SlideShare une entreprise Scribd logo
1  sur  3
Télécharger pour lire hors ligne
f msreliabilit y.com http://www.fmsreliability.com/education/reactive-and-proactive/
Reactive and Proactive
Do you let events happen to you, or do events f ollow your designs
and expectations? Are you a spectator or actor? Do you wonder
about your products f uture or do you control your products
f uture? Are you reactive or proactive?
Every reliability and maintenance program is a system. Every
program has inputs, such as product testing results and f ield
returns. Every reliability program has outputs, such as product
design and production. In the most basic terms, a reliability
program includes product specif ications f or f unctionality including
expected durability. The program includes some f orm of design,
verif ication, production and f ield perf ormance. Given this basic
lif ecycle description it is possible f or two types of approaches to
executing the product lif ecycle.
Every design will fail
Let’s consider the notion that every product will eventually f ail.
Even the most robust product on Earth will f ail when the Sun
expires. Well bef ore the collapse of the solar system most
products made today will have completely f ailed. The f ailures will
range f rom deterioration of materials, to stress conditions (i.e. lightning strike), or simply to misuse. Some will
simply wear out, others will become obsolete and lose compatibility with other systems; others will simply not
provide suf f icient value anymore.
Another important notion is that upon product design, there are a f inite number of f aults in the design. A
button has a limited number of actuation cycles bef ore accumulated stress cracks the switch dome. A material
has a degradation mechanism (corrosion, polymer chain scission) that slowly deteriorates the material’s
strength. A’bug’ in the sof tware can disable the equipment temporarily. Further, there are possible def ects
designed into the product that do not account f or production variation, user demand or environment
variations, or do not anticipate user expectations. In every case, sooner or later, the design f law will lead to
f ailure. Nonetheless, given only a f inite number of f ailures, it is possible to f ind and remove most design
errors.
Reactive Approach
One way to approach product reliability, and the most common method, is to wait f or product f ailures and then
respond with analysis, adjustments and ref inements in an attempt to improve product reliability. The naive wait
f or the f ailure reports f rom customers bef ore taking action. The team’s logic, if even considered is the
f ollowing:
We are good designers
The customer will use the product in unf oreseen environments and applications
If there are customer f ailures we will consider improvements
For some products, with limited release and ample time to redesign the product, this may be perf ectly f easible.
A simple improvement the design team could consider is an estimate of the customer’s use prof ile and
environmental conditions. Armed with this inf ormation, the team then evaluates the impact of the conditions on
the product’s reliability though standardized testing. Setting testing conditions at or slightly above expected
operating environments permits direct evaluation of the design to meet expected conditions. The f aults f ound
would be similar to the f ailure expected to occur in the customer’s hands, and there may be time f or a redesign
bef ore the product is shipped to customers. Carrying out this logic may lead to a broad spectrum of testing
that is both expensive and time consuming.
Part of the logic of product testing includes the thought, “If we test in enough ways over the f ull range of use
and environmental conditions, we should f ind and correct every design f ault.” There is of ten a heavy reliance
on industry standards and common test methods f or every product.
Further improvements to product reliability can ref ine this reactive method, and include using simulations, risk
analysis, and early evaluation and testing of subsystems and components. The overall approach is of ten
limited by knowledge of actual use conditions, lack of test samples, and lack of time.
Proactive Approach
Moving to a proactive approach can permit the reduction of product testing and the increase of product
reliability. While this may seem similar to the above approach, it involves a f ocus on f ailure mechanisms instead
of test methods. Products f ail because they do not have suf f icient strength to withstand a single application
of high stress (drop, static discharge, etc.) or they accumulate damage (wear, corrosion, drif t, etc.) with use or
over time. Thinking though how a product could f ail by considering the materials, design, assembly process,
and the same f or vendor supplied elements, the product team determines a list of possible f ailure mechanisms.
In this approach not all the f ailure mechanisms will be f ully understood or characterized. The risk in this case is
the decision to launch the product while not understanding the possibility or potential magnitude of product
f ailure. The amount of risk itself is unknown. Theref ore, the proactive team proceeds to characterize the
design or material under the expected use conditions. The intent is to reduce the uncertainty of the risk.
A second result of the proactive approach risk assessment is the rank ordering of f ailure mechanisms by
expected rate of occurrence. One way to accomplish this ranking is to evaluate the stress versus strength
relationships. The items with the largest overlap of the two distributions (stress and strength) indicate they
have the highest potential f or f ailure. The solutions may include increasing strength, or reducing the variance
of the strength.
A third result of the risk assessment is similar to the stress and strength evaluation and includes the impacts
of time or usage on the change in the stress and strength distributions. Either curve may experience changes
to the mean or variance over time. This may be due to degradation, wear, or increased expectation of durability
by customers.
The proactive approach takes more thinking and understanding of how testing stresses create f ailures, plus
characterization of product designs, materials, and processes, and their related f ailure mechanisms.
Summary
In summary, a reactive approach creates a design, and then waits f or f ield returns or standard product testing
f ailures to prompt product improvements. The proactive approach anticipates f ailure mechanisms,
experimentally or via simulation, characterizes the response of the design and materials to expected stresses,
and then designs.
There are other aspects that identif y a reactive versus proactive reliability program. For example, if the only
time management discusses product reliability is when a major customer complains about product f ailures, that
is a reactive approach. If the management team regularly inquires and discusses the risk a particular design
presents to reliability perf ormance– that is a proactive approach.
How does your team approach product reliability? Are the results as expected or are there regular surprises?

