LEED Green Building Rating System Leadership in Energy and Environmental Design
Sustainable Sites Intent: 	Limit expansion of developed areas, preserve ecologically productive land Prevent site disturbance during construction Do not develop on inappropriate sites Develop in areas with existing infrastructure, not greenfields Redevelop brownfield sites site selection
Sustainable Sites Intent: 	Reduce emissions & land development impacts from vehicle use Public transportation access Bicycle storage & changing rooms Preferred parking for fuel efficient vehicles & carpools Reduce parking capacity (minimum zoning requirements) transportation
Sustainable Sites Intent: 	Reduce pollutants & strain on infrastructure,  Reduce stormwater quantity, improve quality (wetlands & vegetated filtration) Maximize open areas on the site Protect or restore habitat Eliminate heat island effect Light pollution reduction stormwater / development
Water Efficiency Intent: 	Eliminate potable water use for irrigation, reduce demand on infrastructure & natural resources Use native vegetation Capture rainwater for irrigation Eliminate site irrigation systems Reuse condensate water from HVAC systems landscaping
Water Efficiency Intent: 	Eliminate potable water demand for conveying wastewater Treat wastewater on-site Use stormwater/graywater for sewage conveyance Use high efficiency/dry fixtures Reduce demand on infrastructure wastewater
Water Efficiency Intent: 	Conserve water – it is a natural resource Standard: 	Energy Policy Act of 2005 Use high efficiency/dry fixtures Recycle graywater Dual flush toilets/low flow shower heads reduce water consumption
Energy & Atmosphere Intent: 	Many systems are designed correctly, but installed or operated improperly A quality-oriented process for achieving, verifying and documenting the performance of facilities, systems and assemblies to meet defined objectives and criteria Cost of fundamental commissioning +/- $1/SF Owner develops project requirements Designer develops basis of design commissioning
Energy & Atmosphere Commissioning requirements should be incorporated into the construction documents Enhanced commissioning includes systems manuals, training & a 10-month review commissioning
Energy & Atmosphere optimize energy performance Intent: 	Reduce energy consumption (reduces pollution) Includes building envelope, HVAC, lighting Minimum standard: 	ASHRAE 90.1-2007 Up to 19 points available for 48% energy reduction Over 20,000 SF requires whole building energy simulation
Energy & Atmosphere optimize energy performance Building orientation, improved building shell Appropriately-sized HVAC systems Energy recovery from exhaust air Harvest on-site energy:  solar, wind, geothermal
Energy & Atmosphere Intent: 	CFC’s deplete the ozone layer No CFC’s permitted, phase out of old facilities Reduce use of CFC’s, HCFC’s, HFC’s Consider use of natural refrigerants:  carbon dioxide, ammonia, propane reduce refrigerants
Energy & Atmosphere Maintain equipment:  prevent leakage into the atmosphere Depleted ozone layer permits ultraviolet rays to penetrate the atmosphere reduce refrigerants
Energy & Atmosphere Intent: 	Measure building energy consumption over time Establish a base year of operation Compare future performance to the base M&V period starts after reasonable occupation & stability measure & verify
Energy & Atmosphere Intent: 	Promote alternative energy sources Purchase at least 35% of electricity from Green-e certified provider Tradable renewable energy certificates (REC’s) can be used green power
Materials & Resources Intent: 	Reduce materials extracted, reduce their transportation Reduce:  materials extracted Reuse:  existing products Recycle:  demolition & construction waste ReStore:  Habitat for Humanity Regional:  sustainable for the environment & the economy the 3 R’s + 2
Materials & Resources Intent: 	Reduce waste hauled to & disposed of in landfills During construction:  develop waste management plan Operation:  provide an area within the building for storage & collection of recyclables Minimum:  paper, corrugated cardboard, glass, plastic & metals recycling
Materials & Resources Intent: 	Extend life cycle of existing buildings, reduce impact of new buildings as they relate to materials & transportation Reuse structure & envelope Reuse interior partitions & products where possible Do not reuse contaminants & hazardous materials Upgrade HVAC, windows & plumbing fixtures for increased efficiency building reuse
Materials & Resources Intent: 	Reuse building materials, reduce demand for virgin materials “One man’s trash….” Consider furnishings Other options:  posts & beams, flooring, doors, brick, cabinetry materials reuse
Materials & Resources Intent: 	Reduce demand for virgin materials Post-consumer:  generated by households & businesses Pre-consumer:  generated by manufacturing process Many suppliers list recycled content Establish goals during the design phase recycled content
Materials & Resources Example: 	Steelcase “Context” furniture 40% recycled content 8% post-consumer recycled content 92% recyclable Context also incorporates water-based adhesives with low VOC’s recycled content
Materials & Resources Intent: 	Reduce impact of transportation Options:  concrete, block, brick, wood products West Virginia is in a great location (500 mile radius) Creates healthier local economy regional materials
Materials & Resources Intent: 	Reduce depletion of finite raw materials 10-year plant-to-harvest cycle Options:  bamboo, wool, linoleum, cork, wheatboard, even poplar rapidly renewable materials
Materials & Resources Intent: 	Encourage environmentally responsible forest management Current standard:  Forest Stewardship Council (FSC) Most West Virginia forests adhere to Sustainable Forest Initiative (SFI) standard USGBC is reviewing this credit to possibly include SFI certified woods
Indoor Environmental Quality Intent: 	Enhance indoor air quality in buildings Indoor air can be 2-5 times more polluted than outdoor air Prevent “sick building syndrome” Standard for fresh air: 	ASHRAE 62.1-2007 Eliminate or contain tobacco smoke minimum performance
Indoor Environmental Quality Intent: 	We all need fresh air! Measure fresh air delivery Increase natural ventilation… can be difficult while reducing energy use Monitor air quality during construction to keep workers safe Protect systems during construction ventilation
