ASCE Structures Congress 2015
• Performance-based Design and Seismic
Loss Evaluation
• Multi-Objective Optimization Problem
• Example Design Problem
• Summary and Conclusions
ASCE Structures Congress 2015
ASCE Structures Congress 2015
ASCE Structures Congress 2015
Fragility curves for structural and non-structural
members for different damage measures → based
on parameters given in Hazus technical manual
ASCE Structures Congress 2015
• Expected direct economic losses for each
component (SS, NSD, NSA) are calculated:
• Expected loss is calculated as the sum of
losses for structural and nonstructural
components.
Repair
Costs
&
ASCE Structures Congress 2015
• Hazus recommendations for social loss
calculation→ event tree of consequent
casualty levels for different damage levels
• Social loss is the aggregation different
possible scenarios
• Weights assigned to different casualty
severity levels using National Safety
Council (NSC) suggestions
ASCE Structures Congress 2015
Building
Damage State 1
CSL1
CSL2
CSL3
CSL4
Damage State 2
CSL1
CSL2
CSL3
CSL4
Damage State 3
CSL1
CSL2
CSL3
CSL4
Damage State 4
No Collapse
CSL1
CSL2
CSL3
CSL4
With Collapse
CSL1
CSL2
CSL3
CSL4
ASCE Structures Congress 2015
• Seismic loss parameters are the
optimization objectives
• Two types of seismic losses considered:
economic and social
• Loss parameter is the expected annual
loss value
ASCE Structures Congress 2015
Multi-objective Optimization Procedure:
Non-Dominated Sorting Genetic Algorithm NSGA-II
(Deb et al. 2002)
ASCE Structures Congress 2015
Multi-objective optimization problem
)3,1(:
),,(
 ilctoSubjected
EASLEALWMinimize
ii
ppp
EALEALp 
EASLEASLp 
min,1 : CPCP CLCLc 
min,2 : IOIO CLCLc 
0.1: *
*
3 


pb
pc
M
M
c









 
iii
ii
i
ii
i
i
i
lcif
lcif
c
cl
0.1
where
3
1



The penalty function φ is defined as
Constraints
WWp 
ASCE Structures Congress 2015
PERFORMANCE
OBJECTIVES
Collapse Prevention for hazard level
of 2% POE in 50 years
Immediate Occupancy for hazard
level of 50% POE in 50 years
ASCE Structures Congress 2015
The acceptable confidence levels (CL) for meeting
these performance objectives are:
• CLCP = 90%
• CLIO = 50%
Meeting these performance objectives are set as
the acceptance criteria for the feasibility of the
designs in the multi-objective optimization
problem.
ASCE Structures Congress 2015
ASCE Structures Congress 2015
ASCE Structures Congress 2015
ASCE Structures Congress 2015
ASCE Structures Congress 2015
ASCE Structures Congress 2015
• Seismic loss values as objectives in optimized
probabilistic performance-based design
• Different types of seismic losses considered:
economic and social
• Multi-objective optimization results in the form of
Pareto fronts
• Pareto front: provide decision makers with useful
comparison tool for optimized design considering
different objectives
ASCE Structures Congress 2015
For the example structure considered:
• Reduction in both economic and social losses in the
obtained results with increase in the weight of the
structural system
• Minimum weight design: drift-sensitive non-structural
components have a more significant contribution to the
calculated economic loss
• Minimum loss designs: acceleration-sensitive non-
structural components have a larger contribution to the
calculated economic loss
ASCE Structures Congress 2015

More Related Content

What's hot

Non linear static pushover analysis of irregular space frame structure with a...
Non linear static pushover analysis of irregular space frame structure with a...Non linear static pushover analysis of irregular space frame structure with a...
Non linear static pushover analysis of irregular space frame structure with a...eSAT Publishing House
 
Seismic Vulnerability of RC Building With and Without Soft Storey Effect Usi...
Seismic Vulnerability of RC Building With and Without Soft  Storey Effect Usi...Seismic Vulnerability of RC Building With and Without Soft  Storey Effect Usi...
Seismic Vulnerability of RC Building With and Without Soft Storey Effect Usi...IJMER
 
Pushover analysis of multy story building
Pushover analysis of multy story buildingPushover analysis of multy story building
Pushover analysis of multy story buildingeSAT Publishing House
 
Elastic response spectra
Elastic response spectra Elastic response spectra
Elastic response spectra Alban KURIQI
 
DESIGN AND ANALYSIS OF MULTI STORIED STRUCTURES USING STATIC NON LINEAR ANALYSIS
DESIGN AND ANALYSIS OF MULTI STORIED STRUCTURES USING STATIC NON LINEAR ANALYSISDESIGN AND ANALYSIS OF MULTI STORIED STRUCTURES USING STATIC NON LINEAR ANALYSIS
DESIGN AND ANALYSIS OF MULTI STORIED STRUCTURES USING STATIC NON LINEAR ANALYSISIjripublishers Ijri
 
