cath Lab 10
BIM Everything




The Design Partnership LLP 
Architects + Planners
10
Cath Lab 10: Siemens Biplane Pediatric Cath Lab
    Project Area: 1060 Gross Square Feet    Construction Start: 2010
Procedure Room: 717 Net Square Feet                  BIM Use: Model Everything
3D Scan                 (E) Model   (N) Model   Construction




The Design Partnership LLP 
Architects + Planners
3D Scan                 (E) Model   (N) Model   Construction




The Design Partnership LLP 
Architects + Planners
3D Scan                 (E) Model   (N) Model   Construction




The Design Partnership LLP 
Architects + Planners
3D Scan                 (E) Model   (N) Model   Construction




The Design Partnership LLP 
Architects + Planners
Results




The Design Partnership LLP 
Architects + Planners
Construction Cost
                          BIM Use         % from
                                            CAD

Cath Lab 7                CAD
Cath Lab 9                2” Standard   -15.0%
Cath Lab                  Everything
*All figures in 2010 Relative Value      -4.1%
10
Change Order Cost
                          BIM Use       % of Total

Cath Lab 7                CAD            12.4%
Cath Lab 9                2” Standard     8.1%
Cath Lab                   Everything   <0.1%
10
*All figures in 2010 Relative Value



The Design Partnership LLP 
Architects + Planners
Construction
Schedule BIM Use                                        Construction       Days/SF    % from
                                                                                        CAD

Cath Lab 7               CAD                             8.40 mo        0.23 D/SF
Cath Lab 9               2” Standard                     8.50 mo        0.15 D/SF    -34.8%
Cath Lab                 Everything                      8.45 mo        0.16 D/SF    -30.4%
10
All Costs
                         Survey                 All      Construction     Margin**      Total
                                         Services*                  $
Cath Lab 7                                  18.5%                                     18.5%
Cath Lab 9                 1.6%             27.3%            (15.0%)      (22.0%)    (23.3%)
Cath Lab 10                1.6%             18.5%
*All design professional fees, including non-BIM fees
                                                              (4.1%)      (18.6%)    (17.9%)
**Cath lab contribution margin of ~$8,000 per day



The Design Partnership LLP 
Architects + Planners
Conclusions
Save up to 23% on project costs
Complete project 35% faster
Drop change order rate to <0.1%
44% fewer RFIs




The Design Partnership LLP 
Architects + Planners
Thanks. Questions?


Jason                      David                     Eric Peabody
                                                     eric@dpsf.com
Holbrook                   Denysenko
jholbrook@stanfordmed.or   ddenysenko@stanfordmed.   415 777-3737
g                          org
650 721-1928               650 736-7546

Contenu connexe

Similaire à Experimental BIM Use Comparison on Stanford Hospital Cath Labs

BIM vs Risk on Stanford Cath 9
BIM vs Risk on Stanford Cath 9BIM vs Risk on Stanford Cath 9
BIM vs Risk on Stanford Cath 9
Eric Peabody
 
Design Build Intro
Design Build IntroDesign Build Intro
Design Build Intro
semackler
 

Similaire à Experimental BIM Use Comparison on Stanford Hospital Cath Labs (20)

Reducing Risk with BIM
Reducing Risk with BIMReducing Risk with BIM
Reducing Risk with BIM
 
Revit for Small Projects: Is it worth the effort?
Revit for Small Projects: Is it worth the effort?Revit for Small Projects: Is it worth the effort?
Revit for Small Projects: Is it worth the effort?
 
BIM vs Risk on Stanford Cath 9
BIM vs Risk on Stanford Cath 9BIM vs Risk on Stanford Cath 9
BIM vs Risk on Stanford Cath 9
 
Cc 2009 091202
Cc 2009 091202Cc 2009 091202
Cc 2009 091202
 
Digital & BIM in Total Architecture
Digital & BIM in Total ArchitectureDigital & BIM in Total Architecture
Digital & BIM in Total Architecture
 
Bim
BimBim
Bim
 
Bim
BimBim
Bim
 
14006 bbc zanchetta_141017_
14006 bbc zanchetta_141017_14006 bbc zanchetta_141017_
14006 bbc zanchetta_141017_
 
