SlideShare une entreprise Scribd logo
1  sur  14
Télécharger pour lire hors ligne
Türkseven and Ertek




Turkseven, C.H., and Ertek, G. (2003). "Simulation modeling for quality and productivity in
steel cord manufacturing," in Chick, S., Sánchez, P., Ferrin,D., and Morrice, D.J. (eds.). Pro-
ceedings of 2003 Winter Simulation Conference. Institute of Electrical and Electronics Engi-
neers (IEEE), Piscataway, New Jersey.

Note: This is the final draft version of this paper. Please cite this paper (or this final draft) as
above. You can download this final draft from http://research.sabanciuniv.edu.




                  SIMULATION MODELING FOR QUALITY AND PRODUCTIVITY
                                 IN STEEL CORD MANUFACTURING


              Can Hulusi Türkseven                                          Gürdal Ertek


         School of Industrial Engineering                    Faculty of Engineering and Natural Sciences
               Purdue University                                         Sabancı University
               315 N. Grant Street                                     Orhanli, Tuzla, 34956
        West Lafayette, IN 47907-2023, U.S.A.                            Istanbul, TURKEY
Türkseven and Ertek

ABSTRACT

We describe the application of simulation modeling to estimate and improve quality and
productivity performance of a steel cord manufacturing system. We describe the typical steel
cord manufacturing plant, emphasize its distinguishing characteristics, identify various pro-
duction settings and discuss applicability of simulation as a management decision support tool.
Besides presenting the general structure of the developed simulation model, we focus on wire
fractures, which can be an important source of system disruption.


1   INTRODUCTION

Steel cord is typically used as the main reinforcement material in manufacture of steel radial
tires. It strengthens the tire to provide fuel savings, long mileage, safety and comfort. The
manufacture of steel cord takes place through continuous processes where wire semi-products
are stored on discrete inventory units, namely “spool”s (Figure 1). The steel cord plant is oper-
ated with multiple –possibly conflicting- objectives, both quality related (ex: minimizing the
number of final spools containing knot defects) and productivity related (ex: increasing
throughput). Modeling this type of manufacturing requires special considerations applicable to
a narrow scope of industries. One such consideration is the reversal of the wire wound on the
spools at each bunching operation. Manufacturing systems with similar operating characteris-
tics include cable manufacturing (electric/energy/fiber-optic), nylon cord manufacturing, cop-
per rod manufacturing.

    Literature on steel cord manufacturing is not extensive, since this is a very specialized type
of manufacturing, and the systems required are produced and installed by only a handful of
companies in the world. We refer the interested readers to the following two studies: Thomas
et al. (2002) report improvement of operations in a steel cord manufacturing company using
simulation. Mercankaya (2003) develops an optimization-based decision support system for
steel cord manufacturing.

    We first describe the manufacturing process and outline research objectives. After discuss-
ing various modeling approaches for possible configurations and discussing the relevance of
simulation modeling, we describe the simulation model, including inputs, decision variables,
Türkseven and Ertek

ouputs and results obtained. We conclude with a discussion of future research areas in produc-
tion planning for the described systems.




                           Figure 1. Spool on which Wire is Wound


2 THE MANUFACTURING PROCESS

In steel cord manufacturing incoming raw material, the “steel rod wire”, is thinned into “fila-
ment”s which are used in successive bunching operations to construct the “steel cord” final
products (Figure 2). Between every bunching operation, the intermediate wire products are
wound onto spools of varying capacities (in the scale of thousands of meters). Steel rod wire
enters the steel cord plant with a radius of ~2.5mm and passes through dry drawing and wet
drawing, accompanied with other operations (including chemical processes such as copper and
zinc plating) to produce filaments with a radius of ~0.2mm. Filaments coming out of wet-
drawing are wound on spools and are referred to as “payoff”. Payoff becomes the raw material
for bunching and spiralling operations. At each bunching operation, bunched wires enter as
“core” to be bunched with a new layer of payoff (filaments) to form “take-up”. The “take-up” in
turn becomes the “core” for the following bunching operation (Figure 3).
Türkseven and Ertek

                                              Begin Production

                                           Dry drawing I & II                    Copper plating

           Steel wire rod
                                                 Annealing                         Zinc plating



                                               Cold air bath                      Wet drawing




                                                                                                               RESEARCH FOCUS
                                              Cold water bath                        Bunching                                       Filament



                                              Acidic solution                        Spiralling



                                               Basic solution                       Packaging                                       Steel cord

                                                                                  End production
                                               to Copper plating



               Figure 2. Production Processes in Steel Cord Manufacturing


                                     Steel wire rod
                                                                                                           Operation
                                     (raw material)
                   Drawing




                                    Filament (payoff)
                                                                                                                     Core
                   Bunching 1




                                                                                    Spiral filament

                                                                                                      11   12                   1
                                                             8     1                           10                                   2
                           3                            7                2
                                         Bunching 2                          Bunching 3       9                                         3
                  2             1                                            & Spiralling
                                                        6                3
                                                                                                  8                                 4
                 3x0.2                                       5     4
                                                                                                      7    6                    5
                 Bunched                                    3+8x0.2
                 steel wire                                 Bunched                               Final product
                                                            steel wire                            (construction)
                                                                                                  3+8+12x0.2+1+1



Figure 3. Cross-section of 3+8+12x0.2+1 Construction at Successive Bunching Operations
Türkseven and Ertek

   In each bunching operation the take-up consumes a pay-off longer than its own length, ac-
cording to a “usage factor”. For example, in a bunching operation with a usage ratio of 0.9,
100000 meters of payoff bunches with 90000 meters of core to produce 90000 meters of take-
up. As the product advances along the production line, its thickness increases and thus it takes
a longer payoff to cover the take-up; i.e. the usage ratio decreases. Input ratios are discussed
with other input parameters in Section 5.

   The final steel cord product is obtained by spiralling a single filament after the final bunch-
ing operation, and is referred to as “construction”. Figure 3 illustrates the cross-section of the
wire semi-products at various bunching stages in manufacturing of construction
“3+8+12x0.2+1”.     The naming convention for labeling constructions (and semi-product
bunched wires) uses a “+” sign to denote each additonal bunching operation. The construction
“3+8+12x0.2+1” is obtained by bunching 3 filaments of length 0.2mm in the first bunching op-
eration, then 8 filaments, and then 12 filaments at 0.2mm, followed by a single spiralled fila-
ment.

   Despite product variety (possibly in the scale of hundreds), we focus in our research on
production of a particular construction and analyze quality and productivity issues for that sin-
gle final product. Our approach can be validly applied in analysis and improvement of steel
cord plants where a particular construction constitutes a major share of the production load or
is of primary importance for another reason.

   As the spool of core and spools of payoff are used in a bunching operation, any of the spools
may run out first. The time it takes for this run-out is a function of the spool lengths and pro-
duction rates of the machines, besides other factors, some of which are discussed below. As
run-out takes place, the bunching machine gradually slows down and finally stops. A setup is
performed by a skilled operator to feed the next spool with the same kind of wire (core or pay-
off) into the machine. Payoff or core spool is tied at the wire location where the machine had
stopped, and production in that machine restarts. Since the stopping takes place gradually, a
certain amount of wire is typically wasted at every “change-over”. This tying of changed spools
results in a knot, which is an undesired situation. When the take-up spool (the spool on which
the semi-product wire out of a bunching operation is wound) is completely full, a change of
take-up is performed. Besides knots due to spool changes, “wire fractures”, seemingly random
Türkseven and Ertek

breaks of the wire due to structural properties, may also result in considerable number of addi-
tional knots. By tagging an information card on each spool the locations of knots can be rec-
orded. If the sources of knots (whether they are due to changeovers or fractures) are not rec-
orded, the resulting data would not be perfectly valid from a statistical point of view.

   After the spiralling operation the steel cord is cut into specified lengths and wound onto fi-
nal spools, which are eventually packaged for customers. Tire manufacturers prefer that the
spools with the final cuts of steel cords contain no knots at all. Final spools that contain knots,
namely “rejected spools”, are classified as second quality and are sold at a very low price.
Therefore, it is an important management objective to decrease the number of knots and the
number of rejected spools.