Performance based seismic analysis of rc building considering the effect of d...
Performance based seismic analysis of rc building considering the effect of d...Performance based seismic analysis of rc building considering the effect of d...
Performance based seismic analysis of rc building considering the effect of d...eSAT Journals
 
Performance Based Evaluation of Shear Walled RCC Building by Pushover Analysis
Performance Based Evaluation of Shear Walled RCC Building by Pushover AnalysisPerformance Based Evaluation of Shear Walled RCC Building by Pushover Analysis
Performance Based Evaluation of Shear Walled RCC Building by Pushover AnalysisIJMER
 
Seismic response of existing rc building under revised seismic zone classific...
Seismic response of existing rc building under revised seismic zone classific...Seismic response of existing rc building under revised seismic zone classific...
Seismic response of existing rc building under revised seismic zone classific...IAEME Publication
 
Non linear static pushover analysis
Non linear static pushover analysisNon linear static pushover analysis
Non linear static pushover analysisjeyanthi4
 
Nonlinear modelling of RC frame structures
Nonlinear modelling of RC frame structuresNonlinear modelling of RC frame structures
Nonlinear modelling of RC frame structuresFabioDiTrapani2
 
Non Linear Static Analysis of Dual RC Frame Structure
Non Linear Static Analysis of Dual RC Frame StructureNon Linear Static Analysis of Dual RC Frame Structure
Non Linear Static Analysis of Dual RC Frame StructureIRJET Journal
 
STATIC LINEAR AND NON LINEAR (PUSHOVER) ANALYSIS OF RC BUILDING ON SLOPING GR...
STATIC LINEAR AND NON LINEAR (PUSHOVER) ANALYSIS OF RC BUILDING ON SLOPING GR...STATIC LINEAR AND NON LINEAR (PUSHOVER) ANALYSIS OF RC BUILDING ON SLOPING GR...
STATIC LINEAR AND NON LINEAR (PUSHOVER) ANALYSIS OF RC BUILDING ON SLOPING GR...IAEME Publication
 
Software analysis concepts
Software analysis conceptsSoftware analysis concepts
Software analysis conceptsRishabh Lala
 
Seismic Performance Assessment of RCS Building By Pushover Analysis
Seismic Performance Assessment of RCS Building By Pushover AnalysisSeismic Performance Assessment of RCS Building By Pushover Analysis
Seismic Performance Assessment of RCS Building By Pushover AnalysisIOSR Journals
 
Seismic analysis of reinforced concrete buildings -A Review
Seismic analysis of reinforced concrete buildings -A ReviewSeismic analysis of reinforced concrete buildings -A Review
Seismic analysis of reinforced concrete buildings -A ReviewIRJET Journal
 
Tbi peer2010 05 guidelines for performance based seismic design of tall buil...
Tbi peer2010 05  guidelines for performance based seismic design of tall buil...Tbi peer2010 05  guidelines for performance based seismic design of tall buil...
Tbi peer2010 05 guidelines for performance based seismic design of tall buil...Ramil Artates
 
The Pushover Analysis from basics - Rahul Leslie
The Pushover Analysis from basics - Rahul LeslieThe Pushover Analysis from basics - Rahul Leslie
The Pushover Analysis from basics - Rahul LeslieRahul Leslie
 
IRJET- Comparison of Incremental Dynamic Analysis Curve with Pushover Curve
IRJET- Comparison of Incremental Dynamic Analysis Curve with Pushover CurveIRJET- Comparison of Incremental Dynamic Analysis Curve with Pushover Curve
IRJET- Comparison of Incremental Dynamic Analysis Curve with Pushover CurveIRJET Journal
 

What's hot (20)

Ijciet 06 08_007
Ijciet 06 08_007Ijciet 06 08_007
Ijciet 06 08_007
 
Non linear static pushover analysis of irregular space frame structure with a...
Non linear static pushover analysis of irregular space frame structure with a...Non linear static pushover analysis of irregular space frame structure with a...
Non linear static pushover analysis of irregular space frame structure with a...
 
