PANEL 4
THE COST OF CAPTURE: PROGRESS AND OPPORTUNITIES
Anne Margrete Blaker and Stale Aakenes – Gassnova SF
George Booras – EPRI
Robert Hilton – Alstom
Don Wharton – TransAlta
The Costs of Capture: Progress
               and Opportunity

          GCCSI Annual Meeting
             Calgary, Alberta, Canada

                  Robert G. Hilton
                    October 11, 2012
Introduction

• IPCC 2007: Max GHG 450 ppm for +2°C scenario
   ⇒ reduce massively CO2 emissions in Power Gen
                              Efficiency increase                                                                                   EUROPE - MtCO2 - 2035
                                                                                                                                   New Policies Scenario
                              Nuclear & Renewables                                                                            and 450 Scenario (IEA-WEO 2011)
                              CCS on Fossil plants                                                                                   COAL                     GAS
                                                                                                                                                         449
• CCS necessary because:
                                                                                                                                     397
         2035: >50% of W-W TWh still fossil
         Fossil will remain strong until ~2050                                                                                                                159
         IEA WEO: - 2,7 GtCO2 CCS in 2035                                                                                                          81

         CCS on Coal and Gas
                                                                                                                                    NPS 450              NPS 450

     CCS needed on both Coal and Gas. Will it be competitive ?
                                                                CoE of coal & gas CCS power plants – 14 June 2012
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or                             P3
should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial
circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
Introduction
   Alstom Cost of Electricity study on CCS
CCS experience: 16 pilots/demos                                                                                       Plant integration experience
                                                                                                                    (supply of turnkey power plants)




                                                             Alstom know-how for a solid
                                                                 CoE study on CCS PP


                                                                             Component manufacturer




                                                                CoE of coal & gas CCS power plants – 14 June 2012
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or            P4
should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial
circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
CCS Cost of Electricity study
 Main assumptions
                    Reference plants: Coal & Lignite (without CCS)
                                                                                            EUR                                                     NAM           SEA
  Fuel type                                                 Bituminous                  Raw Lignite               Dried Lignite                 PRB coal       Bituminous
  Fuel heating value KJ/Kg LHV                                24 930                      10 278                     21 283                      20 425          20 896
  Carbon content     UB mass%                                  65%                         31%                        57%                         56%             53%
  Fuel price 2011       Euro/t                                  78,2                       24,3                       24,3                        25,7             53,4
                       Euro/GJ                                  3,14                       2,37                       2,13                        1,26             2,56
  Cycle argt 2020/30 bar/°C/°C                          300b/600/620°C 272b/600/605°C 300b/600/620°C 300b/600/620°C 300b/600/620°C
  Cooling type           °C                              13°C - Direct C 18°C - Direct C 18°C - Direct C                                        19°C - CT     28°C - Direct C
  Net Output          MWe net                                 837            1 000           1 000                                                 837             837
  Net eff. 15/20/30    % LHV                             46.2/48/48.4 %               44/-/- % w HR              47,6/48,8/49 %              44/46.2/46.7 %    41/42.7/43 %
  EPC 2015/20/30      €/KW net                          1421/1518/1518                     1583/-/-             2070/2200/2200 1612/1722/1722                  814/869/869


        • Base case at 7450 hrs per a. plus sensitivity analysis
        • Performance improvement considered (e.g. double reheat ST)
        • Cycle arrangement in 2020/30: 300b-600°C-620°C

                                     Realistic set of assumptions by region
                                                                CoE of coal & gas CCS power plants – 14 June 2012
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or                                      P5
should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial
circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
Hardcoal CCS power plant
 Energy Penalty (EP)

                                                                             (Ref PP net MWe – CCS PP net MWe)
                  Energy penalty (EP) =
                                                                                         (Ref PP net MWe)

                                                    EUR & NAM                                                                                       SEA




               Note : 90% capture of CCS PP CO2 emission, CCS plant and Reference plant at same net


   Performance improvement and cooling temperature impacts
                                                                CoE of coal & gas CCS power plants – 14 June 2012
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or                  P6
should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial
circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
Hardcoal CCS power plant
      CoE base case (with T&S, without CO2 price)

CoE €/MWh net                              EUR                       CoE €/MWh net                               NAM                          CoE €/MWh net             SEA

90                                                                   90                                                                  90
                                      73,5 €/MWh                                                                     Oxy                                                Oxy
80                                       (Post)                      80                                              Post                80                             Post
                                                                                                                     Ref PP                                             Ref PP
70                Oxy                                                70                                                                  70
                  Post                         +45%
60                Ref PP                       (Post)                60                                                                  60
                                                                                                               64 €/MWh                                                62 €/MWh
50                                                                   50                                        (Post)                    50                            (Post)
40                                                                   40                                                                  40

30                                                                   30                                                                  30
 2015         2020          2025          2030          2035           2015          2020          2025          2030          2035        2015          2020   2025   2030      2035


         • All with T&S, on-shore saline aquifer: impact on CoE: 4,8 to 7,2 €/MWh net


     EUR 2032: CCS => +45% increase in CoE; NAM/SEA: lower CoE

                                                                     CoE of coal & gas CCS power plants – 14 June 2012
     © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or                                    P7
     should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial
     circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
Hardcoal CCS power plant
   Fuel, Capex/Opex and T&S contribution in CoE
                                                   CoE Ref Plant & Incremental CCS in 2032
        € / MWh net                 100
                                                                                                                         T&S
                                       90                                                                                Fuel
                                                                          73,5
                                       80                                +45%                                         Capex+Opex

                                       70                                                                   64                              62
                                       60
                                                              50,5
                                       50                                                     40,5                              40
                                       40
                                       30
                                       20
                                       10
                                         0
                                                              REF POST                        REF POST                         REF POST
                                                                 EUR                             NAM                               SEA