Indoor Environmental Quality Intent: 	Reduce harmful contaminants released by many materials  Adhesives & sealants (GreenSeal standard) Paints/stains (low VOC) Flooring (Green Label, Floor Score) Composite wood (no urea formaldehyde)…remember Katrina trailers materials
Indoor Environmental Quality Intent: 	Minimize exposure to pollutants in the indoor environment Entryway systems Housekeeping, copy/print rooms & laundry areas:  separate HVAC systems MERV 13 filters reduce pollutants
Indoor Environmental Quality Intent: 	Promote productivity, comfort & well-being of occupants Controllability of lighting & HVAC systems Set increased HVAC design parameters for temperature & humidity Give a majority of occupants access to daylight & views occupant comfort
Innovation & Design Process Intent: 	Be rewarded for exceptional performance above LEED requirements Innovation Education of the users & general public Life cycle cost analysis additional items…
ZMM Case Studies Lincoln County High School Awarded commission in October 2000 Presented green design study to the Superintendent in 2002 Incorporated affordable green design features Construction bids received in March 2004 Building occupied fall term 2006
ZMM Case Studies Lincoln County High School Sustainable Sites: Building orientation Erosion and sedimentation control Stormwater management Stormwater filtering Holding pond
ZMM Case Studies Lincoln County High School Explored, but not incorporated: Bicycle storage Reflective roof to combat heat island effect Bid add alternate was $95K – not accepted Preferred parking for energy efficient vehicles Could be implemented now at no cost
ZMM Case Studies Lincoln County High School Water efficiency: No landscape irrigation Water use reduction Dual flush fixtures Water saving fixtures Explored, but not incorporated: Graywater system Bid add alternate was $200K, not accepted Graywater sprinkler system Bid add alternate was $250K, not accepted
ZMM Case Studies Lincoln County High School Energy & Atmosphere: High efficiency equipment Condensing boilers (95%+ efficient) Chiller heat recovery Fluorescent lighting, high CRI CFC reduction No ozone-depleting refrigerants Explored, but not incorporated: Full system commissioning Estimated cost was $200K Measurement & verification Estimated cost was $20K
ZMM Case Studies Lincoln County High School Materials & Resources: Storage & collection of recyclables Educational opportunities of recycling Local & regional materials Explored, but not incorporated: Construction waste recycling Estimated cost was $50K Rapidly renewable materials Wood from managed forests
ZMM Case Studies Lincoln County High School Indoor environmental quality: CO2 monitoring/control Construction IAQ management Low VOC-emitting adhesives, paints & carpets HVAC digital control system Daylighting Building orientation Automatic light level control Benefits of natural light Reduce energy consumption
ZMM Case Studies Lincoln County High School Cost breakdown: Sustainable Sites Nominal Water Efficiency Estimated at $50K Energy & Atmosphere Estimated at $50K Materials & Resources Nominal Indoor Environmental Quality Estimated at $625K (daylighting & lighting controls make up $600K of this cost)
ZMM Case Studies Lincoln County High School First costs vs. long-term benefits: First cost of green features $700,000 $3.23 per square foot Percent of construction costs $700,000 $31,400,000 = 2.25%
ZMM Case Studies Lincoln County High School and the numbers demonstrate… Water 4 Consolidated HS Used 2,156,900 Gallons New HS used 618,600 Gallons in the 2nd Year 71% Savings Natural Gas Previous Use:  11,592 MCF New:  7,195 MCF 38% Savings
ZMM Case Studies Lincoln County High School Long-term benefits: Lower natural gas consumption Lower water consumption Lower electricity consumption Longer life of HVAC equipment Lower absenteeism Higher student & teacher performance Much better indoor air quality Lower impact on the environment
ZMM Case Studies WV State Office Buildings  5, 6 & 7 Sustainable Sites: The project site has access to public transportation A bicycle storage & shower area (potentially a campus-wide facility) should be developed to encourage bicycle commuting for employees who live nearby Prime parking areas should be developed for employees who carpool, as well as for alternative fuel vehicles The new roof will be highly reflective to reduce heat island effect
ZMM Case Studies WV State Office Buildings  5, 6 & 7 Water Efficiency: Low flow & dual flush fixtures will be used throughout All new landscaping plans should utilize native vegetation
ZMM Case Studies WV State Office Buildings  5, 6 & 7 Energy & Atmosphere: New windows will help reduce solar heat gain New, more efficient HVAC system will replace the perimeter induction units Systems will be commissioned to ensure that all mechanical and electrical systems operate properly
ZMM Case Studies WV State Office Buildings  5, 6 & 7 Materials & Resources: Recycling areas are developed for each floor, and should be developed for the entire campus A recycling program should be established, and all employees educated in the process A construction waste management plan will be implemented Included in the specifications Has already included recycling of the demolished demountable partitions
ZMM Case Studies WV State Office Buildings  5, 6 & 7 Materials & Resources: Recycled content materials will be utilized, including drywall, steel & acoustic ceiling tiles Locally & regionally produced materials will be used, including acoustic ceiling tiles, plywood, 	carpeting & resilient flooring Cradle-to-Cradle certified furniture systems are specified Raised floor with a modular, “plug & play” wiring system will eliminate future demolition waste
ZMM Case Studies WV State Office Buildings  5, 6 & 7 Indoor Environmental Quality: Smoking will be prohibited near entryways & near air intakes An  indoor air quality (IAQ) management plan will be implemented during construction Air quality will be measured & verified in all occupied areas to ensure that occupants are receiving enough fresh air All paints, mastics & sealants will contain low VOC’s Regular replacement of mechanical filters should be implemented
Final thoughts…. It’s not about doing less… It’s about designing better! 2008 SUSTAINABILITY

