FSM ENERGY POLICY
VISION AND OBJECTIVES
Vision
   Improve life of all FSM citizens with sustainable energy*
    (Sustainable Energy: Affordable, reliable, and environmentally sound energy)


Objectives
   Promote sustainable socio-economic development through
    providing sustainable energy services

   Become less dependent on imported energy through
    increased share of renewable energy, energy conservation
    and efficiency improvement
STRATEGIC GOALS
Institutional
   Improve coordination and program management
Conventional Energy
   Safe, reliable and affordable supply of conventional energy
Renewable Energy
   Increase share of renewable energy
    (More than 30% in 2020)
Energy Efficiency and Conservation
   Conserve energy consumption and improve energy efficiency
    (50% efficiency improvement in 2020)
INSTITUTIONAL FRAMEWORK
                                                     National Energy
                                                        Workgroup
                        National                     (Energy Division)                    AMU
                       Government




 Yap State                          Chuuk State                  Pohnpei State                  Kosrae State
                  YSPSC                            CPUC                             PUC                           KUA
Government                          Government                    Government                    Government



         Yap Energy                       Chuuk Energy                   Pohnpei Energy               Kosrae Energy
         Workgroup                         Workgroup                       Workgroup                    Workgroup



Private Sector        NSAs      Private Sector      NSAs          Private Sector     NSAs       Private Sector   NSAs
ACTION PLAN SUMMARY                               (NATIONAL GOVERNMENT)

    Energy Division (R&D) to act as a center for implementation of Energy Policy


Institutional
    Develop FSM energy information database for effective monitoring and evaluation
Conventional Energy
    Effectively coordinate with regional/sub-regional organizations for stable and
     affordable energy supply
Renewable Energy
    Effectively coordinate with donors and regional/sub-regional organizations to support
     technical/financial source of states’ investment plans
    Conduct nation wide study for renewable energy assessment
Energy Efficiency and Conservation
    Implement government facility conservation plan
    Proceed regulation on building and construction
    Conduct awareness campaign on energy efficiency and conservation
    Conduct training and capacity building programme
ACTION PLAN SUMMARY (STATE GOVERNMENTS)
     First priority on improvement of conventional energy facilities for stable
      supply
          Maintenance and renewal of existing diesel generators
          Upgrade existing distribution lines and equipment
          On-going capacity building program
          Development of energy standards and regulations
          Development of mechanism for periodic tariff review
     Promotion of renewable energies for
          Stand-alone PV system for outer islands and other un-electrified area
          Grid-connected PV system
          Survey/study of other renewable systems
             ―   Wind for Yap, Water for Pohnpei, Wave for Kosrae, Waste to energy
     Efficiency improvement/conservation activities
          Introduction of efficient equipment and systems
          Capacity improvement training for energy efficiency
          Awareness campaign for energy conservation



Effective coordination for overseas assistance is essential for smooth implementation
ACTION PLAN SUMMARY - CONVENTIONAL ENERGY
                                                   YAP                           CHUUK                            POHNPEI                            KOSRAE               TOTAL
No. of customers                                   1,917                          1,800                             6,399                               1,900             12,016
Base-load Demand (kW)                              1,500                          3,000                             4,400                                600              9,500
Peak Demand (kW)                                   2,200                          4,500                             6,500                               1,000             14,200
Renewable Energy Target (30%, kW)                  660                            1,350                             1,950                                300              4,260
Utility Company                                   YSPSC                           CPUC                              PUC                                  KUA                -
Conventional Energy
Diesel Power Generators
Current Generator Situation           #5, 1977,      0, Non         #1                               #4, 1988, 600, Ope.                 #2 1980,   -     , Non (560)
(UNIT#, INSTALL Yr., Capa. kW, status) #6, 1977, 500, Ope.          #2      All stationary           #5, 1988,   - , Non.                #3   - ,    - , Non
                                       #7, 1994, 3,259, Ope.        …..     type engines             #6, 1988, 600, Ope                  #4 1984,    560, Ope.
                                      #8, 1994, 3,259, Ope.         #7      are broken               #7, 1992, 1,750, Ope                #6 1990, 1,500, Ope.
                                     Total        7,090             #8, 2007, 1,200, Ope.            #8, 1992, 1,800, Non                #7 1996,       - , Non (1,650)
                                                                    #9, 2007, 1,000, Ope.            #9, 1994,      - , Non.             #8 2007, 1,015, Ope.
                                                                   #10, 2007,     - , Non           #10, 1994, 1,800, Ope.               Total -    3,075
                                                                   Total        2,200               Total        6,550
Action plan                           1. Purchase 1.5MW new                                         1. Overhaul all generators    1. Replace inoperable back-up
                                      generator                                                     - #5 already done             unit
                                                                                                    2. Purchase 2MW new generator
                                                                                                    to replace old one
Distribution
Action Plan                           1. Replace HV bus (4.16kV)   1. Install three phase           1. Distribution loss reduction
                                      and modern HV Cubicles       transformers                        - Replace poles, cross bars,
                                      2. Recalculate & update      2. Repair broken distribution    transformers, etc.
                                      distribution losses          lines                            2. Capacity-building