High capex, expensive coal                                        Cheap coal, lower efficiency Low Capex, expensive coal

                        Regional differences in Fuel, Capex/Opex costs
                                                                  CoE of coal & gas CCS power plants – 14 June 2012
  © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or            P8
  should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial
  circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
CCS Cost of Electricity study
 Main assumptions
        Gas Reference Combined-Cycle Power Plants (without CCS)
                                                                                          EUR                          NAM                            SEA
                    Fuel type                                                        Natural gas                  Natural gas                   Natural gas
                    Fuel heating value                     KJ/Kg LHV                   50 000                       50 000                        50 000
                    Carbon content                            mass%                        75%                           75%                           75%
                    Fuel price 2011                           Euro/GJ                       7,2                           2,8                       3,8 (subs.)
                    Cycle argt 2020/30                                                   1-1 SS                       2-1 MS                         1-1 SS
                    Cooling type                                   °C             13°C - Direct C                   19°C - CT                28°C - Direct C
                    Net Output 15/20/30 MWe net                                     600/650/700                   850/900/950                  538/583/628
                    Net eff. 15/20/30                          % LHV                 61/62/63 %                   60/61/62 %                    60/61/62 %
                    EPC cost 15/20/30                        €/KW net               558/544/529                   452/441/429                  473/461/449


                             • Base case combined cycle at 6570 hrs per a.
                             • Performance improvement considered

                          Combined cycles realistic set of assumptions
                                                                CoE of coal & gas CCS power plants – 14 June 2012
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or                          P9
should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial
circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
Gas Combined Cycle CCS Power Plant
      CoE base case (with T&S, without CO2 price)
CoE €/MWh net                              EUR                       CoE €/MWh net                               NAM                         CoE €/MWh net                SEA
80                                                                   80                                                                     80
                                  COE - EUROPE                                                                COE - NAM                                                  COE - ASIA
75                                                                   75                                                                     75
                                         68,5 €/ MWh )                                                                                                              Post FGR, 90% capt
70                                                                   70                                Post FGR, 90% capt                   70
                                                                                                                                                                    Ref plant
65                                                                   65                                Ref plant                            65
60        Ref plant
                                                  +28%               60                                                                     60
55                                                                   55                                                                     55
50                                                                   50                                                                     50
45                             Post FGR, 90% capt                    45                                                                     45
40                             Ref plant                             40                                                                     40       Ref plant                    +32%
35                                                                   35                                                                     35
30                                                                   30        Ref plant                                      +42%          30
25                                                                   25                                                                     25
 2015          2020         2025          2030          2035            2015         2020          2025          2030          2035            2015        2020   2025    2030      2035

 • Gas price at 7,2 Euro/GJ                                       • Lowest gas price at 2,8 €/GJ                                          • Subsidized gas price 3,8 €/GJ
                                                                                                                                            => offsets Capex advantage
 • -5 % reduction with FGR

        Note : 90% capture of CCS PP CO2 emissions, CCS plant net output de-rated vs Reference plant (energy penalty)

            Difference in gas price between regions drives CoE level

                                                                     CoE of coal & gas CCS power plants – 14 June 2012
     © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or                                     P 10
     should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial
     circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
Gas Combined Cycle CCS Power Plant
 Fuel contribution in CoE

                 € / MWh net
                                                CoE Ref Plant & Incremental CCS in 2032
                                             100
                                                                                                             Fuel
                                              90                                                 Capex+O&M+T&S
                                              80                           68,5
                                                                           +28%
                                              70
                                              60                 53,6
                                                                                                                                        45,4
                                              50                                                           37,7                        +32%
                                                                                                          +42%
                                              40                                                                              34,4
                                                                                                26,6
                                              30
                                              20
                                              10
                                               0                 REF POST                        REF POST                      REF POST

                                                                    EUR                          NAM                             SEA

                       Smaller % increase in CoE than for coal due to
                                higher fuel cost contribution
                                                                CoE of coal & gas CCS power plants – 14 June 2012
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or            P 11
should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial
circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
CCS competitiveness against other low
      carbon alternatives in Europe in 2012-17
                CoE Low Carbon technologies – New PP over next 5 years                                                                                                 Up to 45€
                                                                                                                                                                       cents/kWh
€ / MWh
300
                                                                                      EUROPE                                                                                       300


250                                                                                                                                                                                250

                                Reference case
200                                                                                                                                                                                200


150                                                                                                                                                                                150
                                                                                                                                                        Low case
                                                                                                                                                       CSP Tower
100                                                                                                                                                    with storage                100
                       86                  79
 50          (82 for Ref                                                                                                                                                           50
             CCS Oxy)

  0                                                                                                                                                                                0
       Hardcoal w Gas CCPP                         Nuclear              Hydro                 Geo-              Wind                 Wind               Solar         Solar PV
        CCS Post   w CCS                                                                    thermal            Onshore              Offshore           Thermal
          2017      2017
 Source : Alstom analysis 2012. CCS w Post amine 2017 costs, including on shore T&S & CO2 price (Flue Gas Recirculation for CCS Gas CC)
 CoE do not include “externalities” of Intermittent power (Back-up cost, balancing cost, grid enhancement if required)

      Under realistic assumptions and with a conservative variation
      range, CCS is already in the “mix” of low carbon alternatives
                                                                   CoE of coal & gas CCS power plants – 14 June 2012
   © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or                                        P 12
   should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial
   circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
Technology and Scale

    •          CCS technology is proven and is technologically feasible.

