SlideShare une entreprise Scribd logo
1  sur  61
PLANNING FOR A MULTIMODAL
TRANSPORT INTERCHANGE

Study Area: Sealdah Interchange, Kolkata

Data Analysis
                                   Gargi Ghosh
                                   10 AR 60 R08

                                   Under the guidance
                                   of:
                                   Prof. Debapratim
•To enable the establishment of quality focused multimodal transport system to provide
  a            “ single journey experience ” i.e. to plan for “seamless travel”

  • To co-coordinate the use of different modes and their proper integration for efficiency
  and cost effectiveness of interchange.




PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
BUS STOP




                                                   BAITHAKHANA
                                                   MARKET
                                                                                             PARKING


                                                                                        SEALDAH
                                                  AUTO STOP                             STATION
                METRO
                                                  KOLEY
                                                  MARKET
                                                                                             BR SINGH
                                                                                             HOSPITAL


                                                       BUS STOP




                                                                           SEALDAH
                                                                           BUS DEPOT


PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
Quantitative Passenger profile for age, sex, income group,
   travel details (mode, expenditure, OD)


   Rank data for importance and satisfaction of parameters.

   Data for QoS for different parameters.

   Data for parameters whose QoS has not been defined.




PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
To derive the QUALITY OF SERVICE values for Sealdah


       To establish parameter priority at Sealdah Interchange.


       To manage pedestrian movement – PRESENT AND POST METRO


       To manage transportation facilities – PRESENT AND POST METRO




PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
TRANSPORT FACILITIES                                       URBAN REALM
       1    Queuing space in auto stop                           12    Distance of paratransit stop from building
            Frequency of auto service= waiting time for
       2    auto service                                         13    Parking areas

            Performance of auto stand( weather                   14    Entrance accessibility
       3    protection, safety, toilet facilities )              15    Location of entrances

            Distance of paratransit stop from building           16    Walking distance (mode1 to ticket counter)
       4
                                                                 17    Pedestrian pathways ( adequacy, safety )
            Queuing space in taxi stand
       5
                                                                 18    Subway
            Frequency of taxi service = waiting time for
       6    taxi service                                         19    Weather protection in interchange area

            Adequacy of queuing space in taxi stand              20    Disabled access
       7
            Performance of taxi stand( weather protection,       21    Surveillance
       8    safety, toilet facilities )
                                                                 22    toilet facilities
            Bus stop performance(queuing space, toilet
       9    facilities etc)
                                                                 23    Cleanliness
                                                                 24    Safety
            Frequency of bus service
      10                                                         25    Organised retail in the interchange
            Feeder service
      11
PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
BUILT FACILITY DESIGN
    26     Level changes

    27     Queuing time in ticket counter

    28     Queuing space for ticket counter

    29     No of ticket counters

    30     Location of ticket counters

    31     Real time information

    32     Information system placement

    33     Walking distance (from ticket counter to platform)

    34     Waiting area in platform

    35     Railway Station performance

    36     Safety & surveillance @ platform

    37     Alignment of platform and the entrance location

    38     Goods loading/unloading area on platform


PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
WAITING TIME at bus stop

 WALKING TIME from bus stop to the terminal
 building

                                                              • AGE WISE
 WAITING TIME at paratransit stop
                                                                                             • DESIRED QoS
                                                              • INCOME CATEGORY
 WALKING TIME from paratransit stop to the                                                   • PRESENT QoS
 terminal building                                                                           • MINIMUM
                                                              WISE                             ACCEPTABLE QoS
 TICKETING TIME
                                                              • GENDER WISE

 WALKING DISTANCE from ticket counter to
                                                              • TRIP TYPE
 platform

 WAITING TIME at Platform


PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
AGE GROUP

                                      QoS FOR WAITING TIME AT BUS STOP                            60 +   0-18

         AGE GR-4


 A
 G
 E                                                                                        40-60                 18-40
         AGE GR-3
 C
 A
 T
 E
 G
 O       AGE GR-2
 R
 Y



         AGE GR-1


     0              2             4                  6                   8       10                12
                                                    TIME

            CATEGORY                     RANGE                    DESIRED    Percentage         MIN.        Percentage
                                                                              satisfied      ACCEPTABL       satisfied
                                                                                                 E
     AGE GROUP 1             NA
     AGE GROUP 2             5 – 9 MIN
                                                                    5 MIN      72%             7 MIN            73%
     AGE GROUP 3             5 – 7 MIN
     AGE GROUP 4             5 – 6 MIN
PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
QoS FOR WAITING TIME AT BUS STOP                        31%




                   FEMALE
                                                                                                                69%
 GENDRT CATEGORY




                                                                                                                      MALE




                   MALE




             2            3   4             5         6          7           8   9         10      11




                   CATEGORY                RANGE                      DESIRED        Percentage      MIN.       Percentage
                                                                                      satisfied   ACCEPTABLE     satisfied
             MALE             7 – 9 MIN
                                                                       5 MIN           95%              9 MIN     80%
             FEMALE           5 – 8 MIN




PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
INCOME GROUPS
                                         QoS FOR WAITING TIME AT BUS STAND
                                                                                                               HIG   MIG    LIG

                                                                                                                      9%

                  LIG

                                                                                                     44%
INCOME CATEGORY




                                                                                                                               47%

                  MIG




                  HIG


             0               2       4             6            8            10        12      14
                                                        TIME



                        CATEGORY          RANGE                DESIRED            Percentage      MIN.                     Percentage
                                                                                   satisfied   ACCEPTABLE                   satisfied
                  HIG              4 - 9 MIN
                  MIG              4 – 10 MIN
                                                                                                    10 MIN
                                                                4 MIN               86%                                      72%
                  LIG              8 – 10 MIN


PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
CATEGORY          RANGE          DESIRED       Percentage satisfied      MIN.      Percentage satisfied
                                                                                 ACCEPTAB
                                                                                    LE
    HIG               4 - 9 MIN
    MIG               4 – 10 MIN            4 MIN               72%              10.5 MIN           73%
    LIG               8 – 10 MIN

      CATEGORY              RANGE          DESIRED      Percentage satisfied       MIN.      Percentage satisfied
                                                                                ACCEPTABLE
   MALE               7 – 9 MIN
                                            5 MIN               84%               9 MIN              80%
   FEMALE             5 – 8 MIN



      CATEGORY              RANGE          DESIRED      Percentage satisfied      MIN.       Percentage satisfied
                                                                                ACCEPTAB
                                                                                   LE
   AGE GROUP 1        NA
   AGE GROUP 2        5 – 9 MIN
                                            5 MIN              86%               7 MIN              72%
   AGE GROUP 3        5 – 7 MIN
   AGE GROUP 4        5 – 6 MIN




PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
QOS FOR WALKING TIME FROM BUS STOP
                      AGE GROUP 4
                                                                                                                     CATEGORY         RANGE      Desired   Min.Accep
                                                                                                                                                             table
AGE CATEGORY




                         AGE GROUP 3
                                                                                                                    AGE GROUP 1     NA
                                                                                                                    AGE GROUP 2     5 – 8 MIN
                                                                                                                                                  5 MIN       7 MIN
                                                                                                                    AGE GROUP 3     4 – 7 MIN

                         AGE GROUP 2                                                                                AGE GROUP 4     NA


                                 AGE GROUP 1

               1                        2       3         4       5       6          7       8       9    10   11


                                                        QoS FOR WALKING TIME FROM BUS STOP

                                  LIG                                                                               CATEGORY        RANGE       Desired    Min.Accept
                                                                                                                                                              able
               INCOME CATEGORY




                                                                                                                    HIG

                                  MIG                                                                               MIG           4 – 7 MIN     4 MIN        7 MIN
                                                                                                                    LIG           5 – 7 MIN


                                  HIG

                            2               3       4         5       6          7       8       9       10    11
                                                                          TIME


               PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
CATEGORY     RANGE      Desired   Min.Accept
                                 QoS FOR WALKING DISTANCE FROM BUS STOP                                                able

                      MALE                                                        AGE        NA
GENDER CATEGORY




                                                                                  GROUP 1
                                                                                  AGE        5 – 8 MIN
                                                                                  GROUP 2
                      FEMALE
                                                                                                          5 MIN       7 MIN
                                                                                  AGE        4 – 7 MIN
                                                                                  GROUP 3
                                                                                  AGE        NA
                                                                                  GROUP 4

                  2          3    4         5     6       7     8       9    10   CATEGORY        RANGE   Desired   Min.Accepta
                                                                                                                        ble
                                                                                  HIG
                      CATEGORY          RANGE         Desired   Min.Accept        MIG        4 – 7 MIN
                                                                   able
                                                                                                           4 MIN      7 MIN

                      MALE            7 – 9 MIN                                   LIG        5 – 7 MIN
                                                      6 MIN         9 MIN
                      FEMALE          6 – 9 MIN                                   CATEGORY     RANGE      Desired   Min.Accept
                                                                                                                       able
                                                                                  MALE       7 – 9 MIN

                                                                                                          6 MIN       9 MIN
                                                                                  FEMALE     6 – 9 MIN




          PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
WAITING TIME AT PARATRASIT STOP
                         AGE GROUP 4                                                              CATEGORY           RANGE        Desired    Min.Acc
                                                                                                                                             eptable
                                                                                             AGE GROUP 1           4-
      AGE CATEGORY




                         AGE GROUP 3
                                                                                             AGE GROUP 2           5.5 – 7 MIN
                                                                                                                                   4 MIN       8 MIN
                         AGE GROUP 2                                                         AGE GROUP 3           4 – 8 MIN

                                                                                             AGE GROUP 4           NA

                         AGE GROUP 1

                     1         2       3        4       5     6        7     8    9   10    11


                                               WAITING TIME AT PARATRANSIT STOP


                  MALE
GENDER CATEGORY




                                                                                                      CATEGOR      RANGE         Desired    Min.Accep
                                                                                                         Y                                    table
                                                                                                  MALE          4 – 7.5 MIN
                                                                                                                                 5 MIN      7.5 MIN
                                                                                                  FEMALE        5.5 – 9 MIN

                     FEMALE




                     2         3           4        5       6 TIME 7        8     9    10        11

PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
CATEGORY          RANGE         Desired    Min.Accep
                              QOS FOR WAITING TIME AT PARATRANSIT STOP
                                                                                                                                  table

                    LIG                                                         AGE GROUP 1          4-

                                                                                AGE GROUP 2          5.5 – 7 MIN
                                                                                                                      4 MIN       8 MIN
INCOME CATEGORY




                                                                                AGE GROUP 3          4 – 8 MIN

                                                                                AGE GROUP 4          NA
                    MIG

                                                                                    CATEGOR        RANGE         Desired   Min.Accep
                                                                                       Y                                     table
                                                                                MALE          4 – 7.5 MIN
                    HIG
                                                                                                                 5 MIN        7.5 MIN
                                                                                FEMALE        5.5 – 9 MIN
             0            2            4           6          8           10   12
                                                 TIME




                  CATEGORY          RANGE       Desired      Min.Accept             CATEGOR     RANGE            Desired      Min.Accept
                                                                able                   Y                                         able
                  HIG          3-                                               HIG           3-

                  MIG          5 – 9 MIN         4 MIN         9 MIN            MIG           5 – 9 MIN          4 MIN          9 MIN
                  LIG          4 – 9 MIN                                        LIG           4 – 9 MIN




PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
QOS FOR TICKETING TIME
                                                                                         CATEGORY        RANGE
         AGE GROUP 4
                                                                                         AGE GROUP   4 – 8 MIN
                                                                                         1
 AGE CATEGORY




         AGE GROUP 3                                                                     AGE GROUP   3 – 8 MIN
                                                                                         2
                                                                                                                    3 MIN   8 MIN
                                                                                         AGE GROUP   4 – 8 MIN
         AGE GROUP 2                                                                     3
                                                                                         AGE GROUP   4 - 8 MIN
                                                                                         4

