Abstract   Internal Paper’s learning center is no longer a place where employees are taught and trained about safety. The learning center has no internet connection which makes it impossible to connect to the company’s intranet to access learning material. Departments no longer gather in the learning center, instead they have move to other rooms and have caused negative results in plant performance. The plant’s network administrator and I have done research and developed several plans that will give the learning center a way to connect to the intranet, internet, and allow wireless connections when needed. We have determined that after this proposal has been approved work can begin in two weeks. The purpose of this is to move employee meetings back to the learning center where learning and training was intended to be.
Report 	The learning center was designed to be a place where plant employees learned new aspects of jobs, performed safety training, and gathered for company meetings.
The company has placed all valuable and undisclosed files on the intranet. This was done to provide a secure place to store files and make them accessible to most employees.
During the time period when the learning center was built there was not a need for internet use in the building because all learning and training was done from books. Every since the company decided to put all training material online, the use of the learning center has declined.
One of the reasons this company has survived for so long is because we have constantly found a way to be cost efficient and be a low cost producer.
We are spending double the money now to fund our monthly training because the weekly safety meetings are usually held an hour before second shift starts. The only available place to meet is the maintenance MWS room which is occupied from 2:00 pm until 4:00 pm.  With this in mind, employees have to come in 2 hours early or stay over 2 hours late.
The company has mandatory OSHA training that must be taken 4 times a year by all employees. Classroom #4 in the learning center has 20 computers that could be used by employees to take the OSHA test.
There have been several times when defective paper has been produced due to the computers not monitoring the paper machines because they were being used for test purposes.
Router Comparison Chart Methods
 I considered several things including the number of ports, our network speed, and power over internet, and switch type. The most valuable feature that this switch adds to the business is Quality of service (QoS).
The FS726TP offers the security features, network speeds, and the Quality of Service features that will ensure that this will meet the company’s security policies. The 24 ports add the ability to easily add another switch, a router, an IP camera, or even VOIP phone service.
Conclusion We have put together this plan that would have cost over $3500 by an outside contractor for under $1000. Not only is this plan two thirds cheaper than an outside contractor would have done it for, but it also will be ready for future additions the company if the decides.

Contenu connexe

Tendances

INPLANT TRAINING at HCL Velachery
INPLANT TRAINING at HCL VelacheryINPLANT TRAINING at HCL Velachery
INPLANT TRAINING at HCL Velacheryhclipt15
 
Ipt @ velachery
Ipt @ velacheryIpt @ velachery
Ipt @ velacheryHCL CDC
 
Mobile Application Developer with Worklight Studio v6.2_certificate
Mobile Application Developer with Worklight Studio v6.2_certificateMobile Application Developer with Worklight Studio v6.2_certificate
Mobile Application Developer with Worklight Studio v6.2_certificateadnan ahmed
 
IPT @ HCL Velachery
IPT @ HCL VelacheryIPT @ HCL Velachery
IPT @ HCL VelacheryHCL CDC
 
Jinu-Resume2015
Jinu-Resume2015Jinu-Resume2015
Jinu-Resume2015Jinu PG
 
Mobile Application Developer with Worklight Studio v6.2_certificate
Mobile Application Developer with Worklight Studio v6.2_certificateMobile Application Developer with Worklight Studio v6.2_certificate
Mobile Application Developer with Worklight Studio v6.2_certificateOmar Mohammed Eltamasehy
 
Internship in-chennai-for-cse-in-cloud-computing
Internship in-chennai-for-cse-in-cloud-computingInternship in-chennai-for-cse-in-cloud-computing
Internship in-chennai-for-cse-in-cloud-computingroshneyarul
 
Internship in-chennai-for-cse-in-bigdata
Internship in-chennai-for-cse-in-bigdataInternship in-chennai-for-cse-in-bigdata
Internship in-chennai-for-cse-in-bigdatadaulatbegam
 
