2. Third Quarter 2008 ANADARKO PETROLEUM CORPORATION
Forward Looking Statement
Cautionary Note to U.S. Investors: The United States Securities This report contains forward-looking statements within the
and Exchange Commission (“SEC”) permits oil and gas meaning of Section 27A of the Securities Act of 1933 and Section
companies, in their filings with the SEC, to disclose only proved 21E of the Securities Exchange Act of 1934. Anadarko believes
reserves that a company has demonstrated by actual production or that its expectations are based on reasonable assumptions. No
conclusive formation tests to be economically and legally assurance, however, can be given that such expectations will prove
producible under existing economic and operating conditions. to have been correct. A number of factors could cause actual results
Anadarko uses certain terms in this operations report, such as to differ materially from the projections, anticipated results or
“estimated recoverable resources,” “recoverable oil” and similar other expectations expressed in this operations report. Anadarko
terms that the SEC’s guidelines strictly prohibit Anadarko from cannot guarantee that it will successfully execute on its
including in filings with the SEC. U.S. Investors are urged to exploration, drilling and development plans or meet its
consider closely the disclosure in Anadarko’s Form 10-K for the production guidance. See “Risk Factors” in the company’s 2007
year ended December 31, 2007, File No. 001-08968, available from Annual Report on Form 10-K and other public filings and press
Anadarko at www.anadarko.com or by writing Anadarko at: releases. Anadarko undertakes no obligation to publicly update or
Anadarko Petroleum Corporation, 1201 Lake Robbins Drive, The revise any forward-looking statements.
Woodlands, Texas 77380 Attn: Investor Relations. You can also
obtain this form from the SEC by calling 1-800-SEC-0330.
2
NYSE:APC www.anadarko.com
3. Third Quarter 2008 ANADARKO PETROLEUM CORPORATION
Overview
– RIG ACTIVITY –
3Q08 Rig Activity
Operated Non-Operated Total
32
Rockies 100
68
27
Southern 39
12
59
LOWER 48 139
80
1
Alaska 2
1
4
Gulf of Mexico 5
1
64
TOTAL U.S. 146
82
3
INTERNATIONAL 5
2
– CAPITAL SPENDING –
67
TOTAL COMPANY 151
84
! The capital program totaled $1,181 million during the quarter.
Full-year capital expenditures are expected to be between $4,650
and $4,750 million (excluding expensed exploration) with – VOLUMES –
approximately 20% allocated to exploration.
! Sales volumes for the 3rd Qtr were 51 MMBOE, which was within
guidance (51-53 MMBOE), overcoming approximately 4.7
MMBOE of storm-related shut-ins during the period.
Capital Spending*
2Q08
3Q08
Net Volumes (MMBOE)*
$ MM $ MM 3Q08
338
422
Rockies % Change
272
282
Southern 3Q08 2Q08 3Q07** vs. 2Q08 vs. 3Q07
609
704
LOWER 48 20 20 17 0% 18%
Rockies
30
10
Alaska 10 11 11 -6% -3%
Southern
289
196
Gulf of Mexico 30 31 27 -2% 10%
LOWER 48
928
910
TOTAL U.S. 2 2 2 -12% -16%
Alaska
100
99
INTERNATIONAL 12 11 10 6% 17%
Gulf of Mexico
133
109
Midstream 43 44 39 0% 10%
TOTAL U.S.
71
63
Capitalized Items / Other 7 7 7 8% 5%
INTERNATIONAL
1,232
1,181
TOTAL COMPANY 51 50 47 1% 9%
TOTAL COMPANY
*Data may not add to totals due to rounding. * Data may not add to totals due to rounding.
** 3Q07 volumes exclude divested volumes.
3
NYSE:APC www.anadarko.com
4. Third Quarter 2008 ANADARKO PETROLEUM CORPORATION
Drilling Efficiencies
3Q08 Drilling Efficiencies*
Spud to Rig Spud
Rig Release Mobilization to Spud
2% 8%
23%
Greater Natural Buttes
10% 17%
48%
Wattenberg
20% 21%
24%
Carthage
7% 7%
16%
Chalk
14% 16%
28%
Freestone
* Percent change from 2007 results.
Note: Company-operated development-drilling programs with at least
three rigs on day rate contracts.