Seismic Vulnerability of RC Building With and Without Soft Storey Effect Usi...
Seismic Vulnerability of RC Building With and Without Soft  Storey Effect Usi...Seismic Vulnerability of RC Building With and Without Soft  Storey Effect Usi...
Seismic Vulnerability of RC Building With and Without Soft Storey Effect Usi...
 
modal pushover analysis
modal pushover analysismodal pushover analysis
modal pushover analysis
 
Pushover analysis of multy story building
Pushover analysis of multy story buildingPushover analysis of multy story building
Pushover analysis of multy story building
 
Elastic response spectra
Elastic response spectra Elastic response spectra
Elastic response spectra
 
DESIGN AND ANALYSIS OF MULTI STORIED STRUCTURES USING STATIC NON LINEAR ANALYSIS
DESIGN AND ANALYSIS OF MULTI STORIED STRUCTURES USING STATIC NON LINEAR ANALYSISDESIGN AND ANALYSIS OF MULTI STORIED STRUCTURES USING STATIC NON LINEAR ANALYSIS
DESIGN AND ANALYSIS OF MULTI STORIED STRUCTURES USING STATIC NON LINEAR ANALYSIS
 
Performance based seismic analysis of rc building considering the effect of d...
Performance based seismic analysis of rc building considering the effect of d...Performance based seismic analysis of rc building considering the effect of d...
Performance based seismic analysis of rc building considering the effect of d...
 
Performance Based Evaluation of Shear Walled RCC Building by Pushover Analysis
Performance Based Evaluation of Shear Walled RCC Building by Pushover AnalysisPerformance Based Evaluation of Shear Walled RCC Building by Pushover Analysis
Performance Based Evaluation of Shear Walled RCC Building by Pushover Analysis
 
Seismic response of existing rc building under revised seismic zone classific...
Seismic response of existing rc building under revised seismic zone classific...Seismic response of existing rc building under revised seismic zone classific...
Seismic response of existing rc building under revised seismic zone classific...
 
Non linear static pushover analysis
Non linear static pushover analysisNon linear static pushover analysis
Non linear static pushover analysis
 
Nonlinear modelling of RC frame structures
Nonlinear modelling of RC frame structuresNonlinear modelling of RC frame structures
Nonlinear modelling of RC frame structures
 
Non Linear Static Analysis of Dual RC Frame Structure
Non Linear Static Analysis of Dual RC Frame StructureNon Linear Static Analysis of Dual RC Frame Structure
Non Linear Static Analysis of Dual RC Frame Structure
 
STATIC LINEAR AND NON LINEAR (PUSHOVER) ANALYSIS OF RC BUILDING ON SLOPING GR...
STATIC LINEAR AND NON LINEAR (PUSHOVER) ANALYSIS OF RC BUILDING ON SLOPING GR...STATIC LINEAR AND NON LINEAR (PUSHOVER) ANALYSIS OF RC BUILDING ON SLOPING GR...
STATIC LINEAR AND NON LINEAR (PUSHOVER) ANALYSIS OF RC BUILDING ON SLOPING GR...
 
Software analysis concepts
Software analysis conceptsSoftware analysis concepts
Software analysis concepts
 
Seismic Performance Assessment of RCS Building By Pushover Analysis
Seismic Performance Assessment of RCS Building By Pushover AnalysisSeismic Performance Assessment of RCS Building By Pushover Analysis
Seismic Performance Assessment of RCS Building By Pushover Analysis
 
Seismic analysis of reinforced concrete buildings -A Review
Seismic analysis of reinforced concrete buildings -A ReviewSeismic analysis of reinforced concrete buildings -A Review
Seismic analysis of reinforced concrete buildings -A Review
 
Tbi peer2010 05 guidelines for performance based seismic design of tall buil...
Tbi peer2010 05  guidelines for performance based seismic design of tall buil...Tbi peer2010 05  guidelines for performance based seismic design of tall buil...
Tbi peer2010 05 guidelines for performance based seismic design of tall buil...
 
The Pushover Analysis from basics - Rahul Leslie
The Pushover Analysis from basics - Rahul LeslieThe Pushover Analysis from basics - Rahul Leslie
The Pushover Analysis from basics - Rahul Leslie
 
IRJET- Comparison of Incremental Dynamic Analysis Curve with Pushover Curve
IRJET- Comparison of Incremental Dynamic Analysis Curve with Pushover CurveIRJET- Comparison of Incremental Dynamic Analysis Curve with Pushover Curve
IRJET- Comparison of Incremental Dynamic Analysis Curve with Pushover Curve
 

Viewers also liked

Probabilistic Ontology: Representation and Modeling Methodology
Probabilistic Ontology: Representation and Modeling MethodologyProbabilistic Ontology: Representation and Modeling Methodology
Probabilistic Ontology: Representation and Modeling MethodologyRommel Carvalho
 
Fragility analysis of open ground storey rc building designed using various m...
Fragility analysis of open ground storey rc building designed using various m...Fragility analysis of open ground storey rc building designed using various m...
Fragility analysis of open ground storey rc building designed using various m...eSAT Journals
 