Contenu connexe

Plus de Accendo Reliability

T or F Must have failure data.pdf
T or F Must have failure data.pdfT or F Must have failure data.pdf
T or F Must have failure data.pdfAccendo Reliability
 
Should RCM Templates be used.pdf
Should RCM Templates be used.pdfShould RCM Templates be used.pdf
Should RCM Templates be used.pdfAccendo Reliability
 
12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdfAccendo Reliability
 
09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdfAccendo Reliability
 
10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdfAccendo Reliability
 
08-Master the basics carousel.pdf
08-Master the basics carousel.pdf08-Master the basics carousel.pdf
08-Master the basics carousel.pdfAccendo Reliability
 
07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdfAccendo Reliability
 
06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdfAccendo Reliability
 
05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdfAccendo Reliability
 
04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdfAccendo Reliability
 
Reliability Engineering Management course flyer
Reliability Engineering Management course flyerReliability Engineering Management course flyer
Reliability Engineering Management course flyerAccendo Reliability
 
How to Create an Accelerated Life Test
How to Create an Accelerated Life TestHow to Create an Accelerated Life Test
How to Create an Accelerated Life TestAccendo Reliability
 

Plus de Accendo Reliability (20)

T or F Must have failure data.pdf
T or F Must have failure data.pdfT or F Must have failure data.pdf
T or F Must have failure data.pdf
 
Should RCM Templates be used.pdf
Should RCM Templates be used.pdfShould RCM Templates be used.pdf
Should RCM Templates be used.pdf
 
12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf
 
13-RCM Reduces Maintenance.pdf
13-RCM Reduces Maintenance.pdf13-RCM Reduces Maintenance.pdf
13-RCM Reduces Maintenance.pdf
 
11-RCM is like a diet.pdf
11-RCM is like a diet.pdf11-RCM is like a diet.pdf
11-RCM is like a diet.pdf
 
09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf
 
10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf
 
08-Master the basics carousel.pdf
08-Master the basics carousel.pdf08-Master the basics carousel.pdf
08-Master the basics carousel.pdf
 
07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf
 
06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf
 
05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf
 
03-3 Ways to Do RCM.pdf
03-3 Ways to Do RCM.pdf03-3 Ways to Do RCM.pdf
03-3 Ways to Do RCM.pdf
 
04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf
 
02-5 RCM Myths Carousel.pdf
02-5 RCM Myths Carousel.pdf02-5 RCM Myths Carousel.pdf
02-5 RCM Myths Carousel.pdf
 
01-5 CBM Facts.pdf
01-5 CBM Facts.pdf01-5 CBM Facts.pdf
01-5 CBM Facts.pdf
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Reliability Engineering Management course flyer
Reliability Engineering Management course flyerReliability Engineering Management course flyer
Reliability Engineering Management course flyer
 
How to Create an Accelerated Life Test
How to Create an Accelerated Life TestHow to Create an Accelerated Life Test
How to Create an Accelerated Life Test
 
Reliability Programs
Reliability ProgramsReliability Programs
Reliability Programs
 
Reliability Distributions
Reliability DistributionsReliability Distributions
Reliability Distributions
 