   The motivation of our research has been to identify improved operating policies, specifically
“optimal” spool lengths for each bunching operation, such that quality and productivity are
improved. Both of these two performance measures can be improved if the number of rejected
spools (spools containing knots) is reduced.


3 MODELING APPROACHES

In this section we discuss under what conditions simulation is a suitable modeling approach
for steel cord manufacturing and discuss various modeling issues. Typically the steel cord final
product is obtained after more than one bunching operation. For example, the construction
3+8+12x0.2+1 goes through 3 successive bunching operations and a final spiralling operation
(Figure 3). If machines of all bunching operations had the same cycle times connected serially,
and/or if random fractures were negligible, modeling the steel cord manufacturing process
would be a fairly simple task. For now, we assume that fracture knots constitute a minor por-
tion of the knots and can be ignored. In Section 4 we provide a detailed discussion of wire frac-
tures and describe approaches to validate data collected on them. We consider three cases that
correspond to various manufacturing settings, as illustrated in Figure 4.

   In Case 1, we assume that each successive bunching operation is connected serially, and the
take-up (output wire) of a bunching operation is directly fed into the next one as core (input
wire) without any work-in-process spool inventory. The quality and productivity of this system
Türkseven and Ertek

would be very high, as production takes place continously except the final cuts. The quality
output of this hypothetical system is 100% and constitutes an upper bound on quality perfor-
mance of a real-world plant.

   In Case 2, we assume that in-process inventories are stored on spools, and the serial nature
of Case 1 is kept. In this type of a system, knots do occur due to spool changes, yet knot loca-
tions at the end of bunching processes can be computed easily as multiples of spool lengths.
From these locations, the number of spools containing knots can be computed (Figure 5). We
can apply search algorithms to find spool lengths that minimize the number of rejected final
spools.

   Case 3 is much more representitive of how steel cord manufacturing takes place in the real
world. Since machine production rates vary for different bunching operations, the numbers of
machines at each bunching operation are typically different. Work-in-process wires are stored
on spools, which are queued before the next set of bunching machines. For operational sim-
plicity, operators use a FIFO (First In First Out) queueing discipline in selecting the next spool
to enter bunching operations. It is extremely difficult to identify mathematically the order in
which spools are queued. Operator times, number of knots, knot locations, heuristic operating
policies (described in Section 6), the current state of the spools in the system, machine speeds
and other factors all affect the time it takes to complete a take-up spool. A linear programming
based model that takes these factors as parameters can be questioned with respect to validity,
as the constraints to reflect fairly complex nature of operations would require definition of a
large number of variables, many of them integer. Therefore, we believe that simulation model-
ing is the best way to analyze the described system. The existence of wire fractures only
strengthens this conclusion.
Türkseven and Ertek


             CASE 1
                            Bunching 1           Bunching 2          Bunching 3




             CASE 2
                            Bunching 1           Bunching 2          Bunching 3




             CASE 3

                            Bunching 1           Bunching 2          Bunching 3

                            Bunching 1           Bunching 2          Bunching 3


                                                 Bunching 2          Bunching 3


                                                                     Bunching 3




  Figure 4. Various Manufacturing Scenarios which Require Different Modeling Approaches


4 MODELING WIRE FRACTURES

Wire fractures may constitute a significant percentage of all the knots, depending on the quali-
ty of incoming steel rod wire, heterogeneity caused by dry drawing processes, the plant envi-
ronment, machine characteristics, and other factors. As opposed to knots from change-overs,
which may be controlled –at least to some degree- through scheduling, wire fractures are un-
controllable. Since the frequency and locations of knots have great impact on quality and
productivity, one would ask the essential question of whether any patterns exist in wire frac-
ture locations. As part of our study, we collected this data from bunching machines in a par-
ticular steel cord plant and carried out basic statistical analysis. The data collected gives the lo-
cations of wire fractures in spools entering the final bunching operation.
Türkseven and Ertek


      Spool length     Spool length          Spool length
      for Bunching 1   for Bunching 2        for Bunching 3




        xx   xx        xx x x x         x xx x       xx         x xx   x x   x     xx      xxx


                                                                             Steel cord construction

Figure 5. Locations of Knots in Case 2. The x Signs Denote the Knots Due to Change-overs. The
   Intervals Shown in Brackets Correspond to Lengths of Work-in-Process Spools, and Are
                          Decision Variables in the Simulation Model.




Fracture locations have been thought to be related to the location of previous fractures, the lo-
cations of previous knots, core and payoff lengths. Production specialists suggested that these
issues do not affect the fractures. It was tested if fracture locations and frequency followed any
distribution. However, statistical analysis of the data did not suggest any patterns. Fracture lo-
cations have been assumed random (uniform distribution) in the simulation model. Thus, in-
ter-fracture distances are assumed to follow exponential distribution and the number of frac-
tures on unit length of wire is assumed to follow poisson distribution. In addition to a known
historical average value for the percentage of fractures, an estimate can also be obtained from a
sample collected during a particular time interval. One important question is whether the col-
lected data agrees with the patterns observed historically. This can be formulated as a statisti-
cal null-hypothesis and tested using statistical techniques.
Türkseven and Ertek

5 SIMULATION MODEL




5.1 Description

In the simulation, the number of rejected spools (a measure of both quality and productivity) is
computed given a set of spool lengths. Through grid-search on spool lengths, the optimal spool
lengths can be determined.

   The optimal spool lengths are constrained to be within a certain percentage of the current
spool lengths. This constraint is imposed by plant managers as a result of the strategy of mak-
ing gradual changes over time, as opposed to rushing in radical changes in short time periods.
One other reason for such constraints is the impact on other operational measures. For exam-
ple, selecting the spool lengths that are too short would lead to prohibitively frequent payoff or
core changes, and increased operator costs.

   Some production issues are almost unique to this particular type of manufacturing: An ex-
ample is that the locations of knots are reversed at every spool change. When a wound spool of
length h with knot locations (k1, k2, ..., kn) is fed into the bunching operation, the unwinding re-
sults in knot locations (h-kn, ..., h-k2, h-k1).




5.2    Implementation

The simulation was programmed in C++ language, and takes ~1 minute running time to com-
pute performance measures for a 10 ton production schedule (10 simulation experiments are
performed). We preferred programming with a general-purpose language, as there are com-
plexities (ex: reversing of knot locations at bunching operations) that would be next to impos-
sible to reflect using spreadsheets and would have to be custom-programmed if a simulation
language or modeling software were used.
Türkseven and Ertek

5.3    Model Inputs, Decision Variables and Outputs

Input Parameters:

      Usage ratios: Ratio of take-up length to incoming payoff length at bunching and sprial-
       ling operations. As the diameter of the wire increases, usage ratios decrease.

      Wire densities: Linear density of wires on spools. These density values are used to con-
       vert meter based calculations to tones, as calculations in the plant are carried out on a
       weight basis.

      Fracture ratios: Expected number of fractures per ton at each bunching operation.

      Machine characteristics and quantities: Primarily the production rates, the rate at which
       bunching machines bunch payoff filament on core to produce take-up.

      Knotting time: The time it takes to restart the bunching process following a changeover
       or fracture. This time is very dependent on the source of the knot and is in the scale of 1-
       20 minutes.

      Final spool length: The length of final cuts that are wound on spools to be packaged and
       sent to tire manufacturers. These final cuts should be free of any knots.

Decision variables:

      Spool lengths: The length of wires on the take up and payoff spools.

Outputs:

      Number of accepted spools: The number of final spools that contain no knots.

      Number of rejected spools: The number of final spools that contain knots.

      Rejected wire length: The length of total rejected wire between knots, with a length
       smaller than final cut length.
Türkseven and Ertek

      Throughput time: Total time required to convert a given tonnage of payoff to steel cord.




6 RESULTS

The simulation program provides an accurate estimation of the system performance measures
given a particular setting. The results were validated with historical data from an existing steel
cord plant and the simulation model was observed to be valid. The program was used to de-
termine optimal spool lengths within a constrained search space. The accuracy of the simula-
tion can be increased through increasing simulation run lengths and number of simulations
and applying experimental design and output analysis techniques.