FORTE-Seismic risk assessment of industrial plants a case study-ID1277-IDRC20...
FORTE-Seismic risk assessment of industrial plants a case study-ID1277-IDRC20...FORTE-Seismic risk assessment of industrial plants a case study-ID1277-IDRC20...
FORTE-Seismic risk assessment of industrial plants a case study-ID1277-IDRC20...Global Risk Forum GRFDavos
 
MATLAB ODE
MATLAB ODEMATLAB ODE
MATLAB ODEKris014
 
Optics Fourier Transform Ii
Optics Fourier Transform IiOptics Fourier Transform Ii
Optics Fourier Transform Iidiarmseven
 
2015 Structures Congress - One Jackson Square
2015 Structures Congress - One Jackson Square2015 Structures Congress - One Jackson Square
2015 Structures Congress - One Jackson SquareGilsanz Murray Steficek
 
Cets 2015 goldsmith two truths and a lie 2015 e l edition quiz w answer key dist
Cets 2015 goldsmith two truths and a lie 2015 e l edition quiz w answer key distCets 2015 goldsmith two truths and a lie 2015 e l edition quiz w answer key dist
Cets 2015 goldsmith two truths and a lie 2015 e l edition quiz w answer key distChicago eLearning & Technology Showcase
 
Cets 2016 heilman fortney bjerkan a 1000 words! – using highly visual techniq...
Cets 2016 heilman fortney bjerkan a 1000 words! – using highly visual techniq...Cets 2016 heilman fortney bjerkan a 1000 words! – using highly visual techniq...
Cets 2016 heilman fortney bjerkan a 1000 words! – using highly visual techniq...Chicago eLearning & Technology Showcase
 
Meinong Taiwan Earthquake Reconnaissance
Meinong Taiwan Earthquake ReconnaissanceMeinong Taiwan Earthquake Reconnaissance
Meinong Taiwan Earthquake ReconnaissanceGilsanz Murray Steficek
 
PERFORMANCE BASED ANALYSIS OF VERTICALLY IRREGULAR STRUCTURE UNDER VARIOUS SE...
PERFORMANCE BASED ANALYSIS OF VERTICALLY IRREGULAR STRUCTURE UNDER VARIOUS SE...PERFORMANCE BASED ANALYSIS OF VERTICALLY IRREGULAR STRUCTURE UNDER VARIOUS SE...
PERFORMANCE BASED ANALYSIS OF VERTICALLY IRREGULAR STRUCTURE UNDER VARIOUS SE...Ijripublishers Ijri
 
Reinventing Woolworth: Adaptive Reuse of an Historic Skyscraper
Reinventing Woolworth: Adaptive Reuse of an Historic SkyscraperReinventing Woolworth: Adaptive Reuse of an Historic Skyscraper
Reinventing Woolworth: Adaptive Reuse of an Historic SkyscraperGilsanz Murray Steficek
 

Viewers also liked (20)

Probabilistic Ontology: Representation and Modeling Methodology
Probabilistic Ontology: Representation and Modeling MethodologyProbabilistic Ontology: Representation and Modeling Methodology
Probabilistic Ontology: Representation and Modeling Methodology
 
Fragility analysis of open ground storey rc building designed using various m...
Fragility analysis of open ground storey rc building designed using various m...Fragility analysis of open ground storey rc building designed using various m...
Fragility analysis of open ground storey rc building designed using various m...
 
FORTE-Seismic risk assessment of industrial plants a case study-ID1277-IDRC20...
FORTE-Seismic risk assessment of industrial plants a case study-ID1277-IDRC20...FORTE-Seismic risk assessment of industrial plants a case study-ID1277-IDRC20...
FORTE-Seismic risk assessment of industrial plants a case study-ID1277-IDRC20...
 
MATLAB ODE
MATLAB ODEMATLAB ODE
MATLAB ODE
 
Optics Fourier Transform Ii
Optics Fourier Transform IiOptics Fourier Transform Ii
Optics Fourier Transform Ii
 
Cets 2015 gaillard engage model guide
Cets 2015 gaillard engage model guideCets 2015 gaillard engage model guide
Cets 2015 gaillard engage model guide
 
2015 Structures Congress - One Jackson Square
2015 Structures Congress - One Jackson Square2015 Structures Congress - One Jackson Square
2015 Structures Congress - One Jackson Square
 
Cets 2013 graunke audio recording studio in a box
Cets 2013 graunke audio recording studio in a boxCets 2013 graunke audio recording studio in a box
Cets 2013 graunke audio recording studio in a box
 
Cets 2013 gander hale_soar_scenario_builder
Cets 2013 gander hale_soar_scenario_builderCets 2013 gander hale_soar_scenario_builder
Cets 2013 gander hale_soar_scenario_builder
 