               Others
                                      1. Purchase 4 fuel meters for 1. Improve management,          7. Cash-meter addition               1. Pre-Paid meters for 90%
                                      power plant                   operation and mainte. of CPUC   8. S/D future plan study             customers
                                      2. Conduct Energy Audit       2. Increase cash-power system   9. Bio-fuel, waste oil utilization   2. KW demand meters for
                                      3. Installation of cash-power                                 study                                large customers
                                      meters                                                                                             3. Compact fluorescent lamps
                                      4. Modernize HV cubicles                                                                           for residential/commercial
                                      5. LED spot light pilot proj.                                                                      facilities
                                      6. Short term energy storage
                                      for stability
ACTION PLAN SUMMARY - RENEWABLE ENERGY
                                                  YAP                              CHUUK                           POHNPEI                              KOSRAE           TOTAL
No. of customers                                  1,917                             1,800                            6,399                              1,800            11,916
Base-load Demand (kW)                             1,500                             3,000                            4,400                                600             9,500
Peak Demand (kW)                                  2,200                             4,500                            6,500                              1,000            14,200
Renewable Energy Target (30%,                      660                              1,350                            1,950                                300             4,260
kW)
SOLAR POWER
                                                                                       MAIN ISLAND
Installed/On-going (kW)                                              Gov. Buildings (70)               President Office (20)            State Building (11.7)             302.5
                                                                                                       COM-FSM (160)                    Hospital (16.4)
                                                                                                                                        Airport (7.8)             52.5
                                                                                                                                        KUA (4.9)
                                                                                                                                        Legislature (11.7)

Next Candidate Site (kW)            Yap Hospital (80kW)              Gov. Bldgs (450kW)                State Hospital & others to attain Other Gov. Bldgs (200kW)
(Source: State Energy Action Plans) Other Gov. Bldgs (160kW)         All public facilities             15% by 2013 (340kW)               Walung Village (School/disp.)
                                                                                     OUTER ISLANDS
Islands installed since 2007* (kW) Asor (19.5)                       Satawan (6.6)                     Kapingamarangi (9.8)                                -             Total 11
(*Before 2007, solar systems were - Mini-grid                         - Hi school                       - School                                                          islands
being installed but no accurate       (100% connected)               Moch (6.7)                         - Disp. + municipal
data available about what % still Fadrai (28.1)                       - Mini-grid (Hi school + disp.   Nukuoro (7.6)
working.)                                                               + municipal                     - School
                                                                     Udot (3.4)                         - Dispensary
                                                                      - Hi school                      Sapwaifik (11.4)
                                                                     Onoun (10.5)                       - School + municipal
                                                                      - Hi school                       - Dispensary
                                                                      - Mini-grid (Hi school           Mwaokillao (8.6)
                                                                        + Ele. School +disp. +          - Dispensary
                                                                     municipal                          - School
                                                                                                       Pingelap (8.7)
                                                                                                        - School
                                                                                                        - Dispensary

Total Capacity:                                     47.6                              27.2                             46.1                                -              120.9
Islands to be installed             Solar: Fais, Satawal, Ifalik,    Hybrid in lagoon islands          Rehabili. to existing SHS                           -
(Source: State Energy Action Plans) Lamotrek, Falaulap, Euaripik,    All public facilities on other    Public Facilities of;
                                    Elato, Ngulu, Woleai, Falalop,   outer islands                     - Parem
                                    Solar+Diesel: Ulithi-Mogmog                                        - Pakin
                                    Ulithi-Falalap, Woleai-Falalap                                     - Mwand
OTHER ALTERNATIVE ENERGY            Wind Power                       Wind Power                        Hydro-Power, Bio-gas             Sea Wave, Wind, Hydro Power