Internship in-chennai-for-eee-matlab-in-advanced-level-of-programming
Internship in-chennai-for-eee-matlab-in-advanced-level-of-programmingInternship in-chennai-for-eee-matlab-in-advanced-level-of-programming
Internship in-chennai-for-eee-matlab-in-advanced-level-of-programmingvijinisuresh
 

Tendances (12)

INPLANT TRAINING at HCL Velachery
INPLANT TRAINING at HCL VelacheryINPLANT TRAINING at HCL Velachery
INPLANT TRAINING at HCL Velachery
 
Ipt @ velachery
Ipt @ velacheryIpt @ velachery
Ipt @ velachery
 
Mobile Application Developer with Worklight Studio v6.2_certificate
Mobile Application Developer with Worklight Studio v6.2_certificateMobile Application Developer with Worklight Studio v6.2_certificate
Mobile Application Developer with Worklight Studio v6.2_certificate
 
IPT @ HCL Velachery
IPT @ HCL VelacheryIPT @ HCL Velachery
IPT @ HCL Velachery
 
Jinu-Resume2015
Jinu-Resume2015Jinu-Resume2015
Jinu-Resume2015
 
Bhuvaneswar
BhuvaneswarBhuvaneswar
Bhuvaneswar
 
Mobile Application Developer with Worklight Studio v6.2_certificate
Mobile Application Developer with Worklight Studio v6.2_certificateMobile Application Developer with Worklight Studio v6.2_certificate
Mobile Application Developer with Worklight Studio v6.2_certificate
 
Internship in-chennai-for-cse-in-cloud-computing
Internship in-chennai-for-cse-in-cloud-computingInternship in-chennai-for-cse-in-cloud-computing
Internship in-chennai-for-cse-in-cloud-computing
 
Internship in-chennai-for-cse-in-bigdata
Internship in-chennai-for-cse-in-bigdataInternship in-chennai-for-cse-in-bigdata
Internship in-chennai-for-cse-in-bigdata
 
ResumeGPS
ResumeGPSResumeGPS
ResumeGPS
 
ResumeGPS
ResumeGPSResumeGPS
ResumeGPS
 
Internship in-chennai-for-eee-matlab-in-advanced-level-of-programming
Internship in-chennai-for-eee-matlab-in-advanced-level-of-programmingInternship in-chennai-for-eee-matlab-in-advanced-level-of-programming
Internship in-chennai-for-eee-matlab-in-advanced-level-of-programming
 

En vedette

Presentacion ONG Dependencia.0
Presentacion ONG Dependencia.0Presentacion ONG Dependencia.0
Presentacion ONG Dependencia.0Dependencia.0
 
M5.3 marketing research
M5.3 marketing researchM5.3 marketing research
M5.3 marketing researchDebCampbell
 
Case Study: Bite Latvija pioneering in social media
Case Study: Bite Latvija pioneering in social mediaCase Study: Bite Latvija pioneering in social media
Case Study: Bite Latvija pioneering in social mediaHauska & Partner
 
Eco 550 assignment 2 (2)
Eco 550 assignment 2 (2)Eco 550 assignment 2 (2)
Eco 550 assignment 2 (2)brooks7117
 

En vedette (7)

Presentacion ONG Dependencia.0
Presentacion ONG Dependencia.0Presentacion ONG Dependencia.0
Presentacion ONG Dependencia.0
 
Activity1
Activity1Activity1
Activity1
 
Eco 550 entire course
Eco 550 entire courseEco 550 entire course
Eco 550 entire course
 
M5.3 marketing research
M5.3 marketing researchM5.3 marketing research
M5.3 marketing research
 
Case Study: Bite Latvija pioneering in social media
Case Study: Bite Latvija pioneering in social mediaCase Study: Bite Latvija pioneering in social media
Case Study: Bite Latvija pioneering in social media
 
References
ReferencesReferences
References
 
Eco 550 assignment 2 (2)
Eco 550 assignment 2 (2)Eco 550 assignment 2 (2)
Eco 550 assignment 2 (2)
 