2015 Structures Congress - 2 day cycle
2015 Structures Congress - 2 day cycle2015 Structures Congress - 2 day cycle
2015 Structures Congress - 2 day cycle
 
Cets 2015 goldsmith two truths and a lie 2015 e l edition quiz w answer key dist
Cets 2015 goldsmith two truths and a lie 2015 e l edition quiz w answer key distCets 2015 goldsmith two truths and a lie 2015 e l edition quiz w answer key dist
Cets 2015 goldsmith two truths and a lie 2015 e l edition quiz w answer key dist
 
Cets 2016 heilman fortney bjerkan a 1000 words! – using highly visual techniq...
Cets 2016 heilman fortney bjerkan a 1000 words! – using highly visual techniq...Cets 2016 heilman fortney bjerkan a 1000 words! – using highly visual techniq...
Cets 2016 heilman fortney bjerkan a 1000 words! – using highly visual techniq...
 
Cets 2013 gander hale_item qa checklist
Cets 2013 gander hale_item qa checklistCets 2013 gander hale_item qa checklist
Cets 2013 gander hale_item qa checklist
 
Meinong Taiwan Earthquake Reconnaissance
Meinong Taiwan Earthquake ReconnaissanceMeinong Taiwan Earthquake Reconnaissance
Meinong Taiwan Earthquake Reconnaissance
 
PERFORMANCE BASED ANALYSIS OF VERTICALLY IRREGULAR STRUCTURE UNDER VARIOUS SE...
PERFORMANCE BASED ANALYSIS OF VERTICALLY IRREGULAR STRUCTURE UNDER VARIOUS SE...PERFORMANCE BASED ANALYSIS OF VERTICALLY IRREGULAR STRUCTURE UNDER VARIOUS SE...
PERFORMANCE BASED ANALYSIS OF VERTICALLY IRREGULAR STRUCTURE UNDER VARIOUS SE...
 
837 Washington
837 Washington837 Washington
837 Washington
 
Reinventing Woolworth: Adaptive Reuse of an Historic Skyscraper
Reinventing Woolworth: Adaptive Reuse of an Historic SkyscraperReinventing Woolworth: Adaptive Reuse of an Historic Skyscraper
Reinventing Woolworth: Adaptive Reuse of an Historic Skyscraper
 
SDEE: Lectures 3 and 4
SDEE: Lectures 3 and 4SDEE: Lectures 3 and 4
SDEE: Lectures 3 and 4
 
Cets 2016 fisher munoz agile project management methods for e learning
Cets 2016 fisher munoz agile project management methods for e learningCets 2016 fisher munoz agile project management methods for e learning
Cets 2016 fisher munoz agile project management methods for e learning
 
Cets 2015 ls van hyfte managing elearning projects
Cets 2015 ls van hyfte managing elearning projectsCets 2015 ls van hyfte managing elearning projects
Cets 2015 ls van hyfte managing elearning projects
 

Similar to 2015 Structures Congress - Probabilistic Performance Based Design

Offshore Europe 2015 1.0 LRED
Offshore Europe 2015 1.0  LREDOffshore Europe 2015 1.0  LRED
Offshore Europe 2015 1.0 LREDPieter van Asten
 
Using Technical Performance Progress
Using Technical Performance ProgressUsing Technical Performance Progress
Using Technical Performance ProgressGlen Alleman
 
An introduction to an effective earned value management system (EVMS) webinar...
An introduction to an effective earned value management system (EVMS) webinar...An introduction to an effective earned value management system (EVMS) webinar...
An introduction to an effective earned value management system (EVMS) webinar...Association for Project Management
 
Optimising equipment Safety, Operations and Cost performance
Optimising equipment Safety, Operations and Cost performanceOptimising equipment Safety, Operations and Cost performance
Optimising equipment Safety, Operations and Cost performanceLloyd's Register Energy
 
Innovative Design Approaches to Improve Disaster Resilience and Reduced Cost ...
Innovative Design Approaches to Improve Disaster Resilience and Reduced Cost ...Innovative Design Approaches to Improve Disaster Resilience and Reduced Cost ...
Innovative Design Approaches to Improve Disaster Resilience and Reduced Cost ...AIT Solutions
 
IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFPieter van Asten
 
Integrated Agile Software Development with Earned Value Management
Integrated Agile Software Development with Earned Value ManagementIntegrated Agile Software Development with Earned Value Management
Integrated Agile Software Development with Earned Value ManagementGlen Alleman
 
IRJET- Life Cycle Cost Analysis of a Residential Building
IRJET-  	  Life Cycle Cost Analysis of a Residential BuildingIRJET-  	  Life Cycle Cost Analysis of a Residential Building
IRJET- Life Cycle Cost Analysis of a Residential BuildingIRJET Journal
 
