 Kevin Hawthorne, Pres.
◦ Fiberglass Tank Solutions
◦ Xerxes Product Manager
 Location
◦ Lake Ozark Missouri Area – Central to US Market
 Facility
◦ 16,000 Sq. Foot Manufacturing Facility
Fiberglass Tank Solutions, LLC
&
Xerxes Relationship
◦ Market required a “Packaged System”.
◦ Product requires special tooling & facilities
◦ Extensive drafting & submittal procedure required
 Packaged Systems to Include:
◦ “Large Diameter” Fiberglass Wet Well Packages
 6’ – 14’ Diameter
◦ Valve Vaults
◦ Rehabilitation Inserts for Concrete Wet Wells
 Pump & WWTP Distribution Houses
 Pump Manufacturers as OEM Product
 Municipal
 Industrial
 Large Commercial
 WWTP Head Works
 Regional Wastewater Collection Pump
Stations
 Industrial Waste Water
 Storm Water
 Potable Water Pump Stations
 Why Fiberglass
◦ Corrosive Resistant to Hydrogen Sulfide
Degradation
◦ Stronger than concrete
◦ Light Weight
◦ Factory Kit Up under manufacturing QC program
◦ No additional liners or coatings needed
 Product Features &
Options
◦ Sizes 6’, 8’, 10’, 12’, 14’
◦ Up to 35’ Deep
◦ Integral Rib = Strength
◦ Self Supporting Base
◦ H-20 Top Loads
◦ Non Concrete Anti Flotation
System
 Top Options
◦ Dome Top
 Top Options
◦ Flat Top
 Top Options
◦ Access Openings
 Top Options
◦ Rim Flange
 Top Options
◦ Vertical Discharges
 Top Options
◦ Horizontal Discharges
 Top Accessories
◦ Vents
 Fiberglass
 Stainless Steel
 Mushroom Vent
◦ Oder Reduction
 Bottoms
◦ Concrete Combo
 Bottoms
◦ Truncated
◦ Flat
 Sidewall
◦ Integral Rib
◦ Oversized Anti-Flotation Rib
 Other Features
◦ Benched Bottoms
◦ Raised Platforms
 Other Features
◦ Base Elbow Mounting
 Milled Stainless Steel
Bar
 SS Base Plate
 Other Features
 Fiberglass Pipe Sleeves
 Link Seals - Discharge
 Press Seals - Inlet
 Other Features
 Air Release
Valves/Vents
 Other Features
 Stilling Wells
 Inlet Drop Structures
 Pipe Options
 2” thru 12”
 Stainless Steel
 316 or 304
 Ductile Iron
 HDPE
 PVC
 CPVC
Stainless Steel
Ductile Iron
HDPE
PVC/CPVC
 Access Covers
◦ Simplex – Quadplex
◦ Safety Grates
◦ H-20
◦ Flood Proof / Odor
 Misc. Options
◦ Trash Baskets
◦ Ladders
◦ Brackets
◦ Float & Chain Hooks
◦ Duplex to Quadplex
◦ 3” thru 12” Pipe
Systems
◦ Stainless Steel
◦ Ductile Iron
◦ Checks
◦ Plugs
◦ Gates
◦ Flow Meters
◦ Sensors
◦ Sloped Floors & Drains
 Allow “Low Impact” construction methods for
wet well replacement.
 Typically sized @ 4” less than inside diameter
of concrete structure.
 Grouted in place
 Field installation of inlet hubs
 Installation Procedures
1. Provide field measurements of existing wet well to include all inverts,
benching, finish grade, and surrounding elevation grades.
2. Prepare CAD drawings for engineering review.
3. Establish bypass pumping and remove existing top section of concrete
wet well.
4. Remove existing pumping, rails, and piping.
5. Prepare base with non-shrink grout.
6. Insert Fiberglass Rehabilitation inserts.
7. Measure and install field inlets.
8. Grout outside area with sandy cement grout.
9. Install pumps and controls.
10. Form and pour finish slab.
 Quotation &Materials Take-off
 CAD Drawings & Submittal Process
 Structural & Buoyancy Calculations
 Literature
 IMOG
◦ – Installation, Maintenance, Operating Guide
 Warranty
 Field Service
◦ ASME Certified & 30 Hour OSHA Trained
◦ Field Inlet Hub Installation
◦ Tank Repairs
Fiberglass tank solutions   rev a
Fiberglass tank solutions   rev a
Fiberglass tank solutions   rev a
Fiberglass tank solutions   rev a
Fiberglass tank solutions   rev a
Fiberglass tank solutions   rev a
Fiberglass tank solutions   rev a

Contenu connexe

Tendances

Preene Groundwater Consulting - Practice Profile
Preene Groundwater Consulting  - Practice ProfilePreene Groundwater Consulting  - Practice Profile
Preene Groundwater Consulting - Practice ProfileMartin Preene
 