    •         CCCS is not commercially available as it has not been demonstrated at
             commercial power plant scale
    •        Demonstration at commercial scale is critical to define risks, optimize
             process and achieve cost reduction to support commercial contracting
    •        The CCS technology requires both policy direction and financial support to
             be demonstrated at commercial scale
    •        CCS could be competitive on a level playing field in a free market
    •        EOR will help close the gap on financing particularly on early move
             projects.
    •        Other products may be helpful depending on markets
    •        Stronger Governmental support is required

                                                                CoE of coal & gas CCS power plants – 14 June 2012
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or            P 13
should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial
circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
www.alstom.com

Contenu connexe

Tendances

Presentation of the Annual Results 2009
Presentation of the Annual Results 2009Presentation of the Annual Results 2009
Presentation of the Annual Results 2009COLEXON Energy AG
 
Day 2 Try NEGAWATT Power Plants
Day 2 Try NEGAWATT Power Plants Day 2 Try NEGAWATT Power Plants
Day 2 Try NEGAWATT Power Plants RCREEE
 
Status of hydro power in india 23.03.10
Status of hydro power in india 23.03.10Status of hydro power in india 23.03.10
Status of hydro power in india 23.03.10Ines Kkumar
 
Can the Global Aluminium Industry Achieve Carbon Neutrality
Can the Global Aluminium Industry Achieve Carbon NeutralityCan the Global Aluminium Industry Achieve Carbon Neutrality
Can the Global Aluminium Industry Achieve Carbon NeutralitySubodh Das
 
Success factors for CDM po a project development
Success factors for CDM po a project developmentSuccess factors for CDM po a project development
Success factors for CDM po a project developmentRCREEE
 
Plein gaz : enjeux et perspectives sur la valorisation du CO2 | LIEGE CREATIV...
Plein gaz : enjeux et perspectives sur la valorisation du CO2 | LIEGE CREATIV...Plein gaz : enjeux et perspectives sur la valorisation du CO2 | LIEGE CREATIV...
Plein gaz : enjeux et perspectives sur la valorisation du CO2 | LIEGE CREATIV...Nancy BOVY
 
Compliance with the Clean Air Act: Remove, Retrofit or Replace
Compliance with the Clean Air Act: Remove, Retrofit or ReplaceCompliance with the Clean Air Act: Remove, Retrofit or Replace
Compliance with the Clean Air Act: Remove, Retrofit or ReplaceTRC Companies, Inc.
 
Black & Veatch Power Generation
Black & Veatch Power GenerationBlack & Veatch Power Generation
Black & Veatch Power GenerationBacchus219
 
NTPC BHEL- event update
NTPC BHEL- event update NTPC BHEL- event update
NTPC BHEL- event update Angel Broking
 
Low-CapEx approach to synthetic transport fuels from biomass – From laborator...
Low-CapEx approach to synthetic transport fuels from biomass – From laborator...Low-CapEx approach to synthetic transport fuels from biomass – From laborator...
Low-CapEx approach to synthetic transport fuels from biomass – From laborator...Ilkka Hannula
 
Nuclear Power India Sample
Nuclear Power   India   SampleNuclear Power   India   Sample
Nuclear Power India Samplevandalmax
 
CIB TG66 South America Webinar 2010-11-04 2 Gautam Dutt
CIB TG66 South America Webinar 2010-11-04 2 Gautam DuttCIB TG66 South America Webinar 2010-11-04 2 Gautam Dutt
CIB TG66 South America Webinar 2010-11-04 2 Gautam DuttINIVE EEIG
 
Final Exeter The Secrets Of Solar Success 10 Nov 2011
Final Exeter The Secrets Of Solar Success 10 Nov 2011Final Exeter The Secrets Of Solar Success 10 Nov 2011
Final Exeter The Secrets Of Solar Success 10 Nov 2011jendacott
 
High Performance Buildings: What are They?
High Performance Buildings: What are They?High Performance Buildings: What are They?
High Performance Buildings: What are They?ASHRAE Region VI
 
Sirrs Materials Day 2010 - C-Power
Sirrs Materials Day 2010 - C-PowerSirrs Materials Day 2010 - C-Power
Sirrs Materials Day 2010 - C-PowerSirris
 

Tendances (20)

Presentation of the Annual Results 2009
Presentation of the Annual Results 2009Presentation of the Annual Results 2009
Presentation of the Annual Results 2009
 
Day 2 Try NEGAWATT Power Plants
Day 2 Try NEGAWATT Power Plants Day 2 Try NEGAWATT Power Plants
Day 2 Try NEGAWATT Power Plants
 
Status of hydro power in india 23.03.10
Status of hydro power in india 23.03.10Status of hydro power in india 23.03.10
Status of hydro power in india 23.03.10
 
Can the Global Aluminium Industry Achieve Carbon Neutrality
Can the Global Aluminium Industry Achieve Carbon NeutralityCan the Global Aluminium Industry Achieve Carbon Neutrality
Can the Global Aluminium Industry Achieve Carbon Neutrality
 
Success factors for CDM po a project development
Success factors for CDM po a project developmentSuccess factors for CDM po a project development
Success factors for CDM po a project development
 
Plein gaz : enjeux et perspectives sur la valorisation du CO2 | LIEGE CREATIV...
Plein gaz : enjeux et perspectives sur la valorisation du CO2 | LIEGE CREATIV...Plein gaz : enjeux et perspectives sur la valorisation du CO2 | LIEGE CREATIV...
Plein gaz : enjeux et perspectives sur la valorisation du CO2 | LIEGE CREATIV...
 