LIFE CYCLE COST CALCULATION MODELS FOR BUILDINGS
LIFE CYCLE COST CALCULATION MODELS FOR BUILDINGSLIFE CYCLE COST CALCULATION MODELS FOR BUILDINGS
LIFE CYCLE COST CALCULATION MODELS FOR BUILDINGSSharan Thampi J
 
Economic Consequence Analysis, Prof. Adam Rose, USC
Economic Consequence Analysis, Prof. Adam Rose, USCEconomic Consequence Analysis, Prof. Adam Rose, USC
Economic Consequence Analysis, Prof. Adam Rose, USCOECD Governance
 
Infrastructure Improvement PowerPoint Presentation Slides
Infrastructure Improvement PowerPoint Presentation SlidesInfrastructure Improvement PowerPoint Presentation Slides
Infrastructure Improvement PowerPoint Presentation SlidesSlideTeam
 
Monetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionMonetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionBlack & Veatch
 
PPP08 - PM Optimization and Efficiency
PPP08 - PM Optimization and EfficiencyPPP08 - PM Optimization and Efficiency
PPP08 - PM Optimization and EfficiencyMaintenance Connection
 
Measurement News Webinar
Measurement News WebinarMeasurement News Webinar
Measurement News WebinarGlen Alleman
 
1-SoftwareEngineeringandBestPractices.ppt
1-SoftwareEngineeringandBestPractices.ppt1-SoftwareEngineeringandBestPractices.ppt
1-SoftwareEngineeringandBestPractices.pptMeenakshiPanda
 
1-SoftwareEngineeringandBestPractices.ppt
1-SoftwareEngineeringandBestPractices.ppt1-SoftwareEngineeringandBestPractices.ppt
1-SoftwareEngineeringandBestPractices.pptBUSHRASHAIKH804312
 
An introduction to an effective earned value management system (EVMS) webinar...
An introduction to an effective earned value management system (EVMS) webinar...An introduction to an effective earned value management system (EVMS) webinar...
An introduction to an effective earned value management system (EVMS) webinar...Association for Project Management
 

Similar to 2015 Structures Congress - Probabilistic Performance Based Design (20)

Presentation_PBD.pptx
Presentation_PBD.pptxPresentation_PBD.pptx
Presentation_PBD.pptx
 
Offshore Europe 2015 1.0 LRED
Offshore Europe 2015 1.0  LREDOffshore Europe 2015 1.0  LRED
Offshore Europe 2015 1.0 LRED
 
Using Technical Performance Progress
Using Technical Performance ProgressUsing Technical Performance Progress
Using Technical Performance Progress
 
An introduction to an effective earned value management system (EVMS) webinar...
An introduction to an effective earned value management system (EVMS) webinar...An introduction to an effective earned value management system (EVMS) webinar...
An introduction to an effective earned value management system (EVMS) webinar...
 
Optimising equipment Safety, Operations and Cost performance
Optimising equipment Safety, Operations and Cost performanceOptimising equipment Safety, Operations and Cost performance
Optimising equipment Safety, Operations and Cost performance
 
Innovative Design Approaches to Improve Disaster Resilience and Reduced Cost ...
Innovative Design Approaches to Improve Disaster Resilience and Reduced Cost ...Innovative Design Approaches to Improve Disaster Resilience and Reduced Cost ...
Innovative Design Approaches to Improve Disaster Resilience and Reduced Cost ...
 
IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDF
 
Integrated Agile Software Development with Earned Value Management
Integrated Agile Software Development with Earned Value ManagementIntegrated Agile Software Development with Earned Value Management
Integrated Agile Software Development with Earned Value Management
 
Larocque ICTH 2015
Larocque ICTH 2015Larocque ICTH 2015
Larocque ICTH 2015
 
IRJET- Life Cycle Cost Analysis of a Residential Building
IRJET-  	  Life Cycle Cost Analysis of a Residential BuildingIRJET-  	  Life Cycle Cost Analysis of a Residential Building
IRJET- Life Cycle Cost Analysis of a Residential Building
 
LIFE CYCLE COST CALCULATION MODELS FOR BUILDINGS
LIFE CYCLE COST CALCULATION MODELS FOR BUILDINGSLIFE CYCLE COST CALCULATION MODELS FOR BUILDINGS
LIFE CYCLE COST CALCULATION MODELS FOR BUILDINGS
 
Economic Consequence Analysis, Prof. Adam Rose, USC
Economic Consequence Analysis, Prof. Adam Rose, USCEconomic Consequence Analysis, Prof. Adam Rose, USC
Economic Consequence Analysis, Prof. Adam Rose, USC
 