More Related Content

What's hot

What is Cambridshire's potential for renewable energy? – Duncan Price, Camco
What is Cambridshire's potential for renewable energy? – Duncan Price, CamcoWhat is Cambridshire's potential for renewable energy? – Duncan Price, Camco
What is Cambridshire's potential for renewable energy? – Duncan Price, Camcocrifcambs
 
Where will CSP plants be built? Incentives, RPS requirements, and Project Eco...
Where will CSP plants be built? Incentives, RPS requirements, and Project Eco...Where will CSP plants be built? Incentives, RPS requirements, and Project Eco...
Where will CSP plants be built? Incentives, RPS requirements, and Project Eco...Smithers Apex
 
Panama juan urriola
Panama   juan urriola Panama   juan urriola
Panama juan urriola enmoveme
 
Global ccs institute aep feed webinar presentation
Global ccs institute aep feed webinar presentationGlobal ccs institute aep feed webinar presentation
Global ccs institute aep feed webinar presentationGlobal CCS Institute
 
E. Larsen, "Efficient integration of EVs with wind power production," in Effi...
E. Larsen, "Efficient integration of EVs with wind power production," in Effi...E. Larsen, "Efficient integration of EVs with wind power production," in Effi...
E. Larsen, "Efficient integration of EVs with wind power production," in Effi...Eamon Keane
 
UBS Australian Utilities Conference
UBS Australian Utilities ConferenceUBS Australian Utilities Conference
UBS Australian Utilities ConferenceAGL Energy Limited
 
4Q08 and 2008 Earnings Results
4Q08 and 2008 Earnings Results4Q08 and 2008 Earnings Results
4Q08 and 2008 Earnings ResultsAES Tietê
 
Baskin UCSC Panel Feb 18 2009 Peter Borden
Baskin UCSC Panel Feb 18 2009   Peter BordenBaskin UCSC Panel Feb 18 2009   Peter Borden
Baskin UCSC Panel Feb 18 2009 Peter BordenMary Trigiani
 
Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Engineers Australia
 
Small Pv Integration On Distribution Pv America 2011 04 04 2011
Small   Pv Integration On Distribution   Pv America 2011   04 04 2011Small   Pv Integration On Distribution   Pv America 2011   04 04 2011
Small Pv Integration On Distribution Pv America 2011 04 04 2011forrestsmall
 
April 2012 - Michigan Energy Forum - Donald H. Williams
April 2012 - Michigan Energy Forum - Donald H. WilliamsApril 2012 - Michigan Energy Forum - Donald H. Williams
April 2012 - Michigan Energy Forum - Donald H. WilliamsAnnArborSPARK
 
Steven Hauser India Delegation May162011
Steven Hauser India Delegation May162011Steven Hauser India Delegation May162011
Steven Hauser India Delegation May162011chandyGhosh
 
SiS Energy Sources And The Climate Change Nexus Brockway 2007
SiS Energy Sources And The Climate Change Nexus Brockway 2007SiS Energy Sources And The Climate Change Nexus Brockway 2007
SiS Energy Sources And The Climate Change Nexus Brockway 2007guestb40d60
 
Geti 1 q10_call_final
Geti 1 q10_call_finalGeti 1 q10_call_final
Geti 1 q10_call_finalAES Tietê
 
09/08/2008 - 2Q08 Earnings Call Presentation
09/08/2008  	-   	2Q08 Earnings Call Presentation09/08/2008  	-   	2Q08 Earnings Call Presentation
09/08/2008 - 2Q08 Earnings Call PresentationAES Tietê
 
AES library.corporate
 AES library.corporate AES library.corporate
AES library.corporatefinance19
 

What's hot (16)

What is Cambridshire's potential for renewable energy? – Duncan Price, Camco
What is Cambridshire's potential for renewable energy? – Duncan Price, CamcoWhat is Cambridshire's potential for renewable energy? – Duncan Price, Camco
What is Cambridshire's potential for renewable energy? – Duncan Price, Camco
 
Where will CSP plants be built? Incentives, RPS requirements, and Project Eco...
Where will CSP plants be built? Incentives, RPS requirements, and Project Eco...Where will CSP plants be built? Incentives, RPS requirements, and Project Eco...
Where will CSP plants be built? Incentives, RPS requirements, and Project Eco...
 
Panama juan urriola
Panama   juan urriola Panama   juan urriola
Panama juan urriola
 
Global ccs institute aep feed webinar presentation
Global ccs institute aep feed webinar presentationGlobal ccs institute aep feed webinar presentation
Global ccs institute aep feed webinar presentation
 
E. Larsen, "Efficient integration of EVs with wind power production," in Effi...
E. Larsen, "Efficient integration of EVs with wind power production," in Effi...E. Larsen, "Efficient integration of EVs with wind power production," in Effi...
E. Larsen, "Efficient integration of EVs with wind power production," in Effi...
 
