Reliability Maturity Matrix
Maturity Matrix
The concept of a maturity model is not new. It provides a means to identif y the current state and illuminate the
possible improvements to a reliability program. The matrix serves a guide to assist an organization in improving
its program.
The matrix has f ive stages. In general, the higher stages are most cost ef f ective and ef f icient at achieving
higher rates of product reliability perf ormance. These stages—uncertainty, awaking, enlightenment, wisdom,
and certainty—are described in today’s post.
Stage 1: Uncertainty
“We don’t know why we have problems with reliability.”
Reliability is rarely discussed or considered during design and production. Product returns resulting f rom f ailure
are considered a part of doing business. Field f ailures are rarely investigated, and of ten blame is assigned to
customers. The f ew people who consider reliability improvements gain little support. Reliability testing is done
in an ad hoc f ashion and of ten just to meet customer requirements or basic industry standards.
Stage 2: Awakening
“Is it absolutely necessary to always have problems with reliability?”
Reliability is discussed by managers but not supported by f unding or training. Some elements of a reliability
program are implemented, yet generally not in a coordinated f ashion. Some tools such as FMEA and
accelerated and highly accelerated lif e testing are experimented with, but most ef f ort still f ocuses on
standards-based testing and meeting customer requirements. Some analysis is done to estimate reliability or
understand f ield f ailure rates, yet limited use is made of these data in making product decisions. There is,
however, an increasing emphasis on understanding f ailures and resolving them. Failure analysis is typically
accomplished by component vendors with little result.
Stage 3: Enlightenment
“Through commitment and reliability improvement we are identif ying and resolving our problems.”
A robust reliability program exists and includes many tools and processes. Generally, signif icant ef f ort is
directed to resolving prototype and f ield reliability issues. Increasing reliance is placed on root-cause analysis
to determine appropriate solutions. Some tools are not used to their f ull potential owing to lack of
understanding of reliability and how the various tools apply. Some reliance is placed on establishing standard
testing and procedures f or all products. Only some use of these testing results is made f or estimating product
reliability to supplement predictions. Predictions are primarily made to address customer requests and not as
f eedback to design teams.
Stage 4: Wisdom
“Failure prevention is a routine part of our operation.”
Each product program or project has a tailored reliability program that can be adjusted as the understanding of
product reliability risks changes. Reliability tools and tasks are selected and implemented because they will
provide needed inf ormation f or decisions. Testing f ocuses on either discovering f ailure mechanisms or
characterizing f ailure mechanisms. Testing of ten proceeds to f ailure, if possible. Advanced data analysis tools
are regularly employed and reports are distributed widely. There is increasing cooperation with key suppliers
and vendors to incorporate the appropriate reliability tools upstream.
Stage 5: Certainty
“We know why we do not have problems with reliability.”
Product reliability is a strategic business activity across the organization. There is widespread understanding
and acceptance of design f or reliability and how it f its into the overall business. Product reliability is accurately
predicted prior to product launch using a mix of appropriate techniques. New materials, processes, and
vendors are caref ully considered f or their ability to meet internally established reliability requirements. The f ew
f ailures that do occur are expected and analysis is done to identif y early signs of material or process changes.
Customers and suppliers are regularly consulted on ways to improve reliability.

Contenu connexe

Plus de Accendo Reliability

12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdfAccendo Reliability
 
09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdfAccendo Reliability
 
10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdfAccendo Reliability
 
08-Master the basics carousel.pdf
08-Master the basics carousel.pdf08-Master the basics carousel.pdf
08-Master the basics carousel.pdfAccendo Reliability
 
07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdfAccendo Reliability
 
06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdfAccendo Reliability
 
05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdfAccendo Reliability
 
04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdfAccendo Reliability
 
Reliability Engineering Management course flyer
Reliability Engineering Management course flyerReliability Engineering Management course flyer
Reliability Engineering Management course flyerAccendo Reliability
 
How to Create an Accelerated Life Test
How to Create an Accelerated Life TestHow to Create an Accelerated Life Test
How to Create an Accelerated Life TestAccendo Reliability
 
Getting Started with Reliability Engineering
Getting Started with Reliability EngineeringGetting Started with Reliability Engineering
Getting Started with Reliability EngineeringAccendo Reliability
 

Plus de Accendo Reliability (20)

12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf
 
13-RCM Reduces Maintenance.pdf
13-RCM Reduces Maintenance.pdf13-RCM Reduces Maintenance.pdf
13-RCM Reduces Maintenance.pdf
 
11-RCM is like a diet.pdf
11-RCM is like a diet.pdf11-RCM is like a diet.pdf
11-RCM is like a diet.pdf
 
09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf
 
10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf
 
08-Master the basics carousel.pdf
08-Master the basics carousel.pdf08-Master the basics carousel.pdf
08-Master the basics carousel.pdf
 