Infrastructure Improvement PowerPoint Presentation Slides
Infrastructure Improvement PowerPoint Presentation SlidesInfrastructure Improvement PowerPoint Presentation Slides
Infrastructure Improvement PowerPoint Presentation Slides
 
Monetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionMonetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization Solution
 
PPP08 - PM Optimization and Efficiency
PPP08 - PM Optimization and EfficiencyPPP08 - PM Optimization and Efficiency
PPP08 - PM Optimization and Efficiency
 
Measurement News Webinar
Measurement News WebinarMeasurement News Webinar
Measurement News Webinar
 
1-SoftwareEngineeringandBestPractices.ppt
1-SoftwareEngineeringandBestPractices.ppt1-SoftwareEngineeringandBestPractices.ppt
1-SoftwareEngineeringandBestPractices.ppt
 
1-SoftwareEngineeringandBestPractices.ppt
1-SoftwareEngineeringandBestPractices.ppt1-SoftwareEngineeringandBestPractices.ppt
1-SoftwareEngineeringandBestPractices.ppt
 
An introduction to an effective earned value management system (EVMS) webinar...
An introduction to an effective earned value management system (EVMS) webinar...An introduction to an effective earned value management system (EVMS) webinar...
An introduction to an effective earned value management system (EVMS) webinar...
 
Delivering nothing efficiently
Delivering nothing efficientlyDelivering nothing efficiently
Delivering nothing efficiently
 

More from Gilsanz Murray Steficek

Overview of M7.8 4/16/16 Ecuador Earthquake
Overview of M7.8 4/16/16 Ecuador EarthquakeOverview of M7.8 4/16/16 Ecuador Earthquake
Overview of M7.8 4/16/16 Ecuador EarthquakeGilsanz Murray Steficek
 
Simplified Analysis to Predict Collapse Resistance
Simplified Analysis to Predict Collapse ResistanceSimplified Analysis to Predict Collapse Resistance
Simplified Analysis to Predict Collapse ResistanceGilsanz Murray Steficek
 
Evaluation and Performance of Taiwan Housing and Schools in the Kaohsiung/Mei...
Evaluation and Performance of Taiwan Housing and Schools in the Kaohsiung/Mei...Evaluation and Performance of Taiwan Housing and Schools in the Kaohsiung/Mei...
Evaluation and Performance of Taiwan Housing and Schools in the Kaohsiung/Mei...Gilsanz Murray Steficek
 
Understanding Resilience through a Musical Analogy
Understanding Resilience through a Musical AnalogyUnderstanding Resilience through a Musical Analogy
Understanding Resilience through a Musical AnalogyGilsanz Murray Steficek
 
McCann Erickson featured in Interior Design Magazine
McCann Erickson featured in Interior Design MagazineMcCann Erickson featured in Interior Design Magazine
McCann Erickson featured in Interior Design MagazineGilsanz Murray Steficek
 

More from Gilsanz Murray Steficek (17)

25 years of CANstruction Participation!
25 years of CANstruction Participation!25 years of CANstruction Participation!
25 years of CANstruction Participation!
 
Vacation Homes
Vacation HomesVacation Homes
Vacation Homes
 
Retail Projects
Retail ProjectsRetail Projects
Retail Projects
 
New Jersey Projects
New Jersey ProjectsNew Jersey Projects
New Jersey Projects
 
Structural Integrity of Flat Slabs
Structural Integrity of Flat SlabsStructural Integrity of Flat Slabs
Structural Integrity of Flat Slabs
 
Overview of M7.8 4/16/16 Ecuador Earthquake
Overview of M7.8 4/16/16 Ecuador EarthquakeOverview of M7.8 4/16/16 Ecuador Earthquake
Overview of M7.8 4/16/16 Ecuador Earthquake
 
Simplified Analysis to Predict Collapse Resistance
Simplified Analysis to Predict Collapse ResistanceSimplified Analysis to Predict Collapse Resistance
Simplified Analysis to Predict Collapse Resistance
 
529 Broadway
529 Broadway529 Broadway
529 Broadway
 
Evaluation and Performance of Taiwan Housing and Schools in the Kaohsiung/Mei...
Evaluation and Performance of Taiwan Housing and Schools in the Kaohsiung/Mei...Evaluation and Performance of Taiwan Housing and Schools in the Kaohsiung/Mei...
Evaluation and Performance of Taiwan Housing and Schools in the Kaohsiung/Mei...
 