Compliance with the Clean Air Act: Remove, Retrofit or Replace
Compliance with the Clean Air Act: Remove, Retrofit or ReplaceCompliance with the Clean Air Act: Remove, Retrofit or Replace
Compliance with the Clean Air Act: Remove, Retrofit or Replace
 
Black & Veatch Power Generation
Black & Veatch Power GenerationBlack & Veatch Power Generation
Black & Veatch Power Generation
 
NTPC BHEL- event update
NTPC BHEL- event update NTPC BHEL- event update
NTPC BHEL- event update
 
New Build Europe 2010
New Build Europe 2010New Build Europe 2010
New Build Europe 2010
 
Low-CapEx approach to synthetic transport fuels from biomass – From laborator...
Low-CapEx approach to synthetic transport fuels from biomass – From laborator...Low-CapEx approach to synthetic transport fuels from biomass – From laborator...
Low-CapEx approach to synthetic transport fuels from biomass – From laborator...
 
CCS and the Carbon Budget
CCS and the Carbon BudgetCCS and the Carbon Budget
CCS and the Carbon Budget
 
Nuclear Power India Sample
Nuclear Power   India   SampleNuclear Power   India   Sample
Nuclear Power India Sample
 
07 carey- Early careers winter school, 9-12th January 2012, University of Cam...
07 carey- Early careers winter school, 9-12th January 2012, University of Cam...07 carey- Early careers winter school, 9-12th January 2012, University of Cam...
07 carey- Early careers winter school, 9-12th January 2012, University of Cam...
 
Usafa jan 2013
Usafa jan 2013Usafa jan 2013
Usafa jan 2013
 
CIB TG66 South America Webinar 2010-11-04 2 Gautam Dutt
CIB TG66 South America Webinar 2010-11-04 2 Gautam DuttCIB TG66 South America Webinar 2010-11-04 2 Gautam Dutt
CIB TG66 South America Webinar 2010-11-04 2 Gautam Dutt
 
Final Exeter The Secrets Of Solar Success 10 Nov 2011
Final Exeter The Secrets Of Solar Success 10 Nov 2011Final Exeter The Secrets Of Solar Success 10 Nov 2011
Final Exeter The Secrets Of Solar Success 10 Nov 2011
 
High Performance Buildings: What are They?
High Performance Buildings: What are They?High Performance Buildings: What are They?
High Performance Buildings: What are They?
 
Sirrs Materials Day 2010 - C-Power
Sirrs Materials Day 2010 - C-PowerSirrs Materials Day 2010 - C-Power
Sirrs Materials Day 2010 - C-Power
 
Leznova JI Po A
Leznova JI Po ALeznova JI Po A
Leznova JI Po A
 

En vedette

Touchten - How Touchten got millions of download with limited or no budget
Touchten - How Touchten got millions of download with limited or no budgetTouchten - How Touchten got millions of download with limited or no budget
Touchten - How Touchten got millions of download with limited or no budgete27
 
Los valores y mi vereda los pinos
Los valores y mi vereda los pinosLos valores y mi vereda los pinos
Los valores y mi vereda los pinosermelcarano
 
Tutorial aprendiendo a programar
Tutorial aprendiendo a programarTutorial aprendiendo a programar
Tutorial aprendiendo a programarEduardo Méndez
 
Capitulo1
Capitulo1Capitulo1
Capitulo1elink02
 
Plano De AcçãO Be D Carlos I
Plano De AcçãO Be D Carlos IPlano De AcçãO Be D Carlos I
Plano De AcçãO Be D Carlos ICristina Calado
 
Data in Switzerland: E-Government CH at OKCon 2013
Data in Switzerland: E-Government CH at OKCon 2013Data in Switzerland: E-Government CH at OKCon 2013
Data in Switzerland: E-Government CH at OKCon 2013CH_Bundesarchiv
 
Ladakh Revisited
Ladakh RevisitedLadakh Revisited
Ladakh Revisited101 Moments
 
El montaje de un ordenador elena cudia morales mejoracion
El montaje de un ordenador elena cudia morales mejoracionEl montaje de un ordenador elena cudia morales mejoracion
El montaje de un ordenador elena cudia morales mejoracionelenaism92
 
Professional photography
Professional photographyProfessional photography
Professional photographyJude Smith
 
Keterampilan bertanya
Keterampilan bertanyaKeterampilan bertanya
Keterampilan bertanyaSayeti Melik
 
Proceso de Planificación Estratégica
Proceso de Planificación EstratégicaProceso de Planificación Estratégica
Proceso de Planificación EstratégicaAFICE
 
IIPRD-Exemplary_Landscape Study-PEF
IIPRD-Exemplary_Landscape Study-PEFIIPRD-Exemplary_Landscape Study-PEF
IIPRD-Exemplary_Landscape Study-PEFTarun Khurana
 
Per no. 913 th 2002 angka kecukupan gizi
Per no. 913 th 2002 angka kecukupan giziPer no. 913 th 2002 angka kecukupan gizi
Per no. 913 th 2002 angka kecukupan giziPurwani Handayani
 

En vedette (20)

Touchten - How Touchten got millions of download with limited or no budget
Touchten - How Touchten got millions of download with limited or no budgetTouchten - How Touchten got millions of download with limited or no budget
Touchten - How Touchten got millions of download with limited or no budget
 
Los valores y mi vereda los pinos
Los valores y mi vereda los pinosLos valores y mi vereda los pinos
Los valores y mi vereda los pinos
 
Bahan berbahaya
Bahan berbahayaBahan berbahaya
Bahan berbahaya
 
Classificação
ClassificaçãoClassificação
Classificação
 
Tutorial aprendiendo a programar
Tutorial aprendiendo a programarTutorial aprendiendo a programar
Tutorial aprendiendo a programar
 
Cadamaanatedoygracias2
Cadamaanatedoygracias2Cadamaanatedoygracias2
Cadamaanatedoygracias2
 