– DRILLING EFFICIENCIES–
Anadarko has greatly enhanced drilling efficiencies across all of the
company-operated, major development-drilling programs that utilize
day-rate contracts. Increasing efficiencies in these major programs has
enabled Anadarko to execute upon the programs without increasing
capital during historic inflation in the industry. The chart above shows
nearly double-digit improvement in each area in 2008 when compared
to 2007 results.
4
NYSE:APC www.anadarko.com
5. Third Quarter 2008 ANADARKO PETROLEUM CORPORATION
Rockies
Gross
Rig Activity Completed Wells
Net Volumes* Capital*
3Q08 3Q08
3Q08 3Q08
2Q08
Expl. Dev.
Oper. Non-Op.
$ MM
MMcf/d MBbls/d MMcf/d MBbls/d
TIGHT GAS
Greater Natural Buttes 261 3 240 4 120 7 1 0 96
Wattenberg 165 20 174 19 103 8 1 0 111
Tight Gas
EOR CBM
Pinedale 54 1 73 1 44 0 28 0 62
Wamsutter 78 7 70 7 35 1 7 0 49
Other 71 3 68 4 17 0 4 0 23
Powder River CBM CBM 378 0 379 0 70 15 27 0 287
EOR 4 12 4 12 33 1 0 0 4
Salt Creek
WYOMING 1,011 46 1,008 46 422 32 68 0 632
TOTAL
Pinedale *Data may not add to totals due to rounding.
Moxa Monell Wamsutter
Monell
Atlantic Rim
Greater
Natural Buttes Wattenberg
Helper ! Drilling efficiencies continued as 96 wells were completed during
the quarter – an increase of 43% from last quarter, while running
seven operated rigs compared to eight operated rigs last quarter.
UTAH COLORADO
Wattenberg
! In the 3rd Qtr, Anadarko drilled 104 wells and performed 311 fracs,
– TIGHT GAS DEVELOPMENT –
surpassing previous records set in the 2nd Qtr. Anadarko is currently
Greater Natural Buttes running eight drilling rigs and is on pace to drill more than 380 wells
and perform more than 1,100 fracs this year – a 60% increase over
! Greater Natural Buttes achieved another great quarter – growing 2007. Planned annual third-party plant maintenance resulted in a
volumes 9% from the 2nd Qtr and 19% from the 1st Qtr, with a new two-week production curtailment.
gross-operated production record of 330 MMcf/d.
5
NYSE:APC www.anadarko.com
6. Third Quarter 2008 ANADARKO PETROLEUM CORPORATION
Rockies
– COALBED METHANE DEVELOPMENT – – GREATER GREEN RIVER BASIN –
! Several sales-volumes records were set in September in the Powder Pinedale
River Basin (PRB), where volumes rebounded quickly following two
separate maintenance events on the WIC pipeline system in August ! Anadarko continues to participate in an active program with 28 rigs
and early September. Gross sales (operated and non-operated) currently running in the Pinedale area. Along with our partners,
exceeded 800 MMcf/d and gross operated sales achieved a single-day Anadarko spud 202 wells and completed 169 wells through the end of
the 3rd Qtr.
high of 430 MMcf/d.
! PRB development activity accelerated throughout the quarter, ! The Bureau of Land Management issued a Record of Decision for the
following the end of seasonal wildlife stipulations. Anadarko and its Pinedale Final Environmental Impact Statement (FEIS) on Sept. 12
partner had a combined total of 37 rigs drilling on operated and non- that provides for year-round drilling and completion activity, which
operated properties by the end of September. A total of 285 wells were should result in increased future activity.
spud during the quarter, an average of over three wells per day.
! Operators shut in approximately 23 MMmcf/d net to Anadarko
because of low prices during September, while maintenance was
performed on REX. Production has since been restored.
– ENHANCED OIL RECOVERY –
Wamsutter / Moxa
! Rockies EOR properties surpassed the 10 MMBO cumulative
production milestone from CO2 operations and are currently ! In the Wamsutter/Moxa areas, 31 Anadarko-operated wells and 162
non-operated wells have been drilled year to date.
producing over 10,000 Bbl/d.
6
NYSE:APC www.anadarko.com
7. Third Quarter 2008 ANADARKO PETROLEUM CORPORATION
Southern
Gross
Net Volumes* Rig Activity Completed Wells
Capital*
3Q08 3Q08 3Q08
3Q08
2Q08
$ MM Expl. Dev.