BIM Show Live 2015: 110 Queen Street – A BIM exemplar
BIM Show Live 2015: 110 Queen Street – A BIM exemplarBIM Show Live 2015: 110 Queen Street – A BIM exemplar
BIM Show Live 2015: 110 Queen Street – A BIM exemplar
 
Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio
 
Using an openBim Workflow
Using an openBim WorkflowUsing an openBim Workflow
Using an openBim Workflow
 
Leaning Project Delivery: Altering the Cost = Risk Equation
Leaning Project Delivery: Altering the Cost = Risk EquationLeaning Project Delivery: Altering the Cost = Risk Equation
Leaning Project Delivery: Altering the Cost = Risk Equation
 
BIM Xchange Welcome - Carl Abbott
BIM Xchange Welcome - Carl AbbottBIM Xchange Welcome - Carl Abbott
BIM Xchange Welcome - Carl Abbott
 
AEC Digital Solutions (Retail)
AEC Digital Solutions (Retail)AEC Digital Solutions (Retail)
AEC Digital Solutions (Retail)
 
2D to 3D modeling and why you need BIM
2D to 3D modeling and why you need BIM2D to 3D modeling and why you need BIM
2D to 3D modeling and why you need BIM
 
A Holistic BIM Framework for Structural Engineering Practices in Hong Kong - ...
A Holistic BIM Framework for Structural Engineering Practices in Hong Kong - ...A Holistic BIM Framework for Structural Engineering Practices in Hong Kong - ...
A Holistic BIM Framework for Structural Engineering Practices in Hong Kong - ...
 
Design Build Intro
Design Build IntroDesign Build Intro
Design Build Intro
 
Adopting BIM - An Architect's Perspective (07 May 2014)
Adopting BIM - An Architect's Perspective (07 May 2014)Adopting BIM - An Architect's Perspective (07 May 2014)
Adopting BIM - An Architect's Perspective (07 May 2014)
 
Generative Design 101 for Architecture, Engineering & Construction by Jad Del...
Generative Design 101 for Architecture, Engineering & Construction by Jad Del...Generative Design 101 for Architecture, Engineering & Construction by Jad Del...
Generative Design 101 for Architecture, Engineering & Construction by Jad Del...
 
Viasys VDC City Models
Viasys VDC City Models Viasys VDC City Models
Viasys VDC City Models
 

Plus de Eric Peabody

Plus de Eric Peabody (12)

HCD 2020 Data-model Driven Master Planning: Merging Departments to Create an ...
HCD 2020 Data-model Driven Master Planning: Merging Departments to Create an ...HCD 2020 Data-model Driven Master Planning: Merging Departments to Create an ...
HCD 2020 Data-model Driven Master Planning: Merging Departments to Create an ...
 
LCI Congress 2018 WB1 Start with Respect for People and Improvement Will Follow
LCI Congress 2018 WB1 Start with Respect for People and Improvement Will FollowLCI Congress 2018 WB1 Start with Respect for People and Improvement Will Follow
LCI Congress 2018 WB1 Start with Respect for People and Improvement Will Follow
 
2016 California Building Code Updates for Science & Education
2016 California Building Code Updates for Science & Education2016 California Building Code Updates for Science & Education
2016 California Building Code Updates for Science & Education
 
2016 California Building Code Updates for Healthcare
2016 California Building Code Updates for Healthcare2016 California Building Code Updates for Healthcare
2016 California Building Code Updates for Healthcare
 
Gleaning Insight from Information: A Strategy for Understanding Customer Value
Gleaning Insight from Information:  A Strategy for Understanding Customer ValueGleaning Insight from Information:  A Strategy for Understanding Customer Value
Gleaning Insight from Information: A Strategy for Understanding Customer Value
 
A Formula for LEED Gold: Lab Remodels without Added Project Costs
A Formula for LEED Gold: Lab Remodels without Added Project CostsA Formula for LEED Gold: Lab Remodels without Added Project Costs
A Formula for LEED Gold: Lab Remodels without Added Project Costs
 