UBS Australian Utilities Conference
UBS Australian Utilities ConferenceUBS Australian Utilities Conference
UBS Australian Utilities Conference
 
4Q08 and 2008 Earnings Results
4Q08 and 2008 Earnings Results4Q08 and 2008 Earnings Results
4Q08 and 2008 Earnings Results
 
Baskin UCSC Panel Feb 18 2009 Peter Borden
Baskin UCSC Panel Feb 18 2009   Peter BordenBaskin UCSC Panel Feb 18 2009   Peter Borden
Baskin UCSC Panel Feb 18 2009 Peter Borden
 
Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9
 
Small Pv Integration On Distribution Pv America 2011 04 04 2011
Small   Pv Integration On Distribution   Pv America 2011   04 04 2011Small   Pv Integration On Distribution   Pv America 2011   04 04 2011
Small Pv Integration On Distribution Pv America 2011 04 04 2011
 
April 2012 - Michigan Energy Forum - Donald H. Williams
April 2012 - Michigan Energy Forum - Donald H. WilliamsApril 2012 - Michigan Energy Forum - Donald H. Williams
April 2012 - Michigan Energy Forum - Donald H. Williams
 
Steven Hauser India Delegation May162011
Steven Hauser India Delegation May162011Steven Hauser India Delegation May162011
Steven Hauser India Delegation May162011
 
SiS Energy Sources And The Climate Change Nexus Brockway 2007
SiS Energy Sources And The Climate Change Nexus Brockway 2007SiS Energy Sources And The Climate Change Nexus Brockway 2007
SiS Energy Sources And The Climate Change Nexus Brockway 2007
 
Geti 1 q10_call_final
Geti 1 q10_call_finalGeti 1 q10_call_final
Geti 1 q10_call_final
 
09/08/2008 - 2Q08 Earnings Call Presentation
09/08/2008  	-   	2Q08 Earnings Call Presentation09/08/2008  	-   	2Q08 Earnings Call Presentation
09/08/2008 - 2Q08 Earnings Call Presentation
 
AES library.corporate
 AES library.corporate AES library.corporate
AES library.corporate
 

Viewers also liked

Micronesia Federated States India Trade & Investment Promotion Group
Micronesia Federated States India Trade & Investment Promotion GroupMicronesia Federated States India Trade & Investment Promotion Group
Micronesia Federated States India Trade & Investment Promotion GroupIndia Advisors
 
Guam final presentation
Guam final presentationGuam final presentation
Guam final presentationSJacobs27
 
Stereotyping, Muslim Stereotyping & Islamophobia by Abid Zafar
Stereotyping, Muslim Stereotyping & Islamophobia by Abid ZafarStereotyping, Muslim Stereotyping & Islamophobia by Abid Zafar
Stereotyping, Muslim Stereotyping & Islamophobia by Abid ZafarAbid Zafar
 
Guam Visitors Bureau
Guam Visitors BureauGuam Visitors Bureau
Guam Visitors BureauOrion Burt
 
Guam Power Point
Guam Power PointGuam Power Point
Guam Power PointKoda79
 
A Guide to the Trump Administration
A Guide to the Trump Administration A Guide to the Trump Administration
A Guide to the Trump Administration MSL
 

Viewers also liked (9)

DREA 2nd Quarter News
DREA 2nd Quarter NewsDREA 2nd Quarter News
DREA 2nd Quarter News
 
Micronesia Federated States India Trade & Investment Promotion Group
Micronesia Federated States India Trade & Investment Promotion GroupMicronesia Federated States India Trade & Investment Promotion Group
Micronesia Federated States India Trade & Investment Promotion Group
 
Guam final presentation
Guam final presentationGuam final presentation
Guam final presentation
 
Stereotyping, Muslim Stereotyping & Islamophobia by Abid Zafar
Stereotyping, Muslim Stereotyping & Islamophobia by Abid ZafarStereotyping, Muslim Stereotyping & Islamophobia by Abid Zafar
Stereotyping, Muslim Stereotyping & Islamophobia by Abid Zafar
 
Guam Visitors Bureau
Guam Visitors BureauGuam Visitors Bureau
Guam Visitors Bureau
 
