2. Legal Disclaimer
No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained on this presentation.
This presentation includes certain “forward‐looking statements”. All statements other than statements of historical fact included on this presentation
including, without limitation, statements regarding potential mineralization, resources and reserves, exploration results, and future plans and objectives
of Genco Resources Ltd., are forward‐looking statements that involve various risks and uncertainties.
There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those
anticipated in such statements. Important factors that could cause actual results to differ materially from Genco’s expectations include, among others,
risks related to operations, the actual results of current exploration activities, conclusions of economic evaluations and changes in project parameters as
plans continue to be refined as well as future prices of silver and gold.
Although Genco has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause
results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate as actual results and
future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward‐looking
statements. Genco does not assume any obligation to update forward looking information if situations, results, management opinions or beliefs change.
NI 43‐101 Disclosure
Technical information contained in this presentation regarding Genco’s La Guitarra Mine has been prepared by or under the supervision of the
Company’s independent mining consultant, Glenn Clark, P. Geol. (a ‘qualified person’ for the purpose of National Instrument 43‐101 Standards of
Disclosure for Mineral Projects of the Canadian Securities Administrators (“NI 43‐101”). He has verified the data comprising such technical information,
including sampling, analytical and test data underlying the information or opinions contained therein. Certain information in this presentation has been
taken from Technical Reports prepared by Genco’s independent mining consultant. The reports have been filed with various Canadian securities
commissions on SEDAR under NI 43‐101. The complete reports can be found in Genco’s filings at www.sedar.com.
The Technical Reports are intended to be read as a whole and sections should not be read or relied upon out of context. The reports contain the
expression of the professional opinions of the authors, based upon information available at the time of preparation. Any reliance on the Technical
Reports by any third party shall be entirely at their own risk. Genco takes no responsibility and accepts no liability whatsoever for any loss arising from
any use of or reliance on the Technical Reports by other parties. The Technical Reports are based, in part, upon information believed to be reliable from
data supplied by Genco and other consultants engaged by Genco. Such information has been reviewed, verified (including sampling, analytical and test
data) by Genco’s ‘qualified person’ or by such independent consultants.
3. Mission Statement
Genco aims to create solid shareholder value through
increased production & reserve and resource growth.
4. What Sets Genco Apart?
Silver/Gold Producer
Feasibility Study ‐ Completed Dec. 2009
10x La Guitarra Mine Expansion
47.3 M oz eAg Proven & Probable Reserves
8.7 M oz eAg Measured & Indicated Resources
144.3M oz eAg Inferred Resources
Excellent Potential for Discovery of Additional
Reserves & Resources on Existing Land Package
8. La Guitarra Mill & Mine
Modern, Trackless Equipment with Ramp Access
320 t/d Flotation Mill for Ag/Au Concentrate
Over 85,000 m Drilling Completed since 2006
9. La Guitarra Infrastructure
Access Paved roads within 2km of plant site
Toluca International Airport ~ 80km
(major commercial & industrial hub)
Mexico City ~ 120km
Power Mexican Federal Power Commission
(connected to national grid)
Urban Temascaltepec ~ 10 minutes drive
Public services: schools, hospital
Emergency services: fire, police
Water Readily available at existing plant site
& all planned areas of expansion
11. NI 43‐101
Reserves & Resources
Summary of La Guitarra and Temascaltepec Silver/Gold Mining District Reserves & Resources
Underground & Surface Reserves
tonnes
Category Ag g/t Au g/t oz eAg
(,000)
Total Underground Reserves 2,185 209 1.46 20,409,000
Total Surface Reserves 6,824 81 0.75 26,930,000
Total Reserves 9,009 113 0.93 47,339,000
La Guitarra Open Pit Resources - 45 g/t eAg Cut-off
Total Measured + Indicated (exclusive of Reserves) 2,156 79 0.82 8,656,000
Inferred 2,683 75 1.00 11,257,000
Underground Inferred Resources
Total Underground Inferred 10,000 305 1.95 133,103,000
Total Inferred 12,683 256 1.75 144,360,000
Notes:
1) The Qualified Persons under NI 43‐101 who have prepared this R&R estimate are
Glenn R. Clark, P. Eng. & John Thornton, SAIMM.
2) For further information, please refer to Genco’s News Releases dated Dec. 16, 2009 and Jan. 29, 2010
and/or NI 43‐101 Independent Technical Report dated Jan. 29, 2010 (www.sedar.com)
15. Genco’s Plans for Expansion
La Guitarra Mill & Mine
La Guitarra Mine Plan Complete
Develop Additional Working Areas for
Increased Underground Production
Temascaltepec District:
Coloso, Nazareno & Mina de Agua
3 New Production Centres
Mine & Development Plans Complete
Permitting & Access
Permitting has been initiated with State &
Federal Authorities
Environmental Impact Study Underway
Ongoing Negotiations for Surface Rights
17. Share Structure
Current as of March 5, 2010
Issued Shares 89,516,626
Issued Warrants & Options 37,210,587
Outstanding Options CAD $0.40 ‐ $4.00 3,897,582
Outstanding Warrants CAD $0.35 ‐ $.045 33,313,005
Insider Holdings 21,490,000
Price – March 5, 2010 CAD $0.44
52 Week High/Low CAD $0.83/$0.22
Market Cap CAD $39M
TSX: GGC
Frankfurt: GSB
18. Corporate Directory
Corporate Management Board of Directors
Leslie D. Goodman – Acting CEO Richard W. Hughes (Chairman)
Wayne R. Moorhouse – CFO & James R. Anderson
Corporate Secretary Robert C. Gardner
Leslie D. Goodman
Charles E. Schroeder
Brian R. D. Smith
Lyle R. Weismantel
19. Corporate Head Office
Genco Resources Ltd.
Suite 550 – 999 W. Hastings Street
Vancouver, BC Canada V6C 2W2
T (604) 682‐2205
F (604) 682‐2235
www.gencoresources.com
info@gencoresources.com