More Related Content

What's hot

Rating Green Buildings - 4th March 2010
Rating Green Buildings - 4th March 2010Rating Green Buildings - 4th March 2010
Rating Green Buildings - 4th March 2010smilerneil
 
Engineered Wood, Sustainability And Green Building Practices
Engineered Wood, Sustainability And Green Building PracticesEngineered Wood, Sustainability And Green Building Practices
Engineered Wood, Sustainability And Green Building Practicesdonaldsimon
 
BREEAM
BREEAMBREEAM
BREEAMmisschand
 
Green Building Project
Green Building ProjectGreen Building Project
Green Building ProjectKaran Sitapara
 
The Process of Building A Green Project
The Process of Building A Green ProjectThe Process of Building A Green Project
The Process of Building A Green ProjectGreen Project Architects
 
GREEN BUILDING
GREEN BUILDING GREEN BUILDING
GREEN BUILDING sanjeev jain
 
Green building GRIHA criteria 32 &33
Green building GRIHA  criteria 32 &33Green building GRIHA  criteria 32 &33
Green building GRIHA criteria 32 &33Ashish Verma
 
Live Well Live Green
Live Well Live GreenLive Well Live Green
Live Well Live GreenIPRA conference
 
leed-case-study_final-reduced
leed-case-study_final-reducedleed-case-study_final-reduced
leed-case-study_final-reducedJames E. Truhan, MCR
 
The british school design case study
The british school design case studyThe british school design case study
The british school design case studyChandan kumar
 
Australian indoor environment rating tools, and the future of building health...
Australian indoor environment rating tools, and the future of building health...Australian indoor environment rating tools, and the future of building health...
Australian indoor environment rating tools, and the future of building health...Michael Taranto
 
GRIHA Rating for MITS college compus
GRIHA Rating for MITS college compus GRIHA Rating for MITS college compus
GRIHA Rating for MITS college compus Raviteja Mukkara
 
Energy efficiency in Green Building
Energy efficiency in Green BuildingEnergy efficiency in Green Building
Energy efficiency in Green Buildingshiva prakash
 
GRIHA RATING SYSTEM
GRIHA RATING SYSTEMGRIHA RATING SYSTEM
GRIHA RATING SYSTEMKrina Vesuwala
 

What's hot (20)