         AGE GROUP 1
           1        3       5           7              9        11        13        15

                                              TIME

                                                                                          CATEGOR      RANGE
                                QOS FOR TICKETING TIME
                                                                                             Y
                                                                                          MALE       8 – 9.5 MIN
MALE
                                                                                                                   5 MIN    9.5 MIN
                                                                                          FEMALE     5 – 9 MIN
 GENDER




FEMALE




                1   3   5           7              9       11        13        15
                                            TIME


PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
QOS FOR TICKETING TIME
                                                                   CATEGORY       RANGE       Desired    Min.Accept
                                                                                                            able
                LIG                                                HIG         4 – 6 MIN

                                                                   MIG         4 – 9 MIN      4 MIN        9 MIN
INCOME




                MIG
                                                                   LIG         4 – 9 MIN




                HIG

      1                3   5           7            9    11   13
                                           TIME


                                QOS FOR TICKETING TIME
                                                                   CATEGORY       RANGE        Desired    Min.Accepta
                                                                                                              ble
             EXPRESS                                               EXPRESS      5.5 – 8 MIN
                                                                                               4 MIN        8 MIN
                                                                   LOCAL        4 – 8 MIN
TRIP TYPE




             LOCAL




         1             3   5           7            9    11   13         15

                                             TIME

PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
CATEGORY                         RANGE                    Desired                 Min.Acceptable
  AGE GROUP 1                 4 – 8 MIN
  AGE GROUP 2                 3 – 8 MIN
                                                                      3 MIN                      8 MIN
  AGE GROUP 3                 4 – 8 MIN
  AGE GROUP 4                 4 - 8 MIN

           CATEGORY                         RANGE                    Desired                 Min.Acceptable
  HIG                         4 – 6 MIN
  MIG                         4 – 9 MIN                               4 MIN                      9 MIN
  LIG                         4 – 9 MIN


           CATEGORY                         RANGE                    Desired                 Min.Acceptable
  EXPRESS                     5.5 – 8 MIN
                                                                      4 MIN                      8 MIN
  LOCAL                       4 – 8 MIN


           CATEGORY                         RANGE                    Desired                 Min.Acceptable
  MALE                        8 – 9.5 MIN
                                                                      5 MIN                     9.5 MIN
  FEMALE                      5 – 9 MIN




PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
WALKING DISTANCE FROM PARATRANSIT STOP
                                                                                                  CATEGORY          RANGE     Desired    Min.Acc
                       AGE GR 4                                                                                                          eptable
                                                                                                AGE GROUP 1    NA
    AGE CATEGORY




                       AGE GR 3
                                                                                                AGE GROUP 2    5 – 7 MIN
                                                                                                                              5 MIN      7 MIN
                                                                                                AGE GROUP 3    5.5 – 7 MIN
                       AGE GR 2
                                                                                                AGE GROUP 4    5 – 7 MIN

                       AGE GR 1

                   1                 3             5                7         9       11
                                                           TIME



                                         WALKING TIME FROM PARATRANSIT STOP                      CATEGORY        RANGE       Desired    Min.Acce
                                                                                                                                         ptable
                                                                                                MALE          8 – 9.5 MIN
                   MALE                                                                                                      5 MIN      9.5 MIN
                                                                                                FEMALE        5 – 9 MIN
GENDER




                   FEMALE




                   1                 3                 5                7         9        11
                                                             TIME



 PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
CATEGORY           RANGE       Desired    Min.Ac
                    WALKING TIME FROM PARATRANSIT STOP                                                            ceptabl
                                                                                                                     e
LIG
                                                                      AGE GROUP 1     NA

                                                                      AGE GROUP 2     5 – 8 MIN
                                                                                                        5 MIN     8 MIN
                                                                      AGE GROUP 3     5 – 8 MIN
MIG                                                                   AGE GROUP 4     NA

                                                                       CATEGORY      RANGE         Desired   Min.Accept
                                                                                                                able
HIG
                                                                      HIG
                                                                      MIG          4 – 7 MIN       4 MIN         8 MIN
2       3       4         5        6     7       8         9     10    LIG
                                                                      11           5 – 8 MIN




      CATEGORY            RANGE

      HIG

      MIG              4 – 7 MIN        4 MIN            8 MIN
      LIG              5 – 8 MIN




PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
WALKING TIME FROM TICKET COUNTER TO PLATFORM
                                                                                        CATEGORY        RANGE        Desired     Min.Acc
AGE GROUP 4                                                                                                                      eptable
                                                                                   AGE GROUP 1       3 – 5 MIN
AGE GROUP 3
                                                                                   AGE GROUP 2       4 – 7.5 MIN
                                                                                                                      4 MIN      7.5 MIN
AGE GROUP 2                                                                        AGE GROUP 3       5 – 7.5MIN
                                                                                   AGE GROUP 4       5.5 -

AGE GROUP 1



    1          2       3     4      5      6     7       8       9       10        11




                   WALKING TIME FROM TICKET COUNTER TO PLATFORM
    MALE


                                                                                        CATEGOR      RANGE         Desired     Min.Accept
                                                                                           Y                                      able
                                                                                    MALE           4 – 7 MIN
FEMALE                                                                                                             3 MIN         5 MIN
                                                                                    FEMALE         3 – 5 MIN




1          2       3         4      5      6         7       8       9        10        11


PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
WALKING TIME FROM TICKET COUNTER TO PLATFORM
                                                                         CATEGORY          RANGE        Desired    Min.Acc
    LIG                                                                                                            eptable
                                                                        AGE GROUP 1     3 – 5 MIN
                                                                        AGE GROUP 2     4 – 7.5 MIN
                                                                                                         4 MIN      7.5 MIN
                                                                        AGE GROUP 3     5 – 7.5MIN
    MIG
                                                                        AGE GROUP 4     5.5 -


                                                                        CATEGORY        RANGE         Desired     Min.Accept
                                                                                                                     able
    HIG
                                                                        MALE        4 – 7 MIN
1         2        3         4     5       6     7       8     9   10
                                                                                                      3 MIN         5 MIN
                                                                        FEMALE      3 – 5 MIN


                                                                        CATEGORY        RANGE         Desired     Min.Accept
                                                                                                                     able

    CATEGORY              RANGE        Desired   Min.Accepta            HIG
                                                     ble
                                                                        MIG           4 – 7 MIN        4 MIN        8 MIN
    HIG
                                                                        LIG           5 – 8 MIN
    MIG                4 – 7 MIN       4 MIN         8 MIN
    LIG                5 – 8 MIN




PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
CATEGORY            RANGE         Desired    Min.Ac
                              WAITING TIME AT PLATFORM
                                                                                                                           ceptabl
        AGE GROUP 4
                                                                                                                              e
                                                                             AGE GROUP 1       9 – 13 MIN
        AGE GROUP 3                                                          AGE GROUP 2       8 – 12 MIN                   12
                                                                                                                8 MIN
                                                                             AGE GROUP 3       8 – 12MIN                    MIN
        AGE GROUP 2                                                          AGE GROUP 4       10 – 12 MIN




        AGE GROUP 1


    4            6        8        10        12        14          16   18   20



                                   WAITING TIME AT PLATFORM
                                                                              CATEGOR        RANGE          Desired     Min.Accep
        MALE
                                                                                 Y                                        table
                                                                             MALE          10 – 13 MIN

                                                                                                            10 MIN        14 MIN
                                                                             FEMALE        11 – 14 MIN


        FEMALE




0                     5       10              15              20        25        30


    PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
CATEGORY           RANGE        Desired    Min.Ac
                                                                                                                              ceptabl
                         WAITNG TIME AT PLATFORM                                                                                 e
     LIG
                                                                                 AGE GROUP 1       9 – 13 MIN
                                                                                 AGE GROUP 2       8 – 12 MIN
                                                                                                                   8 MIN      12 MIN
                                                                                 AGE GROUP 3       8 – 12MIN
                                                                                 AGE GROUP 4       10 – 12 MIN

     MIG
                                                                                  CATEGOR          RANGE         Desire    Min.Accept
                                                                                     Y                             d          able

                                                                                 MALE          10 – 13 MIN

     HIG                                                                                                         10
                                                                                                                             14 MIN
                                                                                 FEMALE        11 – 14 MIN       MIN
2           4     6        8        10     12      14        16        18   20




                                                                                  CATEGORY          RANGE        Desired     Min.Acce
                                                                                                                              ptable
       CATEGORY          RANGE           Desired        Min.Acceptab
                                                                                 HIG            8 – 13 MIN
                                                             le
      HIG             8 – 13 MIN                                                 MIG            11 – 13 MIN      8 MIN       13 MIN
      MIG             11 – 13 MIN        8 MIN            13 MIN                 LIG            10 – 13MIN

      LIG             10 – 13MIN



    PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
TRANSPORT FACILITIES                                       URBAN REALM
       1    Queuing space in auto stop                           12    Distance of paratransit stop from building
            Frequency of auto service= waiting time for
       2    auto service                                         13    Parking areas

            Performance of auto stand( weather                   14    Entrance accessibility
       3    protection, safety, toilet facilities )              15    Location of entrances

            Distance of paratransit stop from building           16    Walking distance (mode1 to ticket counter)
       4
                                                                 17    Pedestrian pathways ( adequacy, safety )
            Queuing space in taxi stand
       5
                                                                 18    Subway
            Frequency of taxi service = waiting time for
       6    taxi service                                         19    Weather protection in interchange area

            Adequacy of queuing space in taxi stand              20    Disabled access
       7
            Performance of taxi stand( weather protection,       21    Surveillance
       8    safety, toilet facilities )
                                                                 22    toilet facilities
            Bus stop performance(queuing space, toilet
       9    facilities etc)
                                                                 23    Cleanliness
                                                                 24    Safety
            Frequency of bus service
      10                                                         25    Organised retail in the interchange
            Feeder service
      11
PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
BUILT FACILITY DESIGN
    26     Level changes

    27     Queuing time in ticket counter

    28     Queuing space for ticket counter

    29     No of ticket counters

    30     Location of ticket counters

    31     Real time information

    32     Information system placement

    33     Walking distance (from ticket counter to platform)

    34     Waiting area in platform

    35     Railway Station performance

    36     Safety & surveillance @ platform

    37     Alignment of platform and the entrance location

    38     Goods loading/unloading area on platform


PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
LIG
                               HIG
                                                                                                                  MIG                                                          5
                 5                                                                           5

                                                                                                                                                                               4                           3, 4       4, 4       5, 4
                 4                                4, 4       5, 4                            4                                          4, 4




                                                                                                                                                                SATISFACTION
                                                                              SATISFACTION
SATISFACTION




                                                                                                                                                                               3                           3, 3       4, 3       5, 3
                 3              2, 3       3, 3   4, 3       5, 3                            3                    2, 3       3, 3       4, 3       5, 3

                                                                                                                                                                               2                           3, 2       4, 2       5, 2
                 2                         3, 2              5, 2                            2                               3, 2       4, 2       5, 2

                                                                                                                                                                               1                                                 5, 1
                                                                                             1
                 1                                           5, 1
                                                                                                                                                                               0
                                                                                             0
                 0                                                                                                                                                                 0   1     2         3          4          5
                                                                                                 0   1        2          3          4          5
        -1               1             3                 5
                                                                                                                                                                                           IMPORTANCE                              LIG
                                                                                                             IMPORTANCE                               MIG
                         IMPORTANCE                                 HIG




                               INCOME
                              CATEGOR               1                     2            3                 4               5                     6            7                      8        9                 10                    11
                                  Y
               IMPORTANCE        HIG                4                     5             5                5               5                     2            3                      3        5                     5                     5
               SATISFACTION      HIG                3                     4             3                3               2                     3            2                      2        2                     1                     3

               IMPORTANCE       MIG                 4                     4             5                5               5                     2            3                      3        5                     5                     5
               SATISFACTION     MIG                 3                     4             3                3               2                     3            2                      2        2                     2                     2