MMcf/d MBbls/d Oper. Non-Op
MMcf/d MBbls/d
90 56 5 3 0 6
Haley 1 84 0
32 3 1 0 0 9
Ozona 1 41 1
56 4 0 0 0 1
Mid-Continent 2 59 1
145 28 3 1 0 4
Bossier 0 156 0
Marcellus
85 67 5 2 0 31
Carthage 5 82 5
41 60 8 2 0 5
Chalk 11 44 12
84 64 5 4 0 13
S. Texas / Other 5 92 5
Hugoton 532 282 27 12 0 69
TOTAL 25 557 24
*Data may not add to totals due to rounding.
Haley
Bossier Carthage
Haynesville
Ozona Tight Gas
East Chalk
Maverick
Fractured Reservoirs
Other
Chalk
South Texas
! The Chalk team continued an active drilling program with eight
operated rigs running throughout the quarter. Seven wells were
All production in the Southern Region has been fully restored. spud and six wells were completed.
However, following Hurricane Ike, production was curtailed for a
number of days across the region due to damages sustained by third- Bossier
rd
party infrastructure. The cumulative 3 Qtr volume impact in the
region was approximately 0.3 MMBOE. ! At the end of the quarter, the Bear Grass field reached a gross
production record of 45 MMcf/d. The team also successfully tested
Carthage the first pilot well on 20-acre spacing in Bear Grass, with
encouraging results that may lead to a 20-acre-spacing development
! The Carthage asset team continued to execute a successful program, program. The Bossier asset team ran three rigs throughout the
completing 22 operated wells. quarter, with seven wells spud and four wells completed.
7
NYSE:APC www.anadarko.com
8. Third Quarter 2008 ANADARKO PETROLEUM CORPORATION
Southern
Haley / Delaware Basin Marcellus
! The Anadarko/Chesapeake partnership had eight rigs running in ! Anadarko's leasehold expanded to approximately 644,000 gross
the Delaware Basin during the 3rd Qtr, with seven wells spud and six acres after successful participation in the Pennsylvania State Forest
lease sale. Our first horizontal well spud during 3rd Qtr and brings
wells completed.
the total number of wells spud this year to four. Testing of two
vertical wells will continue in the 4th Qtr, and we expect to complete
– EXPLORATION –
another vertical well and our first horizontal well by year end.
Anadarko has completed a number of wells with very encouraging
results in its U.S. onshore exploration program, including the
Maverick Basin, Haynesville and Marcellus Shale plays.
Maverick Basin
Current Drilling
rd
! Two horizontal wells were drilled during the 3 Qtr for a total of four
horizontal wells drilled during 2008 (two Eagleford and two Pearsall
tests). Testing continues in the Eagleford where fracture
rd
stimulations and completions commenced late in the 3 Qtr. The
th
Pearsall horizontals will be stimulated and tested during the 4 Qtr.
Haynesville
Marcellus Shale
Gas Fairway
! Anadarko has more than 80,000 net acres in the prospective fairway
of the Haynesville Shale, the majority held by production
underneath our producing fields in the Carthage area in Texas and
Elm Grove in Louisiana. The first Anadarko-operated Haynesville
rd
well was spud, drilled and cored late in the 3 Qtr with completion
th
occurring early in the 4 Qtr. Three to four exploratory tests in the
Haynesville, including one horizontal well, are planned by year end.