Guam Power Point
Guam Power PointGuam Power Point
Guam Power Point
 
Donald Trump
Donald Trump Donald Trump
Donald Trump
 
Donald Trump
Donald TrumpDonald Trump
Donald Trump
 
A Guide to the Trump Administration
A Guide to the Trump Administration A Guide to the Trump Administration
A Guide to the Trump Administration
 

Similar to FSM Energy Policy-Summary

Full Steam Ahead For Philippine Geothermal Energy
Full Steam Ahead For Philippine Geothermal EnergyFull Steam Ahead For Philippine Geothermal Energy
Full Steam Ahead For Philippine Geothermal EnergyFernando Penarroyo
 
Energetic payback time of PV: In Germany and Tunisia
Energetic payback time of PV: In Germany and TunisiaEnergetic payback time of PV: In Germany and Tunisia
Energetic payback time of PV: In Germany and TunisiaInsulin Angel
 
Photovoltaic Market Trends 2015
Photovoltaic Market Trends 2015Photovoltaic Market Trends 2015
Photovoltaic Market Trends 2015Leonardo ENERGY
 
Summary results of EPRI's post-combustion capture retrofit studies - Desmond ...
Summary results of EPRI's post-combustion capture retrofit studies - Desmond ...Summary results of EPRI's post-combustion capture retrofit studies - Desmond ...
Summary results of EPRI's post-combustion capture retrofit studies - Desmond ...Global CCS Institute
 
THE ULTIMATE RENEWABLE RESOURCE - SOLAR POWER
THE ULTIMATE RENEWABLE RESOURCE - SOLAR POWERTHE ULTIMATE RENEWABLE RESOURCE - SOLAR POWER
THE ULTIMATE RENEWABLE RESOURCE - SOLAR POWERDv Nareshkumar
 
The Current Status and Prospect of Distributed Generation in Korea
The Current Status and Prospect of Distributed Generation in Korea The Current Status and Prospect of Distributed Generation in Korea
The Current Status and Prospect of Distributed Generation in Korea IEA DSM Implementing Agreement (IA)
 
DC-Coupled Solar Plus Storage: Results from the Field
DC-Coupled Solar Plus Storage: Results from the FieldDC-Coupled Solar Plus Storage: Results from the Field
DC-Coupled Solar Plus Storage: Results from the FieldNicole Green
 
Power generation and economics
Power generation and economicsPower generation and economics
Power generation and economicsSiraskarCom
 
Day 2 Try NEGAWATT Power Plants
Day 2 Try NEGAWATT Power Plants Day 2 Try NEGAWATT Power Plants
Day 2 Try NEGAWATT Power Plants RCREEE
 
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.pptAPP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.pptsomnathmahapatra6
 
Floating Power Plant
Floating Power PlantFloating Power Plant
Floating Power PlantIvec01
 
CRIF Final Presentation, Camco
CRIF Final Presentation, CamcoCRIF Final Presentation, Camco
CRIF Final Presentation, Camcocrifcambs
 

Similar to FSM Energy Policy-Summary (20)

Full Steam Ahead For Philippine Geothermal Energy
Full Steam Ahead For Philippine Geothermal EnergyFull Steam Ahead For Philippine Geothermal Energy
Full Steam Ahead For Philippine Geothermal Energy
 
Energetic payback time of PV: In Germany and Tunisia
Energetic payback time of PV: In Germany and TunisiaEnergetic payback time of PV: In Germany and Tunisia
Energetic payback time of PV: In Germany and Tunisia
 
Photovoltaic Market Trends 2015
Photovoltaic Market Trends 2015Photovoltaic Market Trends 2015
Photovoltaic Market Trends 2015
 
Summary results of EPRI's post-combustion capture retrofit studies - Desmond ...
Summary results of EPRI's post-combustion capture retrofit studies - Desmond ...Summary results of EPRI's post-combustion capture retrofit studies - Desmond ...
Summary results of EPRI's post-combustion capture retrofit studies - Desmond ...
 
THE ULTIMATE RENEWABLE RESOURCE - SOLAR POWER
THE ULTIMATE RENEWABLE RESOURCE - SOLAR POWERTHE ULTIMATE RENEWABLE RESOURCE - SOLAR POWER
THE ULTIMATE RENEWABLE RESOURCE - SOLAR POWER
 
The Current Status and Prospect of Distributed Generation in Korea
The Current Status and Prospect of Distributed Generation in Korea The Current Status and Prospect of Distributed Generation in Korea
The Current Status and Prospect of Distributed Generation in Korea
 
DC-Coupled Solar Plus Storage: Results from the Field
DC-Coupled Solar Plus Storage: Results from the FieldDC-Coupled Solar Plus Storage: Results from the Field
DC-Coupled Solar Plus Storage: Results from the Field
 