               IMPORTANCE       LIG                 4                     5             5                5               5                     3            3                      3        5                     5                     5
               SATISFACTION     LIG                 4                     4             3                3               3                     4            2                      2        3                     1                     2


                                                   1                      2          3               4                   5                 6                7                      8        9                 10                    11




PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
INCOME
                  CATEGOR    1     2       3       4       5       6       7        8        9     10    11
                      Y
   IMPORTANCE        HIG     4     5       5       5       5       2        3       3        5     5     5
   SATISFACTION      HIG     3     4       3       3       2       3        2       2        2     1     3

   IMPORTANCE       MIG      4     4       5       5       5       2        3       3        5     5     5
   SATISFACTION     MIG      3     4       3       3       2       3        2       2        2     2     2

   IMPORTANCE       LIG      4     5       5       5       5       3        3       3        5     5     5
   SATISFACTION     LIG      4     4       3       3       3       4        2       2        3     1     2



         AGE GROUP

   IMPORTANCE        1      4.8   4.2     3.6      4       3       3        3       4        5      5     4
   SATISFACTION      1                                                                       2      2     1

   IMPORTANCE        2      5     5       5        5       2       3        3       5        5      5     3
   SATISFACTION      2      4     4       3        3       2       3        2       2        2      1     1

   IMPORTANCE        3      5     5       5        5       1       3        3       5        5      5     3
   SATISFACTION      3      3     4       3        3       3       4        2       2        3      2     1

   IMPORTANCE        4      3     3       3        4       2       3        3       5        5      5     4
   SATISFACTION      4      2     3       2        2       2       3        2       3        3      1     1


            GENDER

   IMPORTANCE       F       4.0   5.0     5.0     5.0      1.0     3.0     3.0     5.0       5.0   5.0   4.0
   SATISFACTION     F       4.0   4.0     3.0     3.0      2.0     4.0     2.0     3.0       2.0   1.0   1.0

   IMPORTANCE       M       5.0   5.0     5.0     5.0      2.0     3.0     3.0     5.0       5.0   5.0   4.0
   SATISFACTION     M       4.0   4.0     3.0     3.0      2.0     3.0     2.0     2.0       3.0   2.0   3.0




PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
INCOME GROUP1           2          3          4        5      6        7         8           9        10         11




             1          2          3          4           5   6        7          8          9        10         11

AGE GROUP



             1          2          3          4           5   6        7          8          9        10         11




GENDER
                                                                       Frequency of taxi service = waiting time for
             TRANSPORT FACILITIES                                 6    taxi service
         1   Queuing space in auto stop
                                                                       Adequacy of queuing space in taxi stand
             Frequency of auto service= waiting time for          7
         2   auto service                                              Performance of taxi stand( weather protection,
                                                                  8    safety, toilet facilities )
             Performance of auto stand( weather
         3   protection, safety, toilet facilities )                   Bus stop performance(queuing space, toilet
                                                                  9    facilities etc)
             Distance of paratransit stop from building
         4
                                                                       Frequency of bus service
             Queuing space in taxi stand                          10
         5
                                                                       Feeder service
                                                                  11

PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
12      13     14     15     16     17      18     19     20     21        22   23   24   25
INCOME GROUP
                   5      4      4      4       4      5      5      5      5      5         5    5    5    4
                   3      3      3      3       3      2      2      2      2      3         2    2    3    3

                   5      4      4      4       4      5      5      5      5      5         5    5    5    4
                   3      4      3      3       3      2      2      2      2      3         2    2    3    3

                   5      4      4      4       4      5      5      5      5      5         5    5    5    4
                   3      4      3      3       3      2      3      3      2      3         2    2    3    3



AGE GROUP         12      13     14     15     16     17     18      19     20     21        22   23   24   25

                                        4              4      4      5      5      5         5    5    5    5
                                 3      3      3       2      2      3      2      3         2    2    3    2

                   5      4      4      4      4       5      5      5      5      5         5    5    5    4
                   3      4      3      3      3       2      2      2      2      3         2    2    3    3

                   5      4      4      4      5       5      5      5      5      5         5    5    5    4
                   3      4      3      3      3       2      3      2      2      3         2    2    3    3

                          4      5      5      5       5      5      5      5      5         5    5    5    4
                          4      3      3      3       2      2      3      2      3         2    3    3    3

GENDER
                  12      13     14     15     16     17     18      19     20     21        22   23   24   25


                   5      4      4      4      5       5      5      5      5      5         5    5    5    4
                   3      4      3      3      3       2      2      2      2      3         2    2    3    3

                   5      4      4      4      4       5      5      5      5      5         5    5    5    4
                   3      4      3      3      3       2      3      3      2      3         2    2    3    3




PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
12       13    14     15     16       17   18        19         20       21   22    23      24   25

 INCOME
 GROUP
                    12       13    14     15     16       17   18        19         20       21   22    23      24   25

AGE GROUP

                    12       13   14      15     16       17   18        19         20       21   22     23     24   25

 GENDER


             URBAN REALM

       12    Distance of paratransit stop from building
                                                                    20        Disabled access
       13    Parking areas                                          21        Surveillance

       14    Entrance accessibility                                 22        toilet facilities
       15    Location of entrances
                                                                    23        Cleanliness
       16    Walking distance (mode1 to ticket counter)
                                                                    24        Safety
       17    Pedestrian pathways ( adequacy, safety )
                                                                    25        Organised retail in the interchange
       18    Subway

       19    Weather protection in interchange area



PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
26      27      28     29      30     31      32     33      34      35   36   37   38

                        4       5    5     5       4       5      5       4      5       5    5    3    5
                        3       2    3     3       4       3      3       3      2       3    3    3    3
INCOME GROUP
                        4       5    4     5       4       5      5       4      5       5    5    3    5
                        3       2    2     3       4       3      3       3      3       3    3    3    2

                        4       5    4     5       4       5      5       4      5       4    5    3    5
                        3       2    2     3       3       3      3       3      3       3    3    3    2



                    26      27      28     29      30     31      32     33      34      35   36   37   38

AGE GROUP               3                          4       4      4       4      4       4    5    4    4
                        3       2                  3       3      3       3      2       3    3    3    3

                        4       5    4     5       4       5      5       5      5       5    5    3    5
                        3       2    2     3       4       3      3       3      3       3    3    3    2

                        4       5    4     4       4       5      5       4      5       5    5    3    5
                        3       2    2     3       4       3      3       3      3       3    3    3    2

                        3       5    5     5       4       5      5       4      4       5    5    3    5
                        3       2    2     4       4       2      3       3      3       3    3    3    3




                   26       27      28    29      30      31     32      33      34     35    36   37   38
GENDER
                    3       5       4      5      4       5       5      4       5       4    5    3    4
                    3       2       3      2      4       2       3      3       3       3    3    3    2

                    4       5       5      5      4       5       5      4       5       5    5    3    5
                    3       2       2      3      3       3       3      3       3       3    3    3    3




PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
26         27    28     29       30     31        32       33       34      35     36      37      38

INCOME GROUP


AGE GROUP             26         27    28     29      30      31        32       33      34      35     36      37      38




GENDER                26         27    28     29       30     31        32       33       34      35     36      37      38




         BUILT FACILITY DESIGN
 26      Level changes                                             34        Waiting area in platform

 27      Queuing time in ticket counter                            35        Railway Station performance

 28      Queuing space for ticket counter                          36        Safety & surveillance @ platform

 29      No of ticket counters                                     37        Alignment of platform and the entrance location

 30      Location of ticket counters                               38        Goods loading/unloading area on platform
 31      Real time information

 32      Information system placement

 33      Walking distance (from ticket counter to platform)

PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
Analysis For adequacy of
                                                                 Transport facilities    OD - SURVEY



 ANALYSING ADEQUACY OF               DESIGNING THE                                  MAJOR DIRECTIONS
  TRANSPORT FACILITIES                INTERCHANGE

                                                                                         MAJOR ROUTE

AT PRESENT        POST METRO
                                                                                     PASSENGER SPLIT IN
                                                                                      DIFFERENT ROUTE
      DEMAND FOR
       ADDITIONAL
     VEHICLES ( if any)                                                                  MODAL SPLIT IN
                                                                                          EACH ROUTE
                                    TO KNOW THE NO OF
                                     VEHICLES IN THE
                                       INTERCHANGE                                    BUS PASSENGER IN
                                                                                         EACH ROUTE

                                                                 TRANSPORT SURVEY
                                                                        FOR
                                                                    BUS COUNT IN
                                                                   EACH DIRECTION



                                                                                LOADING PER HOUR PER ROUTE


PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
OTHER, 4
                                                                           TAXI, 2%      %




                                                                    PEDESTR
                                                                    IAN, 31%




                                                                        AUTO, 0%                  BUS, 63%
                              TO NORTH VIA SHYAMBAZAR


                              TO SOUTH VIA ESPLANADE
                                                                 MODAL SPLIT                     PASSENGER VOL/ BUS/ SEAT
                                                                IN EACH ROUTE                           = LOADING
                              TO SOUTH VIA EXIDE
OD - SURVEY
                              TO HOWRAH VIA BBD BAG
                                                          TO                                                BUS FREQ IN
                  MAJOR                                 OTHER, 5
                DIRECTIONS                                                                               DIFFERENT ROUTES
                                                           TO
                                                         SOUTH                TO
                                                           via            HOWRAH
                              PASSENGER SPLIT IN        EXIDE, 13          via BBD
                                                                           BAG, 29               BUS PASSENGERS IN
                             DIFFERENT DIRECTIONS
                                                                                                  DIFFERENT ROUTES
                                                    TO SOUTH
                                                       via
                                                    EXIDE, 20

                                                                     TO NORTH
                                                                        via
                                                                     SHYAMBAZ
                                                                       AR, 33


PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
12221                  5372                         1763                       1605                       7120




             12221                      15397                    12466                       11369                   7151
 HOWRAH                MAHAKARAN                   CENTRAL                       BOWBAZAR              SEALDAH
 STATION



                           2196                        4694                        2702                      11332




  STATION                            PHPD BOARDING              STATION                      PHPD BOARDING

 HOWRAH STN – MAHAKARAN                    12221               HOWRAH STN                            12221

 MAHAKARAN – CENTRAL                       5372                MAHAKARAN                             5372

 CENTRAL - BOWBAZAR                        1762                CENTRAL                               1762

 BOWBAZAR – SEALDAH STN                    1605                BOWBAZAR                              1605

 SEALDAH - PHOOLBAGAN                      7120                SEALDAH                               7120


PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
TRAINS

                              ARRIVING VOL                      DEPARTING VOL



                          PEOPLE DEPARTING VIA                PEOPLE ARRIVING VIA
                            DIFFERENT MODES                    DIFFERENT MODES


                        BUS     AUTO     OTHER                 BUS     AUTO     OTHER


                                                                    PEOPLE NOW
                    PEOPLE SWITCHING
                                                                ARRIVING VIA METRO
                        TO METRO
                                                                 ( EARLIER VIA BUS)

                                         20% = 20% OF BUS RIDERS



                       METRO BOARDING                          METRO ALIGHTING



                        SWITCH OVER                                  TO SUBURN TRAIN         TO OTHER
   FROM OTHER                                                      = 20% OF BUS RIDERS        MODES
     MODES               BUS RIDERS


                                       VALUE AVAILABLEFOR phpd

PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
LOADING ALONG SEALDAH - SHYAMBAZAR ( arrival vol)

2.50                                                                                                                5
            2.26
            2.12
2.00
            1.79                                                                                                        4
                               1.65
1.50                           1.54                                                                 LOADING 4 PM
                               1.31                                                                 LOADING 7 PM
            1.25
                                                    1.05                                            LOADING 12 PM
1.00                                                0.98
            0.91               0.91                                                                 LOADING 10 AM
                                                    0.83
                               0.67                                   0.66                          LOADING 8 AM
                                                    0.58              0.61
0.50                                                0.42
                                                                      0.52
                                                                      0.36
                                                                                                                        3
                                                                      0.26
                                                                                      0
0.00                                                                                  0
        0           1                  2                   3                 4            5