Stanford Hybrid OR - Interventional Radiology + Neurosurgery
Stanford Hybrid OR - Interventional Radiology + Neurosurgery Stanford Hybrid OR - Interventional Radiology + Neurosurgery
Stanford Hybrid OR - Interventional Radiology + Neurosurgery
 
AIA NTAP Conference Set Based Design
AIA NTAP Conference Set Based DesignAIA NTAP Conference Set Based Design
AIA NTAP Conference Set Based Design
 
Lean Community at Herrero: Set Based Desgin
Lean Community at Herrero: Set Based DesginLean Community at Herrero: Set Based Desgin
Lean Community at Herrero: Set Based Desgin
 
Labs21 Conference: BIM for Sustainable Labs
Labs21 Conference: BIM for Sustainable LabsLabs21 Conference: BIM for Sustainable Labs
Labs21 Conference: BIM for Sustainable Labs
 
UC, CSU, CCC Sustainability Conference: BIM for Sustainability
UC, CSU, CCC Sustainability Conference: BIM for SustainabilityUC, CSU, CCC Sustainability Conference: BIM for Sustainability
UC, CSU, CCC Sustainability Conference: BIM for Sustainability
 
High-tech Healthcare Symposium: BIM for High-tech Healthcare
High-tech Healthcare Symposium: BIM for High-tech HealthcareHigh-tech Healthcare Symposium: BIM for High-tech Healthcare
High-tech Healthcare Symposium: BIM for High-tech Healthcare
 

Dernier

一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
yhavx
 
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
eeanqy
 
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
wpkuukw
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
eeanqy
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora Agency
Isadora Agency
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
ehyxf
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
eqaqen
 
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
ZurliaSoop
 
How to Build a Simple Shopify Website
How to Build a Simple Shopify WebsiteHow to Build a Simple Shopify Website
How to Build a Simple Shopify Website
mark11275
 
ab-initio-training basics and architecture
ab-initio-training basics and architectureab-initio-training basics and architecture
ab-initio-training basics and architecture
saipriyacoool
 

Dernier (20)

Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
 
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
 
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentation
 
Furniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptxFurniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptx
 
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
 
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
 
Essential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive GuideEssential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive Guide
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora Agency
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
 
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKLANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
 
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
 
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
 
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
 
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
 
How to Build a Simple Shopify Website
How to Build a Simple Shopify WebsiteHow to Build a Simple Shopify Website
How to Build a Simple Shopify Website
 
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service AvailableCall Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
 
ab-initio-training basics and architecture
ab-initio-training basics and architectureab-initio-training basics and architecture
ab-initio-training basics and architecture
 