07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf
 
06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf
 
05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf
 
03-3 Ways to Do RCM.pdf
03-3 Ways to Do RCM.pdf03-3 Ways to Do RCM.pdf
03-3 Ways to Do RCM.pdf
 
04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf
 
02-5 RCM Myths Carousel.pdf
02-5 RCM Myths Carousel.pdf02-5 RCM Myths Carousel.pdf
02-5 RCM Myths Carousel.pdf
 
01-5 CBM Facts.pdf
01-5 CBM Facts.pdf01-5 CBM Facts.pdf
01-5 CBM Facts.pdf
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Reliability Engineering Management course flyer
Reliability Engineering Management course flyerReliability Engineering Management course flyer
Reliability Engineering Management course flyer
 
How to Create an Accelerated Life Test
How to Create an Accelerated Life TestHow to Create an Accelerated Life Test
How to Create an Accelerated Life Test
 
Reliability Programs
Reliability ProgramsReliability Programs
Reliability Programs
 
Reliability Distributions
Reliability DistributionsReliability Distributions
Reliability Distributions
 
R Software and Reliability
R Software and ReliabilityR Software and Reliability
R Software and Reliability
 
Getting Started with Reliability Engineering
Getting Started with Reliability EngineeringGetting Started with Reliability Engineering
Getting Started with Reliability Engineering
 

Dernier

IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdfChristopherTHyatt
 

Dernier (20)

IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 

Reliability Maturity Matrix stage descriptions - FMS Reliability

  • 1. f msreliabilit y.com http://www.fmsreliability.com/education/reliability-maturity-matrix/ Fred Reliability Maturity Matrix Maturity Matrix The concept of a maturity model is not new. It provides a means to identif y the current state and illuminate the possible improvements to a reliability program. The matrix serves a guide to assist an organization in improving its program. The matrix has f ive stages. In general, the higher stages are most cost ef f ective and ef f icient at achieving higher rates of product reliability perf ormance. These stages—uncertainty, awaking, enlightenment, wisdom, and certainty—are described in today’s post. Stage 1: Uncertainty “We don’t know why we have problems with reliability.” Reliability is rarely discussed or considered during design and production. Product returns resulting f rom f ailure are considered a part of doing business. Field f ailures are rarely investigated, and of ten blame is assigned to customers. The f ew people who consider reliability improvements gain little support. Reliability testing is done in an ad hoc f ashion and of ten just to meet customer requirements or basic industry standards. Stage 2: Awakening “Is it absolutely necessary to always have problems with reliability?” Reliability is discussed by managers but not supported by f unding or training. Some elements of a reliability program are implemented, yet generally not in a coordinated f ashion. Some tools such as FMEA and accelerated and highly accelerated lif e testing are experimented with, but most ef f ort still f ocuses on standards-based testing and meeting customer requirements. Some analysis is done to estimate reliability or understand f ield f ailure rates, yet limited use is made of these data in making product decisions. There is, however, an increasing emphasis on understanding f ailures and resolving them. Failure analysis is typically accomplished by component vendors with little result. Stage 3: Enlightenment
  • 2. “Through commitment and reliability improvement we are identif ying and resolving our problems.” A robust reliability program exists and includes many tools and processes. Generally, signif icant ef f ort is directed to resolving prototype and f ield reliability issues. Increasing reliance is placed on root-cause analysis to determine appropriate solutions. Some tools are not used to their f ull potential owing to lack of understanding of reliability and how the various tools apply. Some reliance is placed on establishing standard testing and procedures f or all products. Only some use of these testing results is made f or estimating product reliability to supplement predictions. Predictions are primarily made to address customer requests and not as f eedback to design teams. Stage 4: Wisdom “Failure prevention is a routine part of our operation.” Each product program or project has a tailored reliability program that can be adjusted as the understanding of product reliability risks changes. Reliability tools and tasks are selected and implemented because they will provide needed inf ormation f or decisions. Testing f ocuses on either discovering f ailure mechanisms or characterizing f ailure mechanisms. Testing of ten proceeds to f ailure, if possible. Advanced data analysis tools are regularly employed and reports are distributed widely. There is increasing cooperation with key suppliers and vendors to incorporate the appropriate reliability tools upstream. Stage 5: Certainty “We know why we do not have problems with reliability.” Product reliability is a strategic business activity across the organization. There is widespread understanding and acceptance of design f or reliability and how it f its into the overall business. Product reliability is accurately predicted prior to product launch using a mix of appropriate techniques. New materials, processes, and vendors are caref ully considered f or their ability to meet internally established reliability requirements. The f ew f ailures that do occur are expected and analysis is done to identif y early signs of material or process changes. Customers and suppliers are regularly consulted on ways to improve reliability.