ApresentaçãO
ApresentaçãOApresentaçãO
ApresentaçãO
 
Rio
RioRio
Rio
 
Capitulo1
Capitulo1Capitulo1
Capitulo1
 
Plano De AcçãO Be D Carlos I
Plano De AcçãO Be D Carlos IPlano De AcçãO Be D Carlos I
Plano De AcçãO Be D Carlos I
 
Data in Switzerland: E-Government CH at OKCon 2013
Data in Switzerland: E-Government CH at OKCon 2013Data in Switzerland: E-Government CH at OKCon 2013
Data in Switzerland: E-Government CH at OKCon 2013
 
Uma Universitária Diferente
Uma              Universitária DiferenteUma              Universitária Diferente
Uma Universitária Diferente
 
Ladakh Revisited
Ladakh RevisitedLadakh Revisited
Ladakh Revisited
 
El montaje de un ordenador elena cudia morales mejoracion
El montaje de un ordenador elena cudia morales mejoracionEl montaje de un ordenador elena cudia morales mejoracion
El montaje de un ordenador elena cudia morales mejoracion
 
Professional photography
Professional photographyProfessional photography
Professional photography
 
Keterampilan bertanya
Keterampilan bertanyaKeterampilan bertanya
Keterampilan bertanya
 
Proceso de Planificación Estratégica
Proceso de Planificación EstratégicaProceso de Planificación Estratégica
Proceso de Planificación Estratégica
 
Regulamento ef 12 13
Regulamento ef 12 13Regulamento ef 12 13
Regulamento ef 12 13
 
IIPRD-Exemplary_Landscape Study-PEF
IIPRD-Exemplary_Landscape Study-PEFIIPRD-Exemplary_Landscape Study-PEF
IIPRD-Exemplary_Landscape Study-PEF
 
Per no. 913 th 2002 angka kecukupan gizi
Per no. 913 th 2002 angka kecukupan giziPer no. 913 th 2002 angka kecukupan gizi
Per no. 913 th 2002 angka kecukupan gizi
 

Similaire à Global CCS Institute - Day 2 - Panel 4 - The Cost of Capture: Progress and Opportunities

TCM Mongstad - Alstom CCS & Chilled Ammonia - May 2012
TCM Mongstad - Alstom CCS & Chilled Ammonia - May 2012TCM Mongstad - Alstom CCS & Chilled Ammonia - May 2012
TCM Mongstad - Alstom CCS & Chilled Ammonia - May 2012Global CCS Institute
 
The Post-2020 Cost- Competitiveness of CCS
The Post-2020 Cost- Competitiveness of CCSThe Post-2020 Cost- Competitiveness of CCS
The Post-2020 Cost- Competitiveness of CCScanaleenergia
 
The Practical Potential for Gas Power with CCS in Europe in 2030 - Final Report
The Practical Potential for Gas Power with CCS in Europe in 2030 - Final ReportThe Practical Potential for Gas Power with CCS in Europe in 2030 - Final Report
The Practical Potential for Gas Power with CCS in Europe in 2030 - Final ReportGreenAllianceUK
 
Estimating the cost of a CCS System - Jean-François Léandri, Alstom
Estimating the cost of a CCS System - Jean-François Léandri, AlstomEstimating the cost of a CCS System - Jean-François Léandri, Alstom
Estimating the cost of a CCS System - Jean-François Léandri, AlstomGlobal CCS Institute
 
Global CCS Institute - Day 2 - Panel 4 - The Cost of Capture: Progress and Op...
Global CCS Institute - Day 2 - Panel 4 - The Cost of Capture: Progress and Op...Global CCS Institute - Day 2 - Panel 4 - The Cost of Capture: Progress and Op...
Global CCS Institute - Day 2 - Panel 4 - The Cost of Capture: Progress and Op...Global CCS Institute
 
Indonesia's emission cap and trade in power sector - Bayu Nugroho, MEMR
Indonesia's emission cap and trade in power sector - Bayu Nugroho, MEMRIndonesia's emission cap and trade in power sector - Bayu Nugroho, MEMR
Indonesia's emission cap and trade in power sector - Bayu Nugroho, MEMROECD Environment
 
Exploring the Role for Long-Term Hydrogen Storage in Alberta Electricity Gene...
Exploring the Role for Long-Term Hydrogen Storage in Alberta Electricity Gene...Exploring the Role for Long-Term Hydrogen Storage in Alberta Electricity Gene...
Exploring the Role for Long-Term Hydrogen Storage in Alberta Electricity Gene...IEA-ETSAP
 
EDF Carbon Capture & Storage
EDF Carbon Capture & StorageEDF Carbon Capture & Storage
EDF Carbon Capture & Storagekene2008
 
Status of US CCS projects and data available
Status of US CCS projects and data availableStatus of US CCS projects and data available
Status of US CCS projects and data availableIEA-ETSAP
 
Variable Renewable Energy in China's Transition
Variable Renewable Energy in China's TransitionVariable Renewable Energy in China's Transition
Variable Renewable Energy in China's TransitionIEA-ETSAP
 
Green technology frontiers; Carbon capture and storage (CCS)
Green technology frontiers; Carbon capture and storage (CCS)Green technology frontiers; Carbon capture and storage (CCS)
Green technology frontiers; Carbon capture and storage (CCS)Gassnova SF
 
Energy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and CostsEnergy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and CostsIEA-ETSAP
 
Why Sustainable Severn - Johnny Gowdy, Regen - Sustainable Severn Forum 2017
Why Sustainable Severn - Johnny Gowdy, Regen - Sustainable Severn Forum 2017Why Sustainable Severn - Johnny Gowdy, Regen - Sustainable Severn Forum 2017
Why Sustainable Severn - Johnny Gowdy, Regen - Sustainable Severn Forum 2017Sustainable Severn
 