8
NYSE:APC www.anadarko.com
9. Third Quarter 2008 ANADARKO PETROLEUM CORPORATION
Gulf of Mexico
Net Volumes
3Q08 2Q08
MMcf/d MBbls/d MMcf/d MBbls/d
68
TOTAL 301
448 51
– PRODUCING PROPERTIES –
LOUISIANA
TEXAS
New Orleans
Once again, Anadarko's operated facilities in the deepwater Gulf of
Mexico proved their robust design and construction by weathering
Baldpate/Conger
several named storms with only minor superficial damage. The
weather did have a significant effect on Gulf of Mexico production, Power Play
Constitution
rd
with a cumulative 3 Qtr volumes impact of almost 4.5 MMBOE net to Nansen
Anadarko. However, within a relatively short time frame, repairs were
made. All of Anadarko's operated facilities are operational with
approximately 73% of normal Gulf production back on line. The Boomvang
Independence
remainder is curtailed due to damage to third-party platforms and
Hub
other third-party infrastructure further downstream. As a result of Marco Polo
these lingering repairs, an additional three to five million barrels of Gunnison Red Hawk
production will likely be deferred and has been factored into the APC acreage
th
updated 4 Qtr volume guidance. APC facilities
9
NYSE:APC www.anadarko.com
10. Third Quarter 2008 ANADARKO PETROLEUM CORPORATION
Gulf of Mexico
– PRODUCING PROPERTIES (CONT.) –
Independence Hub Power Play
! The Independence Hub platform was shut in for approximately 10 Garden Banks 258/302 (APC 45% WI)
days in late July/early August for a check up on the third-party export
! Prior to Hurricane Ike, Power Play was brought on line during the 2nd
pipeline. Upon completion, the facility quickly ramped up to full rates
rd
and is currently producing approximately 900 MMcf/d gross. Qtr and maintained its initial rate of 9,000 BOE/d gross in the 3 Qtr.
Due to damages sustained at the Hess-operated Baldpate platform,
volumes were subsequently shut-in during the month of October.
However, recent repairs to the platform have brought back production
at full rate.
Independence
Hub Marco Polo
Green Canyon 608 (APC 100% WI)
San Jacinto
! Anadarko is currently reinjecting approximately 10 MMcf/d of
Spiderman
natural gas into the Marco Polo reservoirs and producing at restricted
Mondo NW Atlas NW rates from the Marco Polo and K2 fields as downstream third-party
Q
infrastructure damage prevented Anadarko from bringing production
Atlas
Merganser
back on line at full rate. Anadarko anticipates that downstream repairs
Vortex
will be complete and full production will be back on line at year end.
Jubilee
Cheyenne
Boomvang
East Breaks 643/642/688 (APC 30% WI)
East Breaks 598 (APC 100% WI)
East Breaks599 (APC 33% WI)
! The facility experienced no significant hurricane-related damage and
is currently producing at pre-storm rates.
10
NYSE:APC www.anadarko.com
11. Third Quarter 2008 ANADARKO PETROLEUM CORPORATION
Gulf of Mexico
– PRODUCING PROPERTIES (CONT.) –
Nansen
East Breaks 558/602/646/689/690 (APC 50% WI)
! Anadarko continued its platform rig program at Nansen, with ! The Conger subsea wells were not damaged by the storms. However,
successful completion of the A-4 well. The well was brought on line at damage to the third-party host platform resulted in a complete shut in
20 MMcf/d gross and the platform rig was demobilized from the of all incoming production. Anadarko anticipates that repairs will be
facility prior to hurricane season. completed and the Conger wells will be back on line in 1st Qtr 2009.
! East Breaks 646 #8 and 646 #7ST wells (Shackleton and DP-1) Red Hawk
remain on schedule for a mid-year 2009 startup, with installation
activities scheduled to commence in the 1st Qtr 2009. Garden Banks 877 (APC 50% WI)
! Plans to initiate drilling operations on a third well, GB 877 #3, in the
Gunnison
st
1 Qtr of 2009 remain on track. The prospect targets new fault blocks,
Garden Banks 667/668/669 (APC 50% WI) with proven field pay in addition to several new horizons. If
successful, the well would be immediately completed and brought on
! Anadarko is currently producing oil at approximately 3,000 Bbls/d line in the second half of 2009.
gross, and re-injecting natural gas into the reservoir. Repairs to
downstream facilities are expected to be complete in November, when Constitution
the platform should resume pre-storm production rates.
Green Canyon 680 (APC 100% WI)
Conger
! While the Constitutional spar is operational, downstream third-party
Garden Banks 215 (APC 25% WI) infrastructure damage prevented Anadarko from bringing
production back on line. Anadarko anticipates that third-party
! Completion operations on the GB 215 #8 ST1 well were completed downstream repairs will be complete and production will be back on
and the well was brought on line. Initial production quickly ramped line, prior to year end.
up to a rate of approximately 40 MMcf/d and 8,000 BBls/d gross.
