1. The following agreements between PARC (representing the
residential community surrounding the Sherwin Williams project) and
the project developer (Lennar) have been negotiated and agreed upon
by both parties. The following terms are the result of many good faith
meetings between the developer and PARC over the past two years.
With these agreements in place, PARC would recommend certification
of the EIR by City Council.
TERMS OF AGREEMENT 09.02.2016
1. Pass Thru:
The Final Development Plan (FDP) for the project shall include a permanent, public
pass-through of the existing Building 1-31 (also listed as Building “A” in the EIR). This
pass-through shall penetrate the building from east to west, beginning with an opening
at the western terminus of 45th Street at Horton Street and shall extend west through
Building “A” unimpeded by other structures to the community park and open space on
the south and western edges of the project site. The design of the pass-through shall be
such that cyclists shall not be required to dismount and are able to move through the
space continuously between the park and 45th Street. The pass-through shall be
complete prior to the issuance of a final Certificate of Occupancy for Building “A.” and
the both parties agree that costs associated with implementing the pass thru should be
included under the Flexible Public Benefits category of the City’s Density Bonus
program.
2. Car Share:
The project FDP shall include ten (10) dedicated car-share parking spaces which shall
be in place prior to issuance of a certificate of occupancy. The spaces shall be located
both within the project site (7) and on adjacent streets (3) that are publicly accessible so
long as the City of Emeryville (City) agrees that 3 existing public parking spaces may be
so dedicated. These spaces shall be filled with car-share vehicles as the demand for
car-sharing increases. At the outset of occupancy, only two (2) of the on-site dedicated
spaces need to be used for car-share purposes. The remaining five (5) on-site spaces
must remain dedicated to car-share but can be used for alternative parking purposes
until future TDM reports dictate their use. Annual quantifying and reporting of demand
and usage of the car-shares shall be made available in the annual TDM reporting and
the car-shares shall be adjusted as the demand changes. The overall goal is to provide
an adequate number of on-site car share vehicles to assure users that there will always
be a vehicle available when they need to reserve one. The remaining three (3) off-site
2. spaces shall be placed elsewhere within the Park Avenue District in coordination with
the City of Emeryville to help accomplish the goal of reducing parking throughout the
neighborhood.
3. Bike Share/ Bike Lockers:
Prior to issuance of a final certificate of occupancy for the building located closest to the
bike sharing station, the project shall include a permanent, subsidized public bike-share
station with an expandable capacity. The goal is to provide an adequate number of on-
site bike shares as the demand changes and to provide enough bike shares that there
will always be a bike available when there is demand. The vendor for bike-shares shall
be the same vendor that provides bike-sharing opportunities at West Oakland BART,
which is currently Bay Area Bike Share. Annual quantifying and reporting of demand
and usage of the biker-shares shall be made available in the annual TDM reporting and
the bike-shares shall be adjusted as the demand changes. A subsidy program to
encourage residents/employees to become bike-share members shall be 50%
subsidized by the developer and future owners of the project.
The Developer and future owners shall maintain a minimum of thirty (30) lockable,
enclosed bike lockers for residents and employees. The lockers shall be provided by the
developer and no fee shall be charged for their use by project residents and employees.
Annual quantifying and reporting of demand and usage of the bike lockers shall be
made available in the annual TDM reporting and the number of bike lockers shall be
adjusted as the demand changes. No less than 50% of these bike lockers shall be sized
to accommodate “cargo bikes” and employees/residents shall be able to charge electric
bikes within the lockers while being stored.
4. Public Art Gallery
The developer shall provide a permanent Art Gallery space, consisting of not less than
2,000 sq. ft. of a publicly accessible indoor space that is designed to serve as an art
gallery. The space shall include an office and shall be made available as a meeting
room for residents and the local community. No fees of any kind shall be charged for
use of this space. The Emeryville Celebration of the Arts shall be granted 24-hours
access to the space. Both parties agree that costs associated with implementing the
public art gallery and community-meeting room should be included under the Flexible
Public Benefits category of the City’s Density Bonus program.