Similaire à Foreman research

Employee Intranet: 40 Reasons Why Every Business Needs One
Employee Intranet: 40 Reasons Why Every Business Needs OneEmployee Intranet: 40 Reasons Why Every Business Needs One
Employee Intranet: 40 Reasons Why Every Business Needs OneMy Hub Intranet Solutions
 
Android based Attendance and examination automation
Android based Attendance and examination automationAndroid based Attendance and examination automation
Android based Attendance and examination automationRitika Mahajan
 
Assignment 3 Part 1 Operation, Technology, and Management Plan .docx
Assignment 3 Part 1 Operation, Technology, and Management Plan .docxAssignment 3 Part 1 Operation, Technology, and Management Plan .docx
Assignment 3 Part 1 Operation, Technology, and Management Plan .docxrock73
 
SoftSolutions4U- company profile
SoftSolutions4U- company profileSoftSolutions4U- company profile
SoftSolutions4U- company profileSoft Solutions4U
 
Online Examination system mini project -1.ppt
Online Examination system mini project -1.pptOnline Examination system mini project -1.ppt
Online Examination system mini project -1.pptParvatiRathod1
 
Intra mailing-system-documentation-a-asp-net-project
Intra mailing-system-documentation-a-asp-net-projectIntra mailing-system-documentation-a-asp-net-project
Intra mailing-system-documentation-a-asp-net-projectRasa Govindasamy
 
Technology Plan Preparation FormUsing this form as a guide, su.docx
Technology Plan Preparation FormUsing this form as a guide, su.docxTechnology Plan Preparation FormUsing this form as a guide, su.docx
Technology Plan Preparation FormUsing this form as a guide, su.docxmattinsonjanel
 
Hospital management System (asp.net with c#)Project report
Hospital management System (asp.net with c#)Project reportHospital management System (asp.net with c#)Project report
Hospital management System (asp.net with c#)Project reportabhishek singh
 
VDM Reprot By Nikhil Jaiswal
VDM Reprot By Nikhil JaiswalVDM Reprot By Nikhil Jaiswal
VDM Reprot By Nikhil JaiswalNikhil Jaiswal
 
Online jobportal
Online jobportalOnline jobportal
Online jobportalteriwoja
 
Websoft Schenectady International Case Study
Websoft Schenectady International Case StudyWebsoft Schenectady International Case Study
Websoft Schenectady International Case StudyRichard Rodriguez
 
Erudition- Institute Management System
Erudition- Institute Management SystemErudition- Institute Management System
Erudition- Institute Management SystemIRJET Journal
 
Internship report
Internship report Internship report
Internship report Eba Tolesa
 

Similaire à Foreman research (20)

SFC 2019
SFC 2019SFC 2019
SFC 2019
 
Info
InfoInfo
Info
 
Employee Intranet: 40 Reasons Why Every Business Needs One
Employee Intranet: 40 Reasons Why Every Business Needs OneEmployee Intranet: 40 Reasons Why Every Business Needs One
Employee Intranet: 40 Reasons Why Every Business Needs One
 
Android based Attendance and examination automation
Android based Attendance and examination automationAndroid based Attendance and examination automation
Android based Attendance and examination automation
 
Assignment 3 Part 1 Operation, Technology, and Management Plan .docx
Assignment 3 Part 1 Operation, Technology, and Management Plan .docxAssignment 3 Part 1 Operation, Technology, and Management Plan .docx
Assignment 3 Part 1 Operation, Technology, and Management Plan .docx
 
SoftSolutions4U- company profile
SoftSolutions4U- company profileSoftSolutions4U- company profile
SoftSolutions4U- company profile
 
Online Examination system mini project -1.ppt
Online Examination system mini project -1.pptOnline Examination system mini project -1.ppt
Online Examination system mini project -1.ppt
 
Intra mailing-system-documentation-a-asp-net-project
Intra mailing-system-documentation-a-asp-net-projectIntra mailing-system-documentation-a-asp-net-project
Intra mailing-system-documentation-a-asp-net-project
 