11
NYSE:APC www.anadarko.com
12. Third Quarter 2008 ANADARKO PETROLEUM CORPORATION
Gulf of Mexico
– MAJOR DEVELOPMENT PIPELINE –
Caesar / Tonga K2 Complex
Green Canyon 683/726/727/770 (APC 33.75%) Green Canyon 561/562/605/606/518/563/607 (APC 42% WI)
! The partnership drilled a confirmation well of the West Tonga ! Sidetracking operations continued on the GC 562 #4 ST2, with the
discovery. The GC 770 #1 ST 1, located approximately 3,000 feet from well being drilled through the M-20 Sand. Core and fluid samples
the GC 726 #1 BP 3 discovery well, encountered high-quality subsalt were obtained from the M14 sand and Anadarko is preparing to core
Miocene sands with more than 700 feet of net pay in dipping the M20 sand to confirm recent evidence of additional aquifer support
formations. The discovery is part of a large continuous reservoir in both sands, which may result in an improved primary recovery
included in a 20,880-acre unit formed for development with the factor. Work continues to determine the optimum development plan
Caesar discovery, located three miles further to the north. for the field.
Development activities are on track for startup in the first half of 2011.
Mission Deep
! Development activities at the Caesar/Tonga complex progressed in the
rd
Green Canyon 956 (APC 50% WI)
3 Qtr. Procurement activities on long-lead items, front-end
engineering and design (FEED) studies continued. Preliminary
! During the 3rd Qtr, Anadarko initiated sidetrack appraisal operations
testing on the high-pressure riser that will enable development of the
field as a subsea tieback to the Anadarko Constitution spar is expected at its Mission Deep discovery. Anadarko is currently evaluating its
to be complete by year end. In addition, the unitization agreement, options with respect to this field.
previously approved by partners, was approved by the MMS.
Blind Faith
Mississippi Canyon 695/696 (APC 25% WI) – Chevron operated
! Blind Faith commissioning continues, with first production expected
by year end.
12
NYSE:APC www.anadarko.com
13. Second Quarter 2008 ANADARKO PETROLEUM CORPORATION
Gulf of Mexico
– EXPLORATION –
! The Shenandoah prospect (Walker Ridge 8) was spud in early June.
LOUISIANA
TEXAS
The well has a Lower Tertiary (Wilcox) objective and is projected to New Orleans
reach total depth of 31,000 feet (30,500 feet total vertical depth) in the
th
4 Qtr. Anadarko is operator and holds a 30% working interest.
Blind Faith
Partners include Conoco-Phillips (40% WI), Cobalt (20% WI) and
Tonga Caesar
Marathon (10% WI).
! The Sturgis North prospect (Atwater Valley 138) was spud in early
February and was plugged and abandoned at the end of the quarter. Vito
Sturgis North
! The Heidelberg exploration well (Green Canyon 859) is scheduled to K2 Complex
spud in the 4th Qtr. The well is a Miocene target that is on trend with Shenandoah APC acreage
the Tonga West discovery and has a projected total depth of 28,500 feet Exploratory Drilling
Heidelberg
in 5,025-foot water depth. Anadarko holds a 44.25% working interest Major Developments
Mission Deep
and is the operator. Partners include Mariner (12.5% WI), ENI (12.5%
WI), Exxon (9.375% WI), Cobalt (9.375% WI), Statoil-Hydro (12%
WI).
! The Vito exploration well (Mississippi Canyon 984) is scheduled to
th
spud in the 4 Qtr. The well is a middle Miocene test and has a
projected total depth of 29,500 feet in 4,000 feet of water. Anadarko is
operator with 20% working interest, along with Statoil-Hydro (25%
WI) and Shell (55% WI). Shell will operate after the exploration well
has been drilled.
13
NYSE:APC www.anadarko.com
14. Third Quarter 2008 ANADARKO PETROLEUM CORPORATION
International / Frontier
Net Volumes* Capital*
3Q08 2Q08 3Q08
$ MM
MBbls/d MBbls/d
21 10
Alaska 18
56 19
Algeria 64
17 13
China 14
0 67
Other 1
94 109
TOTAL 97
*Data may not add to totals due to rounding.
– DEVELOPMENT –
Alaska China
! During the 3rd Qtr, oil production averaged 46,000 Bbl/d gross from
! Gross oil production for the Colville River Unit averaged 99,000 Bbl/d
during the 3rd Qtr, reflecting the planned annual facility maintenance Bohai Bay.
shutdown executed in August.