5. TDM, Shared Parking & Parking Management:
Prior to approval of the FDP, the developer shall produce a TDM that estimates a 30%
reduction in traffic based on the addition of transit-oriented incentives and mitigations.
This obligation does not require that the developer prove a 30% reduction in traffic upon
3. completion of the project but that the traffic mitigations in the TDM have the potential to
achieve this level of traffic mitigation. The developer agrees to not seek City approval of
the current TDM and to submit a revised and enhanced TDM for approval with the PDP
that is consistent with these goals. Additionally, the developer agrees to create and
provide a shared parking plan that will optimize parking capacity by allowing varying
uses within the project to share spaces, reducing segregated and unused parking.
Public parking shall be included in this plan. Finally, the developer agrees to work with
the City to provide parking management services for time-restricted parking to assist in
facilitating the use of street and other parking for small businesses in the neighborhood
and to contribute financially to the enforcement of those parking restrictions.
6. GreenTrip:
The developer shall achieve an equivalent compliance to the GreenTrip “Platinum”
certification (without seeking such a certification) from TransForm prior to the final
certificate of occupancy for the final residential building of the project, excepting only
that the developer shall not have to meet the 0.5 parking spaces per unit standard
required for “Platinum” certification. Qualifying Traffic Reduction Strategies (TRS) shall
include Shuttle Service to West Oakland BART.
7. West Oakland BART Shuttle:
The developer shall provide a private shuttle service between the project site and West
Oakland BART. A bus stop that is within 500 feet of the project site is sufficient for being
considered “within” the project site. The developer agrees that the service shall
commence within 60 days after occupancy of fifty percent (50%) of the total residential
units for the project and shall endure for a period of five years. Both parties agree that
costs associated with implementing the shuttle for the first five years should be included
under the Flexible Public Benefits category of the City’s Density Bonus program. If, prior
to the onset of the developer’s obligation to provide private shuttle service to West
Oakland BART, or at any time subsequent to the commencement of such service but
prior to the expiration of the five year period of service the developer has negotiated the
provision of transit services from any other existing transit provider that provides the
same or similar frequency, route and stops as the service provided by the developer,
this obligation shall cease and any community benefits not expended shall be returned
to the city in the form of payment. The private shuttle service shall be provided without
cost to residents/employees at the project site and residents of Emeryville.
8. Park Avenue District Overlay:
The developer shall comply with the Park Avenue District overlay and associated
guidelines, including but not limited to the requirements for shared parking, a special
emphasis on the use of building materials and aesthetics that comply with the overlay’s
4. attention to the historic and industrial roots of the community and a fine grain street
layout that is pedestrian and bicycle-friendly, among others.
9. Construction Parking:
The developer shall provide off-street parking for construction workers during all phases
of construction. All construction deliveries shall be within the project and not offloaded
from delivery vehicles on public streets with limited exceptions for site and construction
work done on buildings and infrastructure along the perimeter streets of the project site.
10. Public Process for Park Design:
Working with the City and its bodies and processes, the developer shall engage the
community in a public process that shall include facilitated community workshops
related to design of the parks, bike and pedestrian paths, streetscape and other public
programming.
11. Sidewalks and undergrounding of utilities:
The developer agrees to install or to fund City installation of the following infrastructure
improvements for the neighborhood prior to issuance of the final Certificate of
Occupancy for the final residential structure on the site:
(1) Install curb and sidewalk and underground all utilities on the east side of Hubbard
Street between Sherwin Street to the north and Park Avenue to the south;
(2) Underground all utilities on the east side of Horton Street between the
intersection of the proposed 46th Street to the north and Park Avenue to the
south;
(3) Install curb and sidewalk along the south side of Sherwin Street between Horton
Street to the east and Hubbard Street to the west.
The developer’s intent is to install the improvements listed above concurrent with the
project unless the City deems it more efficient or favorable to have the City perform
the improvements
Both parties agree that costs associated with implementing the improvements above
should be included under the Public Improvements category of the City’s Density Bonus
program.
The following term of agreement could not be finalized or agreed upon. We are
including it for information purposes:
Home ownership:
Prior to granting of the first certificate of occupancy, the developer shall designate not
less than 20% of the project housing units as for-sale units.