                                      POST METRO LOADING ( arriving vol )
 2.50               2.36
             2.32                                                                                                   2
 2.00        1.96
                                       1.72
                                1.69
 1.50        1.51                                                                                   LOADING 8 AM
                                1.43
             1.30                                            1.13                                   LOADING 10 AM
                                1.10                  1.11                                          LOADING 12 PM
 1.00
                                0.95                  0.94
                                                                                                    LOADING 4 PM
                                                                                                                    1
                                                                               0.68
                                                      0.72              0.67                        LOADING 7 PM
                                                      0.62
                                                                        0.57
 0.50
                                                                        0.44
                                                                        0.38                 0.24
                                                                                      0.23
                                                                                      0.20
                                                                                      0.15
                                                                                      0.13
 0.00
        0            1                     2                   3                 4            5



PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
LOADING ALONG SHYAMBAZAR SEALDAH - ( departing vol)
                                                                                                                          LOADING ALONG SEALDAH - SHYAMBAZAR ( arrival vol)
2.50
                                                                                                            2.5
                                                                                                                          2.26
            2.08            2.08
2.00                                                                                                                      2.12
            1.90            1.90                                                                             2
                                                                                                                          1.79
1.50                                                                                                                                        1.65
                                              1.41                                          LOADING 8 AM                                    1.54                                                        LOADING 4 PM
                                                                                                            1.5
                                              1.29                                          LOADING 10 AM
                                                          1.16                                                                              1.31                                                        LOADING 7 PM
                                                          1.06                                                            1.25
1.00                                                                                        LOADING 12 PM                                                                                               #REF!
                                                                                                             1                                              1.05
                                                                                                                                                            0.98
                                                                                            LOADING 4 PM                  0.91              0.91                                                        LOADING 10 AM
                                                                                                                                                            0.83
0.50                                                                                        LOADING 7 PM                                    0.67                          0.66                          LOADING 8 AM
                                                                                                                                                            0.58          0.61
                                                                          0.33                              0.5                                                           0.52
                                                                          0.30                                                                              0.42
                                                                                                                                                                          0.36
                                                                                                                                                                          0.26
0.00
       0    1       1      2        2     3          3    4        4      5           5                      0
                                                                                                                  0              1                 2               3              4                 5

                          POST METRO LOADING ( departing vol )                                                                           POST METRO LOADING ( arriving vol )

3.00
                                                                                                              2.50                 2.36
            2.672.50
2.50        2.48                                                                                                            2.32

                   1.91                                                                                       2.00          1.96
2.00                               1.83                                                                                                              1.72
                            1.95                                                            LOADING 8 AM
            1.86            1.81
                                                                                                                                              1.69                                                      LOADING 8 AM
                                   1.39                                                     LOADING 12 PM
1.50                                                                                                          1.50          1.51                                                                        LOADING 10 AM
                            1.36                   1.20                                     LOADING 4 PM                                      1.43
                                              1.28                                                                          1.30                                   1.13
                                              1.190.92                                                                                                                                                  LOADING 12 PM
1.00                                                                                        LOADING 7 PM                                      1.10          1.11
                                              0.89                 0.73                                       1.00                                                                                      LOADING 4 PM
                                                              0.780.55                      LOADING 10 AM                                     0.95          0.94
                                                              0.72                                                                                                               0.68                   LOADING 7 PM
0.50                                                          0.54                                                                                          0.72
                                                                                     0.25
                                                                                     0.19                                                                   0.62          0.67
                                                                              0.27                                                                                        0.57
                                                                              0.25
                                                                              0.19                            0.50
                                                                                                                                                                          0.44                 0.24
                                                                                                                                                                          0.38
0.00
                                                                                                                                                                                        0.23
                                                                                                                                                                                        0.20
       0            1               2                3              4                 5                                                                                                 0.15
                                                                                                                                                                                        0.13
                                                                                                              0.00
                                                                                                                      0              1                 2            3             4             5


PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
LOADING ALONG ESPLADADE SEALDAH - ROUTE (DEPARTING VOL)
                                                                                                                          LOADING ALONG SEALDAH - ESPLADADE ROUTE (ARRIVAL VOL)
 2.50
                                                                                                             3.00
                   2.17
 2.00                                                                                                                     2.63
                                                                                                             2.50
                                  1.72
                   1.60                                                                                                                        2.08
 1.50                                                                                      LOADING 8 AM
                                                                                                             2.00
                                                                                                                                                                                                               LOADING 8 AM
                                  1.27           1.26                                      LOADING 10 AM                  1.60                                 1.53                                            LOADING 10 AM
                                                                                                             1.50
 1.00                                                                                      LOADING 12 PM                                                                                                       LOADING 12 PM
                                                 0.93          0.96                                                                            1.26
                                                                                           LOADING 4 PM                                                                             1.16
                                                                                                             1.00                                                                                              LOADING 4 PM
                                                               0.70                                                                                            0.93
                                                                                           LOADING 7 PM                                                                                                        LOADING 7 PM
 0.50                                                                                                                                                                               0.70
                                                                                                             0.50

 0.00                                                                        0.02                                                                                                                   0.03
                                                                                                             0.00                                                                                   0.02
           0                 1               2            3            4             5                              0               1                 2               3                    4               5



           POST METRO LOADING -Esplanade - Sealdah route ( departing vol)                                               POST METRO LOADING - Sealdah - Esplanade route ( arrival vol)
4.00                                                                                                         4.00
                                                                                                                        3.64
3.50             3.44                                                                                        3.50
                 3.23                                                                                                   3.33
3.00             3.00                                                                                        3.00       2.95            2.87
                                 2.72
2.50                             2.56                                                        LOADING 8 AM                      2.81     2.63                                                                   LOADING 8 AM
                                                                                                             2.50
                 2.35            2.37                                                                                                   2.33
                                                                                             LOADING 10 AM                                                                                                     LOADING 10 AM
2.00                    2.25                     1.99                                                                                                 2.11
                                 1.86            1.88                                                        2.00                              2.22   1.93
                                                 1.74                                        LOADING 12 PM                     2.16                                                                            LOADING 12 PM
                                                                                                                                                      1.71
1.50                                    1.78                   1.51                                          1.50                                                     1.60
                                                 1.36          1.42                          LOADING 4 PM                                      1.71                   1.47                                     LOADING 4 PM
                                                               1.32                                                                                          1.63     1.30
1.00                                                    1.31   1.04                          LOADING 7 PM                                                                                                      LOADING 7 PM
                                                                                                             1.00                                            1.25            1.24
                                                                      0.99
0.50                                                                                                                                                                         0.95
                                                                                                             0.50
0.00                                                                         0.03
                                                                             0.02
                                                                                                             0.00                                                                     0.04
                                                                                                                                                                                      0.03
       0                 1               2               3             4            0.02
                                                                                      5
                                                                                                                    0           1               2             3               4              0.03
                                                                                                                                                                                             0.02
                                                                                                                                                                                              5            6


PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
LOADING ALONG SEALDAH - EXIDE ROUTE (departing vol)                                                           LOADING ALONG SEALDAH - EXIDE ROUTE (arrival vol)
2.50                                                                                                      2.50

           2.07
2.00                                                                                                      2.00        2.01
                                                                                                                      1.85
           1.68
1.50                                                                                    LOADING 8 AM                                                                                               LOADING 8 AM
                                                                                                          1.50
                            1.32                                                        LOADING 10 AM                                                                                              LOADING 10 AM
                                                                                                                                     1.28
                                                                                        LOADING 12 PM                                1.18
                            1.07                                                                                                                                                                   LOADING 12 PM
1.00                                                                                                      1.00
                                                                                        LOADING 4 PM                                                                                               LOADING 4 PM
                                          0.75
                                                                                        LOADING 7 PM                                               0.73                                            LOADING 7 PM
                                          0.61                                                                                                     0.67
0.50                                                                                                      0.50
                                                         0.38
                                                         0.30                                                                                                    0.37
                                                                                                                                                                 0.34

0.00                                                                     0.00
                                                                            0                                                                                                  0.1
                                                                                                          0.00
       0           1               2             3              4               5
                                                                                                                  0          1              2             3             4              5       6

                         POST METRO LOADING ( DEPARTING VOL)
                                                                                                                                      POST METRO LOADING ( ARRIVAL VOL)
3.00              2.82
                                                                                                           3.00
           2.72
                                                                                                                        2.68
2.50                                                                                                       2.50
                                                                                                                        2.38

2.00       1.97                    1.79                                                                    2.00         1.99
                                                                                          LOADING 8 AM                                                                                             LOADING 8 AM
                            1.73                                                                                                            1.70
                                                                                          LOADING 10 AM                                                                                            LOADING 10 AM
1.50                                                                                                       1.50                             1.51
                                                                                          LOADING 12 PM                                                                                            LOADING 12 PM
                            1.25                  1.02                                                                                      1.26
                                                                                          LOADING 4 PM                                                                                             LOADING 4 PM
1.00                                       0.99                                                            1.00                                           0.97
                                                                                          LOADING 7 PM                                                    0.86                                     LOADING 7 PM
                                           0.72                   0.51                                                                                    0.72
0.50                                                       0.50                                            0.50                                                             0.49
                                                                                                                                                                            0.43
                                                           0.36                                                                                                             0.36
                                                                                    0
0.00                                                                            0                          0.00                                                                            0
       0           1                2                3              4               5                             0              1                 2              3                4           5



PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
Planning for a Multimodal Transport Interchnage
Planning for a Multimodal Transport Interchnage
Planning for a Multimodal Transport Interchnage
Planning for a Multimodal Transport Interchnage
Planning for a Multimodal Transport Interchnage
Planning for a Multimodal Transport Interchnage
Planning for a Multimodal Transport Interchnage
Planning for a Multimodal Transport Interchnage
Planning for a Multimodal Transport Interchnage
Planning for a Multimodal Transport Interchnage
Planning for a Multimodal Transport Interchnage
Planning for a Multimodal Transport Interchnage

Contenu connexe

Tendances

BRT oriented development in China, opportunities and challenges
BRT oriented development  in China, opportunities and challengesBRT oriented development  in China, opportunities and challenges
BRT oriented development in China, opportunities and challengesBRTCoE
 
Microsoft Power Point Cape Town Station
Microsoft Power Point   Cape Town StationMicrosoft Power Point   Cape Town Station
Microsoft Power Point Cape Town StationMike Perk
 
High speed rail 01
High speed rail 01High speed rail 01
High speed rail 01TedGiras
 
Performance Analysis of Continuous Flow Intersection in Mixed Traffic Condition
Performance Analysis of Continuous Flow Intersection in Mixed Traffic Condition Performance Analysis of Continuous Flow Intersection in Mixed Traffic Condition
Performance Analysis of Continuous Flow Intersection in Mixed Traffic Condition IDES Editor
 
Navi mumbai metro new
Navi mumbai metro newNavi mumbai metro new
Navi mumbai metro newRashid Kaskar
 
Public transport improvement
Public transport improvement Public transport improvement
Public transport improvement ICLEI
 
Simulating Performance Impacts of Bus Priority Measures
Simulating Performance Impacts of Bus Priority Measures Simulating Performance Impacts of Bus Priority Measures
Simulating Performance Impacts of Bus Priority Measures IDES Editor
 
Presentation railways
Presentation railwaysPresentation railways
Presentation railwaysjags_champ
 
BRT Chennai
BRT ChennaiBRT Chennai
BRT Chennaiedsley
 
Planning and Design of Feeder Services and Short Routes - Salvador Herrera
Planning and Design of Feeder Services and Short Routes - Salvador HerreraPlanning and Design of Feeder Services and Short Routes - Salvador Herrera
Planning and Design of Feeder Services and Short Routes - Salvador HerreraWRI Ross Center for Sustainable Cities
 
Nepal east west rail project-feasibility study draft report presentation
Nepal east west rail project-feasibility study draft report presentationNepal east west rail project-feasibility study draft report presentation
Nepal east west rail project-feasibility study draft report presentationBhim Upadhyaya
 