   If there is inaccuracy in implementing any type of policy, the simulation can be used only as
a strategic testing tool to evaluate operating policies. Conclusions/suggestions obtained
through the simulation analysis of the analyzed manufacturing plant are as follows:

      Some of the current operational rules used by operators are proven to be useful. One
       such heuristic rule is performing a take-up change-over if only a few hundred meters
       have remained on the bunching operation. This is a reasonable approach: If the final
       spool length is greater than the remaining distance, winding the take-up completely
       would result in a rejected final spool further down the production line. The simulation
       model suggested that this indeed is a very helpful rule and should be implemented by all
       the operators.

      Feasibility of implementing dynamic control policies can be investigated. For example,
       current FIFO rule for selecting among queued spools for bunching can be replaced by a
       more sophisticated approach. The simulation model can be used to evaluate such
       changes in operational policies. However, this would also require that measurements be
       very accurate and that computers be placed at the plant floor.
Türkseven and Ertek

7 FUTURE RESEARCH

Even though the developed simulation model accurately reflects the characteristics of the ana-
lyzed plant, the model can be extended to include new features (such as compensating for ma-
chine break-downs) and operational rules (such as dynamic spool selection). Meanwhile, it can
also be used to test the economic feasibility of investing in new manufacturing technology, in-
cluding better machines. A long term project could be developing the current tool into a gener-
ic modeling environment to analyze systems with similar manufacturing characteristics.


ACKNOWLEDGMENTS

We would like to thank Mr. Turgut Uzer for allowing us to share our experiences with academ-
ia. We would like to thank the anonymous referee and the proceeding editors for their valuable
corrections and remarks.


REFERENCES

Thomas, J., J. Todi, and A. Paranjpe. Optimization of operations in a steel wire manufacturing
   company. In Proceedings of 2002 Winter Simulation Conference, ed. E. Yucesan, C. H.
   Chen, J. L. Snowdon, and J. M. Charnes, 1151-1156. Piscataway, New Jersey: Institute of
   Electrical and Electronics Engineers.

Mercankaya, B. 2003. Sales forecasting and production planning of BEKSA in the context of
   supply chain management. Sabanci University, Istanbul, Turkey.


AUTHOR BIOGRAPHIES

CAN H. TÜRKSEVEN is a graduate student at Purdue University. He received his B.S. from
Manufacturing Systems Engineering Program from Sabancı University, Istanbul, Turkey, in
2003.
Türkseven and Ertek

GÜRDAL ERTEK is an assistant professor at Sabancı University. He received his B.S. from
Industrial Engineering Department of Boğaziçi University, Istanbul, Turkey in 1994 and his
Ph.D. from School of Industrial and Systems Engineering at Georgia Institute of Technology,
Atlanta, GA, in 2001. His research areas include supply chain planning, material handling,
production planning and simulation analysis.

Contenu connexe

En vedette

Gorsel Veri Madenciligi’nde bir Vaka Calısması: OSS Verilerinin Analizi
Gorsel Veri Madenciligi’nde bir Vaka Calısması: OSS Verilerinin AnaliziGorsel Veri Madenciligi’nde bir Vaka Calısması: OSS Verilerinin Analizi
Gorsel Veri Madenciligi’nde bir Vaka Calısması: OSS Verilerinin Analiziertekg
 
Application Of Local Search Methods For Solving A Quadratic Assignment Probl...
Application Of Local Search Methods For Solving  A Quadratic Assignment Probl...Application Of Local Search Methods For Solving  A Quadratic Assignment Probl...
Application Of Local Search Methods For Solving A Quadratic Assignment Probl...ertekg
 
Re-Mining Item Associations: Methodology and a Case Study in Apparel Retailing
Re-Mining Item Associations: Methodology and a Case Study in Apparel RetailingRe-Mining Item Associations: Methodology and a Case Study in Apparel Retailing
Re-Mining Item Associations: Methodology and a Case Study in Apparel Retailingertekg
 
Application of local search methods for solving a quadratic assignment proble...
Application of local search methods for solving a quadratic assignment proble...Application of local search methods for solving a quadratic assignment proble...
Application of local search methods for solving a quadratic assignment proble...ertekg
 
Financial Benchmarking Of Transportation Companies In The New York Stock Exc...
Financial Benchmarking Of Transportation Companies  In The New York Stock Exc...Financial Benchmarking Of Transportation Companies  In The New York Stock Exc...
Financial Benchmarking Of Transportation Companies In The New York Stock Exc...ertekg
 
Compiere kurulumu
Compiere kurulumuCompiere kurulumu
Compiere kurulumuertekg
 
Linking Behavioral Patterns to Personal Attributes through Data Re-Mining
Linking Behavioral Patterns to Personal Attributes through Data Re-MiningLinking Behavioral Patterns to Personal Attributes through Data Re-Mining
Linking Behavioral Patterns to Personal Attributes through Data Re-Miningertekg
 
The Bullwhip Effect In Supply Chain Reflections After A Decade
The Bullwhip Effect In Supply Chain  Reflections After A DecadeThe Bullwhip Effect In Supply Chain  Reflections After A Decade
The Bullwhip Effect In Supply Chain Reflections After A Decadeertekg
 
Optimizing Waste Collection In An Organized Industrial Region: A Case Study
Optimizing Waste Collection  In An Organized Industrial Region: A Case StudyOptimizing Waste Collection  In An Organized Industrial Region: A Case Study
Optimizing Waste Collection In An Organized Industrial Region: A Case Studyertekg
 
Visual Mining of Science Citation Data for Benchmarking Scientific and Techno...
Visual Mining of Science Citation Data for Benchmarking Scientific and Techno...Visual Mining of Science Citation Data for Benchmarking Scientific and Techno...
Visual Mining of Science Citation Data for Benchmarking Scientific and Techno...ertekg
 
Teaching Warehousing Concepts through Interactive Animations and 3-D Models
Teaching Warehousing Concepts through Interactive Animations  and 3-D ModelsTeaching Warehousing Concepts through Interactive Animations  and 3-D Models
Teaching Warehousing Concepts through Interactive Animations and 3-D Modelsertekg
 
Design Requirements For a Tendon Rehabilitation Robot: Results From a Survey ...
Design Requirements For a Tendon Rehabilitation Robot: Results From a Survey ...Design Requirements For a Tendon Rehabilitation Robot: Results From a Survey ...
Design Requirements For a Tendon Rehabilitation Robot: Results From a Survey ...ertekg
 
Rule-based expert systems for supporting university students
Rule-based expert systems for supporting university studentsRule-based expert systems for supporting university students
Rule-based expert systems for supporting university studentsertekg
 
Impact of Cross Aisles in a Rectangular Warehouse: A Computational Study
Impact of Cross Aisles in a Rectangular Warehouse:  A Computational StudyImpact of Cross Aisles in a Rectangular Warehouse:  A Computational Study
Impact of Cross Aisles in a Rectangular Warehouse: A Computational Studyertekg
 
Visual and analytical mining of transactions data for production planning f...
Visual and analytical mining of transactions data  for production planning  f...Visual and analytical mining of transactions data  for production planning  f...
Visual and analytical mining of transactions data for production planning f...ertekg
 
Encapsulating And Representing The Knowledge On The Evolution Of An Engineeri...
Encapsulating And Representing The Knowledge On The Evolution Of An Engineeri...Encapsulating And Representing The Knowledge On The Evolution Of An Engineeri...
Encapsulating And Representing The Knowledge On The Evolution Of An Engineeri...ertekg
 
Depolama Sistemleri
Depolama SistemleriDepolama Sistemleri
Depolama Sistemleriertekg
 
Statistical Scoring Algorithm for Learning and Study Skills
Statistical Scoring Algorithm for Learning and Study SkillsStatistical Scoring Algorithm for Learning and Study Skills
Statistical Scoring Algorithm for Learning and Study Skillsertekg
 
Competitive Pattern-Based Strategies under Complexity: The Case of Turkish Ma...
Competitive Pattern-Based Strategies under Complexity: The Case of Turkish Ma...Competitive Pattern-Based Strategies under Complexity: The Case of Turkish Ma...
Competitive Pattern-Based Strategies under Complexity: The Case of Turkish Ma...ertekg
 
Modelling the supply chain perception gaps
Modelling the supply chain perception gapsModelling the supply chain perception gaps
Modelling the supply chain perception gapsertekg
 

En vedette (20)

Gorsel Veri Madenciligi’nde bir Vaka Calısması: OSS Verilerinin Analizi
Gorsel Veri Madenciligi’nde bir Vaka Calısması: OSS Verilerinin AnaliziGorsel Veri Madenciligi’nde bir Vaka Calısması: OSS Verilerinin Analizi
Gorsel Veri Madenciligi’nde bir Vaka Calısması: OSS Verilerinin Analizi
 
Application Of Local Search Methods For Solving A Quadratic Assignment Probl...
Application Of Local Search Methods For Solving  A Quadratic Assignment Probl...Application Of Local Search Methods For Solving  A Quadratic Assignment Probl...
Application Of Local Search Methods For Solving A Quadratic Assignment Probl...
 