Technology Plan Preparation FormUsing this form as a guide, su.docx
Technology Plan Preparation FormUsing this form as a guide, su.docxTechnology Plan Preparation FormUsing this form as a guide, su.docx
Technology Plan Preparation FormUsing this form as a guide, su.docx
 
Moving finance to the cloud
Moving finance to the cloudMoving finance to the cloud
Moving finance to the cloud
 
Hospital management System (asp.net with c#)Project report
Hospital management System (asp.net with c#)Project reportHospital management System (asp.net with c#)Project report
Hospital management System (asp.net with c#)Project report
 
Cloud Computing Project
Cloud Computing ProjectCloud Computing Project
Cloud Computing Project
 
VDM Reprot By Nikhil Jaiswal
VDM Reprot By Nikhil JaiswalVDM Reprot By Nikhil Jaiswal
VDM Reprot By Nikhil Jaiswal
 
Online jobportal
Online jobportalOnline jobportal
Online jobportal
 
Websoft Schenectady International Case Study
Websoft Schenectady International Case StudyWebsoft Schenectady International Case Study
Websoft Schenectady International Case Study
 
Erudition- Institute Management System
Erudition- Institute Management SystemErudition- Institute Management System
Erudition- Institute Management System
 
Internship report
Internship report Internship report
Internship report
 
Project Plan
Project PlanProject Plan
Project Plan
 
Intranet Software
Intranet SoftwareIntranet Software
Intranet Software
 
Case Study 2
Case Study 2Case Study 2
Case Study 2
 

Foreman research

  • 1. International Paper Renovating the Learning Center Internet Connection By: Guy Foreman 2010
  • 2. Abstract   Internal Paper’s learning center is no longer a place where employees are taught and trained about safety. The learning center has no internet connection which makes it impossible to connect to the company’s intranet to access learning material. Departments no longer gather in the learning center, instead they have move to other rooms and have caused negative results in plant performance. The plant’s network administrator and I have done research and developed several plans that will give the learning center a way to connect to the intranet, internet, and allow wireless connections when needed. We have determined that after this proposal has been approved work can begin in two weeks. The purpose of this is to move employee meetings back to the learning center where learning and training was intended to be.
  • 3. Report The learning center was designed to be a place where plant employees learned new aspects of jobs, performed safety training, and gathered for company meetings.
  • 4. The company has placed all valuable and undisclosed files on the intranet. This was done to provide a secure place to store files and make them accessible to most employees.
  • 5. During the time period when the learning center was built there was not a need for internet use in the building because all learning and training was done from books. Every since the company decided to put all training material online, the use of the learning center has declined.
  • 6. One of the reasons this company has survived for so long is because we have constantly found a way to be cost efficient and be a low cost producer.
  • 7. We are spending double the money now to fund our monthly training because the weekly safety meetings are usually held an hour before second shift starts. The only available place to meet is the maintenance MWS room which is occupied from 2:00 pm until 4:00 pm. With this in mind, employees have to come in 2 hours early or stay over 2 hours late.
  • 8. The company has mandatory OSHA training that must be taken 4 times a year by all employees. Classroom #4 in the learning center has 20 computers that could be used by employees to take the OSHA test.
  • 9. There have been several times when defective paper has been produced due to the computers not monitoring the paper machines because they were being used for test purposes.
  • 11. I considered several things including the number of ports, our network speed, and power over internet, and switch type. The most valuable feature that this switch adds to the business is Quality of service (QoS).
  • 12.
  • 13. The FS726TP offers the security features, network speeds, and the Quality of Service features that will ensure that this will meet the company’s security policies. The 24 ports add the ability to easily add another switch, a router, an IP camera, or even VOIP phone service.
  • 14. Conclusion We have put together this plan that would have cost over $3500 by an outside contractor for under $1000. Not only is this plan two thirds cheaper than an outside contractor would have done it for, but it also will be ready for future additions the company if the decides.