Precast post tensioned tank brochure
Precast post tensioned tank brochurePrecast post tensioned tank brochure
Precast post tensioned tank brochureAdrian Frantescu
 
Geothermal Well Drilling – Keep it Simple
Geothermal Well Drilling – Keep it Simple Geothermal Well Drilling – Keep it Simple
Geothermal Well Drilling – Keep it Simple Iceland Geothermal
 
Development of Tight Gas Fields
Development of Tight Gas FieldsDevelopment of Tight Gas Fields
Development of Tight Gas FieldsNeil Barnard
 
Water transportation to drilling sites
Water transportation to drilling sitesWater transportation to drilling sites
Water transportation to drilling sitesMartin Preene
 
Vsl pt concrete_storage_structures
Vsl pt concrete_storage_structuresVsl pt concrete_storage_structures
Vsl pt concrete_storage_structuresAdrian Frantescu
 
introduction to completions and workovers (2)
introduction to completions and workovers (2)introduction to completions and workovers (2)
introduction to completions and workovers (2)Dr. Arzu Javadova
 
Mine dewatering techniques
Mine dewatering techniquesMine dewatering techniques
Mine dewatering techniquesMartin Preene
 
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsPipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsHammerHead Trenchless Equipment
 
BANFF Presentation_v1 1 (3)
BANFF Presentation_v1 1 (3)BANFF Presentation_v1 1 (3)
BANFF Presentation_v1 1 (3)alois multerer
 
ge_dp_scp_brochure
ge_dp_scp_brochurege_dp_scp_brochure
ge_dp_scp_brochureYanyan Wu
 

Tendances (20)

Preene Groundwater Consulting - Practice Profile
Preene Groundwater Consulting  - Practice ProfilePreene Groundwater Consulting  - Practice Profile
Preene Groundwater Consulting - Practice Profile
 
Precast post tensioned tank brochure
Precast post tensioned tank brochurePrecast post tensioned tank brochure
Precast post tensioned tank brochure
 
Mine dewatering technology data sheet
Mine dewatering technology data sheetMine dewatering technology data sheet
Mine dewatering technology data sheet
 
Geothermal Well Drilling – Keep it Simple
Geothermal Well Drilling – Keep it Simple Geothermal Well Drilling – Keep it Simple
Geothermal Well Drilling – Keep it Simple
 
Containerized Fire Pump house
Containerized Fire Pump houseContainerized Fire Pump house
Containerized Fire Pump house
 
Development of Tight Gas Fields
Development of Tight Gas FieldsDevelopment of Tight Gas Fields
Development of Tight Gas Fields
 
Water transportation to drilling sites
Water transportation to drilling sitesWater transportation to drilling sites
Water transportation to drilling sites
 
Vsl pt concrete_storage_structures
Vsl pt concrete_storage_structuresVsl pt concrete_storage_structures
Vsl pt concrete_storage_structures
 
Shopping for a Solution
Shopping for a SolutionShopping for a Solution
Shopping for a Solution
 
introduction to completions and workovers (2)
introduction to completions and workovers (2)introduction to completions and workovers (2)
introduction to completions and workovers (2)
 
Mine dewatering techniques
Mine dewatering techniquesMine dewatering techniques
Mine dewatering techniques
 
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsPipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
 
BANFF Presentation_v1 1 (3)
BANFF Presentation_v1 1 (3)BANFF Presentation_v1 1 (3)
BANFF Presentation_v1 1 (3)
 
Trenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe InstallationsTrenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe Installations
 
Workover job ppe
Workover job ppeWorkover job ppe
Workover job ppe
 
Finish Ball Packaging
Finish Ball PackagingFinish Ball Packaging
Finish Ball Packaging
 
Shale gas presentation
Shale gas presentationShale gas presentation
Shale gas presentation
 
Hydraulic Fracturing 101
Hydraulic Fracturing 101Hydraulic Fracturing 101
Hydraulic Fracturing 101
 
ge_dp_scp_brochure
ge_dp_scp_brochurege_dp_scp_brochure
ge_dp_scp_brochure
 
Porous Pavement in Cold Climates Part 1
Porous Pavement in Cold Climates Part 1Porous Pavement in Cold Climates Part 1
Porous Pavement in Cold Climates Part 1
 

Similaire à Fiberglass tank solutions rev a

Nu Flow Presentation Eric VA and YMCA
Nu Flow Presentation Eric VA and YMCANu Flow Presentation Eric VA and YMCA
Nu Flow Presentation Eric VA and YMCAEric Hopkins
 