Re-Mining Item Associations: Methodology and a Case Study in Apparel Retailing
Re-Mining Item Associations: Methodology and a Case Study in Apparel RetailingRe-Mining Item Associations: Methodology and a Case Study in Apparel Retailing
Re-Mining Item Associations: Methodology and a Case Study in Apparel Retailing
 
Application of local search methods for solving a quadratic assignment proble...
Application of local search methods for solving a quadratic assignment proble...Application of local search methods for solving a quadratic assignment proble...
Application of local search methods for solving a quadratic assignment proble...
 
Financial Benchmarking Of Transportation Companies In The New York Stock Exc...
Financial Benchmarking Of Transportation Companies  In The New York Stock Exc...Financial Benchmarking Of Transportation Companies  In The New York Stock Exc...
Financial Benchmarking Of Transportation Companies In The New York Stock Exc...
 
Compiere kurulumu
Compiere kurulumuCompiere kurulumu
Compiere kurulumu
 
Linking Behavioral Patterns to Personal Attributes through Data Re-Mining
Linking Behavioral Patterns to Personal Attributes through Data Re-MiningLinking Behavioral Patterns to Personal Attributes through Data Re-Mining
Linking Behavioral Patterns to Personal Attributes through Data Re-Mining
 
The Bullwhip Effect In Supply Chain Reflections After A Decade
The Bullwhip Effect In Supply Chain  Reflections After A DecadeThe Bullwhip Effect In Supply Chain  Reflections After A Decade
The Bullwhip Effect In Supply Chain Reflections After A Decade
 
Optimizing Waste Collection In An Organized Industrial Region: A Case Study
Optimizing Waste Collection  In An Organized Industrial Region: A Case StudyOptimizing Waste Collection  In An Organized Industrial Region: A Case Study
Optimizing Waste Collection In An Organized Industrial Region: A Case Study
 
Visual Mining of Science Citation Data for Benchmarking Scientific and Techno...
Visual Mining of Science Citation Data for Benchmarking Scientific and Techno...Visual Mining of Science Citation Data for Benchmarking Scientific and Techno...
Visual Mining of Science Citation Data for Benchmarking Scientific and Techno...
 
Teaching Warehousing Concepts through Interactive Animations and 3-D Models
Teaching Warehousing Concepts through Interactive Animations  and 3-D ModelsTeaching Warehousing Concepts through Interactive Animations  and 3-D Models
Teaching Warehousing Concepts through Interactive Animations and 3-D Models
 
Design Requirements For a Tendon Rehabilitation Robot: Results From a Survey ...
Design Requirements For a Tendon Rehabilitation Robot: Results From a Survey ...Design Requirements For a Tendon Rehabilitation Robot: Results From a Survey ...
Design Requirements For a Tendon Rehabilitation Robot: Results From a Survey ...
 
Rule-based expert systems for supporting university students
Rule-based expert systems for supporting university studentsRule-based expert systems for supporting university students
Rule-based expert systems for supporting university students
 
Impact of Cross Aisles in a Rectangular Warehouse: A Computational Study
Impact of Cross Aisles in a Rectangular Warehouse:  A Computational StudyImpact of Cross Aisles in a Rectangular Warehouse:  A Computational Study
Impact of Cross Aisles in a Rectangular Warehouse: A Computational Study
 
Visual and analytical mining of transactions data for production planning f...
Visual and analytical mining of transactions data  for production planning  f...Visual and analytical mining of transactions data  for production planning  f...
Visual and analytical mining of transactions data for production planning f...
 
Encapsulating And Representing The Knowledge On The Evolution Of An Engineeri...
Encapsulating And Representing The Knowledge On The Evolution Of An Engineeri...Encapsulating And Representing The Knowledge On The Evolution Of An Engineeri...
Encapsulating And Representing The Knowledge On The Evolution Of An Engineeri...
 
Depolama Sistemleri
Depolama SistemleriDepolama Sistemleri
Depolama Sistemleri
 
Statistical Scoring Algorithm for Learning and Study Skills
Statistical Scoring Algorithm for Learning and Study SkillsStatistical Scoring Algorithm for Learning and Study Skills
Statistical Scoring Algorithm for Learning and Study Skills
 
Competitive Pattern-Based Strategies under Complexity: The Case of Turkish Ma...
Competitive Pattern-Based Strategies under Complexity: The Case of Turkish Ma...Competitive Pattern-Based Strategies under Complexity: The Case of Turkish Ma...
Competitive Pattern-Based Strategies under Complexity: The Case of Turkish Ma...
 
Modelling the supply chain perception gaps
Modelling the supply chain perception gapsModelling the supply chain perception gaps
Modelling the supply chain perception gaps
 

Similaire à Simulation Modeling For Quality And Productivity In Steel Cord Manufacturing

Simulation modeling for quality and productivity in steel cord manufacturing
Simulation modeling for quality and productivity in steel cord manufacturingSimulation modeling for quality and productivity in steel cord manufacturing
Simulation modeling for quality and productivity in steel cord manufacturingGurdal Ertek
 
International Journal of Computational Engineering Research(IJCER)
International Journal of Computational Engineering Research(IJCER)International Journal of Computational Engineering Research(IJCER)
International Journal of Computational Engineering Research(IJCER)ijceronline
 
IRJET- Effect of Soft Annealing on Copper, Brass and Gunmetal
IRJET- Effect of Soft Annealing on Copper, Brass and GunmetalIRJET- Effect of Soft Annealing on Copper, Brass and Gunmetal
IRJET- Effect of Soft Annealing on Copper, Brass and GunmetalIRJET Journal
 
TALAT Lecture 3210: Continuous Casting
TALAT Lecture 3210: Continuous CastingTALAT Lecture 3210: Continuous Casting
TALAT Lecture 3210: Continuous CastingCORE-Materials
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
High Performance Printed Circuit Boards - Lecture #2
High Performance Printed Circuit Boards - Lecture #2High Performance Printed Circuit Boards - Lecture #2
High Performance Printed Circuit Boards - Lecture #2Samsung Electro-Mechanics
 
Wire electric discharge machine
Wire electric discharge machineWire electric discharge machine
Wire electric discharge machineEr. BHUSHAN SARISE
 
Non Linear Finite Element Method of Analysis of Reinforced Concrete Deep Beam
Non Linear Finite Element Method of Analysis of Reinforced Concrete Deep BeamNon Linear Finite Element Method of Analysis of Reinforced Concrete Deep Beam
Non Linear Finite Element Method of Analysis of Reinforced Concrete Deep BeamIJMER
 
477 report spiral welded pipe Erdi Karaçal Mechanical Engineer University of...
477  report spiral welded pipe Erdi Karaçal Mechanical Engineer University of...477  report spiral welded pipe Erdi Karaçal Mechanical Engineer University of...
477 report spiral welded pipe Erdi Karaçal Mechanical Engineer University of...Erdi Karaçal
 
Fabrication process of integrated circuit
Fabrication process of integrated circuitFabrication process of integrated circuit
Fabrication process of integrated circuitCIKGUNURUL4
 