Dernier

presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 

Dernier (20)

presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 

Reactive and Proactive FMS Reliability

  • 1. f msreliabilit y.com http://www.fmsreliability.com/education/reactive-and-proactive/ Reactive and Proactive Do you let events happen to you, or do events f ollow your designs and expectations? Are you a spectator or actor? Do you wonder about your products f uture or do you control your products f uture? Are you reactive or proactive? Every reliability and maintenance program is a system. Every program has inputs, such as product testing results and f ield returns. Every reliability program has outputs, such as product design and production. In the most basic terms, a reliability program includes product specif ications f or f unctionality including expected durability. The program includes some f orm of design, verif ication, production and f ield perf ormance. Given this basic lif ecycle description it is possible f or two types of approaches to executing the product lif ecycle. Every design will fail Let’s consider the notion that every product will eventually f ail. Even the most robust product on Earth will f ail when the Sun expires. Well bef ore the collapse of the solar system most products made today will have completely f ailed. The f ailures will range f rom deterioration of materials, to stress conditions (i.e. lightning strike), or simply to misuse. Some will simply wear out, others will become obsolete and lose compatibility with other systems; others will simply not provide suf f icient value anymore. Another important notion is that upon product design, there are a f inite number of f aults in the design. A button has a limited number of actuation cycles bef ore accumulated stress cracks the switch dome. A material has a degradation mechanism (corrosion, polymer chain scission) that slowly deteriorates the material’s strength. A’bug’ in the sof tware can disable the equipment temporarily. Further, there are possible def ects designed into the product that do not account f or production variation, user demand or environment variations, or do not anticipate user expectations. In every case, sooner or later, the design f law will lead to f ailure. Nonetheless, given only a f inite number of f ailures, it is possible to f ind and remove most design errors. Reactive Approach One way to approach product reliability, and the most common method, is to wait f or product f ailures and then respond with analysis, adjustments and ref inements in an attempt to improve product reliability. The naive wait f or the f ailure reports f rom customers bef ore taking action. The team’s logic, if even considered is the f ollowing: We are good designers The customer will use the product in unf oreseen environments and applications If there are customer f ailures we will consider improvements
  • 2. For some products, with limited release and ample time to redesign the product, this may be perf ectly f easible. A simple improvement the design team could consider is an estimate of the customer’s use prof ile and environmental conditions. Armed with this inf ormation, the team then evaluates the impact of the conditions on the product’s reliability though standardized testing. Setting testing conditions at or slightly above expected operating environments permits direct evaluation of the design to meet expected conditions. The f aults f ound would be similar to the f ailure expected to occur in the customer’s hands, and there may be time f or a redesign bef ore the product is shipped to customers. Carrying out this logic may lead to a broad spectrum of testing that is both expensive and time consuming. Part of the logic of product testing includes the thought, “If we test in enough ways over the f ull range of use and environmental conditions, we should f ind and correct every design f ault.” There is of ten a heavy reliance on industry standards and common test methods f or every product. Further improvements to product reliability can ref ine this reactive method, and include using simulations, risk analysis, and early evaluation and testing of subsystems and components. The overall approach is of ten limited by knowledge of actual use conditions, lack of test samples, and lack of time. Proactive Approach Moving to a proactive approach can permit the reduction of product testing and the increase of product reliability. While this may seem similar to the above approach, it involves a f ocus on f ailure mechanisms instead of test methods. Products f ail because they do not have suf f icient strength to withstand a single application of high stress (drop, static discharge, etc.) or they accumulate damage (wear, corrosion, drif t, etc.) with use or over time. Thinking though how a product could f ail by considering the materials, design, assembly process, and the same f or vendor supplied elements, the product team determines a list of possible f ailure mechanisms. In this approach not all the f ailure mechanisms will be f ully understood or characterized. The risk in this case is the decision to launch the product while not understanding the possibility or potential magnitude of product f ailure. The amount of risk itself is unknown. Theref ore, the proactive team proceeds to characterize the design or material under the expected use conditions. The intent is to reduce the uncertainty of the risk. A second result of the proactive approach risk assessment is the rank ordering of f ailure mechanisms by expected rate of occurrence. One way to accomplish this ranking is to evaluate the stress versus strength relationships. The items with the largest overlap of the two distributions (stress and strength) indicate they have the highest potential f or f ailure. The solutions may include increasing strength, or reducing the variance of the strength. A third result of the risk assessment is similar to the stress and strength evaluation and includes the impacts of time or usage on the change in the stress and strength distributions. Either curve may experience changes to the mean or variance over time. This may be due to degradation, wear, or increased expectation of durability by customers. The proactive approach takes more thinking and understanding of how testing stresses create f ailures, plus characterization of product designs, materials, and processes, and their related f ailure mechanisms. Summary In summary, a reactive approach creates a design, and then waits f or f ield returns or standard product testing f ailures to prompt product improvements. The proactive approach anticipates f ailure mechanisms, experimentally or via simulation, characterizes the response of the design and materials to expected stresses, and then designs.
  • 3. There are other aspects that identif y a reactive versus proactive reliability program. For example, if the only time management discusses product reliability is when a major customer complains about product f ailures, that is a reactive approach. If the management team regularly inquires and discusses the risk a particular design presents to reliability perf ormance– that is a proactive approach. How does your team approach product reliability? Are the results as expected or are there regular surprises?