Rating Green Buildings - 4th March 2010
Rating Green Buildings - 4th March 2010Rating Green Buildings - 4th March 2010
Rating Green Buildings - 4th March 2010
 
LEED green buildings
LEED green buildingsLEED green buildings
LEED green buildings
 
Engineered Wood, Sustainability And Green Building Practices
Engineered Wood, Sustainability And Green Building PracticesEngineered Wood, Sustainability And Green Building Practices
Engineered Wood, Sustainability And Green Building Practices
 
BREEAM
BREEAMBREEAM
BREEAM
 
Green Building Project
Green Building ProjectGreen Building Project
Green Building Project
 
The Process of Building A Green Project
The Process of Building A Green ProjectThe Process of Building A Green Project
The Process of Building A Green Project
 
Green building prepared eh
Green building prepared ehGreen building prepared eh
Green building prepared eh
 
GREEN BUILDING
GREEN BUILDING GREEN BUILDING
GREEN BUILDING
 
GRIHA
GRIHAGRIHA
GRIHA
 
BREEAM
BREEAMBREEAM
BREEAM
 
Green building GRIHA criteria 32 &33
Green building GRIHA  criteria 32 &33Green building GRIHA  criteria 32 &33
Green building GRIHA criteria 32 &33
 
Live Well Live Green
Live Well Live GreenLive Well Live Green
Live Well Live Green
 
Campus square building
Campus square buildingCampus square building
Campus square building
 
leed-case-study_final-reduced
leed-case-study_final-reducedleed-case-study_final-reduced
leed-case-study_final-reduced
 
The british school design case study
The british school design case studyThe british school design case study
The british school design case study
 
Australian indoor environment rating tools, and the future of building health...
Australian indoor environment rating tools, and the future of building health...Australian indoor environment rating tools, and the future of building health...
Australian indoor environment rating tools, and the future of building health...
 
GRIHA Rating for MITS college compus
GRIHA Rating for MITS college compus GRIHA Rating for MITS college compus
GRIHA Rating for MITS college compus
 
Energy efficiency in Green Building
Energy efficiency in Green BuildingEnergy efficiency in Green Building
Energy efficiency in Green Building
 
GRIHA RATING SYSTEM
GRIHA RATING SYSTEMGRIHA RATING SYSTEM
GRIHA RATING SYSTEM
 
Low Carbon Housing and Supply Chain Development - Dr Andrew Platten
Low Carbon Housing and Supply Chain Development - Dr Andrew PlattenLow Carbon Housing and Supply Chain Development - Dr Andrew Platten
Low Carbon Housing and Supply Chain Development - Dr Andrew Platten
 

Viewers also liked

LEED & the Triple Bottom Line in WV
LEED & the Triple Bottom Line in WVLEED & the Triple Bottom Line in WV
LEED & the Triple Bottom Line in WVZMM, Inc.
 
Cognitive mapping
Cognitive mappingCognitive mapping
Cognitive mappingIbrahim Adhnan
 
theories and urbanism- cognitive mapping
theories and urbanism- cognitive mappingtheories and urbanism- cognitive mapping
theories and urbanism- cognitive mappingWen Yee
 
The perceptual dimensions and urban design
The perceptual dimensions and urban designThe perceptual dimensions and urban design
The perceptual dimensions and urban designKU Leuven
 
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...Make Mannan
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Centerbaburajiv2007
 

Viewers also liked (8)

LEED & the Triple Bottom Line in WV
LEED & the Triple Bottom Line in WVLEED & the Triple Bottom Line in WV
LEED & the Triple Bottom Line in WV
 
Cognitive mapping
Cognitive mappingCognitive mapping
Cognitive mapping
 
theories and urbanism- cognitive mapping
theories and urbanism- cognitive mappingtheories and urbanism- cognitive mapping
theories and urbanism- cognitive mapping
 
The perceptual dimensions and urban design
The perceptual dimensions and urban designThe perceptual dimensions and urban design
The perceptual dimensions and urban design
 
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
 
Geological Site Investigation Methods
Geological Site Investigation MethodsGeological Site Investigation Methods
Geological Site Investigation Methods
 
Soil investigation
Soil investigationSoil investigation
Soil investigation
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
 

Similar to Sustainable Design Principles Adam Krason, Zmm

Building sustainability green building
Building sustainability   green buildingBuilding sustainability   green building
Building sustainability green buildingMasoud Fayeq
 
Greening the Energy Retrofit
Greening the Energy RetrofitGreening the Energy Retrofit
Greening the Energy RetrofitERH West
 
revised-Live Well, Live Green, Build Green
revised-Live Well, Live Green, Build Greenrevised-Live Well, Live Green, Build Green
revised-Live Well, Live Green, Build GreenIPRA conference
 