Understanding Resilience through a Musical Analogy
Understanding Resilience through a Musical AnalogyUnderstanding Resilience through a Musical Analogy
Understanding Resilience through a Musical Analogy
 
Regions - Hazards - People
Regions - Hazards - PeopleRegions - Hazards - People
Regions - Hazards - People
 
NJ Projects - Anthony Pagnotta
NJ Projects - Anthony PagnottaNJ Projects - Anthony Pagnotta
NJ Projects - Anthony Pagnotta
 
New World Symphony - Phil Murray
New World Symphony - Phil MurrayNew World Symphony - Phil Murray
New World Symphony - Phil Murray
 
Quinnipiac University - Gary Steficek
Quinnipiac University - Gary SteficekQuinnipiac University - Gary Steficek
Quinnipiac University - Gary Steficek
 
Avalon West Chelsea - Ramon Gilsanz
Avalon West Chelsea - Ramon GilsanzAvalon West Chelsea - Ramon Gilsanz
Avalon West Chelsea - Ramon Gilsanz
 
GMS Healthcare Projects
GMS Healthcare ProjectsGMS Healthcare Projects
GMS Healthcare Projects
 
McCann Erickson featured in Interior Design Magazine
McCann Erickson featured in Interior Design MagazineMcCann Erickson featured in Interior Design Magazine
McCann Erickson featured in Interior Design Magazine
 

Recently uploaded

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 

Recently uploaded (20)

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 

2015 Structures Congress - Probabilistic Performance Based Design

  • 1. ASCE Structures Congress 2015 Sanaz Saadat, Ph.D. - Gilsanz Murray Steficek LLP Charles Camp, Ph.D. - University of Memphis Shahram Pezshk, Ph.D. - University of Memphis Christopher Foley, Ph.D. - Marquette University April 2015
  • 2. ASCE Structures Congress 2015 • Performance-based Design and Seismic Loss Evaluation • Multi-Objective Optimization Problem • Example Design Problem • Summary and Conclusions
  • 5. ASCE Structures Congress 2015 Fragility curves for structural and non-structural members for different damage measures → based on parameters given in Hazus technical manual
  • 6. ASCE Structures Congress 2015 • Expected direct economic losses for each component (SS, NSD, NSA) are calculated: • Expected loss is calculated as the sum of losses for structural and nonstructural components. Repair Costs &
  • 7. ASCE Structures Congress 2015 • Hazus recommendations for social loss calculation→ event tree of consequent casualty levels for different damage levels • Social loss is the aggregation different possible scenarios • Weights assigned to different casualty severity levels using National Safety Council (NSC) suggestions
  • 8. ASCE Structures Congress 2015 Building Damage State 1 CSL1 CSL2 CSL3 CSL4 Damage State 2 CSL1 CSL2 CSL3 CSL4 Damage State 3 CSL1 CSL2 CSL3 CSL4 Damage State 4 No Collapse CSL1 CSL2 CSL3 CSL4 With Collapse CSL1 CSL2 CSL3 CSL4
  • 9. ASCE Structures Congress 2015 • Seismic loss parameters are the optimization objectives • Two types of seismic losses considered: economic and social • Loss parameter is the expected annual loss value
  • 10. ASCE Structures Congress 2015 Multi-objective Optimization Procedure: Non-Dominated Sorting Genetic Algorithm NSGA-II (Deb et al. 2002)
  • 11. ASCE Structures Congress 2015 Multi-objective optimization problem )3,1(: ),,(  ilctoSubjected EASLEALWMinimize ii ppp EALEALp  EASLEASLp  min,1 : CPCP CLCLc  min,2 : IOIO CLCLc  0.1: * * 3    pb pc M M c            iii ii i ii i i i lcif lcif c cl 0.1 where 3 1    The penalty function φ is defined as Constraints WWp 
  • 12. ASCE Structures Congress 2015 PERFORMANCE OBJECTIVES Collapse Prevention for hazard level of 2% POE in 50 years Immediate Occupancy for hazard level of 50% POE in 50 years
  • 13. ASCE Structures Congress 2015 The acceptable confidence levels (CL) for meeting these performance objectives are: • CLCP = 90% • CLIO = 50% Meeting these performance objectives are set as the acceptance criteria for the feasibility of the designs in the multi-objective optimization problem.
  • 19. ASCE Structures Congress 2015 • Seismic loss values as objectives in optimized probabilistic performance-based design • Different types of seismic losses considered: economic and social • Multi-objective optimization results in the form of Pareto fronts • Pareto front: provide decision makers with useful comparison tool for optimized design considering different objectives
  • 20. ASCE Structures Congress 2015 For the example structure considered: • Reduction in both economic and social losses in the obtained results with increase in the weight of the structural system • Minimum weight design: drift-sensitive non-structural components have a more significant contribution to the calculated economic loss • Minimum loss designs: acceleration-sensitive non- structural components have a larger contribution to the calculated economic loss