I 3 practical implementation of clean coal technologies j pacyna nilu
I   3 practical implementation of clean coal technologies j pacyna niluI   3 practical implementation of clean coal technologies j pacyna nilu
I 3 practical implementation of clean coal technologies j pacyna niluInnovation Norway
 
EPRI Low CO2 Emission Coal R&D For Kpic
EPRI Low CO2 Emission Coal R&D For KpicEPRI Low CO2 Emission Coal R&D For Kpic
EPRI Low CO2 Emission Coal R&D For KpicJeffrey Phillips
 

Similaire à Global CCS Institute - Day 2 - Panel 4 - The Cost of Capture: Progress and Opportunities (20)

TCM Mongstad - Alstom CCS & Chilled Ammonia - May 2012
TCM Mongstad - Alstom CCS & Chilled Ammonia - May 2012TCM Mongstad - Alstom CCS & Chilled Ammonia - May 2012
TCM Mongstad - Alstom CCS & Chilled Ammonia - May 2012
 
Carbon Capture
Carbon CaptureCarbon Capture
Carbon Capture
 
The Post-2020 Cost- Competitiveness of CCS
The Post-2020 Cost- Competitiveness of CCSThe Post-2020 Cost- Competitiveness of CCS
The Post-2020 Cost- Competitiveness of CCS
 
Roadmap 2050 - A practical guide to a prosperous, low-carbon Europe
Roadmap 2050 - A practical guide to a prosperous, low-carbon EuropeRoadmap 2050 - A practical guide to a prosperous, low-carbon Europe
Roadmap 2050 - A practical guide to a prosperous, low-carbon Europe
 
The Practical Potential for Gas Power with CCS in Europe in 2030 - Final Report
The Practical Potential for Gas Power with CCS in Europe in 2030 - Final ReportThe Practical Potential for Gas Power with CCS in Europe in 2030 - Final Report
The Practical Potential for Gas Power with CCS in Europe in 2030 - Final Report
 
Estimating the cost of a CCS System - Jean-François Léandri, Alstom
Estimating the cost of a CCS System - Jean-François Léandri, AlstomEstimating the cost of a CCS System - Jean-François Léandri, Alstom
Estimating the cost of a CCS System - Jean-François Léandri, Alstom
 
Global CCS Institute - Day 2 - Panel 4 - The Cost of Capture: Progress and Op...
Global CCS Institute - Day 2 - Panel 4 - The Cost of Capture: Progress and Op...Global CCS Institute - Day 2 - Panel 4 - The Cost of Capture: Progress and Op...
Global CCS Institute - Day 2 - Panel 4 - The Cost of Capture: Progress and Op...
 
Indonesia's emission cap and trade in power sector - Bayu Nugroho, MEMR
Indonesia's emission cap and trade in power sector - Bayu Nugroho, MEMRIndonesia's emission cap and trade in power sector - Bayu Nugroho, MEMR
Indonesia's emission cap and trade in power sector - Bayu Nugroho, MEMR
 
Exploring the Role for Long-Term Hydrogen Storage in Alberta Electricity Gene...
Exploring the Role for Long-Term Hydrogen Storage in Alberta Electricity Gene...Exploring the Role for Long-Term Hydrogen Storage in Alberta Electricity Gene...
Exploring the Role for Long-Term Hydrogen Storage in Alberta Electricity Gene...
 
EDF Carbon Capture & Storage
EDF Carbon Capture & StorageEDF Carbon Capture & Storage
EDF Carbon Capture & Storage
 
Carlos Calad
Carlos  CaladCarlos  Calad
Carlos Calad
 
Sgcp12 crisp-decc
Sgcp12 crisp-deccSgcp12 crisp-decc
Sgcp12 crisp-decc
 
Status of US CCS projects and data available
Status of US CCS projects and data availableStatus of US CCS projects and data available
Status of US CCS projects and data available
 
Variable Renewable Energy in China's Transition
Variable Renewable Energy in China's TransitionVariable Renewable Energy in China's Transition
Variable Renewable Energy in China's Transition
 
Green technology frontiers; Carbon capture and storage (CCS)
Green technology frontiers; Carbon capture and storage (CCS)Green technology frontiers; Carbon capture and storage (CCS)
Green technology frontiers; Carbon capture and storage (CCS)
 
Energy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and CostsEnergy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and Costs
 
ID-109.pdf
ID-109.pdfID-109.pdf
ID-109.pdf
 
Why Sustainable Severn - Johnny Gowdy, Regen - Sustainable Severn Forum 2017
Why Sustainable Severn - Johnny Gowdy, Regen - Sustainable Severn Forum 2017Why Sustainable Severn - Johnny Gowdy, Regen - Sustainable Severn Forum 2017
Why Sustainable Severn - Johnny Gowdy, Regen - Sustainable Severn Forum 2017
 
I 3 practical implementation of clean coal technologies j pacyna nilu
I   3 practical implementation of clean coal technologies j pacyna niluI   3 practical implementation of clean coal technologies j pacyna nilu
I 3 practical implementation of clean coal technologies j pacyna nilu
 
EPRI Low CO2 Emission Coal R&D For Kpic
EPRI Low CO2 Emission Coal R&D For KpicEPRI Low CO2 Emission Coal R&D For Kpic
EPRI Low CO2 Emission Coal R&D For Kpic
 

Plus de Global CCS Institute

Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project Global CCS Institute
 
Webinar: Policy priorities to incentivise large scale deployment of CCS
Webinar: Policy priorities to incentivise large scale deployment of CCSWebinar: Policy priorities to incentivise large scale deployment of CCS
Webinar: Policy priorities to incentivise large scale deployment of CCSGlobal CCS Institute
 