Green Remediation on a LEED Certified Brownfield Site
Green Remediation on a LEED Certified Brownfield SiteGreen Remediation on a LEED Certified Brownfield Site
Green Remediation on a LEED Certified Brownfield Sitedavidwinslow
 
Green building
Green buildingGreen building
Green buildingJNTUK
 
Intent: The Real LEED Requirements
Intent: The Real LEED RequirementsIntent: The Real LEED Requirements
Intent: The Real LEED RequirementsScott DeGaro
 
Green building
Green buildingGreen building
Green buildingArun Bhargav
 
Sustainability and Specifications
Sustainability and SpecificationsSustainability and Specifications
Sustainability and SpecificationsAndrej_M
 
Jacob burns presentation 021214
Jacob burns presentation   021214Jacob burns presentation   021214
Jacob burns presentation 021214emosborne
 
Sustainable Parking - NPA 2011 - Carl Walker, Inc.
Sustainable Parking - NPA 2011 - Carl Walker, Inc.Sustainable Parking - NPA 2011 - Carl Walker, Inc.
Sustainable Parking - NPA 2011 - Carl Walker, Inc.Green Parking Council
 
leed certified buildings examplsPresentation team work
leed certified buildings examplsPresentation team workleed certified buildings examplsPresentation team work
leed certified buildings examplsPresentation team workgatti Teja
 
Green Presentation
Green PresentationGreen Presentation
Green PresentationSoma Majumdar
 
presentation_green_buildings_an_approach_towards_pollution_prevention_1450359...
presentation_green_buildings_an_approach_towards_pollution_prevention_1450359...presentation_green_buildings_an_approach_towards_pollution_prevention_1450359...
presentation_green_buildings_an_approach_towards_pollution_prevention_1450359...FAIZANAli575592
 
Bubble Building-PPT.pptx
Bubble Building-PPT.pptxBubble Building-PPT.pptx
Bubble Building-PPT.pptxdanieldanish5
 
Duke Medicine And Sustainability Overview
Duke Medicine And Sustainability OverviewDuke Medicine And Sustainability Overview
Duke Medicine And Sustainability Overviewklj9c
 
Energy efficiency in buildings
Energy efficiency in buildingsEnergy efficiency in buildings
Energy efficiency in buildingsD.Pawan Kumar
 
Green campus indicators
Green campus indicatorsGreen campus indicators
Green campus indicatorsSrujan Foundation
 
Rainwater Reuse, Low-impact Design and New Water-storage Technology
Rainwater Reuse, Low-impact Design and New Water-storage TechnologyRainwater Reuse, Low-impact Design and New Water-storage Technology
Rainwater Reuse, Low-impact Design and New Water-storage TechnologyElemental Stone and Waterworks, Inc.
 
Green building - Introduction & general ideas
Green building - Introduction & general ideasGreen building - Introduction & general ideas
Green building - Introduction & general ideasSanjay Kashyap
 

Similar to Sustainable Design Principles Adam Krason, Zmm (20)

Building sustainability green building
Building sustainability   green buildingBuilding sustainability   green building
Building sustainability green building
 
Greening the Energy Retrofit
Greening the Energy RetrofitGreening the Energy Retrofit
Greening the Energy Retrofit
 
revised-Live Well, Live Green, Build Green
revised-Live Well, Live Green, Build Greenrevised-Live Well, Live Green, Build Green
revised-Live Well, Live Green, Build Green
 
Green Remediation on a LEED Certified Brownfield Site
Green Remediation on a LEED Certified Brownfield SiteGreen Remediation on a LEED Certified Brownfield Site
Green Remediation on a LEED Certified Brownfield Site
 
Green building
Green buildingGreen building
Green building
 
Intent: The Real LEED Requirements
Intent: The Real LEED RequirementsIntent: The Real LEED Requirements
Intent: The Real LEED Requirements
 
Green building
Green buildingGreen building
Green building
 
Sustainability and Specifications
Sustainability and SpecificationsSustainability and Specifications
Sustainability and Specifications
 
Jacob burns presentation 021214
Jacob burns presentation   021214Jacob burns presentation   021214
Jacob burns presentation 021214
 
Sustainable Parking - NPA 2011 - Carl Walker, Inc.
Sustainable Parking - NPA 2011 - Carl Walker, Inc.Sustainable Parking - NPA 2011 - Carl Walker, Inc.
Sustainable Parking - NPA 2011 - Carl Walker, Inc.
 
leed certified buildings examplsPresentation team work
leed certified buildings examplsPresentation team workleed certified buildings examplsPresentation team work
leed certified buildings examplsPresentation team work
 
Green Presentation
Green PresentationGreen Presentation
Green Presentation
 
presentation_green_buildings_an_approach_towards_pollution_prevention_1450359...
presentation_green_buildings_an_approach_towards_pollution_prevention_1450359...presentation_green_buildings_an_approach_towards_pollution_prevention_1450359...
presentation_green_buildings_an_approach_towards_pollution_prevention_1450359...
 