Report ntpc auraiya
Report ntpc auraiyaReport ntpc auraiya
Report ntpc auraiya
 
Barrack
BarrackBarrack
Barrack
 
Resd technologies-epri
Resd technologies-epriResd technologies-epri
Resd technologies-epri
 
Power generation and economics
Power generation and economicsPower generation and economics
Power generation and economics
 
Day 2 Try NEGAWATT Power Plants
Day 2 Try NEGAWATT Power Plants Day 2 Try NEGAWATT Power Plants
Day 2 Try NEGAWATT Power Plants
 
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.pptAPP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
 
Amber kinetics intro non nda 06-16-2017
Amber kinetics intro non nda 06-16-2017Amber kinetics intro non nda 06-16-2017
Amber kinetics intro non nda 06-16-2017
 
Usafa jan 2013
Usafa jan 2013Usafa jan 2013
Usafa jan 2013
 
Floating Power Plant
Floating Power PlantFloating Power Plant
Floating Power Plant
 
CRIF Final Presentation, Camco
CRIF Final Presentation, CamcoCRIF Final Presentation, Camco
CRIF Final Presentation, Camco
 
Reports ntpc
Reports ntpcReports ntpc
Reports ntpc
 
Managing the Winds of Change – California Experiences
Managing the Winds of Change – California ExperiencesManaging the Winds of Change – California Experiences
Managing the Winds of Change – California Experiences
 
BHEL CCDP audit
BHEL CCDP auditBHEL CCDP audit
BHEL CCDP audit
 

More from FSM Department of Resources & Development

More from FSM Department of Resources & Development (20)

Serehd Quarterly Newsletter
Serehd Quarterly NewsletterSerehd Quarterly Newsletter
Serehd Quarterly Newsletter
 
Final outcomes document forum trade ministers meeting-2012
Final outcomes document   forum trade ministers meeting-2012Final outcomes document   forum trade ministers meeting-2012
Final outcomes document forum trade ministers meeting-2012
 
GLISPA Brochure 2012 - Final
GLISPA Brochure 2012 - FinalGLISPA Brochure 2012 - Final
GLISPA Brochure 2012 - Final
 
DREA 1st Quarter Newsletter
DREA 1st Quarter NewsletterDREA 1st Quarter Newsletter
DREA 1st Quarter Newsletter
 
Micronesia Challenge - 5 Year Progress Report
Micronesia Challenge - 5 Year Progress ReportMicronesia Challenge - 5 Year Progress Report
Micronesia Challenge - 5 Year Progress Report
 
FSMRD Organization Chart
FSMRD Organization ChartFSMRD Organization Chart
FSMRD Organization Chart
 
JICA Solar Project
JICA Solar ProjectJICA Solar Project
JICA Solar Project
 
Energy Policy (Volume II Action Plans) - Updated
Energy Policy (Volume II   Action Plans) - UpdatedEnergy Policy (Volume II   Action Plans) - Updated
Energy Policy (Volume II Action Plans) - Updated
 
Energy Policy (volume I) - Updated
Energy Policy (volume I) - UpdatedEnergy Policy (volume I) - Updated
Energy Policy (volume I) - Updated
 
15th_MCES_Signed_Joint_Communique
15th_MCES_Signed_Joint_Communique15th_MCES_Signed_Joint_Communique
15th_MCES_Signed_Joint_Communique
 
Electricity Production Data (YAP)
Electricity Production Data (YAP)Electricity Production Data (YAP)
Electricity Production Data (YAP)
 
Electricity Production Data (KOSRAE)
Electricity Production Data (KOSRAE)Electricity Production Data (KOSRAE)
Electricity Production Data (KOSRAE)
 
Electricity Production Data (CHUUK)
Electricity Production Data (CHUUK)Electricity Production Data (CHUUK)
Electricity Production Data (CHUUK)
 
Petroleum Import (2000-2010)
Petroleum Import (2000-2010)Petroleum Import (2000-2010)
Petroleum Import (2000-2010)
 
SPREP_Meeting_Report-Implementing_the_Nagoya_Outcomes_FINAL_24_06_2011.pdf
SPREP_Meeting_Report-Implementing_the_Nagoya_Outcomes_FINAL_24_06_2011.pdf SPREP_Meeting_Report-Implementing_the_Nagoya_Outcomes_FINAL_24_06_2011.pdf
SPREP_Meeting_Report-Implementing_the_Nagoya_Outcomes_FINAL_24_06_2011.pdf
 