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...BRTCoE
 

Tendances (20)

Hyd metro rail
Hyd metro railHyd metro rail
Hyd metro rail
 
BRT oriented development in China, opportunities and challenges
BRT oriented development  in China, opportunities and challengesBRT oriented development  in China, opportunities and challenges
BRT oriented development in China, opportunities and challenges
 
Microsoft Power Point Cape Town Station
Microsoft Power Point   Cape Town StationMicrosoft Power Point   Cape Town Station
Microsoft Power Point Cape Town Station
 
BRT in China: A brief review
BRT in China: A brief reviewBRT in China: A brief review
BRT in China: A brief review
 
High speed rail 01
High speed rail 01High speed rail 01
High speed rail 01
 
Qatar rail - Geoff Mee presentation
Qatar rail - Geoff Mee presentationQatar rail - Geoff Mee presentation
Qatar rail - Geoff Mee presentation
 
REPORT
REPORTREPORT
REPORT
 
Performance Analysis of Continuous Flow Intersection in Mixed Traffic Condition
Performance Analysis of Continuous Flow Intersection in Mixed Traffic Condition Performance Analysis of Continuous Flow Intersection in Mixed Traffic Condition
Performance Analysis of Continuous Flow Intersection in Mixed Traffic Condition
 
Navi mumbai metro new
Navi mumbai metro newNavi mumbai metro new
Navi mumbai metro new
 
Public transport improvement
Public transport improvement Public transport improvement
Public transport improvement
 
Simulating Performance Impacts of Bus Priority Measures
Simulating Performance Impacts of Bus Priority Measures Simulating Performance Impacts of Bus Priority Measures
Simulating Performance Impacts of Bus Priority Measures
 
Presentation railways
Presentation railwaysPresentation railways
Presentation railways
 
BRT Chennai
BRT ChennaiBRT Chennai
BRT Chennai
 
BRT Workshop - Bus Rapid Transit and Traffic Safety
BRT Workshop - Bus Rapid Transit and Traffic SafetyBRT Workshop - Bus Rapid Transit and Traffic Safety
BRT Workshop - Bus Rapid Transit and Traffic Safety
 
Railway System in Indiapptx
Railway System in IndiapptxRailway System in Indiapptx
Railway System in Indiapptx
 
BRTS
BRTSBRTS
BRTS
 
Planning and Design of Feeder Services and Short Routes - Salvador Herrera
Planning and Design of Feeder Services and Short Routes - Salvador HerreraPlanning and Design of Feeder Services and Short Routes - Salvador Herrera
Planning and Design of Feeder Services and Short Routes - Salvador Herrera
 
Nepal east west rail project-feasibility study draft report presentation
Nepal east west rail project-feasibility study draft report presentationNepal east west rail project-feasibility study draft report presentation
Nepal east west rail project-feasibility study draft report presentation
 
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
 
UK Rail_(c) Arup
UK Rail_(c) ArupUK Rail_(c) Arup
UK Rail_(c) Arup
 

En vedette

HaHagana Train Station-Tel Aviv New CBS Intermodal Interchange: A Sustainable...
HaHagana Train Station-Tel Aviv New CBS Intermodal Interchange: A Sustainable...HaHagana Train Station-Tel Aviv New CBS Intermodal Interchange: A Sustainable...
HaHagana Train Station-Tel Aviv New CBS Intermodal Interchange: A Sustainable...Dan Berkowitz
 
HS2.6 Interchange Stations Exec Report
HS2.6 Interchange Stations Exec ReportHS2.6 Interchange Stations Exec Report
HS2.6 Interchange Stations Exec ReportRobert Keenan AIA, OAA
 
Presentation_Sahil Singh_26.11.15
Presentation_Sahil Singh_26.11.15Presentation_Sahil Singh_26.11.15
Presentation_Sahil Singh_26.11.15Sahil Singh Kapoor
 
"Rail + Property" Joint Developing in China: The Shenzen Case Study - Lulu Xu...
"Rail + Property" Joint Developing in China: The Shenzen Case Study - Lulu Xu..."Rail + Property" Joint Developing in China: The Shenzen Case Study - Lulu Xu...
"Rail + Property" Joint Developing in China: The Shenzen Case Study - Lulu Xu...WRI Ross Center for Sustainable Cities
 
Planning for a Multi-Modal Transportation Hub at Rourkela
Planning for a Multi-Modal Transportation Hub at RourkelaPlanning for a Multi-Modal Transportation Hub at Rourkela
Planning for a Multi-Modal Transportation Hub at RourkelaMaitreyi Yellapragada
 
Multi-modal transportation, dissertation brief
Multi-modal transportation, dissertation brief Multi-modal transportation, dissertation brief
Multi-modal transportation, dissertation brief Piyush KumAr
 
case study of netaji metro station
case study of netaji metro station case study of netaji metro station
case study of netaji metro station Kishmish Sethi
 
Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Aashna Sharma
 

En vedette (9)

HaHagana Train Station-Tel Aviv New CBS Intermodal Interchange: A Sustainable...
HaHagana Train Station-Tel Aviv New CBS Intermodal Interchange: A Sustainable...HaHagana Train Station-Tel Aviv New CBS Intermodal Interchange: A Sustainable...
HaHagana Train Station-Tel Aviv New CBS Intermodal Interchange: A Sustainable...
 
HS2.6 Interchange Stations Exec Report
HS2.6 Interchange Stations Exec ReportHS2.6 Interchange Stations Exec Report
HS2.6 Interchange Stations Exec Report
 
Presentation_Sahil Singh_26.11.15
Presentation_Sahil Singh_26.11.15Presentation_Sahil Singh_26.11.15
Presentation_Sahil Singh_26.11.15
 
"Rail + Property" Joint Developing in China: The Shenzen Case Study - Lulu Xu...
"Rail + Property" Joint Developing in China: The Shenzen Case Study - Lulu Xu..."Rail + Property" Joint Developing in China: The Shenzen Case Study - Lulu Xu...
"Rail + Property" Joint Developing in China: The Shenzen Case Study - Lulu Xu...
 
Planning for a Multi-Modal Transportation Hub at Rourkela
Planning for a Multi-Modal Transportation Hub at RourkelaPlanning for a Multi-Modal Transportation Hub at Rourkela
Planning for a Multi-Modal Transportation Hub at Rourkela
 
Multi-modal transportation, dissertation brief
Multi-modal transportation, dissertation brief Multi-modal transportation, dissertation brief
Multi-modal transportation, dissertation brief
 
case study of netaji metro station
case study of netaji metro station case study of netaji metro station
case study of netaji metro station
 
Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)
 
metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)
 

Similaire à Planning for a Multimodal Transport Interchnage

Trivandrum Monorail Preliminary Study
Trivandrum Monorail Preliminary StudyTrivandrum Monorail Preliminary Study
Trivandrum Monorail Preliminary StudyAjay Prasad
 
Smart Space @ BuroHappold Engineering
Smart Space @ BuroHappold EngineeringSmart Space @ BuroHappold Engineering
Smart Space @ BuroHappold EngineeringShrikant Sharma
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metrosatish choudhari
 
Creating Smart City Public Transit System on Blockchain
Creating Smart City Public Transit System on BlockchainCreating Smart City Public Transit System on Blockchain
Creating Smart City Public Transit System on BlockchainSOLYD
 
Are we giving BRT passengers what they want?
Are we giving BRT passengers what they want?Are we giving BRT passengers what they want?
Are we giving BRT passengers what they want?Tristan Wiggill
 
Adding value to rail
Adding value to railAdding value to rail
Adding value to railcircus3d
 
Ilmastotalkoot: Robbert Lohmann
Ilmastotalkoot: Robbert LohmannIlmastotalkoot: Robbert Lohmann
Ilmastotalkoot: Robbert LohmannDemos Helsinki
 
A Review on Performance of Toll Plaza by using Queuing Theory
A Review on Performance of Toll Plaza by using Queuing TheoryA Review on Performance of Toll Plaza by using Queuing Theory
A Review on Performance of Toll Plaza by using Queuing Theoryijtsrd
 
A Presentation on Railway Passenger Reservation System (PRS) by Sourabh Kumar
A Presentation on Railway Passenger Reservation System (PRS) by Sourabh KumarA Presentation on Railway Passenger Reservation System (PRS) by Sourabh Kumar
A Presentation on Railway Passenger Reservation System (PRS) by Sourabh KumarSourabh Kumar
 
અમદાવાદ - સ્માર્ટ સીટી મિશન
અમદાવાદ - સ્માર્ટ સીટી મિશન અમદાવાદ - સ્માર્ટ સીટી મિશન
અમદાવાદ - સ્માર્ટ સીટી મિશન AMC_Updates
 
A Sensing Coverage Analysis of a Route Control Method for Vehicular Crowd Sen...
A Sensing Coverage Analysis of a Route Control Method for Vehicular Crowd Sen...A Sensing Coverage Analysis of a Route Control Method for Vehicular Crowd Sen...
A Sensing Coverage Analysis of a Route Control Method for Vehicular Crowd Sen...Osamu Masutani
 
Towards an effective transitioning of public transport system in Ghana
Towards an effective transitioning of public transport system in GhanaTowards an effective transitioning of public transport system in Ghana
Towards an effective transitioning of public transport system in GhanaInstitute for Transport Studies (ITS)
 
Smart City/Operation Management -Gazi Sanaul Hasan
Smart City/Operation Management -Gazi Sanaul Hasan Smart City/Operation Management -Gazi Sanaul Hasan
Smart City/Operation Management -Gazi Sanaul Hasan Gazi Sanaul Hasan
 
Supply chain concor ir
Supply chain concor irSupply chain concor ir
Supply chain concor irRahul Rathi
 

Similaire à Planning for a Multimodal Transport Interchnage (20)

Dubai metro paper in ASPECT Conference
Dubai metro paper in ASPECT Conference Dubai metro paper in ASPECT Conference
Dubai metro paper in ASPECT Conference
 
Dubai metro paper in IRSE magazine
Dubai metro paper in IRSE magazineDubai metro paper in IRSE magazine
Dubai metro paper in IRSE magazine
 
Trivandrum Monorail Preliminary Study
Trivandrum Monorail Preliminary StudyTrivandrum Monorail Preliminary Study
Trivandrum Monorail Preliminary Study
 
Genpact - I Travel Smart
Genpact - I Travel SmartGenpact - I Travel Smart
Genpact - I Travel Smart
 
Smart Space @ BuroHappold Engineering
Smart Space @ BuroHappold EngineeringSmart Space @ BuroHappold Engineering
Smart Space @ BuroHappold Engineering
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metro
 
Creating Smart City Public Transit System on Blockchain
Creating Smart City Public Transit System on BlockchainCreating Smart City Public Transit System on Blockchain
Creating Smart City Public Transit System on Blockchain
 
MaaS sota
MaaS sotaMaaS sota
MaaS sota
 
Are we giving BRT passengers what they want?
Are we giving BRT passengers what they want?Are we giving BRT passengers what they want?
Are we giving BRT passengers what they want?
 
Adding value to rail
Adding value to railAdding value to rail
Adding value to rail
 
Ilmastotalkoot: Robbert Lohmann
Ilmastotalkoot: Robbert LohmannIlmastotalkoot: Robbert Lohmann
Ilmastotalkoot: Robbert Lohmann
 
A Review on Performance of Toll Plaza by using Queuing Theory
A Review on Performance of Toll Plaza by using Queuing TheoryA Review on Performance of Toll Plaza by using Queuing Theory
A Review on Performance of Toll Plaza by using Queuing Theory
 
Metro.pptx
Metro.pptxMetro.pptx
Metro.pptx
 
A Presentation on Railway Passenger Reservation System (PRS) by Sourabh Kumar
A Presentation on Railway Passenger Reservation System (PRS) by Sourabh KumarA Presentation on Railway Passenger Reservation System (PRS) by Sourabh Kumar
A Presentation on Railway Passenger Reservation System (PRS) by Sourabh Kumar
 
અમદાવાદ - સ્માર્ટ સીટી મિશન
અમદાવાદ - સ્માર્ટ સીટી મિશન અમદાવાદ - સ્માર્ટ સીટી મિશન
અમદાવાદ - સ્માર્ટ સીટી મિશન
 
A Sensing Coverage Analysis of a Route Control Method for Vehicular Crowd Sen...
A Sensing Coverage Analysis of a Route Control Method for Vehicular Crowd Sen...A Sensing Coverage Analysis of a Route Control Method for Vehicular Crowd Sen...
A Sensing Coverage Analysis of a Route Control Method for Vehicular Crowd Sen...
 