NRC _Green Intelligent Buildings
NRC _Green Intelligent BuildingsNRC _Green Intelligent Buildings
NRC _Green Intelligent Buildings
 
Bubble Building-PPT.pptx
Bubble Building-PPT.pptxBubble Building-PPT.pptx
Bubble Building-PPT.pptx
 
Duke Medicine And Sustainability Overview
Duke Medicine And Sustainability OverviewDuke Medicine And Sustainability Overview
Duke Medicine And Sustainability Overview
 
Energy efficiency in buildings
Energy efficiency in buildingsEnergy efficiency in buildings
Energy efficiency in buildings
 
Green campus indicators
Green campus indicatorsGreen campus indicators
Green campus indicators
 
Rainwater Reuse, Low-impact Design and New Water-storage Technology
Rainwater Reuse, Low-impact Design and New Water-storage TechnologyRainwater Reuse, Low-impact Design and New Water-storage Technology
Rainwater Reuse, Low-impact Design and New Water-storage Technology
 
Green building - Introduction & general ideas
Green building - Introduction & general ideasGreen building - Introduction & general ideas
Green building - Introduction & general ideas
 

Recently uploaded

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 

Recently uploaded (20)

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow â‚ą,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow â‚ą,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow â‚ą,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow â‚ą,9517
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 