Signed Water Day Proclamation
Signed Water Day ProclamationSigned Water Day Proclamation
Signed Water Day Proclamation
 
Fsm EPA Resolution_ 2011
Fsm EPA Resolution_ 2011Fsm EPA Resolution_ 2011
Fsm EPA Resolution_ 2011
 
Water summit resolution and policy framework
Water summit resolution and policy frameworkWater summit resolution and policy framework
Water summit resolution and policy framework
 
Poster & Essay Competition
Poster & Essay CompetitionPoster & Essay Competition
Poster & Essay Competition
 
Communique
CommuniqueCommunique
Communique
 

Recently uploaded

如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书Fi L
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...Diya Sharma
 
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct CommiteemenRoberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemenkfjstone13
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...narsireddynannuri1
 
25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdf25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docxkfjstone13
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceDelhi Call girls
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...Ismail Fahmi
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoSABC News
 
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docxkfjstone13
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...Axel Bruns
 
Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024Ismail Fahmi
 
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...Muhammad Shamsaddin Megalommatis
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxlorenzodemidio01
 
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Axel Bruns
 
Minto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxMinto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxAwaiskhalid96
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadershipanjanibaddipudi1
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxjohnandrewcarlos
 
26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdfFIRST INDIA
 

Recently uploaded (20)

如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
 
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct CommiteemenRoberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
 
25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdf25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdf
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election Manifesto
 
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
 
Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024
 
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
 
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
 
Minto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxMinto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptx
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
 