Trench Drain Systems: Types, Benefits, Applications, and Overview
Trench Drain Systems: Types, Benefits, Applications, and OverviewTrench Drain Systems: Types, Benefits, Applications, and Overview
Trench Drain Systems: Types, Benefits, Applications, and OverviewMorris Group International
 
Sand Filter
Sand Filter Sand Filter
Sand Filter wesme1234
 
Lift off presentation full version
Lift off presentation full versionLift off presentation full version
Lift off presentation full version500 Projects LLC
 
Norstar U Shaped Drains
Norstar U Shaped DrainsNorstar U Shaped Drains
Norstar U Shaped Drainsnorslides
 
Stress Analysis in District Cooling Projects
Stress Analysis in District Cooling ProjectsStress Analysis in District Cooling Projects
Stress Analysis in District Cooling ProjectsAmer Abdul Aziz
 
BridgProdPPTJan_2024_Reduced_Productline.pptx
BridgProdPPTJan_2024_Reduced_Productline.pptxBridgProdPPTJan_2024_Reduced_Productline.pptx
BridgProdPPTJan_2024_Reduced_Productline.pptxThe D.S. Brown Company
 
Construction Observation Tips
Construction Observation TipsConstruction Observation Tips
Construction Observation Tipsncengineer
 
design-and-installation-guide-for-pvc-fittings-and-laterals-for-solid-wall-pv...
design-and-installation-guide-for-pvc-fittings-and-laterals-for-solid-wall-pv...design-and-installation-guide-for-pvc-fittings-and-laterals-for-solid-wall-pv...
design-and-installation-guide-for-pvc-fittings-and-laterals-for-solid-wall-pv...ManishPatel169454
 
General mining presentation
General mining presentationGeneral mining presentation
General mining presentationMark Lewis
 
Installation of mains
Installation of mainsInstallation of mains
Installation of mainsGasUtility
 

Similaire à Fiberglass tank solutions rev a (20)

Nu Flow Presentation Eric VA and YMCA
Nu Flow Presentation Eric VA and YMCANu Flow Presentation Eric VA and YMCA
Nu Flow Presentation Eric VA and YMCA
 
Trench Drain Systems: Types, Benefits, Applications, and Overview
Trench Drain Systems: Types, Benefits, Applications, and OverviewTrench Drain Systems: Types, Benefits, Applications, and Overview
Trench Drain Systems: Types, Benefits, Applications, and Overview
 
Rehab Solutions for Today's Infrastructure
Rehab Solutions for Today's InfrastructureRehab Solutions for Today's Infrastructure
Rehab Solutions for Today's Infrastructure
 
BTMA PIPELINE PA AWWA 2014 v5
BTMA PIPELINE PA AWWA 2014 v5BTMA PIPELINE PA AWWA 2014 v5
BTMA PIPELINE PA AWWA 2014 v5
 
Nu flow sales presentation
Nu flow sales presentationNu flow sales presentation
Nu flow sales presentation
 
Pipe Support & EJ Field Examples & Case Studies
Pipe Support & EJ Field Examples & Case StudiesPipe Support & EJ Field Examples & Case Studies
Pipe Support & EJ Field Examples & Case Studies
 
11.01.04 Trench Drains
11.01.04    Trench  Drains11.01.04    Trench  Drains
11.01.04 Trench Drains
 
Sand Filter
Sand FilterSand Filter
Sand Filter
 
Sand Filter
Sand Filter Sand Filter
Sand Filter
 
Lift off presentation full version
Lift off presentation full versionLift off presentation full version
Lift off presentation full version
 
Norstar U Shaped Drains
Norstar U Shaped DrainsNorstar U Shaped Drains
Norstar U Shaped Drains
 
Stress Analysis in District Cooling Projects
Stress Analysis in District Cooling ProjectsStress Analysis in District Cooling Projects
Stress Analysis in District Cooling Projects
 
BridgProdPPTJan_2024_Reduced_Productline.pptx
BridgProdPPTJan_2024_Reduced_Productline.pptxBridgProdPPTJan_2024_Reduced_Productline.pptx
BridgProdPPTJan_2024_Reduced_Productline.pptx
 
Pipe Support Field Examples & Case Studies
Pipe Support Field Examples & Case StudiesPipe Support Field Examples & Case Studies
Pipe Support Field Examples & Case Studies
 
Construction Observation Tips
Construction Observation TipsConstruction Observation Tips
Construction Observation Tips
 
Field Services: Problem Resolution
Field Services: Problem ResolutionField Services: Problem Resolution
Field Services: Problem Resolution
 
design-and-installation-guide-for-pvc-fittings-and-laterals-for-solid-wall-pv...
design-and-installation-guide-for-pvc-fittings-and-laterals-for-solid-wall-pv...design-and-installation-guide-for-pvc-fittings-and-laterals-for-solid-wall-pv...
design-and-installation-guide-for-pvc-fittings-and-laterals-for-solid-wall-pv...
 