! Development drilling continued, with two wells drilled in the CFD
! Development drilling at the Qannik Satellite continued as four new 11-1 field and four wells drilled in the CFD 12-1S field during the
wells were drilled and completed during the quarter. quarter.
Algeria Brazil
! During the 3rd Qtr, oil production from the Hassi Berkine South and ! Sale of the Peregrino project is progressing toward transaction close,
which should be around year-end 2008.
the Ourhoud Central Processing Facilities was 448,000 Bbl/d gross.
! The BKNE-B field came on production two months ahead of forecast
and is currently producing at 4,000 Bbl/d. Additional drilling in the
field is scheduled for 4th Qtr 2008 and into 2009.
! Anadarko and its partners broke ground and began site preparation
for the El Merk project.
14
NYSE:APC www.anadarko.com
15. Third Quarter 2008 ANADARKO PETROLEUM CORPORATION
International / Frontier
– EXPLORATION –
Brazil China
! During the 3rd Qtr, Anadarko completed acquisition of 1,550
! Anadarko announced a significant pre-salt discovery at the Wahoo
prospect on block BM-C-30 offshore Brazil in the Campos Basin at the kilometers (~960 miles) of 2D seismic. Preparations continue for a
end of the 3rd Qtr. Since that time, the well reached total depth of planned 4,000-meter (~13,000-foot) exploratory well during late 4th
Qtr 2008 or early 1st Qtr 2009.
approximately 20,000 feet, encountered an additional oil
accumulation in a deeper zone and confirmed the quality of the
previously announced reservoir. Extensive logging, fluid and pressure
sampling has now confirmed more than 200 feet of net pay consisting
of high-quality, high-gravity crude oil in the upper zone with
additional hydrocarbon-bearing sands encountered in a deeper zone.
Anadarko believes the reservoir properties are similar to the giant
Jubarte field, which is estimated to hold more than a billion barrels of
recoverable oil. Anadarko and its partners are currently running
casing to total depth to prepare for drillstem tests in 2009 to further
evaluate the multiple hydrocarbon-bearing zones, as well as further
exploration and appraisal drilling on the block in 2009.
! Having control of the Transocean Deepwater Millennium drillship
enables Anadarko to execute upon its pre-salt program, which
includes appraisal drilling around the Wahoo well, re-entering the
Serpa prospect in the Espírito Santo Basin and drilling at least five
additional deepwater pre-salt tests in the Espírito Santo and Campos
basins.
15
NYSE:APC www.anadarko.com
16. Third Quarter 2008 ANADARKO PETROLEUM CORPORATION
International / Frontier
APC Acreage
APC Discovery
2008 Drilling
2009 Drilling
Tertiary Trend
Cretaceous Trend
103 BBOE Discovered
2 BBOE Discovered
Under-Explored
Cretaceous Trend
8 BBOE Discovered
– EXPLORATION (CONT.) –
Ghana West Africa
! Plans to sanction the Jubilee Field, with estimated recoverable ! Anadarko was awarded a 100% working interest in Block 10, a 3,465-
resources of between 500 million and 1.8 billion BOE, remain on square-kilometer (~1,340-square-mile) tract offshore Liberia. This
track. A suitable FPSO has been selected and a Letter of Intent has block is located in the Liberian basin and is on trend with the
been signed on the vessel. Project awards on several long-lead items emerging Upper Cretaceous fan play.
rd
were executed in the 3 Qtr.
! Anadarko signed a contract to acquire 3D seismic on Liberia blocks
15, 16 and 17 as part of the exploration program. The current plan is to
! The deepwater drilling rig Blackford Dolphin arrived during the
acquire 4,700 square kilometers (~1,800 square miles) of data over the
second week of October, and the Erik Raude rig is expected to arrive
deepwater portion of the blocks to evaluate for potential Cretaceous
before the end of 2008. These two rigs will continue the exploration,
fan prospect development in this emerging basin. Seismic acquisition
appraisal and development well drilling program in the Deepwater
is planned to start in the 4th Qtr. Anadarko operates the blocks with a
Tano Lisence and West Cape Three Points blocks. In addition, the
partners have contracted for two additional rigs, the Aban Abraham 65% working interest.
and Atwood Hunter, which will arrive in early 2009 and will be
focused on exploratory and appraisal work.
16