IRJET- Quality Improvement of Ductile Iron Casting by Thermal Analysis
IRJET- Quality Improvement of Ductile Iron Casting by Thermal AnalysisIRJET- Quality Improvement of Ductile Iron Casting by Thermal Analysis
IRJET- Quality Improvement of Ductile Iron Casting by Thermal AnalysisIRJET Journal
 
Experimental Analysis on Wire Arc Additive Manufacturing
Experimental Analysis on Wire Arc Additive ManufacturingExperimental Analysis on Wire Arc Additive Manufacturing
Experimental Analysis on Wire Arc Additive ManufacturingIRJET Journal
 
Molecular Beam Epitaxy (MBE)
Molecular Beam Epitaxy (MBE)Molecular Beam Epitaxy (MBE)
Molecular Beam Epitaxy (MBE)AJAL A J
 
7.metal forming bending 1
7.metal forming bending 17.metal forming bending 1
7.metal forming bending 1aydagnew
 
IJERD (www.ijerd.com) International Journal of Engineering Research and Devel...
IJERD (www.ijerd.com) International Journal of Engineering Research and Devel...IJERD (www.ijerd.com) International Journal of Engineering Research and Devel...
IJERD (www.ijerd.com) International Journal of Engineering Research and Devel...IJERD Editor
 
IRJET- Effects of Electropulsing on Steels
IRJET- Effects of Electropulsing on SteelsIRJET- Effects of Electropulsing on Steels
IRJET- Effects of Electropulsing on SteelsIRJET Journal
 

Similaire à Simulation Modeling For Quality And Productivity In Steel Cord Manufacturing (20)

Simulation modeling for quality and productivity in steel cord manufacturing
Simulation modeling for quality and productivity in steel cord manufacturingSimulation modeling for quality and productivity in steel cord manufacturing
Simulation modeling for quality and productivity in steel cord manufacturing
 
International Journal of Computational Engineering Research(IJCER)
International Journal of Computational Engineering Research(IJCER)International Journal of Computational Engineering Research(IJCER)
International Journal of Computational Engineering Research(IJCER)
 
IRJET- Effect of Soft Annealing on Copper, Brass and Gunmetal
IRJET- Effect of Soft Annealing on Copper, Brass and GunmetalIRJET- Effect of Soft Annealing on Copper, Brass and Gunmetal
IRJET- Effect of Soft Annealing on Copper, Brass and Gunmetal
 
TALAT Lecture 3210: Continuous Casting
TALAT Lecture 3210: Continuous CastingTALAT Lecture 3210: Continuous Casting
TALAT Lecture 3210: Continuous Casting
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
I1076368
I1076368I1076368
I1076368
 
EFFECT OF ELECTRODE WEAR RATE ON MACHINING OF STAINLESS STEEL – 202 USING COP...
EFFECT OF ELECTRODE WEAR RATE ON MACHINING OF STAINLESS STEEL – 202 USING COP...EFFECT OF ELECTRODE WEAR RATE ON MACHINING OF STAINLESS STEEL – 202 USING COP...
EFFECT OF ELECTRODE WEAR RATE ON MACHINING OF STAINLESS STEEL – 202 USING COP...
 
High Performance Printed Circuit Boards - Lecture #2
High Performance Printed Circuit Boards - Lecture #2High Performance Printed Circuit Boards - Lecture #2
High Performance Printed Circuit Boards - Lecture #2
 
Wire electric discharge machine
Wire electric discharge machineWire electric discharge machine
Wire electric discharge machine
 
Non Linear Finite Element Method of Analysis of Reinforced Concrete Deep Beam
Non Linear Finite Element Method of Analysis of Reinforced Concrete Deep BeamNon Linear Finite Element Method of Analysis of Reinforced Concrete Deep Beam
Non Linear Finite Element Method of Analysis of Reinforced Concrete Deep Beam
 
M1303047377
M1303047377M1303047377
M1303047377
 
477 report spiral welded pipe Erdi Karaçal Mechanical Engineer University of...
477  report spiral welded pipe Erdi Karaçal Mechanical Engineer University of...477  report spiral welded pipe Erdi Karaçal Mechanical Engineer University of...
477 report spiral welded pipe Erdi Karaçal Mechanical Engineer University of...
 
Lec22
Lec22Lec22
Lec22
 
Fabrication process of integrated circuit
Fabrication process of integrated circuitFabrication process of integrated circuit
Fabrication process of integrated circuit
 
IRJET- Quality Improvement of Ductile Iron Casting by Thermal Analysis
IRJET- Quality Improvement of Ductile Iron Casting by Thermal AnalysisIRJET- Quality Improvement of Ductile Iron Casting by Thermal Analysis
IRJET- Quality Improvement of Ductile Iron Casting by Thermal Analysis
 
Experimental Analysis on Wire Arc Additive Manufacturing
Experimental Analysis on Wire Arc Additive ManufacturingExperimental Analysis on Wire Arc Additive Manufacturing
Experimental Analysis on Wire Arc Additive Manufacturing
 
Molecular Beam Epitaxy (MBE)
Molecular Beam Epitaxy (MBE)Molecular Beam Epitaxy (MBE)
Molecular Beam Epitaxy (MBE)
 
7.metal forming bending 1
7.metal forming bending 17.metal forming bending 1
7.metal forming bending 1
 
IJERD (www.ijerd.com) International Journal of Engineering Research and Devel...
IJERD (www.ijerd.com) International Journal of Engineering Research and Devel...IJERD (www.ijerd.com) International Journal of Engineering Research and Devel...
IJERD (www.ijerd.com) International Journal of Engineering Research and Devel...
 
IRJET- Effects of Electropulsing on Steels
IRJET- Effects of Electropulsing on SteelsIRJET- Effects of Electropulsing on Steels
IRJET- Effects of Electropulsing on Steels
 

Plus de ertekg

Optimizing the electric charge station network of EŞARJ
Optimizing the electric charge station network of EŞARJOptimizing the electric charge station network of EŞARJ
Optimizing the electric charge station network of EŞARJertekg
 
Competitiveness of Top 100 U.S. Universities: A Benchmark Study Using Data En...
Competitiveness of Top 100 U.S. Universities: A Benchmark Study Using Data En...Competitiveness of Top 100 U.S. Universities: A Benchmark Study Using Data En...
Competitiveness of Top 100 U.S. Universities: A Benchmark Study Using Data En...ertekg
 
Industrial Benchmarking through Information Visualization and Data Envelopmen...
Industrial Benchmarking through Information Visualization and Data Envelopmen...Industrial Benchmarking through Information Visualization and Data Envelopmen...
Industrial Benchmarking through Information Visualization and Data Envelopmen...ertekg
 
Risk Factors and Identifiers for Alzheimer’s Disease: A Data Mining Analysis
Risk Factors and Identifiers for Alzheimer’s Disease:  A Data Mining AnalysisRisk Factors and Identifiers for Alzheimer’s Disease:  A Data Mining Analysis
Risk Factors and Identifiers for Alzheimer’s Disease: A Data Mining Analysisertekg
 
Text Mining with RapidMiner
Text Mining with RapidMinerText Mining with RapidMiner
Text Mining with RapidMinerertekg
 
Supplier and Buyer Driven Channels in a Two-Stage Supply Chain
Supplier and Buyer Driven Channels in a  Two-Stage Supply ChainSupplier and Buyer Driven Channels in a  Two-Stage Supply Chain
Supplier and Buyer Driven Channels in a Two-Stage Supply Chainertekg
 
A Tutorial On Crossdocking
A Tutorial On CrossdockingA Tutorial On Crossdocking
A Tutorial On Crossdockingertekg
 
Demonstrating Warehousing Concepts Through Interactive Animations
Demonstrating Warehousing Concepts Through Interactive AnimationsDemonstrating Warehousing Concepts Through Interactive Animations
Demonstrating Warehousing Concepts Through Interactive Animationsertekg
 
A Framework for Visualizing Association Mining Results
A Framework for Visualizing  Association Mining ResultsA Framework for Visualizing  Association Mining Results
A Framework for Visualizing Association Mining Resultsertekg
 