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...Global CCS Institute
 
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...Global CCS Institute
 
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCSDecarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCSGlobal CCS Institute
 
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Global CCS Institute
 
Membrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationMembrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationGlobal CCS Institute
 
Mission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation ChallengeMission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation ChallengeGlobal CCS Institute
 
Can the United States Achieve a Low Carbon Economy by 2050?
Can the United States Achieve a Low Carbon Economy by 2050?Can the United States Achieve a Low Carbon Economy by 2050?
Can the United States Achieve a Low Carbon Economy by 2050?Global CCS Institute
 
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...Global CCS Institute
 
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...Global CCS Institute
 
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...Global CCS Institute
 
Managing carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basinsManaging carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basinsGlobal CCS Institute
 
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Global CCS Institute
 
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...Global CCS Institute
 
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...Global CCS Institute
 
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...Global CCS Institute
 
Water use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systemsWater use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systemsGlobal CCS Institute
 

Plus de Global CCS Institute (20)

Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project
 
Webinar: Policy priorities to incentivise large scale deployment of CCS
Webinar: Policy priorities to incentivise large scale deployment of CCSWebinar: Policy priorities to incentivise large scale deployment of CCS
Webinar: Policy priorities to incentivise large scale deployment of CCS
 
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
 
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
 
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCSDecarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
 
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
 
Global CCS Institute Presentation
Global CCS Institute PresentationGlobal CCS Institute Presentation
Global CCS Institute Presentation
 
ION Engineering Presentation
ION Engineering PresentationION Engineering Presentation
ION Engineering Presentation
 
Membrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationMembrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) Presentation
 
Mission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation ChallengeMission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation Challenge
 
Can the United States Achieve a Low Carbon Economy by 2050?
Can the United States Achieve a Low Carbon Economy by 2050?Can the United States Achieve a Low Carbon Economy by 2050?
Can the United States Achieve a Low Carbon Economy by 2050?
 
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
 
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
 
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
 
Managing carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basinsManaging carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basins
 
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
 
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
 
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
 
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
 
Water use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systemsWater use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systems
 

Global CCS Institute - Day 2 - Panel 4 - The Cost of Capture: Progress and Opportunities