CBTC World Congress paper on creating safe CBTC system without secondary dete...
CBTC World Congress paper on creating safe CBTC system without secondary dete...CBTC World Congress paper on creating safe CBTC system without secondary dete...
CBTC World Congress paper on creating safe CBTC system without secondary dete...
 
Towards an effective transitioning of public transport system in Ghana
Towards an effective transitioning of public transport system in GhanaTowards an effective transitioning of public transport system in Ghana
Towards an effective transitioning of public transport system in Ghana
 
Smart City/Operation Management -Gazi Sanaul Hasan
Smart City/Operation Management -Gazi Sanaul Hasan Smart City/Operation Management -Gazi Sanaul Hasan
Smart City/Operation Management -Gazi Sanaul Hasan
 
Supply chain concor ir
Supply chain concor irSupply chain concor ir
Supply chain concor ir
 

Dernier

Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxBkGupta21
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 

Dernier (20)

Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptx
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 

Planning for a Multimodal Transport Interchnage

  • 1. PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE Study Area: Sealdah Interchange, Kolkata Data Analysis Gargi Ghosh 10 AR 60 R08 Under the guidance of: Prof. Debapratim
  • 2. •To enable the establishment of quality focused multimodal transport system to provide a “ single journey experience ” i.e. to plan for “seamless travel” • To co-coordinate the use of different modes and their proper integration for efficiency and cost effectiveness of interchange. PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 3. BUS STOP BAITHAKHANA MARKET PARKING SEALDAH AUTO STOP STATION METRO KOLEY MARKET BR SINGH HOSPITAL BUS STOP SEALDAH BUS DEPOT PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 4. Quantitative Passenger profile for age, sex, income group, travel details (mode, expenditure, OD) Rank data for importance and satisfaction of parameters. Data for QoS for different parameters. Data for parameters whose QoS has not been defined. PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 5. To derive the QUALITY OF SERVICE values for Sealdah To establish parameter priority at Sealdah Interchange. To manage pedestrian movement – PRESENT AND POST METRO To manage transportation facilities – PRESENT AND POST METRO PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 6. PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 7. TRANSPORT FACILITIES URBAN REALM 1 Queuing space in auto stop 12 Distance of paratransit stop from building Frequency of auto service= waiting time for 2 auto service 13 Parking areas Performance of auto stand( weather 14 Entrance accessibility 3 protection, safety, toilet facilities ) 15 Location of entrances Distance of paratransit stop from building 16 Walking distance (mode1 to ticket counter) 4 17 Pedestrian pathways ( adequacy, safety ) Queuing space in taxi stand 5 18 Subway Frequency of taxi service = waiting time for 6 taxi service 19 Weather protection in interchange area Adequacy of queuing space in taxi stand 20 Disabled access 7 Performance of taxi stand( weather protection, 21 Surveillance 8 safety, toilet facilities ) 22 toilet facilities Bus stop performance(queuing space, toilet 9 facilities etc) 23 Cleanliness 24 Safety Frequency of bus service 10 25 Organised retail in the interchange Feeder service 11 PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 8. BUILT FACILITY DESIGN 26 Level changes 27 Queuing time in ticket counter 28 Queuing space for ticket counter 29 No of ticket counters 30 Location of ticket counters 31 Real time information 32 Information system placement 33 Walking distance (from ticket counter to platform) 34 Waiting area in platform 35 Railway Station performance 36 Safety & surveillance @ platform 37 Alignment of platform and the entrance location 38 Goods loading/unloading area on platform PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 9. WAITING TIME at bus stop WALKING TIME from bus stop to the terminal building • AGE WISE WAITING TIME at paratransit stop • DESIRED QoS • INCOME CATEGORY WALKING TIME from paratransit stop to the • PRESENT QoS terminal building • MINIMUM WISE ACCEPTABLE QoS TICKETING TIME • GENDER WISE WALKING DISTANCE from ticket counter to • TRIP TYPE platform WAITING TIME at Platform PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 10. AGE GROUP QoS FOR WAITING TIME AT BUS STOP 60 + 0-18 AGE GR-4 A G E 40-60 18-40 AGE GR-3 C A T E G O AGE GR-2 R Y AGE GR-1 0 2 4 6 8 10 12 TIME CATEGORY RANGE DESIRED Percentage MIN. Percentage satisfied ACCEPTABL satisfied E AGE GROUP 1 NA AGE GROUP 2 5 – 9 MIN 5 MIN 72% 7 MIN 73% AGE GROUP 3 5 – 7 MIN AGE GROUP 4 5 – 6 MIN PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 11. QoS FOR WAITING TIME AT BUS STOP 31% FEMALE 69% GENDRT CATEGORY MALE MALE 2 3 4 5 6 7 8 9 10 11 CATEGORY RANGE DESIRED Percentage MIN. Percentage satisfied ACCEPTABLE satisfied MALE 7 – 9 MIN 5 MIN 95% 9 MIN 80% FEMALE 5 – 8 MIN PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 12. INCOME GROUPS QoS FOR WAITING TIME AT BUS STAND HIG MIG LIG 9% LIG 44% INCOME CATEGORY 47% MIG HIG 0 2 4 6 8 10 12 14 TIME CATEGORY RANGE DESIRED Percentage MIN. Percentage satisfied ACCEPTABLE satisfied HIG 4 - 9 MIN MIG 4 – 10 MIN 10 MIN 4 MIN 86% 72% LIG 8 – 10 MIN PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 13. CATEGORY RANGE DESIRED Percentage satisfied MIN. Percentage satisfied ACCEPTAB LE HIG 4 - 9 MIN MIG 4 – 10 MIN 4 MIN 72% 10.5 MIN 73% LIG 8 – 10 MIN CATEGORY RANGE DESIRED Percentage satisfied MIN. Percentage satisfied ACCEPTABLE MALE 7 – 9 MIN 5 MIN 84% 9 MIN 80% FEMALE 5 – 8 MIN CATEGORY RANGE DESIRED Percentage satisfied MIN. Percentage satisfied ACCEPTAB LE AGE GROUP 1 NA AGE GROUP 2 5 – 9 MIN 5 MIN 86% 7 MIN 72% AGE GROUP 3 5 – 7 MIN AGE GROUP 4 5 – 6 MIN PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 14. QOS FOR WALKING TIME FROM BUS STOP AGE GROUP 4 CATEGORY RANGE Desired Min.Accep table AGE CATEGORY AGE GROUP 3 AGE GROUP 1 NA AGE GROUP 2 5 – 8 MIN 5 MIN 7 MIN AGE GROUP 3 4 – 7 MIN AGE GROUP 2 AGE GROUP 4 NA AGE GROUP 1 1 2 3 4 5 6 7 8 9 10 11 QoS FOR WALKING TIME FROM BUS STOP LIG CATEGORY RANGE Desired Min.Accept able INCOME CATEGORY HIG MIG MIG 4 – 7 MIN 4 MIN 7 MIN LIG 5 – 7 MIN HIG 2 3 4 5 6 7 8 9 10 11 TIME PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 15. CATEGORY RANGE Desired Min.Accept QoS FOR WALKING DISTANCE FROM BUS STOP able MALE AGE NA GENDER CATEGORY GROUP 1 AGE 5 – 8 MIN GROUP 2 FEMALE 5 MIN 7 MIN AGE 4 – 7 MIN GROUP 3 AGE NA GROUP 4 2 3 4 5 6 7 8 9 10 CATEGORY RANGE Desired Min.Accepta ble HIG CATEGORY RANGE Desired Min.Accept MIG 4 – 7 MIN able 4 MIN 7 MIN MALE 7 – 9 MIN LIG 5 – 7 MIN 6 MIN 9 MIN FEMALE 6 – 9 MIN CATEGORY RANGE Desired Min.Accept able MALE 7 – 9 MIN 6 MIN 9 MIN FEMALE 6 – 9 MIN PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 16. WAITING TIME AT PARATRASIT STOP AGE GROUP 4 CATEGORY RANGE Desired Min.Acc eptable AGE GROUP 1 4- AGE CATEGORY AGE GROUP 3 AGE GROUP 2 5.5 – 7 MIN 4 MIN 8 MIN AGE GROUP 2 AGE GROUP 3 4 – 8 MIN AGE GROUP 4 NA AGE GROUP 1 1 2 3 4 5 6 7 8 9 10 11 WAITING TIME AT PARATRANSIT STOP MALE GENDER CATEGORY CATEGOR RANGE Desired Min.Accep Y table MALE 4 – 7.5 MIN 5 MIN 7.5 MIN FEMALE 5.5 – 9 MIN FEMALE 2 3 4 5 6 TIME 7 8 9 10 11 PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 17. CATEGORY RANGE Desired Min.Accep QOS FOR WAITING TIME AT PARATRANSIT STOP table LIG AGE GROUP 1 4- AGE GROUP 2 5.5 – 7 MIN 4 MIN 8 MIN INCOME CATEGORY AGE GROUP 3 4 – 8 MIN AGE GROUP 4 NA MIG CATEGOR RANGE Desired Min.Accep Y table MALE 4 – 7.5 MIN HIG 5 MIN 7.5 MIN FEMALE 5.5 – 9 MIN 0 2 4 6 8 10 12 TIME CATEGORY RANGE Desired Min.Accept CATEGOR RANGE Desired Min.Accept able Y able HIG 3- HIG 3- MIG 5 – 9 MIN 4 MIN 9 MIN MIG 5 – 9 MIN 4 MIN 9 MIN LIG 4 – 9 MIN LIG 4 – 9 MIN PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 18. QOS FOR TICKETING TIME CATEGORY RANGE AGE GROUP 4 AGE GROUP 4 – 8 MIN 1 AGE CATEGORY AGE