Application of the Cutting Stock Problem to a Construction Company: A Case Study
Application of the Cutting Stock Problem to a Construction Company: A Case StudyApplication of the Cutting Stock Problem to a Construction Company: A Case Study
Application of the Cutting Stock Problem to a Construction Company: A Case Studyertekg
 
Benchmarking The Turkish Apparel Retail Industry Through Data Envelopment Ana...
Benchmarking The Turkish Apparel Retail Industry Through Data Envelopment Ana...Benchmarking The Turkish Apparel Retail Industry Through Data Envelopment Ana...
Benchmarking The Turkish Apparel Retail Industry Through Data Envelopment Ana...ertekg
 
An Open Source Java Code For Visualizing Supply Chain Problems
An Open Source Java Code For Visualizing Supply Chain ProblemsAn Open Source Java Code For Visualizing Supply Chain Problems
An Open Source Java Code For Visualizing Supply Chain Problemsertekg
 
Dairy Logistics: A Tutorial
Dairy Logistics: A TutorialDairy Logistics: A Tutorial
Dairy Logistics: A Tutorialertekg
 
A Taxonomy Of Logistics Innovations
A Taxonomy Of Logistics InnovationsA Taxonomy Of Logistics Innovations
A Taxonomy Of Logistics Innovationsertekg
 
Innovation in Product Form And Function: Customer Perception Of Their Value
Innovation in Product Form And Function: Customer Perception Of Their ValueInnovation in Product Form And Function: Customer Perception Of Their Value
Innovation in Product Form And Function: Customer Perception Of Their Valueertekg
 
Developing Competitive Strategies in Higher Education through Visual Data Mining
Developing Competitive Strategies in Higher Education through Visual Data MiningDeveloping Competitive Strategies in Higher Education through Visual Data Mining
Developing Competitive Strategies in Higher Education through Visual Data Miningertekg
 
Kimya Sanayinde Su Tasarrufu İçin Karar Destek Sistemi
Kimya Sanayinde Su Tasarrufu İçin Karar  Destek Sistemi Kimya Sanayinde Su Tasarrufu İçin Karar  Destek Sistemi
Kimya Sanayinde Su Tasarrufu İçin Karar Destek Sistemi ertekg
 

Plus de ertekg (17)

Optimizing the electric charge station network of EŞARJ
Optimizing the electric charge station network of EŞARJOptimizing the electric charge station network of EŞARJ
Optimizing the electric charge station network of EŞARJ
 
Competitiveness of Top 100 U.S. Universities: A Benchmark Study Using Data En...
Competitiveness of Top 100 U.S. Universities: A Benchmark Study Using Data En...Competitiveness of Top 100 U.S. Universities: A Benchmark Study Using Data En...
Competitiveness of Top 100 U.S. Universities: A Benchmark Study Using Data En...
 
Industrial Benchmarking through Information Visualization and Data Envelopmen...
Industrial Benchmarking through Information Visualization and Data Envelopmen...Industrial Benchmarking through Information Visualization and Data Envelopmen...
Industrial Benchmarking through Information Visualization and Data Envelopmen...
 
Risk Factors and Identifiers for Alzheimer’s Disease: A Data Mining Analysis
Risk Factors and Identifiers for Alzheimer’s Disease:  A Data Mining AnalysisRisk Factors and Identifiers for Alzheimer’s Disease:  A Data Mining Analysis
Risk Factors and Identifiers for Alzheimer’s Disease: A Data Mining Analysis
 
Text Mining with RapidMiner
Text Mining with RapidMinerText Mining with RapidMiner
Text Mining with RapidMiner
 
Supplier and Buyer Driven Channels in a Two-Stage Supply Chain
Supplier and Buyer Driven Channels in a  Two-Stage Supply ChainSupplier and Buyer Driven Channels in a  Two-Stage Supply Chain
Supplier and Buyer Driven Channels in a Two-Stage Supply Chain
 
A Tutorial On Crossdocking
A Tutorial On CrossdockingA Tutorial On Crossdocking
A Tutorial On Crossdocking
 
Demonstrating Warehousing Concepts Through Interactive Animations
Demonstrating Warehousing Concepts Through Interactive AnimationsDemonstrating Warehousing Concepts Through Interactive Animations
Demonstrating Warehousing Concepts Through Interactive Animations
 
A Framework for Visualizing Association Mining Results
A Framework for Visualizing  Association Mining ResultsA Framework for Visualizing  Association Mining Results
A Framework for Visualizing Association Mining Results
 
Application of the Cutting Stock Problem to a Construction Company: A Case Study
Application of the Cutting Stock Problem to a Construction Company: A Case StudyApplication of the Cutting Stock Problem to a Construction Company: A Case Study
Application of the Cutting Stock Problem to a Construction Company: A Case Study
 
Benchmarking The Turkish Apparel Retail Industry Through Data Envelopment Ana...
Benchmarking The Turkish Apparel Retail Industry Through Data Envelopment Ana...Benchmarking The Turkish Apparel Retail Industry Through Data Envelopment Ana...
Benchmarking The Turkish Apparel Retail Industry Through Data Envelopment Ana...
 
An Open Source Java Code For Visualizing Supply Chain Problems
An Open Source Java Code For Visualizing Supply Chain ProblemsAn Open Source Java Code For Visualizing Supply Chain Problems
An Open Source Java Code For Visualizing Supply Chain Problems
 
Dairy Logistics: A Tutorial
Dairy Logistics: A TutorialDairy Logistics: A Tutorial
Dairy Logistics: A Tutorial
 
A Taxonomy Of Logistics Innovations
A Taxonomy Of Logistics InnovationsA Taxonomy Of Logistics Innovations
A Taxonomy Of Logistics Innovations
 
Innovation in Product Form And Function: Customer Perception Of Their Value
Innovation in Product Form And Function: Customer Perception Of Their ValueInnovation in Product Form And Function: Customer Perception Of Their Value
Innovation in Product Form And Function: Customer Perception Of Their Value
 
Developing Competitive Strategies in Higher Education through Visual Data Mining
Developing Competitive Strategies in Higher Education through Visual Data MiningDeveloping Competitive Strategies in Higher Education through Visual Data Mining
Developing Competitive Strategies in Higher Education through Visual Data Mining
 
Kimya Sanayinde Su Tasarrufu İçin Karar Destek Sistemi
Kimya Sanayinde Su Tasarrufu İçin Karar  Destek Sistemi Kimya Sanayinde Su Tasarrufu İçin Karar  Destek Sistemi
Kimya Sanayinde Su Tasarrufu İçin Karar Destek Sistemi
 

Dernier

Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 

Dernier (20)

Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 

Simulation Modeling For Quality And Productivity In Steel Cord Manufacturing

  • 1. Türkseven and Ertek Turkseven, C.H., and Ertek, G. (2003). "Simulation modeling for quality and productivity in steel cord manufacturing," in Chick, S., Sánchez, P., Ferrin,D., and Morrice, D.J. (eds.). Pro- ceedings of 2003 Winter Simulation Conference. Institute of Electrical and Electronics Engi- neers (IEEE), Piscataway, New Jersey. Note: This is the final draft version of this paper. Please cite this paper (or this final draft) as above. You can download this final draft from http://research.sabanciuniv.edu. SIMULATION MODELING FOR QUALITY AND PRODUCTIVITY IN STEEL CORD MANUFACTURING Can Hulusi Türkseven Gürdal Ertek School of Industrial Engineering Faculty of Engineering and Natural Sciences Purdue University Sabancı University 315 N. Grant Street Orhanli, Tuzla, 34956 West Lafayette, IN 47907-2023, U.S.A. Istanbul, TURKEY
  • 2. Türkseven and Ertek ABSTRACT We describe the application of simulation modeling to estimate and improve quality and productivity performance of a steel cord manufacturing system. We describe the typical steel cord manufacturing plant, emphasize its distinguishing characteristics, identify various pro- duction settings and discuss applicability of simulation as a management decision support tool. Besides presenting the general structure of the developed simulation model, we focus on wire fractures, which can be an important source of system disruption. 1 INTRODUCTION Steel cord is typically used as the main reinforcement material in manufacture of steel radial tires. It strengthens the tire to provide fuel savings, long mileage, safety and comfort. The manufacture of steel cord takes place through continuous processes where wire semi-products are stored on discrete inventory units, namely “spool”s (Figure 1). The steel cord plant is oper- ated with multiple –possibly conflicting- objectives, both quality related (ex: minimizing the number of final spools containing knot defects) and productivity related (ex: increasing throughput). Modeling this type of manufacturing requires special considerations applicable to a narrow scope of industries. One such consideration is the reversal of the wire wound on the spools at each bunching operation. Manufacturing systems with similar operating characteris- tics include cable manufacturing (electric/energy/fiber-optic), nylon cord manufacturing, cop- per rod manufacturing. Literature on steel cord manufacturing is not extensive, since this is a very specialized type of manufacturing, and the systems required are produced and installed by only a handful of companies in the world. We refer the interested readers to the following two studies: Thomas et al. (2002) report improvement of operations in a steel cord manufacturing company using simulation. Mercankaya (2003) develops an optimization-based decision support system for steel cord manufacturing. We first describe the manufacturing process and outline research objectives. After discuss- ing various modeling approaches for possible configurations and discussing the relevance of simulation modeling, we describe the simulation model, including inputs, decision variables,
  • 3. Türkseven and Ertek ouputs and results obtained. We conclude with a discussion of future research areas in produc- tion planning for the described systems. Figure 1. Spool on which Wire is Wound 2 THE MANUFACTURING PROCESS In steel cord manufacturing incoming raw material, the “steel rod wire”, is thinned into “fila- ment”s which are used in successive bunching operations to construct the “steel cord” final products (Figure 2). Between every bunching operation, the intermediate wire products are wound onto spools of varying capacities (in the scale of thousands of meters). Steel rod wire enters the steel cord plant with a radius of ~2.5mm and passes through dry drawing and wet drawing, accompanied with other operations (including chemical processes such as copper and zinc plating) to produce filaments with a radius of ~0.2mm. Filaments coming out of wet- drawing are wound on spools and are referred to as “payoff”. Payoff becomes the raw material for bunching and spiralling operations. At each bunching operation, bunched wires enter as “core” to be bunched with a new layer of payoff (filaments) to form “take-up”. The “take-up” in turn becomes the “core” for the following bunching operation (Figure 3).
  • 4. Türkseven and Ertek Begin Production Dry drawing I & II Copper plating Steel wire rod Annealing Zinc plating Cold air bath Wet drawing RESEARCH FOCUS Cold water bath Bunching Filament Acidic solution Spiralling Basic solution Packaging Steel cord End production to Copper plating Figure 2. Production Processes in Steel Cord Manufacturing Steel wire rod Operation (raw material) Drawing Filament (payoff) Core Bunching 1 Spiral filament 11 12 1 8 1 10 2 3 7 2 Bunching 2 Bunching 3 9 3 2 1 & Spiralling 6 3 8 4 3x0.2 5 4 7 6 5 Bunched 3+8x0.2 steel wire Bunched Final product steel wire (construction) 3+8+12x0.2+1+1 Figure 3. Cross-section of 3+8+12x0.2+1 Construction at Successive Bunching Operations
  • 5. Türkseven and Ertek In each bunching operation the take-up consumes a pay-off longer than its own length, ac- cording to a “usage factor”. For example, in a bunching operation with a usage ratio of 0.9, 100000 meters of payoff bunches with 90000 meters of core to produce 90000 meters of take- up. As the product advances along the production line, its thickness increases and thus it takes a longer payoff to cover the take-up; i.e. the usage ratio decreases. Input ratios are discussed with other input parameters in Section 5. The final steel cord product is obtained by spiralling a single filament after the final bunch- ing operation, and is referred to as “construction”. Figure 3 illustrates the cross-section of the wire semi-products at various bunching stages in manufacturing of construction “3+8+12x0.2+1”. The naming convention for labeling constructions (and semi-product bunched wires) uses a “+” sign to denote each additonal bunching operation. The construction “3+8+12x0.2+1” is obtained by bunching 3 filaments of length 0.2mm in the first bunching op- eration, then 8 filaments, and then 12 filaments at 0.2mm, followed by a single spiralled fila- ment. Despite product variety (possibly in the scale of hundreds), we focus in our research on production of a particular construction and analyze quality and productivity issues for that sin- gle final product. Our approach can be validly applied in analysis and improvement of steel cord plants where a particular construction constitutes a major share of the production load or is of primary importance for another reason. As the spool of core and spools of payoff are used in a bunching operation, any of the spools may run out first. The time it takes for this run-out is a function of the spool lengths and pro- duction rates of the machines, besides other factors, some of which are discussed below. As run-out takes place, the bunching machine gradually slows down and finally stops. A setup is performed by a skilled operator to feed the next spool with the same kind of wire (core or pay- off) into the machine. Payoff or core spool is tied at the wire location where the machine had stopped, and production in that machine restarts. Since the stopping takes place gradually, a certain amount of wire is typically wasted at every “change-over”. This tying of changed spools results in a knot, which is an undesired situation. When the take-up spool (the spool on which the semi-product wire out of a bunching operation is wound) is completely full, a change of take-up is performed. Besides knots due to spool changes, “wire fractures”, seemingly random
  • 6. Türkseven and Ertek breaks of the wire due to structural properties, may also result in considerable number of addi- tional knots. By tagging an information card on each spool the locations of knots can be rec- orded. If the sources of knots (whether they are due to changeovers or fractures) are not rec- orded, the resulting data would not be perfectly valid from a statistical point of view. After the spiralling operation the steel cord is cut into specified lengths and wound onto fi- nal spools, which are eventually packaged for customers. Tire manufacturers prefer that the spools with the final cuts of steel cords contain no knots at all. Final spools that contain knots, namely “rejected spools”, are classified as second quality and are sold at a very low price. Therefore, it is an important management objective to decrease the number of knots and the number of rejected spools. The motivation of our research has been to identify improved operating policies, specifically “optimal” spool lengths for each bunching operation, such that quality and productivity are improved. Both of these two performance measures can be improved if the number of rejected spools (spools containing knots) is reduced. 3 MODELING APPROACHES In this section we discuss under what conditions simulation is a suitable modeling approach for steel cord manufacturing and discuss various modeling issues. Typically the steel cord final product is obtained after more than one bunching operation. For example, the construction 3+8+12x0.2+1 goes through 3 successive bunching operations and a final spiralling operation (Figure 3). If machines of all bunching operations had the same cycle times connected serially, and/or if random fractures were negligible, modeling the steel cord manufacturing process would be a fairly simple task. For now, we assume that fracture knots constitute a minor por- tion of the knots and can be ignored. In Section 4 we provide a detailed discussion of wire frac- tures and describe approaches to validate data collected on them. We consider three cases that correspond to various manufacturing settings, as illustrated in Figure 4. In Case 1, we assume that each successive bunching operation is connected serially, and the take-up (output wire) of a bunching operation is directly fed into the next one as core (input wire) without any work-in-process spool inventory. The quality and productivity of this system