Sustainable Design Principles Adam Krason, Zmm

  • 2. The U.S. Green Building Council
  • 3. The U.S. Green Building Council
  • 4. LEED Green Building Rating System Leadership in Energy and Environmental Design
  • 5. Sustainable Sites Intent: Limit expansion of developed areas, preserve ecologically productive land Prevent site disturbance during construction Do not develop on inappropriate sites Develop in areas with existing infrastructure, not greenfields Redevelop brownfield sites site selection
  • 6. Sustainable Sites Intent: Reduce emissions & land development impacts from vehicle use Public transportation access Bicycle storage & changing rooms Preferred parking for fuel efficient vehicles & carpools Reduce parking capacity (minimum zoning requirements) transportation
  • 7. Sustainable Sites Intent: Reduce pollutants & strain on infrastructure, Reduce stormwater quantity, improve quality (wetlands & vegetated filtration) Maximize open areas on the site Protect or restore habitat Eliminate heat island effect Light pollution reduction stormwater / development
  • 8. Water Efficiency Intent: Eliminate potable water use for irrigation, reduce demand on infrastructure & natural resources Use native vegetation Capture rainwater for irrigation Eliminate site irrigation systems Reuse condensate water from HVAC systems landscaping
  • 9. Water Efficiency Intent: Eliminate potable water demand for conveying wastewater Treat wastewater on-site Use stormwater/graywater for sewage conveyance Use high efficiency/dry fixtures Reduce demand on infrastructure wastewater
  • 10. Water Efficiency Intent: Conserve water – it is a natural resource Standard: Energy Policy Act of 2005 Use high efficiency/dry fixtures Recycle graywater Dual flush toilets/low flow shower heads reduce water consumption
  • 11. Energy & Atmosphere Intent: Many systems are designed correctly, but installed or operated improperly A quality-oriented process for achieving, verifying and documenting the performance of facilities, systems and assemblies to meet defined objectives and criteria Cost of fundamental commissioning +/- $1/SF Owner develops project requirements Designer develops basis of design commissioning
  • 12. Energy & Atmosphere Commissioning requirements should be incorporated into the construction documents Enhanced commissioning includes systems manuals, training & a 10-month review commissioning
  • 13. Energy & Atmosphere optimize energy performance Intent: Reduce energy consumption (reduces pollution) Includes building envelope, HVAC, lighting Minimum standard: ASHRAE 90.1-2007 Up to 19 points available for 48% energy reduction Over 20,000 SF requires whole building energy simulation
  • 14. Energy & Atmosphere optimize energy performance Building orientation, improved building shell Appropriately-sized HVAC systems Energy recovery from exhaust air Harvest on-site energy: solar, wind, geothermal
  • 15. Energy & Atmosphere Intent: CFC’s deplete the ozone layer No CFC’s permitted, phase out of old facilities Reduce use of CFC’s, HCFC’s, HFC’s Consider use of natural refrigerants: carbon dioxide, ammonia, propane reduce refrigerants
  • 16. Energy & Atmosphere Maintain equipment: prevent leakage into the atmosphere Depleted ozone layer permits ultraviolet rays to penetrate the atmosphere reduce refrigerants
  • 17. Energy & Atmosphere Intent: Measure building energy consumption over time Establish a base year of operation Compare future performance to the base M&V period starts after reasonable occupation & stability measure & verify
  • 18. Energy & Atmosphere Intent: Promote alternative energy sources Purchase at least 35% of electricity from Green-e certified provider Tradable renewable energy certificates (REC’s) can be used green power
  • 19. Materials & Resources Intent: Reduce materials extracted, reduce their transportation Reduce: materials extracted Reuse: existing products Recycle: demolition & construction waste ReStore: Habitat for Humanity Regional: sustainable for the environment & the economy the 3 R’s + 2
  • 20. Materials & Resources Intent: Reduce waste hauled to & disposed of in landfills During construction: develop waste management plan Operation: provide an area within the building for storage & collection of recyclables Minimum: paper, corrugated cardboard, glass, plastic & metals recycling
  • 21. Materials & Resources Intent: Extend life cycle of existing buildings, reduce impact of new buildings as they relate to materials & transportation Reuse structure & envelope Reuse interior partitions & products where possible Do not reuse contaminants & hazardous materials Upgrade HVAC, windows & plumbing fixtures for increased efficiency building reuse
  • 22. Materials & Resources Intent: Reuse building materials, reduce demand for virgin materials “One man’s trash….” Consider furnishings Other options: posts & beams, flooring, doors, brick, cabinetry materials reuse
  • 23. Materials & Resources Intent: Reduce demand for virgin materials Post-consumer: generated by households & businesses Pre-consumer: generated by manufacturing process Many suppliers list recycled content Establish goals during the design phase recycled content
  • 24. Materials & Resources Example: Steelcase “Context” furniture 40% recycled content 8% post-consumer recycled content 92% recyclable Context also incorporates water-based adhesives with low VOC’s recycled content
  • 25. Materials & Resources Intent: Reduce impact of transportation Options: concrete, block, brick, wood products West Virginia is in a great location (500 mile radius) Creates healthier local economy regional materials
  • 26. Materials & Resources Intent: Reduce depletion of finite raw materials 10-year plant-to-harvest cycle Options: bamboo, wool, linoleum, cork, wheatboard, even poplar rapidly renewable materials
  • 27. Materials & Resources Intent: Encourage environmentally responsible forest management Current standard: Forest Stewardship Council (FSC) Most West Virginia forests adhere to Sustainable Forest Initiative (SFI) standard USGBC is reviewing this credit to possibly include SFI certified woods
  • 28. Indoor Environmental Quality Intent: Enhance indoor air quality in buildings Indoor air can be 2-5 times more polluted than outdoor air Prevent “sick building syndrome” Standard for fresh air: ASHRAE 62.1-2007 Eliminate or contain tobacco smoke minimum performance
  • 29. Indoor Environmental Quality Intent: We all need fresh air! Measure fresh air delivery Increase natural ventilation… can be difficult while reducing energy use Monitor air quality during construction to keep workers safe Protect systems during construction ventilation