26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf
 

FSM Energy Policy-Summary

  • 2. VISION AND OBJECTIVES Vision  Improve life of all FSM citizens with sustainable energy* (Sustainable Energy: Affordable, reliable, and environmentally sound energy) Objectives  Promote sustainable socio-economic development through providing sustainable energy services  Become less dependent on imported energy through increased share of renewable energy, energy conservation and efficiency improvement
  • 3. STRATEGIC GOALS Institutional  Improve coordination and program management Conventional Energy  Safe, reliable and affordable supply of conventional energy Renewable Energy  Increase share of renewable energy (More than 30% in 2020) Energy Efficiency and Conservation  Conserve energy consumption and improve energy efficiency (50% efficiency improvement in 2020)
  • 4. INSTITUTIONAL FRAMEWORK National Energy Workgroup National (Energy Division) AMU Government Yap State Chuuk State Pohnpei State Kosrae State YSPSC CPUC PUC KUA Government Government Government Government Yap Energy Chuuk Energy Pohnpei Energy Kosrae Energy Workgroup Workgroup Workgroup Workgroup Private Sector NSAs Private Sector NSAs Private Sector NSAs Private Sector NSAs
  • 5. ACTION PLAN SUMMARY (NATIONAL GOVERNMENT) Energy Division (R&D) to act as a center for implementation of Energy Policy Institutional  Develop FSM energy information database for effective monitoring and evaluation Conventional Energy  Effectively coordinate with regional/sub-regional organizations for stable and affordable energy supply Renewable Energy  Effectively coordinate with donors and regional/sub-regional organizations to support technical/financial source of states’ investment plans  Conduct nation wide study for renewable energy assessment Energy Efficiency and Conservation  Implement government facility conservation plan  Proceed regulation on building and construction  Conduct awareness campaign on energy efficiency and conservation  Conduct training and capacity building programme
  • 6. ACTION PLAN SUMMARY (STATE GOVERNMENTS)  First priority on improvement of conventional energy facilities for stable supply  Maintenance and renewal of existing diesel generators  Upgrade existing distribution lines and equipment  On-going capacity building program  Development of energy standards and regulations  Development of mechanism for periodic tariff review  Promotion of renewable energies for  Stand-alone PV system for outer islands and other un-electrified area  Grid-connected PV system  Survey/study of other renewable systems ― Wind for Yap, Water for Pohnpei, Wave for Kosrae, Waste to energy  Efficiency improvement/conservation activities  Introduction of efficient equipment and systems  Capacity improvement training for energy efficiency  Awareness campaign for energy conservation Effective coordination for overseas assistance is essential for smooth implementation
  • 7. ACTION PLAN SUMMARY - CONVENTIONAL ENERGY YAP CHUUK POHNPEI KOSRAE TOTAL No. of customers 1,917 1,800 6,399 1,900 12,016 Base-load Demand (kW) 1,500 3,000 4,400 600 9,500 Peak Demand (kW) 2,200 4,500 6,500 1,000 14,200 Renewable Energy Target (30%, kW) 660 1,350 1,950 300 4,260 Utility Company YSPSC CPUC PUC KUA - Conventional Energy Diesel Power Generators Current Generator Situation #5, 1977, 0, Non #1 #4, 1988, 600, Ope. #2 1980, - , Non (560) (UNIT#, INSTALL Yr., Capa. kW, status) #6, 1977, 500, Ope. #2 All stationary #5, 1988, - , Non. #3 - , - , Non #7, 1994, 3,259, Ope. ….. type engines #6, 1988, 600, Ope #4 1984, 560, Ope. #8, 1994, 3,259, Ope. #7 are broken #7, 1992, 1,750, Ope #6 1990, 1,500, Ope. Total 7,090 #8, 2007, 1,200, Ope. #8, 1992, 1,800, Non #7 1996, - , Non (1,650) #9, 2007, 1,000, Ope. #9, 1994, - , Non. #8 2007, 1,015, Ope. #10, 2007, - , Non #10, 1994, 1,800, Ope. Total - 3,075 Total 2,200 Total 6,550 Action plan 1. Purchase 1.5MW new 1. Overhaul all generators 1. Replace inoperable back-up generator - #5 already done unit 2. Purchase 2MW new generator to replace old one Distribution Action Plan 1. Replace HV bus (4.16kV) 1. Install three phase 1. Distribution loss reduction and modern HV Cubicles transformers - Replace poles, cross bars, 2. Recalculate & update 2. Repair broken distribution transformers, etc. distribution losses lines 2. Capacity-building Others 1. Purchase 4 fuel meters for 1. Improve management, 7. Cash-meter addition 1. Pre-Paid meters for 90% power plant operation and mainte. of CPUC 8. S/D future plan study customers 2. Conduct Energy Audit 2. Increase cash-power system 9. Bio-fuel, waste oil utilization 2. KW demand meters for 3. Installation of cash-power study large customers meters 3. Compact fluorescent lamps 4. Modernize HV cubicles for residential/commercial 5. LED spot light pilot proj. facilities 6. Short term energy storage for stability
  • 8. ACTION PLAN SUMMARY - RENEWABLE ENERGY YAP CHUUK POHNPEI KOSRAE TOTAL No. of customers 1,917 1,800 6,399 1,800 11,916 Base-load Demand (kW) 1,500 3,000 4,400 600 9,500 Peak Demand (kW) 2,200 4,500 6,500 1,000 14,200 Renewable Energy Target (30%, 660 1,350 1,950 300 4,260 kW) SOLAR POWER MAIN ISLAND Installed/On-going (kW) Gov. Buildings (70) President Office (20) State Building (11.7) 302.5 COM-FSM (160) Hospital (16.4) Airport (7.8) 52.5 KUA (4.9) Legislature (11.7) Next Candidate Site (kW) Yap Hospital (80kW) Gov. Bldgs (450kW) State Hospital & others to attain Other Gov. Bldgs (200kW) (Source: State Energy Action Plans) Other Gov. Bldgs (160kW) All public facilities 15% by 2013 (340kW) Walung Village (School/disp.) OUTER ISLANDS Islands installed since 2007* (kW) Asor (19.5) Satawan (6.6) Kapingamarangi (9.8) - Total 11 (*Before 2007, solar systems were - Mini-grid - Hi school - School islands being installed but no accurate (100% connected) Moch (6.7) - Disp. + municipal data available about what % still Fadrai (28.1) - Mini-grid (Hi school + disp. Nukuoro (7.6) working.) + municipal - School Udot (3.4) - Dispensary - Hi school Sapwaifik (11.4) Onoun (10.5) - School + municipal - Hi school - Dispensary - Mini-grid (Hi school Mwaokillao (8.6) + Ele. School +disp. + - Dispensary municipal - School Pingelap (8.7) - School - Dispensary Total Capacity: 47.6 27.2 46.1 - 120.9 Islands to be installed Solar: Fais, Satawal, Ifalik, Hybrid in lagoon islands Rehabili. to existing SHS - (Source: State Energy Action Plans) Lamotrek, Falaulap, Euaripik, All public facilities on other Public Facilities of; Elato, Ngulu, Woleai, Falalop, outer islands - Parem Solar+Diesel: Ulithi-Mogmog - Pakin Ulithi-Falalap, Woleai-Falalap - Mwand OTHER ALTERNATIVE ENERGY Wind Power Wind Power Hydro-Power, Bio-gas Sea Wave, Wind, Hydro Power