  • 7. Türkseven and Ertek would be very high, as production takes place continously except the final cuts. The quality output of this hypothetical system is 100% and constitutes an upper bound on quality perfor- mance of a real-world plant. In Case 2, we assume that in-process inventories are stored on spools, and the serial nature of Case 1 is kept. In this type of a system, knots do occur due to spool changes, yet knot loca- tions at the end of bunching processes can be computed easily as multiples of spool lengths. From these locations, the number of spools containing knots can be computed (Figure 5). We can apply search algorithms to find spool lengths that minimize the number of rejected final spools. Case 3 is much more representitive of how steel cord manufacturing takes place in the real world. Since machine production rates vary for different bunching operations, the numbers of machines at each bunching operation are typically different. Work-in-process wires are stored on spools, which are queued before the next set of bunching machines. For operational sim- plicity, operators use a FIFO (First In First Out) queueing discipline in selecting the next spool to enter bunching operations. It is extremely difficult to identify mathematically the order in which spools are queued. Operator times, number of knots, knot locations, heuristic operating policies (described in Section 6), the current state of the spools in the system, machine speeds and other factors all affect the time it takes to complete a take-up spool. A linear programming based model that takes these factors as parameters can be questioned with respect to validity, as the constraints to reflect fairly complex nature of operations would require definition of a large number of variables, many of them integer. Therefore, we believe that simulation model- ing is the best way to analyze the described system. The existence of wire fractures only strengthens this conclusion.
  • 8. Türkseven and Ertek CASE 1 Bunching 1 Bunching 2 Bunching 3 CASE 2 Bunching 1 Bunching 2 Bunching 3 CASE 3 Bunching 1 Bunching 2 Bunching 3 Bunching 1 Bunching 2 Bunching 3 Bunching 2 Bunching 3 Bunching 3 Figure 4. Various Manufacturing Scenarios which Require Different Modeling Approaches 4 MODELING WIRE FRACTURES Wire fractures may constitute a significant percentage of all the knots, depending on the quali- ty of incoming steel rod wire, heterogeneity caused by dry drawing processes, the plant envi- ronment, machine characteristics, and other factors. As opposed to knots from change-overs, which may be controlled –at least to some degree- through scheduling, wire fractures are un- controllable. Since the frequency and locations of knots have great impact on quality and productivity, one would ask the essential question of whether any patterns exist in wire frac- ture locations. As part of our study, we collected this data from bunching machines in a par- ticular steel cord plant and carried out basic statistical analysis. The data collected gives the lo- cations of wire fractures in spools entering the final bunching operation.
  • 9. Türkseven and Ertek Spool length Spool length Spool length for Bunching 1 for Bunching 2 for Bunching 3 xx xx xx x x x x xx x xx x xx x x x xx xxx Steel cord construction Figure 5. Locations of Knots in Case 2. The x Signs Denote the Knots Due to Change-overs. The Intervals Shown in Brackets Correspond to Lengths of Work-in-Process Spools, and Are Decision Variables in the Simulation Model. Fracture locations have been thought to be related to the location of previous fractures, the lo- cations of previous knots, core and payoff lengths. Production specialists suggested that these issues do not affect the fractures. It was tested if fracture locations and frequency followed any distribution. However, statistical analysis of the data did not suggest any patterns. Fracture lo- cations have been assumed random (uniform distribution) in the simulation model. Thus, in- ter-fracture distances are assumed to follow exponential distribution and the number of frac- tures on unit length of wire is assumed to follow poisson distribution. In addition to a known historical average value for the percentage of fractures, an estimate can also be obtained from a sample collected during a particular time interval. One important question is whether the col- lected data agrees with the patterns observed historically. This can be formulated as a statisti- cal null-hypothesis and tested using statistical techniques.
  • 10. Türkseven and Ertek 5 SIMULATION MODEL 5.1 Description In the simulation, the number of rejected spools (a measure of both quality and productivity) is computed given a set of spool lengths. Through grid-search on spool lengths, the optimal spool lengths can be determined. The optimal spool lengths are constrained to be within a certain percentage of the current spool lengths. This constraint is imposed by plant managers as a result of the strategy of mak- ing gradual changes over time, as opposed to rushing in radical changes in short time periods. One other reason for such constraints is the impact on other operational measures. For exam- ple, selecting the spool lengths that are too short would lead to prohibitively frequent payoff or core changes, and increased operator costs. Some production issues are almost unique to this particular type of manufacturing: An ex- ample is that the locations of knots are reversed at every spool change. When a wound spool of length h with knot locations (k1, k2, ..., kn) is fed into the bunching operation, the unwinding re- sults in knot locations (h-kn, ..., h-k2, h-k1). 5.2 Implementation The simulation was programmed in C++ language, and takes ~1 minute running time to com- pute performance measures for a 10 ton production schedule (10 simulation experiments are performed). We preferred programming with a general-purpose language, as there are com- plexities (ex: reversing of knot locations at bunching operations) that would be next to impos- sible to reflect using spreadsheets and would have to be custom-programmed if a simulation language or modeling software were used.
  • 11. Türkseven and Ertek 5.3 Model Inputs, Decision Variables and Outputs Input Parameters:  Usage ratios: Ratio of take-up length to incoming payoff length at bunching and sprial- ling operations. As the diameter of the wire increases, usage ratios decrease.  Wire densities: Linear density of wires on spools. These density values are used to con- vert meter based calculations to tones, as calculations in the plant are carried out on a weight basis.  Fracture ratios: Expected number of fractures per ton at each bunching operation.  Machine characteristics and quantities: Primarily the production rates, the rate at which bunching machines bunch payoff filament on core to produce take-up.  Knotting time: The time it takes to restart the bunching process following a changeover or fracture. This time is very dependent on the source of the knot and is in the scale of 1- 20 minutes.  Final spool length: The length of final cuts that are wound on spools to be packaged and sent to tire manufacturers. These final cuts should be free of any knots. Decision variables:  Spool lengths: The length of wires on the take up and payoff spools. Outputs:  Number of accepted spools: The number of final spools that contain no knots.  Number of rejected spools: The number of final spools that contain knots.  Rejected wire length: The length of total rejected wire between knots, with a length smaller than final cut length.
  • 12. Türkseven and Ertek  Throughput time: Total time required to convert a given tonnage of payoff to steel cord. 6 RESULTS The simulation program provides an accurate estimation of the system performance measures given a particular setting. The results were validated with historical data from an existing steel cord plant and the simulation model was observed to be valid. The program was used to de- termine optimal spool lengths within a constrained search space. The accuracy of the simula- tion can be increased through increasing simulation run lengths and number of simulations and applying experimental design and output analysis techniques. If there is inaccuracy in implementing any type of policy, the simulation can be used only as a strategic testing tool to evaluate operating policies. Conclusions/suggestions obtained through the simulation analysis of the analyzed manufacturing plant are as follows:  Some of the current operational rules used by operators are proven to be useful. One such heuristic rule is performing a take-up change-over if only a few hundred meters have remained on the bunching operation. This is a reasonable approach: If the final spool length is greater than the remaining distance, winding the take-up completely would result in a rejected final spool further down the production line. The simulation model suggested that this indeed is a very helpful rule and should be implemented by all the operators.  Feasibility of implementing dynamic control policies can be investigated. For example, current FIFO rule for selecting among queued spools for bunching can be replaced by a more sophisticated approach. The simulation model can be used to evaluate such changes in operational policies. However, this would also require that measurements be very accurate and that computers be placed at the plant floor.
  • 13. Türkseven and Ertek 7 FUTURE RESEARCH Even though the developed simulation model accurately reflects the characteristics of the ana- lyzed plant, the model can be extended to include new features (such as compensating for ma- chine break-downs) and operational rules (such as dynamic spool selection). Meanwhile, it can also be used to test the economic feasibility of investing in new manufacturing technology, in- cluding better machines. A long term project could be developing the current tool into a gener- ic modeling environment to analyze systems with similar manufacturing characteristics. ACKNOWLEDGMENTS We would like to thank Mr. Turgut Uzer for allowing us to share our experiences with academ- ia. We would like to thank the anonymous referee and the proceeding editors for their valuable corrections and remarks. REFERENCES Thomas, J., J. Todi, and A. Paranjpe. Optimization of operations in a steel wire manufacturing company. In Proceedings of 2002 Winter Simulation Conference, ed. E. Yucesan, C. H. Chen, J. L. Snowdon, and J. M. Charnes, 1151-1156. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers. Mercankaya, B. 2003. Sales forecasting and production planning of BEKSA in the context of supply chain management. Sabanci University, Istanbul, Turkey. AUTHOR BIOGRAPHIES CAN H. TÜRKSEVEN is a graduate student at Purdue University. He received his B.S. from Manufacturing Systems Engineering Program from Sabancı University, Istanbul, Turkey, in 2003.
  • 14. Türkseven and Ertek GÜRDAL ERTEK is an assistant professor at Sabancı University. He received his B.S. from Industrial Engineering Department of Boğaziçi University, Istanbul, Turkey in 1994 and his Ph.D. from School of Industrial and Systems Engineering at Georgia Institute of Technology, Atlanta, GA, in 2001. His research areas include supply chain planning, material handling, production planning and simulation analysis.