  • 30. Indoor Environmental Quality Intent: Reduce harmful contaminants released by many materials Adhesives & sealants (GreenSeal standard) Paints/stains (low VOC) Flooring (Green Label, Floor Score) Composite wood (no urea formaldehyde)…remember Katrina trailers materials
  • 31. Indoor Environmental Quality Intent: Minimize exposure to pollutants in the indoor environment Entryway systems Housekeeping, copy/print rooms & laundry areas: separate HVAC systems MERV 13 filters reduce pollutants
  • 32. Indoor Environmental Quality Intent: Promote productivity, comfort & well-being of occupants Controllability of lighting & HVAC systems Set increased HVAC design parameters for temperature & humidity Give a majority of occupants access to daylight & views occupant comfort
  • 33. Innovation & Design Process Intent: Be rewarded for exceptional performance above LEED requirements Innovation Education of the users & general public Life cycle cost analysis additional items…
  • 34. ZMM Case Studies Lincoln County High School Awarded commission in October 2000 Presented green design study to the Superintendent in 2002 Incorporated affordable green design features Construction bids received in March 2004 Building occupied fall term 2006
  • 35. ZMM Case Studies Lincoln County High School Sustainable Sites: Building orientation Erosion and sedimentation control Stormwater management Stormwater filtering Holding pond
  • 36. ZMM Case Studies Lincoln County High School Explored, but not incorporated: Bicycle storage Reflective roof to combat heat island effect Bid add alternate was $95K – not accepted Preferred parking for energy efficient vehicles Could be implemented now at no cost
  • 37. ZMM Case Studies Lincoln County High School Water efficiency: No landscape irrigation Water use reduction Dual flush fixtures Water saving fixtures Explored, but not incorporated: Graywater system Bid add alternate was $200K, not accepted Graywater sprinkler system Bid add alternate was $250K, not accepted
  • 38. ZMM Case Studies Lincoln County High School Energy & Atmosphere: High efficiency equipment Condensing boilers (95%+ efficient) Chiller heat recovery Fluorescent lighting, high CRI CFC reduction No ozone-depleting refrigerants Explored, but not incorporated: Full system commissioning Estimated cost was $200K Measurement & verification Estimated cost was $20K
  • 39. ZMM Case Studies Lincoln County High School Materials & Resources: Storage & collection of recyclables Educational opportunities of recycling Local & regional materials Explored, but not incorporated: Construction waste recycling Estimated cost was $50K Rapidly renewable materials Wood from managed forests
  • 40. ZMM Case Studies Lincoln County High School Indoor environmental quality: CO2 monitoring/control Construction IAQ management Low VOC-emitting adhesives, paints & carpets HVAC digital control system Daylighting Building orientation Automatic light level control Benefits of natural light Reduce energy consumption
  • 41. ZMM Case Studies Lincoln County High School Cost breakdown: Sustainable Sites Nominal Water Efficiency Estimated at $50K Energy & Atmosphere Estimated at $50K Materials & Resources Nominal Indoor Environmental Quality Estimated at $625K (daylighting & lighting controls make up $600K of this cost)
  • 42. ZMM Case Studies Lincoln County High School First costs vs. long-term benefits: First cost of green features $700,000 $3.23 per square foot Percent of construction costs $700,000 $31,400,000 = 2.25%
  • 43. ZMM Case Studies Lincoln County High School and the numbers demonstrate… Water 4 Consolidated HS Used 2,156,900 Gallons New HS used 618,600 Gallons in the 2nd Year 71% Savings Natural Gas Previous Use: 11,592 MCF New: 7,195 MCF 38% Savings
  • 44. ZMM Case Studies Lincoln County High School Long-term benefits: Lower natural gas consumption Lower water consumption Lower electricity consumption Longer life of HVAC equipment Lower absenteeism Higher student & teacher performance Much better indoor air quality Lower impact on the environment
  • 45. ZMM Case Studies WV State Office Buildings 5, 6 & 7 Sustainable Sites: The project site has access to public transportation A bicycle storage & shower area (potentially a campus-wide facility) should be developed to encourage bicycle commuting for employees who live nearby Prime parking areas should be developed for employees who carpool, as well as for alternative fuel vehicles The new roof will be highly reflective to reduce heat island effect
  • 46. ZMM Case Studies WV State Office Buildings 5, 6 & 7 Water Efficiency: Low flow & dual flush fixtures will be used throughout All new landscaping plans should utilize native vegetation
  • 47. ZMM Case Studies WV State Office Buildings 5, 6 & 7 Energy & Atmosphere: New windows will help reduce solar heat gain New, more efficient HVAC system will replace the perimeter induction units Systems will be commissioned to ensure that all mechanical and electrical systems operate properly
  • 48. ZMM Case Studies WV State Office Buildings 5, 6 & 7 Materials & Resources: Recycling areas are developed for each floor, and should be developed for the entire campus A recycling program should be established, and all employees educated in the process A construction waste management plan will be implemented Included in the specifications Has already included recycling of the demolished demountable partitions
  • 49. ZMM Case Studies WV State Office Buildings 5, 6 & 7 Materials & Resources: Recycled content materials will be utilized, including drywall, steel & acoustic ceiling tiles Locally & regionally produced materials will be used, including acoustic ceiling tiles, plywood, carpeting & resilient flooring Cradle-to-Cradle certified furniture systems are specified Raised floor with a modular, “plug & play” wiring system will eliminate future demolition waste
  • 50. ZMM Case Studies WV State Office Buildings 5, 6 & 7 Indoor Environmental Quality: Smoking will be prohibited near entryways & near air intakes An indoor air quality (IAQ) management plan will be implemented during construction Air quality will be measured & verified in all occupied areas to ensure that occupants are receiving enough fresh air All paints, mastics & sealants will contain low VOC’s Regular replacement of mechanical filters should be implemented
  • 51. Final thoughts…. It’s not about doing less… It’s about designing better! 2008 SUSTAINABILITY