GROUP 3 AGE GROUP 3 – 8 MIN 2 3 MIN 8 MIN AGE GROUP 4 – 8 MIN AGE GROUP 2 3 AGE GROUP 4 - 8 MIN 4 AGE GROUP 1 1 3 5 7 9 11 13 15 TIME CATEGOR RANGE QOS FOR TICKETING TIME Y MALE 8 – 9.5 MIN MALE 5 MIN 9.5 MIN FEMALE 5 – 9 MIN GENDER FEMALE 1 3 5 7 9 11 13 15 TIME PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 19. QOS FOR TICKETING TIME CATEGORY RANGE Desired Min.Accept able LIG HIG 4 – 6 MIN MIG 4 – 9 MIN 4 MIN 9 MIN INCOME MIG LIG 4 – 9 MIN HIG 1 3 5 7 9 11 13 TIME QOS FOR TICKETING TIME CATEGORY RANGE Desired Min.Accepta ble EXPRESS EXPRESS 5.5 – 8 MIN 4 MIN 8 MIN LOCAL 4 – 8 MIN TRIP TYPE LOCAL 1 3 5 7 9 11 13 15 TIME PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 20. CATEGORY RANGE Desired Min.Acceptable AGE GROUP 1 4 – 8 MIN AGE GROUP 2 3 – 8 MIN 3 MIN 8 MIN AGE GROUP 3 4 – 8 MIN AGE GROUP 4 4 - 8 MIN CATEGORY RANGE Desired Min.Acceptable HIG 4 – 6 MIN MIG 4 – 9 MIN 4 MIN 9 MIN LIG 4 – 9 MIN CATEGORY RANGE Desired Min.Acceptable EXPRESS 5.5 – 8 MIN 4 MIN 8 MIN LOCAL 4 – 8 MIN CATEGORY RANGE Desired Min.Acceptable MALE 8 – 9.5 MIN 5 MIN 9.5 MIN FEMALE 5 – 9 MIN PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 21. WALKING DISTANCE FROM PARATRANSIT STOP CATEGORY RANGE Desired Min.Acc AGE GR 4 eptable AGE GROUP 1 NA AGE CATEGORY AGE GR 3 AGE GROUP 2 5 – 7 MIN 5 MIN 7 MIN AGE GROUP 3 5.5 – 7 MIN AGE GR 2 AGE GROUP 4 5 – 7 MIN AGE GR 1 1 3 5 7 9 11 TIME WALKING TIME FROM PARATRANSIT STOP CATEGORY RANGE Desired Min.Acce ptable MALE 8 – 9.5 MIN MALE 5 MIN 9.5 MIN FEMALE 5 – 9 MIN GENDER FEMALE 1 3 5 7 9 11 TIME PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 22. CATEGORY RANGE Desired Min.Ac WALKING TIME FROM PARATRANSIT STOP ceptabl e LIG AGE GROUP 1 NA AGE GROUP 2 5 – 8 MIN 5 MIN 8 MIN AGE GROUP 3 5 – 8 MIN MIG AGE GROUP 4 NA CATEGORY RANGE Desired Min.Accept able HIG HIG MIG 4 – 7 MIN 4 MIN 8 MIN 2 3 4 5 6 7 8 9 10 LIG 11 5 – 8 MIN CATEGORY RANGE HIG MIG 4 – 7 MIN 4 MIN 8 MIN LIG 5 – 8 MIN PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 23. WALKING TIME FROM TICKET COUNTER TO PLATFORM CATEGORY RANGE Desired Min.Acc AGE GROUP 4 eptable AGE GROUP 1 3 – 5 MIN AGE GROUP 3 AGE GROUP 2 4 – 7.5 MIN 4 MIN 7.5 MIN AGE GROUP 2 AGE GROUP 3 5 – 7.5MIN AGE GROUP 4 5.5 - AGE GROUP 1 1 2 3 4 5 6 7 8 9 10 11 WALKING TIME FROM TICKET COUNTER TO PLATFORM MALE CATEGOR RANGE Desired Min.Accept Y able MALE 4 – 7 MIN FEMALE 3 MIN 5 MIN FEMALE 3 – 5 MIN 1 2 3 4 5 6 7 8 9 10 11 PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 24. WALKING TIME FROM TICKET COUNTER TO PLATFORM CATEGORY RANGE Desired Min.Acc LIG eptable AGE GROUP 1 3 – 5 MIN AGE GROUP 2 4 – 7.5 MIN 4 MIN 7.5 MIN AGE GROUP 3 5 – 7.5MIN MIG AGE GROUP 4 5.5 - CATEGORY RANGE Desired Min.Accept able HIG MALE 4 – 7 MIN 1 2 3 4 5 6 7 8 9 10 3 MIN 5 MIN FEMALE 3 – 5 MIN CATEGORY RANGE Desired Min.Accept able CATEGORY RANGE Desired Min.Accepta HIG ble MIG 4 – 7 MIN 4 MIN 8 MIN HIG LIG 5 – 8 MIN MIG 4 – 7 MIN 4 MIN 8 MIN LIG 5 – 8 MIN PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 25. CATEGORY RANGE Desired Min.Ac WAITING TIME AT PLATFORM ceptabl AGE GROUP 4 e AGE GROUP 1 9 – 13 MIN AGE GROUP 3 AGE GROUP 2 8 – 12 MIN 12 8 MIN AGE GROUP 3 8 – 12MIN MIN AGE GROUP 2 AGE GROUP 4 10 – 12 MIN AGE GROUP 1 4 6 8 10 12 14 16 18 20 WAITING TIME AT PLATFORM CATEGOR RANGE Desired Min.Accep MALE Y table MALE 10 – 13 MIN 10 MIN 14 MIN FEMALE 11 – 14 MIN FEMALE 0 5 10 15 20 25 30 PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 26. CATEGORY RANGE Desired Min.Ac ceptabl WAITNG TIME AT PLATFORM e LIG AGE GROUP 1 9 – 13 MIN AGE GROUP 2 8 – 12 MIN 8 MIN 12 MIN AGE GROUP 3 8 – 12MIN AGE GROUP 4 10 – 12 MIN MIG CATEGOR RANGE Desire Min.Accept Y d able MALE 10 – 13 MIN HIG 10 14 MIN FEMALE 11 – 14 MIN MIN 2 4 6 8 10 12 14 16 18 20 CATEGORY RANGE Desired Min.Acce ptable CATEGORY RANGE Desired Min.Acceptab HIG 8 – 13 MIN le HIG 8 – 13 MIN MIG 11 – 13 MIN 8 MIN 13 MIN MIG 11 – 13 MIN 8 MIN 13 MIN LIG 10 – 13MIN LIG 10 – 13MIN PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 27. PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 28. TRANSPORT FACILITIES URBAN REALM 1 Queuing space in auto stop 12 Distance of paratransit stop from building Frequency of auto service= waiting time for 2 auto service 13 Parking areas Performance of auto stand( weather 14 Entrance accessibility 3 protection, safety, toilet facilities ) 15 Location of entrances Distance of paratransit stop from building 16 Walking distance (mode1 to ticket counter) 4 17 Pedestrian pathways ( adequacy, safety ) Queuing space in taxi stand 5 18 Subway Frequency of taxi service = waiting time for 6 taxi service 19 Weather protection in interchange area Adequacy of queuing space in taxi stand 20 Disabled access 7 Performance of taxi stand( weather protection, 21 Surveillance 8 safety, toilet facilities ) 22 toilet facilities Bus stop performance(queuing space, toilet 9 facilities etc) 23 Cleanliness 24 Safety Frequency of bus service 10 25 Organised retail in the interchange Feeder service 11 PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 29. BUILT FACILITY DESIGN 26 Level changes 27 Queuing time in ticket counter 28 Queuing space for ticket counter 29 No of ticket counters 30 Location of ticket counters 31 Real time information 32 Information system placement 33 Walking distance (from ticket counter to platform) 34 Waiting area in platform 35 Railway Station performance 36 Safety & surveillance @ platform 37 Alignment of platform and the entrance location 38 Goods loading/unloading area on platform PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 30. LIG HIG MIG 5 5 5 4 3, 4 4, 4 5, 4 4 4, 4 5, 4 4 4, 4 SATISFACTION SATISFACTION SATISFACTION 3 3, 3 4, 3 5, 3 3 2, 3 3, 3 4, 3 5, 3 3 2, 3 3, 3 4, 3 5, 3 2 3, 2 4, 2 5, 2 2 3, 2 5, 2 2 3, 2 4, 2 5, 2 1 5, 1 1 1 5, 1 0 0 0 0 1 2 3 4 5 0 1 2 3 4 5 -1 1 3 5 IMPORTANCE LIG IMPORTANCE MIG IMPORTANCE HIG INCOME CATEGOR 1 2 3 4 5 6 7 8 9 10 11 Y IMPORTANCE HIG 4 5 5 5 5 2 3 3 5 5 5 SATISFACTION HIG 3 4 3 3 2 3 2 2 2 1 3 IMPORTANCE MIG 4 4 5 5 5 2 3 3 5 5 5 SATISFACTION MIG 3 4 3 3 2 3 2 2 2 2 2 IMPORTANCE LIG 4 5 5 5 5 3 3 3 5 5 5 SATISFACTION LIG 4 4 3 3 3 4 2 2 3 1 2 1 2 3 4 5 6 7 8 9 10 11 PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 31. INCOME CATEGOR 1 2 3 4 5 6 7 8 9 10 11 Y IMPORTANCE HIG 4 5 5 5 5 2 3 3 5 5 5 SATISFACTION HIG 3 4 3 3 2 3 2 2 2 1 3 IMPORTANCE MIG 4 4 5 5 5 2 3 3 5 5 5 SATISFACTION MIG 3 4 3 3 2 3 2 2 2 2 2 IMPORTANCE LIG 4 5 5 5 5 3 3 3 5 5 5 SATISFACTION LIG 4 4 3 3 3 4 2 2 3 1 2 AGE GROUP IMPORTANCE 1 4.8 4.2 3.6 4 3 3 3 4 5 5 4 SATISFACTION 1 2 2 1 IMPORTANCE 2 5 5 5 5 2 3 3 5 5 5 3 SATISFACTION 2 4 4 3 3 2 3 2 2 2 1 1 IMPORTANCE 3 5 5 5 5 1 3 3 5 5 5 3 SATISFACTION 3 3 4 3 3 3 4 2 2 3 2 1 IMPORTANCE 4 3 3 3 4 2 3 3 5 5 5 4 SATISFACTION 4 2 3 2 2 2 3 2 3 3 1 1 GENDER IMPORTANCE F 4.0 5.0 5.0 5.0 1.0 3.0 3.0 5.0 5.0 5.0 4.0 SATISFACTION F 4.0 4.0 3.0 3.0 2.0 4.0 2.0 3.0 2.0 1.0 1.0 IMPORTANCE M 5.0 5.0 5.0 5.0 2.0 3.0 3.0 5.0 5.0 5.0 4.0 SATISFACTION M 4.0 4.0 3.0 3.0 2.0 3.0 2.0 2.0 3.0 2.0 3.0 PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 32. INCOME GROUP1 2 3 4 5 6 7 8 9 10 11 1 2 3 4 5 6 7 8 9 10 11 AGE GROUP 1 2 3 4 5 6 7 8 9 10 11 GENDER Frequency of taxi service = waiting time for TRANSPORT FACILITIES 6 taxi service 1 Queuing space in auto stop Adequacy of queuing space in taxi stand Frequency of auto service= waiting time for 7 2 auto service Performance of taxi stand( weather protection, 8 safety, toilet facilities ) Performance of auto stand( weather 3 protection, safety, toilet facilities ) Bus stop performance(queuing space, toilet 9 facilities etc) Distance of paratransit stop from building 4 Frequency of bus service Queuing space in taxi stand 10 5 Feeder service 11 PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 33. 