General mining presentation
General mining presentationGeneral mining presentation
General mining presentation
 
Trenchless Technology
Trenchless TechnologyTrenchless Technology
Trenchless Technology
 
Installation of mains
Installation of mainsInstallation of mains
Installation of mains
 

Dernier

VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 

Dernier (20)

VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 

Fiberglass tank solutions rev a

  • 1.
  • 2.  Kevin Hawthorne, Pres. ◦ Fiberglass Tank Solutions ◦ Xerxes Product Manager  Location ◦ Lake Ozark Missouri Area – Central to US Market  Facility ◦ 16,000 Sq. Foot Manufacturing Facility
  • 3. Fiberglass Tank Solutions, LLC & Xerxes Relationship ◦ Market required a “Packaged System”. ◦ Product requires special tooling & facilities ◦ Extensive drafting & submittal procedure required
  • 4.  Packaged Systems to Include: ◦ “Large Diameter” Fiberglass Wet Well Packages  6’ – 14’ Diameter ◦ Valve Vaults ◦ Rehabilitation Inserts for Concrete Wet Wells
  • 5.  Pump & WWTP Distribution Houses  Pump Manufacturers as OEM Product
  • 7.  WWTP Head Works  Regional Wastewater Collection Pump Stations  Industrial Waste Water  Storm Water  Potable Water Pump Stations
  • 8.  Why Fiberglass ◦ Corrosive Resistant to Hydrogen Sulfide Degradation ◦ Stronger than concrete ◦ Light Weight ◦ Factory Kit Up under manufacturing QC program ◦ No additional liners or coatings needed
  • 9.  Product Features & Options ◦ Sizes 6’, 8’, 10’, 12’, 14’ ◦ Up to 35’ Deep ◦ Integral Rib = Strength ◦ Self Supporting Base ◦ H-20 Top Loads ◦ Non Concrete Anti Flotation System
  • 12.  Top Options ◦ Access Openings
  • 13.  Top Options ◦ Rim Flange
  • 14.  Top Options ◦ Vertical Discharges
  • 15.  Top Options ◦ Horizontal Discharges
  • 16.  Top Accessories ◦ Vents  Fiberglass  Stainless Steel  Mushroom Vent ◦ Oder Reduction
  • 19.  Sidewall ◦ Integral Rib ◦ Oversized Anti-Flotation Rib
  • 20.  Other Features ◦ Benched Bottoms ◦ Raised Platforms
  • 21.  Other Features ◦ Base Elbow Mounting  Milled Stainless Steel Bar  SS Base Plate
  • 22.  Other Features  Fiberglass Pipe Sleeves  Link Seals - Discharge  Press Seals - Inlet
  • 23.  Other Features  Air Release Valves/Vents
  • 24.  Other Features  Stilling Wells  Inlet Drop Structures
  • 25.  Pipe Options  2” thru 12”  Stainless Steel  316 or 304  Ductile Iron  HDPE  PVC  CPVC Stainless Steel Ductile Iron HDPE PVC/CPVC
  • 26.  Access Covers ◦ Simplex – Quadplex ◦ Safety Grates ◦ H-20 ◦ Flood Proof / Odor
  • 27.  Misc. Options ◦ Trash Baskets ◦ Ladders ◦ Brackets ◦ Float & Chain Hooks
  • 28. ◦ Duplex to Quadplex ◦ 3” thru 12” Pipe Systems
  • 29.
  • 30.
  • 31. ◦ Stainless Steel ◦ Ductile Iron ◦ Checks ◦ Plugs ◦ Gates ◦ Flow Meters ◦ Sensors ◦ Sloped Floors & Drains
  • 32.  Allow “Low Impact” construction methods for wet well replacement.  Typically sized @ 4” less than inside diameter of concrete structure.  Grouted in place  Field installation of inlet hubs
  • 33.  Installation Procedures 1. Provide field measurements of existing wet well to include all inverts, benching, finish grade, and surrounding elevation grades. 2. Prepare CAD drawings for engineering review. 3. Establish bypass pumping and remove existing top section of concrete wet well. 4. Remove existing pumping, rails, and piping. 5. Prepare base with non-shrink grout. 6. Insert Fiberglass Rehabilitation inserts. 7. Measure and install field inlets. 8. Grout outside area with sandy cement grout. 9. Install pumps and controls. 10. Form and pour finish slab.
  • 34.
  • 35.  Quotation &Materials Take-off  CAD Drawings & Submittal Process  Structural & Buoyancy Calculations  Literature  IMOG ◦ – Installation, Maintenance, Operating Guide  Warranty  Field Service ◦ ASME Certified & 30 Hour OSHA Trained ◦ Field Inlet Hub Installation ◦ Tank Repairs