Experimental BIM Use Comparison on Stanford Hospital Cath Labs

  • 1. Stanford Cath Labs 7, 9, & 10 Numeric results of CAD vs. BIM to 2” vs. full BIM Jason David Eric Peabody Holbrook Denysenko
  • 2.
  • 4. Experimental Controls Experimental Variables BIM Use Area* Start** Architect Cath Lab 7 CAD 720 SF 2006 Cath Lab 9 2” 1,173 SF 2009 Standard Cath Lab Everything 1,060 SF 2010 10 *Results expressed per SF to normalize this variable **Cost values escalated to 2010 relative value to normalize this variable
  • 5. What’s supposedly in it for me? Save up to 23% on project costs Complete project 35% faster Drop change order rate to <0.1% 44% fewer RFIs The Design Partnership LLP  Architects + Planners
  • 6. What’s supposedly in it for me? 23% less $ Complete project 35% faster Drop change order rate to <0.1% 44% fewer RFIs The Design Partnership LLP  Architects + Planners
  • 7. What’s supposedly in it for me? Save up to 23% on project costs 35% faster Drop change order rate to <0.1% 44% fewer RFIs The Design Partnership LLP  Architects + Planners
  • 8. What’s supposedly in it for me? Save up to 23% on project costs Complete project 35% faster Changes to <0.1% 44% fewer RFIs The Design Partnership LLP  Architects + Planners
  • 9. What’s supposedly in it for me? Save up to 23% on project costs Complete project 35% faster Drop change order rate to <0.1% 44% fewer RFIs The Design Partnership LLP  Architects + Planners
  • 10. Cath Lab 7 CAD Only The Design Partnership LLP  Architects + Planners
  • 11. 7
  • 12. Cath Lab 7: Siemens Biplane Cath Lab Project Area: 720 Gross Square Feet Construction Start: 2006 Procedure Room: 600 Net Square Feet BIM Use: None
  • 13. (E) CAD V.I.F. (N) CAD Construction The Design Partnership LLP  Architects + Planners
  • 14. (E) CAD V.I.F. (N) CAD Construction The Design Partnership LLP  Architects + Planners
  • 15. (E) CAD V.I.F. (N) CAD Construction The Design Partnership LLP  Architects + Planners
  • 16. (E) CAD V.I.F. (N) CAD Construction The Design Partnership LLP  Architects + Planners
  • 17. The delay was caused…by the over-head structural and M/E/P/FP not being coordinated. The majority of the overhead had to be re-designed. DPR Construction The Design Partnership LLP  Architects + Planners
  • 18. Cath Lab 9 BIM to 2” The Design Partnership LLP  Architects + Planners
  • 19. 9
  • 20. Cath Lab 9: Siemens Biplane Hybrid OR Project Area: 1,173 Gross Square Feet Construction Start: 2009 Procedure Room: 821 Net Square Feet BIM Use: Model to 2”
  • 21. 3D Scan (E) Model (N) Model Construction The Design Partnership LLP  Architects + Planners
  • 22. 3D Scan (E) Model (N) Model Construction The Design Partnership LLP  Architects + Planners
  • 23. 3D Scan (E) Model (N) Model Construction The Design Partnership LLP  Architects + Planners
  • 24. 3D Scan (E) Model (N) Model Construction The Design Partnership LLP  Architects + Planners
  • 25. Cath Lab 10 BIM Everything The Design Partnership LLP  Architects + Planners
  • 26. 10
  • 27. Cath Lab 10: Siemens Biplane Pediatric Cath Lab Project Area: 1060 Gross Square Feet Construction Start: 2010 Procedure Room: 717 Net Square Feet BIM Use: Model Everything
  • 28. 3D Scan (E) Model (N) Model Construction The Design Partnership LLP  Architects + Planners
  • 29. 3D Scan (E) Model (N) Model Construction The Design Partnership LLP  Architects + Planners
  • 30. 3D Scan (E) Model (N) Model Construction The Design Partnership LLP  Architects + Planners
  • 31. 3D Scan (E) Model (N) Model Construction The Design Partnership LLP  Architects + Planners
  • 32. Results The Design Partnership LLP  Architects + Planners
  • 33. Construction Cost BIM Use % from CAD Cath Lab 7 CAD Cath Lab 9 2” Standard -15.0% Cath Lab Everything *All figures in 2010 Relative Value -4.1% 10 Change Order Cost BIM Use % of Total Cath Lab 7 CAD 12.4% Cath Lab 9 2” Standard 8.1% Cath Lab Everything <0.1% 10 *All figures in 2010 Relative Value The Design Partnership LLP  Architects + Planners
  • 34. Construction Schedule BIM Use Construction Days/SF % from CAD Cath Lab 7 CAD 8.40 mo 0.23 D/SF Cath Lab 9 2” Standard 8.50 mo 0.15 D/SF -34.8% Cath Lab Everything 8.45 mo 0.16 D/SF -30.4% 10 All Costs Survey All Construction Margin** Total Services* $ Cath Lab 7 18.5% 18.5% Cath Lab 9 1.6% 27.3% (15.0%) (22.0%) (23.3%) Cath Lab 10 1.6% 18.5% *All design professional fees, including non-BIM fees (4.1%) (18.6%) (17.9%) **Cath lab contribution margin of ~$8,000 per day The Design Partnership LLP  Architects + Planners
  • 35. Conclusions Save up to 23% on project costs Complete project 35% faster Drop change order rate to <0.1% 44% fewer RFIs The Design Partnership LLP  Architects + Planners
  • 36. Thanks. Questions? Jason David Eric Peabody eric@dpsf.com Holbrook Denysenko jholbrook@stanfordmed.or ddenysenko@stanfordmed. 415 777-3737 g org 650 721-1928 650 736-7546

Notes de l'éditeur

  1. Quarter million $ saved on Cath 9