12 13 14 15 16 17 18 19 20 21 22 23 24 25 INCOME GROUP 5 4 4 4 4 5 5 5 5 5 5 5 5 4 3 3 3 3 3 2 2 2 2 3 2 2 3 3 5 4 4 4 4 5 5 5 5 5 5 5 5 4 3 4 3 3 3 2 2 2 2 3 2 2 3 3 5 4 4 4 4 5 5 5 5 5 5 5 5 4 3 4 3 3 3 2 3 3 2 3 2 2 3 3 AGE GROUP 12 13 14 15 16 17 18 19 20 21 22 23 24 25 4 4 4 5 5 5 5 5 5 5 3 3 3 2 2 3 2 3 2 2 3 2 5 4 4 4 4 5 5 5 5 5 5 5 5 4 3 4 3 3 3 2 2 2 2 3 2 2 3 3 5 4 4 4 5 5 5 5 5 5 5 5 5 4 3 4 3 3 3 2 3 2 2 3 2 2 3 3 4 5 5 5 5 5 5 5 5 5 5 5 4 4 3 3 3 2 2 3 2 3 2 3 3 3 GENDER 12 13 14 15 16 17 18 19 20 21 22 23 24 25 5 4 4 4 5 5 5 5 5 5 5 5 5 4 3 4 3 3 3 2 2 2 2 3 2 2 3 3 5 4 4 4 4 5 5 5 5 5 5 5 5 4 3 4 3 3 3 2 3 3 2 3 2 2 3 3 PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 34. 12 13 14 15 16 17 18 19 20 21 22 23 24 25 INCOME GROUP 12 13 14 15 16 17 18 19 20 21 22 23 24 25 AGE GROUP 12 13 14 15 16 17 18 19 20 21 22 23 24 25 GENDER URBAN REALM 12 Distance of paratransit stop from building 20 Disabled access 13 Parking areas 21 Surveillance 14 Entrance accessibility 22 toilet facilities 15 Location of entrances 23 Cleanliness 16 Walking distance (mode1 to ticket counter) 24 Safety 17 Pedestrian pathways ( adequacy, safety ) 25 Organised retail in the interchange 18 Subway 19 Weather protection in interchange area PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 35. 26 27 28 29 30 31 32 33 34 35 36 37 38 4 5 5 5 4 5 5 4 5 5 5 3 5 3 2 3 3 4 3 3 3 2 3 3 3 3 INCOME GROUP 4 5 4 5 4 5 5 4 5 5 5 3 5 3 2 2 3 4 3 3 3 3 3 3 3 2 4 5 4 5 4 5 5 4 5 4 5 3 5 3 2 2 3 3 3 3 3 3 3 3 3 2 26 27 28 29 30 31 32 33 34 35 36 37 38 AGE GROUP 3 4 4 4 4 4 4 5 4 4 3 2 3 3 3 3 2 3 3 3 3 4 5 4 5 4 5 5 5 5 5 5 3 5 3 2 2 3 4 3 3 3 3 3 3 3 2 4 5 4 4 4 5 5 4 5 5 5 3 5 3 2 2 3 4 3 3 3 3 3 3 3 2 3 5 5 5 4 5 5 4 4 5 5 3 5 3 2 2 4 4 2 3 3 3 3 3 3 3 26 27 28 29 30 31 32 33 34 35 36 37 38 GENDER 3 5 4 5 4 5 5 4 5 4 5 3 4 3 2 3 2 4 2 3 3 3 3 3 3 2 4 5 5 5 4 5 5 4 5 5 5 3 5 3 2 2 3 3 3 3 3 3 3 3 3 3 PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 36. 26 27 28 29 30 31 32 33 34 35 36 37 38 INCOME GROUP AGE GROUP 26 27 28 29 30 31 32 33 34 35 36 37 38 GENDER 26 27 28 29 30 31 32 33 34 35 36 37 38 BUILT FACILITY DESIGN 26 Level changes 34 Waiting area in platform 27 Queuing time in ticket counter 35 Railway Station performance 28 Queuing space for ticket counter 36 Safety & surveillance @ platform 29 No of ticket counters 37 Alignment of platform and the entrance location 30 Location of ticket counters 38 Goods loading/unloading area on platform 31 Real time information 32 Information system placement 33 Walking distance (from ticket counter to platform) PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 37. PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 38. Analysis For adequacy of Transport facilities OD - SURVEY ANALYSING ADEQUACY OF DESIGNING THE MAJOR DIRECTIONS TRANSPORT FACILITIES INTERCHANGE MAJOR ROUTE AT PRESENT POST METRO PASSENGER SPLIT IN DIFFERENT ROUTE DEMAND FOR ADDITIONAL VEHICLES ( if any) MODAL SPLIT IN EACH ROUTE TO KNOW THE NO OF VEHICLES IN THE INTERCHANGE BUS PASSENGER IN EACH ROUTE TRANSPORT SURVEY FOR BUS COUNT IN EACH DIRECTION LOADING PER HOUR PER ROUTE PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 39. OTHER, 4 TAXI, 2% % PEDESTR IAN, 31% AUTO, 0% BUS, 63% TO NORTH VIA SHYAMBAZAR TO SOUTH VIA ESPLANADE MODAL SPLIT PASSENGER VOL/ BUS/ SEAT IN EACH ROUTE = LOADING TO SOUTH VIA EXIDE OD - SURVEY TO HOWRAH VIA BBD BAG TO BUS FREQ IN MAJOR OTHER, 5 DIRECTIONS DIFFERENT ROUTES TO SOUTH TO via HOWRAH PASSENGER SPLIT IN EXIDE, 13 via BBD BAG, 29 BUS PASSENGERS IN DIFFERENT DIRECTIONS DIFFERENT ROUTES TO SOUTH via EXIDE, 20 TO NORTH via SHYAMBAZ AR, 33 PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 40. 12221 5372 1763 1605 7120 12221 15397 12466 11369 7151 HOWRAH MAHAKARAN CENTRAL BOWBAZAR SEALDAH STATION 2196 4694 2702 11332 STATION PHPD BOARDING STATION PHPD BOARDING HOWRAH STN – MAHAKARAN 12221 HOWRAH STN 12221 MAHAKARAN – CENTRAL 5372 MAHAKARAN 5372 CENTRAL - BOWBAZAR 1762 CENTRAL 1762 BOWBAZAR – SEALDAH STN 1605 BOWBAZAR 1605 SEALDAH - PHOOLBAGAN 7120 SEALDAH 7120 PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 41. TRAINS ARRIVING VOL DEPARTING VOL PEOPLE DEPARTING VIA PEOPLE ARRIVING VIA DIFFERENT MODES DIFFERENT MODES BUS AUTO OTHER BUS AUTO OTHER PEOPLE NOW PEOPLE SWITCHING ARRIVING VIA METRO TO METRO ( EARLIER VIA BUS) 20% = 20% OF BUS RIDERS METRO BOARDING METRO ALIGHTING SWITCH OVER TO SUBURN TRAIN TO OTHER FROM OTHER = 20% OF BUS RIDERS MODES MODES BUS RIDERS VALUE AVAILABLEFOR phpd PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 42. PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 43. LOADING ALONG SEALDAH - SHYAMBAZAR ( arrival vol) 2.50 5 2.26 2.12 2.00 1.79 4 1.65 1.50 1.54 LOADING 4 PM 1.31 LOADING 7 PM 1.25 1.05 LOADING 12 PM 1.00 0.98 0.91 0.91 LOADING 10 AM 0.83 0.67 0.66 LOADING 8 AM 0.58 0.61 0.50 0.42 0.52 0.36 3 0.26 0 0.00 0 0 1 2 3 4 5 POST METRO LOADING ( arriving vol ) 2.50 2.36 2.32 2 2.00 1.96 1.72 1.69 1.50 1.51 LOADING 8 AM 1.43 1.30 1.13 LOADING 10 AM 1.10 1.11 LOADING 12 PM 1.00 0.95 0.94 LOADING 4 PM 1 0.68 0.72 0.67 LOADING 7 PM 0.62 0.57 0.50 0.44 0.38 0.24 0.23 0.20 0.15 0.13 0.00 0 1 2 3 4 5 PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 44. LOADING ALONG SHYAMBAZAR SEALDAH - ( departing vol) LOADING ALONG SEALDAH - SHYAMBAZAR ( arrival vol) 2.50 2.5 2.26 2.08 2.08 2.00 2.12 1.90 1.90 2 1.79 1.50 1.65 1.41 LOADING 8 AM 1.54 LOADING 4 PM 1.5 1.29 LOADING 10 AM 1.16 1.31 LOADING 7 PM 1.06 1.25 1.00 LOADING 12 PM #REF! 1 1.05 0.98 LOADING 4 PM 0.91 0.91 LOADING 10 AM 0.83 0.50 LOADING 7 PM 0.67 0.66 LOADING 8 AM 0.58 0.61 0.33 0.5 0.52 0.30 0.42 0.36 0.26 0.00 0 1 1 2 2 3 3 4 4 5 5 0 0 1 2 3 4 5 POST METRO LOADING ( departing vol ) POST METRO LOADING ( arriving vol ) 3.00 2.50 2.36 2.672.50 2.50 2.48 2.32 1.91 2.00 1.96 2.00 1.83 1.72 1.95 LOADING 8 AM 1.86 1.81 1.69 LOADING 8 AM 1.39 LOADING 12 PM 1.50 1.50 1.51 LOADING 10 AM 1.36 1.20 LOADING 4 PM 1.43 1.28 1.30 1.13 1.190.92 LOADING 12 PM 1.00 LOADING 7 PM 1.10 1.11 0.89 0.73 1.00 LOADING 4 PM 0.780.55 LOADING 10 AM 0.95 0.94 0.72 0.68 LOADING 7 PM 0.50 0.54 0.72 0.25 0.19 0.62 0.67 0.27 0.57 0.25 0.19 0.50 0.44 0.24 0.38 0.00 0.23 0.20 0 1 2 3 4 5 0.15 0.13 0.00 0 1 2 3 4 5 PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 45. PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 46. LOADING ALONG ESPLADADE SEALDAH - ROUTE (DEPARTING VOL) LOADING ALONG SEALDAH - ESPLADADE ROUTE (ARRIVAL VOL) 2.50 3.00 2.17 2.00 2.63 2.50 1.72 1.60 2.08 1.50 LOADING 8 AM 2.00 LOADING 8 AM 1.27 1.26 LOADING 10 AM 1.60 1.53 LOADING 10 AM 1.50 1.00 LOADING 12 PM LOADING 12 PM 0.93 0.96 1.26 LOADING 4 PM 1.16 1.00 LOADING 4 PM 0.70 0.93 LOADING 7 PM LOADING 7 PM 0.50 0.70 0.50 0.00 0.02 0.03 0.00 0.02 0 1 2 3 4 5 0 1 2 3 4 5 POST METRO LOADING -Esplanade - Sealdah route ( departing vol) POST METRO LOADING - Sealdah - Esplanade route ( arrival vol) 4.00 4.00 3.64 3.50 3.44 3.50 3.23 3.33 3.00 3.00 3.00 2.95 2.87 2.72 2.50 2.56 LOADING 8 AM 2.81 2.63 LOADING 8 AM 2.50 2.35 2.37 2.33 LOADING 10 AM LOADING 10 AM 2.00 2.25 1.99 2.11 1.86 1.88 2.00 2.22 1.93 1.74 LOADING 12 PM 2.16 LOADING 12 PM 1.71 1.50 1.78 1.51 1.50 1.60 1.36 1.42 LOADING 4 PM 1.71 1.47 LOADING 4 PM 1.32 1.63 1.30 1.00 1.31 1.04 LOADING 7 PM LOADING 7 PM 1.00 1.25 1.24 0.99 0.50 0.95 0.50 0.00 0.03 0.02 0.00 0.04 0.03 0 1 2 3 4 0.02 5 0 1 2 3 4 0.03 0.02 5 6 PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 47. PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 48. LOADING ALONG SEALDAH - EXIDE ROUTE (departing vol) LOADING ALONG SEALDAH - EXIDE ROUTE (arrival vol) 2.50 2.50 2.07 2.00 2.00 2.01 1.85 1.68 1.50 LOADING 8 AM LOADING 8 AM 1.50 1.32 LOADING 10 AM LOADING 10 AM 1.28 LOADING 12 PM 1.18 1.07 LOADING 12 PM 1.00 1.00 LOADING 4 PM LOADING 4 PM 0.75 LOADING 7 PM 0.73 LOADING 7 PM 0.61 0.67 0.50 0.50 0.38 0.30 0.37 0.34 0.00 0.00 0 0.1 0.00 0 1 2 3 4 5 0 1 2 3 4 5 6 POST METRO LOADING ( DEPARTING VOL) POST METRO LOADING ( ARRIVAL VOL) 3.00 2.82 3.00 2.72 2.68 2.50 2.50 2.38 2.00 1.97 1.79 2.00 1.99 LOADING 8 AM LOADING 8 AM 1.73 1.70 LOADING 10 AM LOADING 10 AM 1.50 1.50 1.51 LOADING 12 PM LOADING 12 PM 1.25 1.02 1.26 LOADING 4 PM LOADING 4 PM 1.00 0.99 1.00 0.97 LOADING 7 PM 0.86 LOADING 7 PM 0.72 0.51 0.72 0.50 0.50 0.50 0.49 0.43 0.36 0.36 0 0.00 0 0.00 0 0 1 2 3 4 5 0 1 2 3 4 5 PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata
  • 49. PLANNING FOR A MULTIMODAL TRANSPORT INTERCHANGE : Study Area: Sealdah Interchange, Kolkata