  • 1. PANEL 4 THE COST OF CAPTURE: PROGRESS AND OPPORTUNITIES Anne Margrete Blaker and Stale Aakenes – Gassnova SF George Booras – EPRI Robert Hilton – Alstom Don Wharton – TransAlta
  • 2. The Costs of Capture: Progress and Opportunity GCCSI Annual Meeting Calgary, Alberta, Canada Robert G. Hilton October 11, 2012
  • 3. Introduction • IPCC 2007: Max GHG 450 ppm for +2°C scenario ⇒ reduce massively CO2 emissions in Power Gen  Efficiency increase EUROPE - MtCO2 - 2035 New Policies Scenario  Nuclear & Renewables and 450 Scenario (IEA-WEO 2011)  CCS on Fossil plants COAL GAS 449 • CCS necessary because: 397  2035: >50% of W-W TWh still fossil  Fossil will remain strong until ~2050 159  IEA WEO: - 2,7 GtCO2 CCS in 2035 81  CCS on Coal and Gas NPS 450 NPS 450 CCS needed on both Coal and Gas. Will it be competitive ? CoE of coal & gas CCS power plants – 14 June 2012 © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or P3 should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
  • 4. Introduction Alstom Cost of Electricity study on CCS CCS experience: 16 pilots/demos Plant integration experience (supply of turnkey power plants) Alstom know-how for a solid CoE study on CCS PP Component manufacturer CoE of coal & gas CCS power plants – 14 June 2012 © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or P4 should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
  • 5. CCS Cost of Electricity study Main assumptions Reference plants: Coal & Lignite (without CCS) EUR NAM SEA Fuel type Bituminous Raw Lignite Dried Lignite PRB coal Bituminous Fuel heating value KJ/Kg LHV 24 930 10 278 21 283 20 425 20 896 Carbon content UB mass% 65% 31% 57% 56% 53% Fuel price 2011 Euro/t 78,2 24,3 24,3 25,7 53,4 Euro/GJ 3,14 2,37 2,13 1,26 2,56 Cycle argt 2020/30 bar/°C/°C 300b/600/620°C 272b/600/605°C 300b/600/620°C 300b/600/620°C 300b/600/620°C Cooling type °C 13°C - Direct C 18°C - Direct C 18°C - Direct C 19°C - CT 28°C - Direct C Net Output MWe net 837 1 000 1 000 837 837 Net eff. 15/20/30 % LHV 46.2/48/48.4 % 44/-/- % w HR 47,6/48,8/49 % 44/46.2/46.7 % 41/42.7/43 % EPC 2015/20/30 €/KW net 1421/1518/1518 1583/-/- 2070/2200/2200 1612/1722/1722 814/869/869 • Base case at 7450 hrs per a. plus sensitivity analysis • Performance improvement considered (e.g. double reheat ST) • Cycle arrangement in 2020/30: 300b-600°C-620°C Realistic set of assumptions by region CoE of coal & gas CCS power plants – 14 June 2012 © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or P5 should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
  • 6. Hardcoal CCS power plant Energy Penalty (EP) (Ref PP net MWe – CCS PP net MWe) Energy penalty (EP) = (Ref PP net MWe) EUR & NAM SEA Note : 90% capture of CCS PP CO2 emission, CCS plant and Reference plant at same net Performance improvement and cooling temperature impacts CoE of coal & gas CCS power plants – 14 June 2012 © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or P6 should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
  • 7. Hardcoal CCS power plant CoE base case (with T&S, without CO2 price) CoE €/MWh net EUR CoE €/MWh net NAM CoE €/MWh net SEA 90 90 90 73,5 €/MWh Oxy Oxy 80 (Post) 80 Post 80 Post Ref PP Ref PP 70 Oxy 70 70 Post +45% 60 Ref PP (Post) 60 60 64 €/MWh 62 €/MWh 50 50 (Post) 50 (Post) 40 40 40 30 30 30 2015 2020 2025 2030 2035 2015 2020 2025 2030 2035 2015 2020 2025 2030 2035 • All with T&S, on-shore saline aquifer: impact on CoE: 4,8 to 7,2 €/MWh net EUR 2032: CCS => +45% increase in CoE; NAM/SEA: lower CoE CoE of coal & gas CCS power plants – 14 June 2012 © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or P7 should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
  • 8. Hardcoal CCS power plant Fuel, Capex/Opex and T&S contribution in CoE CoE Ref Plant & Incremental CCS in 2032 € / MWh net 100 T&S 90 Fuel 73,5 80 +45% Capex+Opex 70 64 62 60 50,5 50 40,5 40 40 30 20 10 0 REF POST REF POST REF POST EUR NAM SEA High capex, expensive coal Cheap coal, lower efficiency Low Capex, expensive coal Regional differences in Fuel, Capex/Opex costs CoE of coal & gas CCS power plants – 14 June 2012 © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or P8 should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
  • 9. CCS Cost of Electricity study Main assumptions Gas Reference Combined-Cycle Power Plants (without CCS) EUR NAM SEA Fuel type Natural gas Natural gas Natural gas Fuel heating value KJ/Kg LHV 50 000 50 000 50 000 Carbon content mass% 75% 75% 75% Fuel price 2011 Euro/GJ 7,2 2,8 3,8 (subs.) Cycle argt 2020/30 1-1 SS 2-1 MS 1-1 SS Cooling type °C 13°C - Direct C 19°C - CT 28°C - Direct C Net Output 15/20/30 MWe net 600/650/700 850/900/950 538/583/628 Net eff. 15/20/30 % LHV 61/62/63 % 60/61/62 % 60/61/62 % EPC cost 15/20/30 €/KW net 558/544/529 452/441/429 473/461/449 • Base case combined cycle at 6570 hrs per a. • Performance improvement considered Combined cycles realistic set of assumptions CoE of coal & gas CCS power plants – 14 June 2012 © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or P9 should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
  • 10. Gas Combined Cycle CCS Power Plant CoE base case (with T&S, without CO2 price) CoE €/MWh net EUR CoE €/MWh net NAM CoE €/MWh net SEA 80 80 80 COE - EUROPE COE - NAM COE - ASIA 75 75 75 68,5 €/ MWh ) Post FGR, 90% capt 70 70 Post FGR, 90% capt 70 Ref plant 65 65 Ref plant 65 60 Ref plant +28% 60 60 55 55 55 50 50 50 45 Post FGR, 90% capt 45 45 40 Ref plant 40 40 Ref plant +32% 35 35 35 30 30 Ref plant +42% 30 25 25 25 2015 2020 2025 2030 2035 2015 2020 2025 2030 2035 2015 2020 2025 2030 2035 • Gas price at 7,2 Euro/GJ • Lowest gas price at 2,8 €/GJ • Subsidized gas price 3,8 €/GJ => offsets Capex advantage • -5 % reduction with FGR Note : 90% capture of CCS PP CO2 emissions, CCS plant net output de-rated vs Reference plant (energy penalty) Difference in gas price between regions drives CoE level CoE of coal & gas CCS power plants – 14 June 2012 © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or P 10 should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
  • 11. Gas Combined Cycle CCS Power Plant Fuel contribution in CoE € / MWh net CoE Ref Plant & Incremental CCS in 2032 100 Fuel 90 Capex+O&M+T&S 80 68,5 +28% 70 60 53,6 45,4 50 37,7 +32% +42% 40 34,4 26,6 30 20 10 0 REF POST REF POST REF POST EUR NAM SEA Smaller % increase in CoE than for coal due to higher fuel cost contribution CoE of coal & gas CCS power plants – 14 June 2012 © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or P 11 should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
  • 12. CCS competitiveness against other low carbon alternatives in Europe in 2012-17 CoE Low Carbon technologies – New PP over next 5 years Up to 45€ cents/kWh € / MWh 300 EUROPE 300 250 250 Reference case 200 200 150 150 Low case CSP Tower 100 with storage 100 86 79 50 (82 for Ref 50 CCS Oxy) 0 0 Hardcoal w Gas CCPP Nuclear Hydro Geo- Wind Wind Solar Solar PV CCS Post w CCS thermal Onshore Offshore Thermal 2017 2017 Source : Alstom analysis 2012. CCS w Post amine 2017 costs, including on shore T&S & CO2 price (Flue Gas Recirculation for CCS Gas CC) CoE do not include “externalities” of Intermittent power (Back-up cost, balancing cost, grid enhancement if required) Under realistic assumptions and with a conservative variation range, CCS is already in the “mix” of low carbon alternatives CoE of coal & gas CCS power plants – 14 June 2012 © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or P 12 should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without
  • 13. Technology and Scale • CCS technology is proven and is technologically feasible. • CCCS is not commercially available as it has not been demonstrated at commercial power plant scale • Demonstration at commercial scale is critical to define risks, optimize process and achieve cost reduction to support commercial contracting • The CCS technology requires both policy direction and financial support to be demonstrated at commercial scale • CCS could be competitive on a level playing field in a free market • EOR will help close the gap on financing particularly on early move projects. • Other products may be helpful depending on markets • Stronger Governmental support is required CoE of coal & gas CCS power plants – 14 June 2012 © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or P 13 should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties without