Preliminary Draft Summary
                 Grandview Small Area Plan
                                  Edina, Minnesota




                           DRAFT November 9, 2011


DRAFT 11/09/11
1. Hope for Change




      Table of Contents                                           Steering Committee

      1. Hope for Change                                          Ken Potts            Tom Ruppert
                                                                  Kim Melin            Peter Sussman
             A. Review of the Small Area Plan Guide               Randy Halvorson      Lisa Diehl
             B. Purpose of the Small Area Plan                    Chris Rofidal        Bob Kojetin
             C. Project Schedule and Approach
             D. Background Analysis                               Steve Buss           David Davison
                                                                  Gene Persha          Bernie Beaver
      2. Thoughts and Interactions                                Richard Borland      Mike Platteter
                                                                  Larry Chestler       Peyton Robb
             A. Community Workshop #1                             Laura Giertsen       Dan Gieseke
             B. Community Workshop #2                             Ellen Jones          Diane Reinhart
                                                                  Terry Ahlstrum       James Justice
      3. Patterns for a Neighrbohood Center
                                                                  Dick Ward            Darcy Winter
             A. Neighborhood Center                               Bill Neuendorf       Paul Nelson
             B. Frameworks and Strategies                         Tim McIlwain         David Novak
             C. Land Use Options                                  Bright Dornblaser    Linda Urban
             D. Benchmarks                                        Any Brown            Tom Mattison
             E. Concept Diagram                                   Suzanne Davison      Ken and Adele Floren
             F. Draft Illustrative Plan
             G. Initiatl Phase                                    Greg Domke           Michael Schroeder
             H. Public Works Site                                 Sandy Fox            Kevin Staunton
             J. Build Form                                        Dick Crockett        Michael Fischer
             K. Ideas and Options                                 Arne Cook            Brett Johnson
                                                                  Tom Bonneville       Collin Bredeson
      4. Moving Forward with a Purpose                            Kim Montgomery       Deron Lindquist
                                                                  Tim Murphy           Eric Bredesen
                                                                                       Jim Baisch




DRAFT 11/09/11                                                2
1. Hope for Change




DRAFT 11/09/11
1. Hope for Change




      Review of the Small Area Plan Guide                                                   Purpose of the Small Area Plan
      The GrandView District includes the area between Eden and Vernon Avenues,             In late 2009, the Edina City Council – seeking to ensure that redevelopment
      crossing Highway 100 on each street. This crescent‐shaped district comprises          of the GrandView District was driven by community residents and other
      19 parcels, and a variety of land uses, including retail, commercial, office,         stakeholders – approved a Small Area Guide Plan process designed to engage
      housing, public uses, and historic buildings.                                         the community in developing a vision for redevelopment of the City’s old
                                                                                            Public Works site, and the area surrounding it (the GrandView District). To
      Historically, the area was defined commercially by its proximity to Highway           accomplish this goal, a Community Advisory Team (CAT) was formed to lead
      100, built in the 1930’s. At one time, Vernon Avenue was Highway 169, which           the process. In November and December of 2010, the CAT submitted the
      made this area an important commercial hub for shopping, recreation, and              Small Area Guide Plan Report to the Edina Planning Commission and City
      services. Over time, the district has evolved to serve more neighborhood‐             Council.
      oriented needs such as grocery, hardware, restaurants, clinics, and significant
      public uses such as the Senior Center, Library and City Hall. As such, the            After approving and adopting the Report and receiving the Livable
      district is seen by residents as an important node for services, and by land          Communities Grant from the Metropolitan Council, the City Council
      owners and tenants as an ideal location adjacent to a busy highway.                   authorized commencement of this Small Area Plan process (essentially
                                                                                            ‘Phase II’ of the work already underway). The Phase II process is being led by
      In late 2009, the Council approved a process designed to engage the                   a community-based Steering Committee comprised of interested residents,
      community in planning for the future of the old Public Works site and the             members of the Guide Plan process CAT, District business and property
      area surrounding it. The process was to be led by a Community Advisory                owners, City board and commission members, and members of the Guide Plan
      Team (CAT) made up of interested residents, representatives from City                 Design Team. Information gathered and ideas generated through this process
      Boards and Commissions, area business and property owners, and a school               will then be used to craft a development framework and implementation plan
      district representative. The CAT was to be supported by a Design Team made            for the GrandView District.
      up of Edina residents in the design field, and a staff‐led Technical Advisory
      Committee (TAC). The roles to be played by members of the CAT, Design
      Team, and TAC were outlined in writing before the process commenced.

      Beginning with a kick‐off meeting on April 8, 2010, the CAT met 10 times
      in a 20‐day period during the months of April and May 2010 to study the
      site and the surrounding area. They determined that the study area should
      encompass the commercial node at Highway 100 and Vernon, as well as the
      City Hall campus across Highway 100. During the process (which is described
      in greater detail later in this report), the CAT, TAC and Design Team members
      walked the study area, and looked at potential areas of change, transportation
      challenges, pedestrian access, and other development issues. By the end of the
      process, the CAT had developed a set of seven guiding principles to define the
      future of the Grandview District. These guiding principles were shared with
      the City Council in May 2010.



DRAFT 11/09/11                                                                          4
1. Hope for Change




      Guiding Principles                                                                      Approach of the Small Area Plan

                                                                                              The Consulting Team will work closely with the Steering Committee and its
        The Guiding Principles                                                                sub-committee structure to support a process that is focused on key issues,
                                                                                              opportunities, and recommendations. The approach is organized around the
        1.Leverage publicly-owned parcels and civic presence to create a vibrant              Steering Committee that meets on a regular basis to guide the Consulting
        and connected district that serves as a catalyst for high quality, integrated         Team. A key feature of the approach is using a Community Workshop format
        public and private development.                                                       to facilitate a highly interactive process over an approximately four (4) month
                                                                                              schedule, which continues the progress that has been made by the Steering
        2.Enhance the District’s economic viability as a neighborhood center                  Committee and community stakeholders. The Workshop format is designed
        with regional connections, recognizing that meeting the needs of                      to quickly and efficiently present ideas, get feedback, make adjustments, and
        both businesses and residents will make the district a good place to do               re-engage local stakeholders
        business.

        3.Turn perceived barriers into opportunities. Consider layering                       The plan is to conduct three (3) Community Workshops at specific milestones.
        development over supporting infrastructure and taking advantage of the                The community participation process includes these primary groups of
        natural topography of the area.                                                       participants: Steering Committee, Executive Committee, Work Groups, City
                                                                                              Staff, Focus Groups (land owners, neighborhoods, public officials, school
        4.Design for the present and the future by pursuing logical increments of             district, institutions, city departments, business operators, and others as
        change using key parcels as stepping stones to a more vibrant, walkable,              identified during the process), Plan Commission, and City Council. Additional
        functional, attractive, and life-filled place.                                        Focus Group meetings may be held with representatives from the development
                                                                                              and construction sectors to provide context and more detail regarding trends,
        5.Organize parking as an effective resource for the district by linking               market, and costs. Each of these groups is engaged at key times throughout the
        community parking to public and private destinations while also                       process.
        providing parking that is convenient for businesses and customers.

        6.Improve movement within and access to the district for people of all
        ages by facilitating multiple modes of transportation, and preserve future
        transit opportunities provided by the rail corridor.

        7.Create an identity and unique sense of place that incorporates natural
        spaces into a high quality and sustainable development reflecting Edina’s
        innovative development heritage.




DRAFT 11/09/11                                                                            5
1. Hope for Change




      Project Schedule and approach
                                                                                         GrandView District Small Area Plan
                                                                                         Project Schedule
                                                                                            Project Schedule
      Part I – Discussion and Discovery                                                     Exhibit C
      Part I is about learning from and listening to the Steering Committee, Work                                                                             Sept             Oct               Nov        Dec

      Groups, and other stakeholders; analyzing the study area and understanding                     Part I
      the work done to-date; appreciating the larger dynamics of the area; and                        Discussion and Discovery

      clearly defining the opportunities. An initial Community Workshop is held to                    Community Workshop #1
                                                                                                     Part II
      conduct work group discussions/downloads; a public meeting/presentation is                      Ideas and Options
      hosted by the Steering Committee and the Consulting Team.                                       Community Workshop #2
                                                                                                     Part III
      Part II – Ideas and Options                                                                     Decide and Deliver

      Part II focuses on developing ideas and options that address the specific issues                Community Workshop #3

      raised by the Steering Committee, stakeholders and the public process. The                      Deliverables

      Consulting Team conducts a three-day Community Workshop (to be held in                         Project/Community Meetings                               Sept             Oct               Nov        Dec

      the study area) that will include Steering Committee meetings, focus group                      Steering Committee
                                                                                                      Staff Coordination
      meetings, stakeholder interviews, team work sessions, and conclude with a
                                                                                                      Executive Team Meeting
      public meeting/presentation.                                                                    Community Workshop                                              #1             #2                #3

                                                                                                      Work Group Meetings
      Part III – Decide and Deliver                                                                   Plan Commission/Council
                                                                                                      Project Update
      Part III consolidates all the comments, ideas, and options into a preferred
                                                                                                     Note: Scope and schedule subject to review and approval by the Client and Cuningham Group
      direction. This part includes a third Community Workshop and public meeting.
      The Consulting Team prepares a summary document that may be widely
                                                                                                       Community Workshops                                                     Typical Workshop Schedule
      distributed via a variety of sources (i.e., print, web, etc.) and a Sketch-up 3D
                                                                                                       Community workshops are held over a 2-3                                 Day 1/2
      model of the area with preferred options.                                                        day period as an inter-active way to facilitate                         Morning
                                                                                                       stakeholder focus groups and provide the                                  • Team coordination
                                                                                                       consulting team a continuous point of contact                             • Focus and work group meetings
                                                                                                       and organization with the Steering Committee,                           Lunch
                                                                                                       staff and stakeholders. The first day would                               • Focus group meetings
                                                                                                       accommodate focus group meetings,                                       Evening
                                                                                                                                                                                 • Steering Committee meeting
                                                                                                       interviews, and consultant team coordination.
                                                                                                       The first day would conclude with a Steering
                                                                                                                                                                               Day 3
                                                                                                       Committee meeting in the evening. The
                                                                                                                                                                                 • Team work session
                                                                                                       second day would allow for additional team
                                                                                                                                                                               Lunch
                                                                                                       work-sessions and client coordination prior to                            • Team work session
                                                                                                       hosting a public meeting in the evening.                                  • Meeting preparation
                                                                                                                                                                               Evening
                                                                                                                                                                                 • Community presentation




DRAFT 11/09/11                                                                           6                                                                                                                         9
1. Hope for Change
                                                                                                                                                                         GrandView District – Small Area G


                                                 In 2008, the Edina Comprehensive Plan was amended to identify several Potential Areas of 
      Background Analysis                        Change in the City.  As shown in the chart below, the GrandView District is one of these 
                                                 Potential Areas of Change.  




                                                                                   Edina Potential Areas of Change

                                                                                                                                 
                                                  
                                                 The amended Comprehensive Plan provides that small area studies of these areas should be
      Grandview Aerial
                                                 conducted in consultation with residents, property owners, business owners and commercia
                                                 property owners, to produce a guide for redevelopment. A request to initiate a specific smal
                                                 area plan or study can be made by community groups, business groups, the Planning 
                                                 Commission, or City staff. A development proposal that involves a Comprehensive Plan 
                                                 Amendment or a rezoning will require a small area plan study prior to planning application. 
                                                 However, the authority to initiate a small area plan rests with the City Council.  
                                                  
                                                 In late 2009, the Council approved a process designed to engage the community in planning 
                                                 the future of the old Public Works site and the area surrounding it. The process was to be led
                                                 a Community Advisory Team (CAT) made up of interested residents, representatives from Ci
                                                 Boards and Commissions, area business and property owners, and a school district 
                                                 representative.  The CAT was to be supported by a Design Team made up of Edina residents 
DRAFT 11/09/11                      7            the design field, and a staff‐led Technical Advisory Committee (TAC). The roles to be played b
                                                 members of the CAT, Design Team, and TAC were outlined in writing before the process 
                                                 commenced. Copies of the descriptions are attached at Appendix B.  
1. Hope for Change




DRAFT 11/09/11           8
1. Hope for Change




      Building Footprints               Site Topography




      Public Right of Way               Building Uses




DRAFT 11/09/11                      9
1. Hope for Change




      Sidewalks               Parking




DRAFT 11/09/11           10
1. Hope for Change




      East/West section through site




      North/South Section through site




DRAFT 11/09/11                                  11
1. Hope for Change




      Aerial of site from southeast               Aerial of site from northwest




DRAFT 11/09/11                               12
1. Hope for Change




      History

      •	 Historical Society maintains history of the community; Heritage
         Preservation Board is the official city organization with staff support from
         Joyce Repya
      •	 There is reference to “natural” togography but in reality terrain has been
         significantly altered over time with hill tops removed and the excavation of
         Hwy 100 (material was deposited at what is now the sports fields at OLG)
      •	 Yancy family was one of the early (minority) families that owned and help
         settle the GrandView Heights area
      •	 Area was considered third class farmland more appropriate for grazing;
         mention of orchards – were probably apples
      •	 Hwy 169 (Vernon) and Hwy 212 intersected here at grade; later Hwy 100
         was introduced as one of the first metropolitan “ring” roads in the country.
      •	 Train service around late 1800’s, probably around 1890 provided passenger
         service into Minneapolis
      •	 City grew up around the Edina Mills site on the creek; the Grange Hall was
         originally located at the SE corner of Woodale and W 50th St. Mills site is
         now an archaeology resource
      •	 Current of location of Tupa Park is general area of city public works (in the
         “woods”); Grange Hall and Cahill School are both listed on the National
         Register but were moved to present location. Access is not good and the two
         wood buildings should not be co-located – fire hazard
      •	 Historical Society has artifacts and items in storage and have available area
         in Arneson Acres park
      •	 Society has had issues generating support and attendance at functions like
         board meetings; Grange Hall was the social and public/governmental center
         of the city for years
      •	 Jerrys was originally a Krogers and was local market before that; other
         businesses in that location included Humpty Dumpty, Jerrys Lucky Dollar,
         Animal Crackers, Lucilles, Jerrys Printing, Cedars and a drive-in




DRAFT 11/09/11                                                                           13
2. Thoughts and Interactions




DRAFT 11/09/11
2. Thoughts and Interactions




      Community Workshop #1
      September 21, 2011

      A) What is the best thing about                     If we have a community commons at
      GrandView?                                          Grandview, what would it be?
      •	 Services	(variety	useful	and	accessible)	   13                                                            •	 Open	space	bordered	by	community	center,	
                                                          •	 My	first	thought	is	that	I	don’t	see	a	need	for	         good	eating
      •	 Location:		      	        	        	        6       a	community	commons	area.		It	may	be	OK.		I	
      •	 Civic	Places:		 	         	        	        2       don’t	see	it	yet.                                     •	 Gathering	place	for	activities
                                                          •	 A	place	to	gather,	farmers	market,	learning/          •	 “Gathering	place”	with	places	to	meet,	eat,	and	
      B) What is the worst thing about                       performance	center                                       sit	for	awhile
      GrandView?                                          •	 Public	meeting	spaces	-	open	building	                •	 Build	on	city	hall	and	library/senior	center	in	
                                                             architecture	including	art,	cafe,	restaurant	space       area	including	landscape	area
      •	 Lack	of	accessibility	by		                                                                                •	 A	gathering	place	with	greens,	restaurants,	
         peds	and	bikes:			         	       9             •	 Community	center	adjoined	to	by	a	green	
                                                             thoroughfare	to	small	stores,	services,	sitting	         theater,	bicycle	paths	and	possibly	a	light	rail	
      •	 Unattractive:		 	          	       6	                                                                        station
                                                             area,	and	rest	spots
      •	 Parking	and	traffic:		     	       6                                                                      •	 Community	center	with	meeting	rooms,	
                                                          •	 Outdoor	gathering	space,	indoor	and	outdoor	
      •	 Disconnected:		 	          	       4                meeting	space                                            recreation	and	cultural	spaces
                                                          •	 Margo’s	big	table,	a	place	to	gather	(with	a	         •	 Park-like	-	an	open	shelter	for	events,	play	area,	
                                                             reason	that	makes	us	want	to	gather	there),	a	           trees,	benches,	etc.
                                                             place	with	a	community	feel                           •	 A	community	center	with	green	space,	meeting	
                                                          •	 A	public-private	configuration	of	spaces	that	           areas,	roof	top	cafe,	arts	space,	a	place	to	spend	
                                                             allow	people	to	gather	-	almost	a	Starbucks	             time
                                                             writ	large                                            •	 Safe	place	for	teens	to	meet
                                                          •	 Must	have	shade	trees,	greenscape,	must	have	         •	 Place	to	gather	as	well	as	to	have	retail	
                                                             public	art	activities	to	do	like	a	public	gallery,	      shopping,	should	have	regional	focus
                                                             seating	outside	and	inside	for	groups	of	people,	     •	 Public	area	of	aesthetic	and	purposeful	
                                                             place	for	other	groups	to	gather                         gathering
                                                          •	 A	bazaar-type	space	for	local	food,	plant	and	        •	 A	performing	and	visual	arts	center	with	walk	
                                                             flower	vendors,	plus	arts	and	crafts	booths,	with	       paths	and	benches	around	it
                                                             adjacent	meeting	space	for	community	groups
                                                                                                                   •	 Community	center	should	include	recreational	
                                                          •	 An	informally	programmed	outdoor	space	                  facilities,	meeting	rooms,	outdoor	spaces,	and	
                                                             that	allows	for	current	generations	of	users	to	         public	art,	space	to	house	community	needs	
                                                             congregate	and	do	as	they	wish                           that	previously	have	not	been	served	or	that	are	
                                                                                                                      being	served	in	obsolete	facilities




DRAFT 11/09/11                                                                      15
2. Thoughts and Interactions




      Community Workshop #1
      September 21, 2011


      Describe one successful outcome within 5 years.
                                                                                             •	 Steps	toward	services	of	need	and	enjoyment	for	local	residents	and	greater	
      •	 Decision	to	use	public	squares,	etc.,	for	public	purpose	vs.	commercial                community
      •	 Off-road	biking,	safe	pedestrian	paths,	better	flow                                 •	 More	connections	within	area	to	enable	easy	walking
      •	 Breaking	ground	on	a	public	realm	element	that	begins	to	attract	people	to	         •	 Traffic	reduced	to	make	the	area	pedestrian-friendly
         “stay”
                                                                                             •	 Sidewalks	and	pathways	in	logical	configuration,	development	of	Public	
      •	 Improved	access	to	Grandview	from	the	other	side	of	Vernon	and	across	                 Works	site	with	multi-use	public/private	facilities
         Hwy	100
                                                                                             •	 Transit	station
      •	 Redevelopment	of	north	side	of	Eden	Ave	from	Vernon	to	Hwy	100
                                                                                             •	 A	community	building	built	with	uses	designated
      •	 Safe	bike	and	foot	traffic,	restaurants	and	green	space	and	performance	
         space                                                                               •	 Keep	it	small.		I	live	on	a	feeder	street,	which	is	too	busy	now.

      •	 Pedestrian	and	bike	improvements	(i.e.	safety,	ease	of	access)	along	with	          •	 Rail	station/connections	to	places	nearby,	commons
         better	traffic	management                                                           •	 Bus	garage	to	higher/better	use,	intro	of	residential	uses,	pedestrian	
      •	 Create	multi-age	community	center                                                      improvements

      •	 Taming	traffic	and	parking                                                          •	 A	greater	sense	of	community,	perhaps	partially	due	to	CAT	efforts

      •	 Transportation	issues	would	be	“fixed,”	park	once	to	do	all	my	business	            •	 A	new	community	center	and	a	green	walkway	that	covers	part	of	the	RR	
         there                                                                                  tracks

      •	 Identity	as	center	for	services	with	draw	for	residents                             •	 Beginnings	of	a	community	building	-	maybe	just	a	hole	in	the	ground
                                                                                             •	 Promote	renting	of	space	in	the	existing	homes	so	people	will	not	need	to	
                                                                                                drive	so	far




DRAFT 11/09/11                                                                          16
2. Thoughts and Interactions




      Community Workshop #1
      September 21, 2011


      Describe one successful outcome within 20 years.
      •	 Community	gathering	place	-	transportation	center,	art	in	public	places,	a	          •	 A	thriving	community/public	use	and	lively	retail	hub	with	good	access
         ?	for	Edina                                                                          •	 Bring	in	housing	apartments	or	?
      •	 A	place	that	is	comfortable	to	go	to	-	no	high	rises	-	all	on	human	scale	           •	 Recognition	of	foresight	for	gathering	place	and	excellence	for	community	
         where	there	is	a	common	area	nd	transportation	flow	is	even	better	-	more	              service
         small	businesses,	especially	services,	a	thriving	“civic	gathering	spot”
                                                                                              •	 Rail	transit	center,	new	freeway	interchanges
      •	 A	new	configuration	of	the	transportation	infrastructure
                                                                                              •	 Incorporating	mass	transit	in	a	meaningful	way
      •	 More	densely	developed	mixed-use	center	with	commercial	uses,	
         communityh	benefits,	and	possibly	a	residential	component,	also	a	transit	           •	 A	new	configuration	of	bridge	and	roads	over	Hwy	100	and	the	trails
         hub                                                                                  •	 True	community	space,	vibrant,	walkable,	a	market,	artists,	people	
      •	 Better	use	of	Hwy	100	public	area,	including	improved	pedestrian	access	                interacting	in	and	with	a	beautiful	place
         from	one	side	to	another
      •	 Light	rail
      •	 Redevelopment	of	functionally	obsolete	real	estate	and	incorporating	
         sustainable	improvements
      •	 Solve	connectibility	issues:	transit,	walking/biking,	connections	to	
         neighborhood
      •	 More	choesive/neighborhood	feel,	businesses/residential	share	goals	and	
         identity	and	spaces	-	cooperative-openn-pleasant	destination
      •	 Some	sort	of	efficient,	green	mass	transit	connection	(LRT?,	PRT?)	to	
         downtown	Mpls
      •	 Focus	of	transit	within	Edina	and	beyond	for	residents
      •	 Completed	project	for	public	enjoyment
      •	 Circle	tram	to	go	from	place	to	place
      •	 A	cultural	center	with	meeting	rooms	and	a	performing	arts	venue,	as	well	
         as	shopping
      •	 Reorganization	of	transportation	facilities	-	ped	plaza	over	TH	100	with	
         park	and	public	art,	elimination	of	concrete	and	duplicate	roadways
      •	 Transit	station,	multi-modal	transportation	auto/bicycle/pedestrian




DRAFT 11/09/11                                                                           17
2. Thoughts and Interactions




      Community Workshop #2
      October 25, 2011

      Program Meeting Summaries                                                               Three	Rivers	Park	District	–	working	on	regional	level	connections/projects
                                                                                              CP	Rail	corridor	will	probably	not	be	feasible	for	a	bik/pedestrian	trail	due	to	
      8:00am Legacy and Sustainability                                                        slope	and	ROW	constraints
      •	 Stormwater	management	–	GrandView	sits	in	both	the	Minnehaha	Creek	                  Hennepin	County	promotes	Active	Living	which	may	apply	here
         and	Nine	Mile	Creek	watersheds                                                       Senior	Center	may	be	under-programmed;	parking	need	for	the	library	during	
      •	 Remember	Minnehaha	Creek	is	nearby	–	how	do	we	connect	to	                           several	weekdays	and	nights
         GrandView?                                                                           OLG	–	play	fields	have	been	upgraded	and	are	very	well	used;	school	is	K-8	
      •	 Can	we	consider	a	sustainability	ordinance?	–	state	code	does	not	equal	local	       with	about	650	students.	Considered	potential	for	Park	n	Ride	in	the	past.	
         ordinance                                                                            Warner	property	is	potential	development	site	(housing	of	some	type?)
      •	 Think	in	terms	of	the	‘sustainability	infrastructure’,	and	how	to	work	with	the	
         market                                                                               10:00am             Arts and Culture
                                                                                              •	 Consider	the	Bergamot	Station	in	Santa	Monica	as	a	model
      •	 Incorporate	electric	vehicle	charging	stations	into	new	parking	areas/decks
                                                                                              •	 Use	empty	storefronts	as	a	way	to	build	awareness	and	communicate	arts
      •	 Consider	the	play	fields	at	OLG	as	potential	use	for	geothermal
                                                                                              •	 Arts	Center	is	limited	by	its	location	and	converted	residential	structure	is	a	
      •	 Hennepin	County	has	‘complete	streets’	policy	but	no	current	plans	for	
                                                                                                 long	term	constraint;	membership	and	activity	is	limited
         Vernon	–	think	in	terms	of	measurement,	community	education	and	brand-
         sustainability                                                                       •	 Consider	mapping	the	arts	and	culture	assets	of	the	community	and	consider	
                                                                                                 how	to	incorporate	’placemaking’	into	the	process	–	think	about	who	are	the	
      •	 AIA	Green	Building	Council	has	policies/principles	that	can	apply	to	where	
                                                                                                 producers	and	who	are	the	consumers
         to	build,	building	performance,	and	neighborhood	pattern
                                                                                              •	 Sewell	Ballet	could	use	“big	rooms”	for	classes	and	education
      •	 About	160	homes	in	Edina	are	in	the	“Home	Energy	Squad”
                                                                                              •	 Hopkins	is	good	model	that	is	a	community	facility	but	is	run	as	a	501c3	and	
      •	 Excel	has	a	solar	rewards	program	and	programs	that	require	energy	
                                                                                                 programmed	by	8	different	local	organizations	that	rent	the	space
         mandates
                                                                                              •	 Need	to	think	beyond	the	bricks	and	mortar	and	understand	the	“content”	of	
                                                                                                 arts	and	culture	for	the	city	–	what	is	that	and	then	how	does	the	city/process	
      9:00am Parks and Public Realm
                                                                                                 respond]
      Consider	rain	gardens	and	other	stormwater	runoff	design	similar	to	what	
      Edina	County	Club	has	done	(and	what	was	not	done	at	the	new	City	Hall	                 •	 Good	examples	–	Museum	of	Possibilites	in	Montreal,	Asia	Art	Archives	in	
                                                                                                 Hong	Kong;	Grand	Rapids	Art	Prize
      project)
      Minnehaha	Creek	Watershed	provided	additional	funding	($600-700k)	for	
      green	roofs	and	underground	recharge	areas	in	the	West	End	development	(St.	            11:00am             Facilities and Community Needs
                                                                                              •	 Edina	High	School	senior	survey	–	need	more	activities	for	teens;	school	
      Louis	Park)
                                                                                                 already	has	May	Term	(custom	curriculum	in	last	May	of	senior	year),	movie	
      Jerrys	parking	is	located	in	the	Nine	Mile	Creek	watershed                                 nights,	and	Group	212	–	community	service	oriented
      City	of	Edina	currently	exceeds	national	park	standards/benchmarks	
                                                                                              •	 City	priorities	–	better	operational	performance	for	facilities;	how	to	
      (15ac/1000	pop.	vs.	about	20-25ac/1000pop.)
                                                                                                 program	or	change;	are	there	potentials	to	consolidate	some	buildings	and	
      Garden	Club	–	use	walking	boulevards	to	connect	City	Hall	with	Westside	(re:	              functions	(e.g.,	move	toddler	use	out	of	the	Edinborough	building)
      Longfellow	gardens	bridging	Hwy	55)



DRAFT 11/09/11                                                                           18
2. Thoughts and Interactions




      •	 How	can	City	think	about	more	or	better	use	of	Senior	Center	–	not	just	                 board	meetings;	Grange	Hall	was	the	social	and	public/governmental	center	
         a	building	dedicated	to	a	single	demographic	–	think	more	inter-generational             of	the	city	for	years
      •	 Consider	how	wellness	should	be	a	quality	of	life	issue	for	all	demographics          •	 Jerrys	was	originally	a	Krogers	and	was	local	market	before	that;	other	
      •	 Mankato	University	has	a	presence	in	Edina	and	is	adding	30,000	sf	to	                   businesses	in	that	location	included	Humpty	Dumpty,	Jerrys	Lucky	Dollar,	
         location	at	7700	France	Ave                                                              Animal	Crackers,	Lucilles,	Jerrys	Printing,	Cedars	and	a	drive-in
      •	 Need	to	better	support	the	neighborhood	associations
                                                                                               2:00pm Transportation and Highway 100
      •	 Lack	of	cultural	venues	–	many	people	leave	the	community	for	needs/
                                                                                               •	 Metro	Transit	confirmed	need	for	a	Park	N	Ride	here;	they	refer	to	this	
         activities….
                                                                                                  location	as	a	“hide	n	ride”	as	commuters	are	parking	here	(mostly	in	the	city		
                                                                                                  parking	deck)	and	catching	the	587	express	to	downtown.	This	route	makes	
      1:00pm History and Meaning of Place                                                         it	way	along	Normandale	(frontage	road	west	of	Hwy	100)	to	GrandView	
      •	 Edina	Historical	Society	maintains	history	of	the	community;	Heritage	                   stops	before	getting	onto	Hwy	100
         Preservation	Board	is	the	official	city	organization	with	staff	support	from	
         Joyce	Repya                                                                           •	 Metro	Transit	is	ready	to	work	with	the	City	and	land	owners	to	build	a	park	
                                                                                                  n	ride	lot;	their	market	research	indicates	a	need	for	abou	170	parking	spaces
      •	 There	is	reference	to	“natural”	togography	but	in	reality	terrain	has	been	
         significantly	altered	over	time	with	hill	tops	removed	and	the	excavation	of	         •	 Hennepin	County	encourages	multi-modal	use	of	facilities	for	bikes,	
         Hwy	100	(material	was	deposited	at	what	is	now	the	sports	fields	at	OLG)                 pedestrians	with	their	complete	streets	policy	which	could	be	applied	to	
                                                                                                  Vernon;	nothing	identified	for	Vernon	in	the	5	year	CIP	but	other	types	of	
      •	 Yancy	family	was	one	of	the	early	(minority)	families	that	owned	and	help	               funding	could	be	considered	for	pedestrian	and	bike	improvements
         settle	the	GrandView	Heights	area
                                                                                               •	 Mn	Dot	representatives	were	not	present	at	this	meeting
      •	 Area	was	considered	third	class	farmland	more	appropriate	for	grazing;	
         mention	of	orchards	–	were	probably	apples
      •	 Hwy	169	(Vernon)	and	Hwy	212	intersected	here	at	grade;	later	Hwy	100	
         was	introduced	as	one	of	the	first	metropolitan	“ring”	roads	in	the	country.
      •	 Train	service	around	late	1800’s,	probably	around	1890	provided	passenger	
         service	into	Minneapolis
      •	 City	grew	up	around	the	Edina	Mills	site	on	the	creek;	the	Grange	Hall	was	
         originally	located	at	the	SE	corner	of	Woodale	and	W	50th	St.	Mills	site	is	
         now	an	archaeology	resource
      •	 Current	of	location	of	Tupa	Park	is	general	area	of	city	public	works	(in	the	
         “woods”);	Grange	Hall	and	Cahill	School	are	both	listed	on	the	National	
         Register	but	were	moved	to	present	location.	Access	is	not	good	and	the	two	
         wood	buildings	should	not	be	co-located	–	fire	hazard
      •	 Historical	Society	has	artifacts	and	items	in	storage	and	have	available	area	
         in	Arneson	Acres	park
      •	 Society	has	had	issues	generating	support	and	attendance	at	functions	like	




DRAFT 11/09/11                                                                            19
2. Thoughts and Interactions




      Community Workshop #2
      October 27, 2011

      Small Group Responses


      What do you like about what you saw
      tonight?
      •	 Tony:	financial	reality
                                                      •	 Green/complete	streets,	especially	Eden      •	 Green	bridge	over	100	(bike/ped	only)
      •	 Cloverleaf:	more	land,	less	congestion,	
         neighborhood	alternatives,	potential	for	    •	 Topic	of	100	and	Vernon	interchange          •	 Choices	for	bikes	and	peds
         upgrading	bridges                            •	 Like	seeing	PW	and	bus	sites	developed       •	 Process:	understand	the	tools,	input	is	
      •	 Realigning	Eden                              •	 Like	that	people	invited                        important
      •	 Civic	buildings                              •	 Cul-de-sac	-	??                              •	 Considering	phases	in	next	steps,	knowing	it	
                                                                                                         will	take	years
      •	 Green	connector	over	100                     •	 Central	corridor	concept
                                                                                                      •	 Understanding	the	sub-region	in	terms	of	
      •	 Bikeways                                     •	 Pedestrian	and	wheelchair	emphasis              traffic
      •	 GrandView	Square                             •	 Streets	that	I	can’t	cross                   •	 Open	space	with	walks
      •	 Pedestrian	connections                       •	 Not	remove	??	winter	and	snow                •	 Look	at	potential	for	all	sites,	even	Jerry’s
      •	 Green	space                                  •	 Focus	on	safety	and	less	car	traffic         •	 Realistic/feasible	about	what	likely	won’t	
      •	 Park	and	ride	place                          •	 Development	is	away	from	homes                  change
      •	 Multi-purpose	space	and	public	realm         •	 Better,	wider	sidewalks                      GrandView	housing	(170	families),	big	impact	
      •	 Priority	on	traffic	flow	and	movement                                                        on	them
                                                      •	 Increased	green	space
      •	 Pedestrian	bridge	over	100                   •	 Connection	to	Minnehaha	Creek
      •	 Bike	paths	and	pedestrian	concept            •	 Bridge	over	tracks--important
      •	 Capacity	to	expand	on	pedestrian	and	bike	   •	 Cleans	up	“mess”
         ideas	in	the	future
                                                      •	 Bicycle	improvements
      •	 Financial	perspective
                                                      •	 More	accessible	towards	area
      •	 Mixed-use	and	community-oriented
                                                      •	 Vernon	traffic	improvements
      •	 Use	of	topography
                                                      •	 Traffic	calming
      •	 Possibility	to	include	this	as	part	of	
                                                      •	 Looking	at	all	ingredients
         comprehensive	plan
                                                      •	 Bike	and	pedestrian	solution	focus	on	Eden




DRAFT 11/09/11                                                                  20
2. Thoughts and Interactions




      Community Workshop #2
      October 27, 2011

      Small Group Responses

      What do you dislike about what you
      saw tonight?
      •	 Not	sure	what	deficit	is	today
                                                             •	 Specifically	address	ADA                          •	 Extremes--more	mixed,	not	all	commercial	or	
      •	 Concern	about	civic	center	economics                                                                        residential
                                                             •	 Park	and	ride
      •	 Bus	garage/civic/housing	sandwich                                                                        •	 Developers	build	the	city--parks,	public	
                                                             •	 Bridge	over	tracks--necessary?
      •	 Not	sure	(confirm	need,	support,	capacity)	for	                                                             buildings
                                                             •	 Large	parking	ramps--like	the	close	parking	to	
         civic	building,	make	sure	it	can	happen                                                                  •	 False	dichotomy--financial	analysis	to	explore	
                                                                services
      •	 Bus	garage                                                                                                  partnerships,	perhaps	last	opportunity
                                                             •	 No	new	residential--focus	on	businesses	and	
      •	 Park	and	repark                                        offices                                           •	 Moved	away	from	major	public	amenity,	and	
                                                                                                                     perhaps	a	later	phase
      •	 Clean	up	car	wash	site                              •	 No	McDonald’s
                                                                                                                  •	 Underlying	implication	of	“heavier”	mixed-use
      •	 Missing	loop	on	100	access                          •	 City	may	let	ALL	public	works	site	go	private
                                                                                                                  •	 Take	a	position	on	LRT
      •	 Not	seeing	a	balance	of	parking	types:	pull-up	     •	 Want	to	have	people	gather	outside
         front	door	parking	very	important	in	addition	
                                                             •	 Not	dense	enough	development--want	mixed-
         to	ramps
                                                                use
      •	 Missing	focal	point
                                                             •	 Interlachen	part	of	traffic	evaluation
      •	 No	identity/gateway/announcement	of	
                                                             •	 Winter	activity/use
         GrandView
                                                             •	 Change	to	100	not	realistic,	underestimated
      •	 Attention	to	balancing	additional	traffic	that	
         comes	with	new	development                          •	 Primary/secondary/ancillary--how	big	is	the	
                                                                draw,	the	market?
      •	 No	eminent	domain--it’s	shown
                                                             •	 Will	commercial	development	“pay	for	this”
      •	 Road	redesign	is	critical
      •	 Traffic	flow	and	intersections--need	traffic	flow
      •	 Reduction	in	Vernon--it’s	the	??	things	are,	but	
         safety	is	good
      •	 All	the	restaurants--want	to	keep	a	quiet	
         neighborhood
      •	 No	new	intersection




DRAFT 11/09/11                                                                        21
2. Thoughts and Interactions




      Community Workshop #2
      October 27, 2011

      Small Group Responses

      What would you change?
      •	 Not	recorded
      •	 How	is	the	southwest	corner	traffic	working	on	   •	 Prepare	PW	site	for	development                   •	 Prepare	public	works	site	for	development
         Eden	Ave/100/with	more	density                    •	 Conditions	can	be	set	for	development             •	 Set	conditions	for	development
      •	 Change	all	things	we	don’t	like!		:)              •	 Connectivity	needs	to	occur	early	over	railroad   •	 Connectivity	needs	to	occur	early	over	railroad
      •	 Use	railroad	bridges	as	land	masses               •	 Center	of	center	at	public	works,	not	east	of	    •	 Connection,	extension,	expansion	related	to	
      •	 Water	systems:	drainage,	retention,	recycling        100                                                  50th	and	France	(draw	from	the	east	side)

      •	 Be	deliberate,	purposeful                         •	 Financial:	money	from	public	works	site	to	       •	 Right	where	we	need	to	be	in	this	process
                                                              work	bus	site                                     •	 More	landowner	participation
      •	 Establish	and	follow	strong	overarching	
         guiding	principles                                •	 More	connectivity	for	pedestrian	movements,	      •	 What	caused	business	failure
                                                              gathering	spaces,	promenade
      •	 More	detail--rearranging	100	intriguing--                                                              •	 Add	a	timeline	to	the	process
         Interlachen	good	insight                          •	 Do	green	bridge	later
                                                                                                                •	 Full	assessment	of	public	need
      •	 Would	like	to	keep	scale	small                    •	 Did	not	see	storefronts	facing	green	spaces
                                                                                                                •	 Offering	option	for	public	realm	and	how	to	
      •	 Not	enough	E-W	??                                 •	 Add	focus	on	night	activities--lighting	needed       pay	for	them-show	us	how	to	get	this!
      •	 No	stoplight--like	roundabouts,	one-way	          •	 Reroute	Link	Road	soon	so	can	assemble	land       •	 Continue	to	show	examples	in	similar	climates
         streets,	two	levels	for	ped/bikes                 •	 Light	rail	potential                              •	 Parking	for	bikes
      •	 Smaller	buildings                                 •	 Zoning	changes	required	for	height	and	           •	 Existing	parking	ramp	potential	for	change
      •	 Start	out	slower	and	smaller                         sustainability
                                                                                                                •	 Based	on	this	plan,	want	no	new	
      •	 Emphasis	on	ROI	vs	quality	of	life                                                                        taxes--10/100,000
      •	 Build	additional	emphasis	on	“intangibles”
      •	 Better	define	mixed-use
      •	 No	toll/big	buildings
      •	 What	kind	of	residential--like	cottage	concept
      •	 Light	rail	potential
      •	 Zoning	changes	required--height,	
         sustainability




DRAFT 11/09/11                                                                       22
3. Patterns for a Neighborhood Center




DRAFT 02/10/10
3. Patterns for a Neighborhood Center




      Neighborhood Center




                                                                    Excelsior and Grand,
                                                                    Saint Louis Park, MN




                                                                    Lniden Hills,
                                                                    Minneapolis MN




                                                                    Highland Park,
                                                                    Saint Paul, MN




DRAFT 02/10/10                              24
3. Patterns for a Neighborhood Center




      Frameworks

      Streets as Frame
                                                                Emphasis on the
                                                                frame...pursue the
                                                                “Living Streets”
                                                                approach




                         Emphasis on the Frame . . . pursue
                     4   the ‘Living Streets’ approach          Eden Avenue as Main
                                                                Street...creating a
                                                                signature destination




                              Eden Avenue Main Street . . .
                          7   creating a signature destination

DRAFT 02/10/10                                                            25
3. Patterns for a Neighborhood Center




      Frameworks

      Center
                                                                The Village Center....
                                                                one signature
                                                                gathering place at
                                                                the heart




                                                                                              Small Area Guide                                Concept Plan

                                                                                              Plan Illustrative...the
                                                                                                                   Small Area Guide Plan Illustrative . . .
                 3   The Village Center . . . one signature
                     gathering place at the heart
                                                          Three distinct
                                                          places...but
                                                                                              green bridge   1     the green bridge
                                                                connected




                                                 Concept Plan

                                 Three Distinct Places . . .
                             2   but connected

DRAFT 02/10/10                                                             26
3. Patterns for a Neighborhood Center




      Frameworks

      Internal Streets
                                                                New England /
                                                                European Village...
                                                                work withthe
                                                                topography




                          New England / European Village . . .
                     6    work with the topography             Emphasis on the
                                                                internal streets...the
                                                                connective tiissue




                         Emphasis on the Internal Streets . . .
                    5    the connective tissue

DRAFT 02/10/10                                                             27
3. Patterns for a Neighborhood Center




      Strategies




      Break Down the Scale                                       Mix up the uses




      Easty to get to; easy to get around                        Connect throughout




DRAFT 02/10/10                                              28
3. Patterns for a Neighborhood Center




      Land Use Options




      More Commercial                         More Residential




      More Mixed-use



DRAFT 02/10/10                           29
3. Patterns for a Neighborhood Center




      Benchmarks

      Legacy and Sustainability
      1. Take a position on sustainability . . . expectations and outcomes                  Facilities and Community Needs
      2. Be a model for city wide sustainability ordinance                                  1. Determine best use of existing facilities…efficiency, improvements, relocate
      3. Define incentives to attract “Best-in-Class” development                           2. Address needs of underserved populations…teens, singles, etc.
      4. Seek partners and follow the money (creative financing strategies)                 3. Establish community commons at Grandview…multi-purpose model with
      5. Maximize use of the freebies . . . focus on what and why, not how                  connections to wide audience
      6. Connect to Minnehaha Creek                                                         4. Provide indoor and outdoor spaces for both planned and spontaneous
                                                                                            activities
                                                                                            5. Respond to “Whole Life – Whole Body” approach…food, exercise, rest, etc.
      Parks and Public Realm
      1. Acknowledge “No net loss”, yet aggressively seek new public space
      2. Provide legible green armature as primary form giver
      3. Build on existing strengths…inventory; assessment; repurpose; improve              History and Meaning of Place
      4. Reject single purpose in favor of integrated/overlapping goals                     1. Is “Grandview Heights” the place name?
      5. Re-prioritize bike and pedestrian movement as a district signature                 2. Tell the stories…connect the dots with historic and interpretive sites
      6. Health and wellness underpins design decisions                                     3. Reveal the resource…increase community awareness and active use of
                                                                                            existing facilities
                                                                                            4. Develop the Mill Site…celebrate the “Birthplace” of Edina
      Arts and Culture                                                                      5. Record the oral history of the Grandview District
      1. Create a recognized, visible, connected arts identity (uniquely Grandview)         Make it Beautiful !
      2. Resolve…Consolidated (central) vs. Fragmented (satellite)
      3. Advocate for content…then build                                                    Transportation and Highway 100
         infrastructure                                                                     1. Partner to implement Park-n-Ride in Grandview…on your terms
      4. Build on and leverage what you have                                                2. Identify and implement demonstration project for “Complete/Living” streets
      5. Build capacity for both producers                                                  3. It’s not safe!! Parking, access, movement, lighting need attention now
         and consumers                                                                      4. Complete the public walkway system…bikes and pedestrians are a priority
      6. Provide space/place for community                                                  5. Take leadership and direct discussion related to highway 100 interchange…
         purpose                                                                            build the “Reason Platform”
      7. Napa + Brooklyn = Edina




DRAFT 02/10/10                                                                         30
3. Patterns for a Neighborhood Center




      Concept Diagram

                                                                Key Elements to the
                                                                Concept Diagram
                                                                Vernon is improved to
                                                                become a Main Street

                                                                Eden is realigned to connect
                                                                the Library to City Hall

                                                                The barrier Hwy 100 is
                                                                reduced by eliminating
                                                                redundant ramps

                                                                A strong connection
                                                                between City hall and the
                                                                ibrary is created through the
                                                                site

                                                                Three smaller “villages”
                                                                connected by a prominent
                                                                public realm.




DRAFT 02/10/10                          31
3. Patterns for a Neighborhood Center




      Illustrative Master Plan




                                                                                                     Public Realm




      Illustrative Master Plan - Full Build-Out - 20 years                                           Street Network & Parking




DRAFT 02/10/10                                                               32
3. Patterns for a Neighborhood Center




      Illustrative Master Plan




DRAFT 02/10/10                                   33
3. Patterns for a Neighborhood Center




       East West Section - Existing




        Vernon                Jerry’s   public    rail                Public Works site          Arcadia   Hwy 100
                                        grarage


       East West Section - Proposed




DRAFT 02/10/10                                                           34
3. Patterns for a Neighborhood Center




      Potential Early Phase




          New Bridge

                                 Park and Ride beneath
                                 the “Center for the
                                 Center.”



                                  Community Use



          Commercial
          development             Mixed-use
                                  development




                              Residential
                              development




DRAFT 02/10/10                                                  35
3. Patterns for a Neighborhood Center




      Potential Early Phase

      Parcels & Proposed Projects




                                                                            A-   Public Works site
                                                                            B-   School garage site
                                                                            C-   Warner site- OLG
                                                                            D-   CSM tenant building
                                                                            E-   City parking deck

                                                                            1-   New East-West Bridge
                                                                            2-   New deck access ramp
                                                                            3-   Single bay parking deck
                                                                            4-   Multi-level parking/Park-n-Ride/Green Deck
                                                                            5-   Remove exit ramp
                                                                            6-   Remove entrance ramp
                                                                            7-   Arcadia/Eden/Normandale roundabout
                                                                            8-   Potential street connection
                                                                            9-   Potential street connection




DRAFT 02/10/10                                      36
3. Patterns for a Neighborhood Center




      Public Works Site




DRAFT 02/10/10                            37
3. Patterns for a Neighborhood Center




      Transportation and Movement




DRAFT 02/10/10                                      38
3. Patterns for a Neighborhood Center




DRAFT 02/10/10                   39
3. Patterns for a Neighborhood Center




      Built Form
      Great Lawn                        Civic Center




DRAFT 02/10/10                     40
3. Patterns for a Neighborhood Center




      Ideas and Options




DRAFT 02/10/10                            41
3. Patterns for a Neighborhood Center




      Ideas and Options

      Bracketing the Options




      Emphasize the Frame      Emphasize the East West Green Connection          Emphasize the Interior Network


      Public Works Site




DRAFT 02/10/10                                           42
3. Patterns for a Neighborhood Center




      Ideas and Options

      Alternatives




DRAFT 02/10/10                            43
3. Patterns for a Neighborhood Center




      Ideas and Options




DRAFT 02/10/10                            44

Contenu connexe

Tendances

Item 8.3 Promenade Rezoning
Item 8.3 Promenade RezoningItem 8.3 Promenade Rezoning
Item 8.3 Promenade Rezoningarounddublin
 
May 2009 Usgbc Newsletter 050109 Final
May 2009 Usgbc Newsletter 050109 FinalMay 2009 Usgbc Newsletter 050109 Final
May 2009 Usgbc Newsletter 050109 Finaltmastran
 
Clean Rivers, Clean Lake 8 -- Opening Remarks -- Nancy Frank
Clean Rivers, Clean Lake 8 -- Opening Remarks -- Nancy FrankClean Rivers, Clean Lake 8 -- Opening Remarks -- Nancy Frank
Clean Rivers, Clean Lake 8 -- Opening Remarks -- Nancy FrankSweet Water
 
Re - 1100 2nd Street S Environmental_RCA
Re - 1100 2nd Street S Environmental_RCARe - 1100 2nd Street S Environmental_RCA
Re - 1100 2nd Street S Environmental_RCAMill City Times
 
Appendices - Draft RiverFIRST Proposal
Appendices - Draft RiverFIRST ProposalAppendices - Draft RiverFIRST Proposal
Appendices - Draft RiverFIRST ProposalRiverFirst Initiative
 
Sept 2012 Covert Park APF Grant Request
Sept 2012 Covert Park APF Grant Request Sept 2012 Covert Park APF Grant Request
Sept 2012 Covert Park APF Grant Request Fred Bothwell
 
Design Portfolio | Addison Pritchard
Design Portfolio | Addison PritchardDesign Portfolio | Addison Pritchard
Design Portfolio | Addison Pritchardapritchard88
 
Town of Gibsons Harbour Area Plan
Town of Gibsons Harbour Area PlanTown of Gibsons Harbour Area Plan
Town of Gibsons Harbour Area PlanJennifer Mauel
 
Lower 9th Ward: Art, Culture Community Engagement Center
Lower 9th Ward: Art, Culture Community Engagement CenterLower 9th Ward: Art, Culture Community Engagement Center
Lower 9th Ward: Art, Culture Community Engagement CenterAshutosh Tamrakar
 
South Lincoln County, Parks & Recreation Master Plan
South Lincoln County, Parks & Recreation Master PlanSouth Lincoln County, Parks & Recreation Master Plan
South Lincoln County, Parks & Recreation Master PlanTravel Oregon
 
HMH Portfolio Excerpt
HMH Portfolio ExcerptHMH Portfolio Excerpt
HMH Portfolio Excerpthmhiggins
 
Community Newsletter January 2011
Community  Newsletter  January 2011Community  Newsletter  January 2011
Community Newsletter January 2011cercopan
 
An overview of wind power effects on visual impacts, electromagnetic interfe...
An overview of wind power effects on visual impacts, electromagnetic  interfe...An overview of wind power effects on visual impacts, electromagnetic  interfe...
An overview of wind power effects on visual impacts, electromagnetic interfe...riseagrant
 
Mahdollisuus menestyä, entä jos? 10.9.2009 / Michael Lovejoy
Mahdollisuus menestyä, entä jos? 10.9.2009 / Michael LovejoyMahdollisuus menestyä, entä jos? 10.9.2009 / Michael Lovejoy
Mahdollisuus menestyä, entä jos? 10.9.2009 / Michael LovejoySitra the Finnish Innovation Fund
 

Tendances (20)

Item 8.3 Promenade Rezoning
Item 8.3 Promenade RezoningItem 8.3 Promenade Rezoning
Item 8.3 Promenade Rezoning
 
Ignite Columbia 2012
Ignite Columbia 2012Ignite Columbia 2012
Ignite Columbia 2012
 
May 2009 Usgbc Newsletter 050109 Final
May 2009 Usgbc Newsletter 050109 FinalMay 2009 Usgbc Newsletter 050109 Final
May 2009 Usgbc Newsletter 050109 Final
 
Chapter1
Chapter1Chapter1
Chapter1
 
Clean Rivers, Clean Lake 8 -- Opening Remarks -- Nancy Frank
Clean Rivers, Clean Lake 8 -- Opening Remarks -- Nancy FrankClean Rivers, Clean Lake 8 -- Opening Remarks -- Nancy Frank
Clean Rivers, Clean Lake 8 -- Opening Remarks -- Nancy Frank
 
Re - 1100 2nd Street S Environmental_RCA
Re - 1100 2nd Street S Environmental_RCARe - 1100 2nd Street S Environmental_RCA
Re - 1100 2nd Street S Environmental_RCA
 
Appendices - Draft RiverFIRST Proposal
Appendices - Draft RiverFIRST ProposalAppendices - Draft RiverFIRST Proposal
Appendices - Draft RiverFIRST Proposal
 
Sept 2012 Covert Park APF Grant Request
Sept 2012 Covert Park APF Grant Request Sept 2012 Covert Park APF Grant Request
Sept 2012 Covert Park APF Grant Request
 
Draft Community Invol august 2010 rev2
Draft Community Invol august 2010 rev2Draft Community Invol august 2010 rev2
Draft Community Invol august 2010 rev2
 
Design Portfolio | Addison Pritchard
Design Portfolio | Addison PritchardDesign Portfolio | Addison Pritchard
Design Portfolio | Addison Pritchard
 
Town of Gibsons Harbour Area Plan
Town of Gibsons Harbour Area PlanTown of Gibsons Harbour Area Plan
Town of Gibsons Harbour Area Plan
 
Lower 9th Ward: Art, Culture Community Engagement Center
Lower 9th Ward: Art, Culture Community Engagement CenterLower 9th Ward: Art, Culture Community Engagement Center
Lower 9th Ward: Art, Culture Community Engagement Center
 
Resume Kenneth Johnson
Resume Kenneth JohnsonResume Kenneth Johnson
Resume Kenneth Johnson
 
Statistics
StatisticsStatistics
Statistics
 
South Lincoln County, Parks & Recreation Master Plan
South Lincoln County, Parks & Recreation Master PlanSouth Lincoln County, Parks & Recreation Master Plan
South Lincoln County, Parks & Recreation Master Plan
 
HMH Portfolio Excerpt
HMH Portfolio ExcerptHMH Portfolio Excerpt
HMH Portfolio Excerpt
 
Community Newsletter January 2011
Community  Newsletter  January 2011Community  Newsletter  January 2011
Community Newsletter January 2011
 
An overview of wind power effects on visual impacts, electromagnetic interfe...
An overview of wind power effects on visual impacts, electromagnetic  interfe...An overview of wind power effects on visual impacts, electromagnetic  interfe...
An overview of wind power effects on visual impacts, electromagnetic interfe...
 
Mahdollisuus menestyä, entä jos? 10.9.2009 / Michael Lovejoy
Mahdollisuus menestyä, entä jos? 10.9.2009 / Michael LovejoyMahdollisuus menestyä, entä jos? 10.9.2009 / Michael Lovejoy
Mahdollisuus menestyä, entä jos? 10.9.2009 / Michael Lovejoy
 
Architecture landscape design
Architecture landscape designArchitecture landscape design
Architecture landscape design
 

En vedette

Four alternative design concepts: Bridge Square, Northfield MN
Four alternative design concepts: Bridge Square, Northfield MNFour alternative design concepts: Bridge Square, Northfield MN
Four alternative design concepts: Bridge Square, Northfield MNWigley and Associates
 
Grandview edina workshop #1 presentation
Grandview edina workshop #1 presentationGrandview edina workshop #1 presentation
Grandview edina workshop #1 presentationWigley and Associates
 
Bridge Square Oct 23 open house presentation
Bridge Square Oct 23 open house presentationBridge Square Oct 23 open house presentation
Bridge Square Oct 23 open house presentationWigley and Associates
 
CROCT presentation to 3rd Annual Soup & Cycles, 2016
CROCT presentation to 3rd Annual Soup & Cycles, 2016CROCT presentation to 3rd Annual Soup & Cycles, 2016
CROCT presentation to 3rd Annual Soup & Cycles, 2016Wigley and Associates
 
Woodley St. Reconstruction Project - Presentation to Northfield City Council
Woodley St. Reconstruction Project - Presentation to Northfield City CouncilWoodley St. Reconstruction Project - Presentation to Northfield City Council
Woodley St. Reconstruction Project - Presentation to Northfield City CouncilWigley and Associates
 
Bridge Square May 14, 2014 open house presentation
Bridge Square May 14, 2014 open house presentationBridge Square May 14, 2014 open house presentation
Bridge Square May 14, 2014 open house presentationWigley and Associates
 
Using power tools in Northfield’s Sechler Park
Using power tools in Northfield’s Sechler ParkUsing power tools in Northfield’s Sechler Park
Using power tools in Northfield’s Sechler ParkWigley and Associates
 

En vedette (8)

Four alternative design concepts: Bridge Square, Northfield MN
Four alternative design concepts: Bridge Square, Northfield MNFour alternative design concepts: Bridge Square, Northfield MN
Four alternative design concepts: Bridge Square, Northfield MN
 
Grandview edina workshop #1 presentation
Grandview edina workshop #1 presentationGrandview edina workshop #1 presentation
Grandview edina workshop #1 presentation
 
Bridge Square Oct 23 open house presentation
Bridge Square Oct 23 open house presentationBridge Square Oct 23 open house presentation
Bridge Square Oct 23 open house presentation
 
CROCT presentation to Soup & Cycles
CROCT presentation to Soup & CyclesCROCT presentation to Soup & Cycles
CROCT presentation to Soup & Cycles
 
CROCT presentation to 3rd Annual Soup & Cycles, 2016
CROCT presentation to 3rd Annual Soup & Cycles, 2016CROCT presentation to 3rd Annual Soup & Cycles, 2016
CROCT presentation to 3rd Annual Soup & Cycles, 2016
 
Woodley St. Reconstruction Project - Presentation to Northfield City Council
Woodley St. Reconstruction Project - Presentation to Northfield City CouncilWoodley St. Reconstruction Project - Presentation to Northfield City Council
Woodley St. Reconstruction Project - Presentation to Northfield City Council
 
Bridge Square May 14, 2014 open house presentation
Bridge Square May 14, 2014 open house presentationBridge Square May 14, 2014 open house presentation
Bridge Square May 14, 2014 open house presentation
 
Using power tools in Northfield’s Sechler Park
Using power tools in Northfield’s Sechler ParkUsing power tools in Northfield’s Sechler Park
Using power tools in Northfield’s Sechler Park
 

Similaire à Grandview District Book - Draft

Draft report Grandview District Plan, Jan. 31, 2012
Draft report Grandview District Plan, Jan. 31, 2012Draft report Grandview District Plan, Jan. 31, 2012
Draft report Grandview District Plan, Jan. 31, 2012Wigley and Associates
 
Neighborhood Plan
Neighborhood PlanNeighborhood Plan
Neighborhood Plantsalmieri
 
Grandview district 10.27.11 public meeting and open house
Grandview district 10.27.11 public meeting and open houseGrandview district 10.27.11 public meeting and open house
Grandview district 10.27.11 public meeting and open houseWigley and Associates
 
Draft report Grandview District Plan, Dec. 9, 2011
Draft report Grandview District Plan, Dec. 9, 2011Draft report Grandview District Plan, Dec. 9, 2011
Draft report Grandview District Plan, Dec. 9, 2011Wigley and Associates
 
Woodside Residential Design Guidelines
Woodside Residential Design GuidelinesWoodside Residential Design Guidelines
Woodside Residential Design GuidelinesJim Kaskade
 
Downtown Master Plan Draft Summary
Downtown Master Plan Draft SummaryDowntown Master Plan Draft Summary
Downtown Master Plan Draft SummaryStateCollegePA
 
Opun presentation
Opun presentationOpun presentation
Opun presentationOPUNArch
 
Homestead%20workshop%20mock Up%20all%20color
Homestead%20workshop%20mock Up%20all%20colorHomestead%20workshop%20mock Up%20all%20color
Homestead%20workshop%20mock Up%20all%20colorDanielinpgh
 
Bergen Communities United Presentation
Bergen Communities United PresentationBergen Communities United Presentation
Bergen Communities United PresentationAPA-NJ
 
PlanDSM Workbook
PlanDSM WorkbookPlanDSM Workbook
PlanDSM WorkbookDMESC
 
NJ Future Forum 2012 Equity in TOD Hsueh
NJ Future Forum 2012 Equity in TOD HsuehNJ Future Forum 2012 Equity in TOD Hsueh
NJ Future Forum 2012 Equity in TOD HsuehNew Jersey Future
 
Making Headway in Your Community - Bucksport Closing Celebration, 2/3/16
Making Headway in Your Community - Bucksport Closing Celebration, 2/3/16Making Headway in Your Community - Bucksport Closing Celebration, 2/3/16
Making Headway in Your Community - Bucksport Closing Celebration, 2/3/16GrowSmart Maine
 
Pdm Planning Process Public Hearing 12 April 2011
Pdm Planning Process Public Hearing 12 April 2011Pdm Planning Process Public Hearing 12 April 2011
Pdm Planning Process Public Hearing 12 April 2011Sharon Armstrong
 
Ithaca's Northside: Turning the Corner
Ithaca's Northside: Turning the CornerIthaca's Northside: Turning the Corner
Ithaca's Northside: Turning the CornerArmin Heurich
 
Neal Payton on Deferential Urbanism
Neal Payton on Deferential UrbanismNeal Payton on Deferential Urbanism
Neal Payton on Deferential UrbanismNachman Shelef
 

Similaire à Grandview District Book - Draft (20)

Draft report Grandview District Plan, Jan. 31, 2012
Draft report Grandview District Plan, Jan. 31, 2012Draft report Grandview District Plan, Jan. 31, 2012
Draft report Grandview District Plan, Jan. 31, 2012
 
Neighborhood Plan
Neighborhood PlanNeighborhood Plan
Neighborhood Plan
 
Grandview district 10.27.11 public meeting and open house
Grandview district 10.27.11 public meeting and open houseGrandview district 10.27.11 public meeting and open house
Grandview district 10.27.11 public meeting and open house
 
Draft report Grandview District Plan, Dec. 9, 2011
Draft report Grandview District Plan, Dec. 9, 2011Draft report Grandview District Plan, Dec. 9, 2011
Draft report Grandview District Plan, Dec. 9, 2011
 
Sasaki Parks Master Plan Presentation
Sasaki Parks Master Plan PresentationSasaki Parks Master Plan Presentation
Sasaki Parks Master Plan Presentation
 
Woodside Residential Design Guidelines
Woodside Residential Design GuidelinesWoodside Residential Design Guidelines
Woodside Residential Design Guidelines
 
Sasaki Bridgeport Parks Master Plan Final Presentation
Sasaki Bridgeport Parks Master Plan Final PresentationSasaki Bridgeport Parks Master Plan Final Presentation
Sasaki Bridgeport Parks Master Plan Final Presentation
 
Downtown Master Plan Draft Summary
Downtown Master Plan Draft SummaryDowntown Master Plan Draft Summary
Downtown Master Plan Draft Summary
 
Opun presentation
Opun presentationOpun presentation
Opun presentation
 
Homestead%20workshop%20mock Up%20all%20color
Homestead%20workshop%20mock Up%20all%20colorHomestead%20workshop%20mock Up%20all%20color
Homestead%20workshop%20mock Up%20all%20color
 
2015_Bridge_Road
2015_Bridge_Road2015_Bridge_Road
2015_Bridge_Road
 
Glx meeting 4 presentation
Glx meeting 4   presentationGlx meeting 4   presentation
Glx meeting 4 presentation
 
Bergen Communities United Presentation
Bergen Communities United PresentationBergen Communities United Presentation
Bergen Communities United Presentation
 
PlanDSM Workbook
PlanDSM WorkbookPlanDSM Workbook
PlanDSM Workbook
 
NJ Future Forum 2012 Equity in TOD Hsueh
NJ Future Forum 2012 Equity in TOD HsuehNJ Future Forum 2012 Equity in TOD Hsueh
NJ Future Forum 2012 Equity in TOD Hsueh
 
Making Headway in Your Community - Bucksport Closing Celebration, 2/3/16
Making Headway in Your Community - Bucksport Closing Celebration, 2/3/16Making Headway in Your Community - Bucksport Closing Celebration, 2/3/16
Making Headway in Your Community - Bucksport Closing Celebration, 2/3/16
 
RPS 205 2012 Facilities Master Plan
RPS 205 2012 Facilities Master PlanRPS 205 2012 Facilities Master Plan
RPS 205 2012 Facilities Master Plan
 
Pdm Planning Process Public Hearing 12 April 2011
Pdm Planning Process Public Hearing 12 April 2011Pdm Planning Process Public Hearing 12 April 2011
Pdm Planning Process Public Hearing 12 April 2011
 
Ithaca's Northside: Turning the Corner
Ithaca's Northside: Turning the CornerIthaca's Northside: Turning the Corner
Ithaca's Northside: Turning the Corner
 
Neal Payton on Deferential Urbanism
Neal Payton on Deferential UrbanismNeal Payton on Deferential Urbanism
Neal Payton on Deferential Urbanism
 

Plus de Wigley and Associates

Northfield Bridge Square - online straw poll results
Northfield Bridge Square - online straw poll resultsNorthfield Bridge Square - online straw poll results
Northfield Bridge Square - online straw poll resultsWigley and Associates
 
Bridge Square Dec. 9 2013 open house presentation
Bridge Square Dec. 9 2013 open house presentationBridge Square Dec. 9 2013 open house presentation
Bridge Square Dec. 9 2013 open house presentationWigley and Associates
 
School calendars, research and parameters
School calendars, research and parametersSchool calendars, research and parameters
School calendars, research and parametersWigley and Associates
 
Fat Bikes and Fat Biking: State of the Industry
Fat Bikes and Fat Biking: State of the IndustryFat Bikes and Fat Biking: State of the Industry
Fat Bikes and Fat Biking: State of the IndustryWigley and Associates
 
Blogging and social media for leaders - Brooklyn Center version
Blogging and social media for leaders - Brooklyn Center versionBlogging and social media for leaders - Brooklyn Center version
Blogging and social media for leaders - Brooklyn Center versionWigley and Associates
 
Blogging and social media for leaders - Mankato version
Blogging and social media for leaders - Mankato versionBlogging and social media for leaders - Mankato version
Blogging and social media for leaders - Mankato versionWigley and Associates
 
Blogging and social media for leaders - Nisswa version
Blogging and social media for leaders - Nisswa versionBlogging and social media for leaders - Nisswa version
Blogging and social media for leaders - Nisswa versionWigley and Associates
 
Government 2.0 New strategies for engaging the public
Government 2.0 New strategies for engaging the publicGovernment 2.0 New strategies for engaging the public
Government 2.0 New strategies for engaging the publicWigley and Associates
 
June 29 2011 anthony smith minnesota presentation -community
June 29 2011 anthony smith minnesota presentation -communityJune 29 2011 anthony smith minnesota presentation -community
June 29 2011 anthony smith minnesota presentation -communityWigley and Associates
 
Cannon Valley Mountain Bike Team info mtg May 15
Cannon Valley Mountain Bike Team info mtg May 15Cannon Valley Mountain Bike Team info mtg May 15
Cannon Valley Mountain Bike Team info mtg May 15Wigley and Associates
 
Minnesota high school cycling league overview for school admins
Minnesota high school cycling league overview for school adminsMinnesota high school cycling league overview for school admins
Minnesota high school cycling league overview for school adminsWigley and Associates
 
Minnesota high school cycling league background
Minnesota high school cycling league backgroundMinnesota high school cycling league background
Minnesota high school cycling league backgroundWigley and Associates
 
Grandview public meeting presentation, Nov. 16, 2011
Grandview public meeting presentation, Nov. 16, 2011Grandview public meeting presentation, Nov. 16, 2011
Grandview public meeting presentation, Nov. 16, 2011Wigley and Associates
 
Citizens league & City of Edina budget workshop 2011
Citizens league & City of Edina budget workshop 2011Citizens league & City of Edina budget workshop 2011
Citizens league & City of Edina budget workshop 2011Wigley and Associates
 
Grandview District steering committee presentation Nov. 3, 2011
Grandview District steering committee presentation Nov. 3, 2011Grandview District steering committee presentation Nov. 3, 2011
Grandview District steering committee presentation Nov. 3, 2011Wigley and Associates
 
Grandview District Boards presented at 10.27.11 open house
Grandview District Boards presented at 10.27.11 open houseGrandview District Boards presented at 10.27.11 open house
Grandview District Boards presented at 10.27.11 open houseWigley and Associates
 
Edina Sports dome needs and interest survey edina final
Edina Sports dome needs and interest survey edina finalEdina Sports dome needs and interest survey edina final
Edina Sports dome needs and interest survey edina finalWigley and Associates
 

Plus de Wigley and Associates (20)

Northfield Bridge Square - online straw poll results
Northfield Bridge Square - online straw poll resultsNorthfield Bridge Square - online straw poll results
Northfield Bridge Square - online straw poll results
 
Bridge Square Dec. 9 2013 open house presentation
Bridge Square Dec. 9 2013 open house presentationBridge Square Dec. 9 2013 open house presentation
Bridge Square Dec. 9 2013 open house presentation
 
School calendars, research and parameters
School calendars, research and parametersSchool calendars, research and parameters
School calendars, research and parameters
 
Comparing calendars and schedules
Comparing calendars and schedulesComparing calendars and schedules
Comparing calendars and schedules
 
Fat Bikes and Fat Biking: State of the Industry
Fat Bikes and Fat Biking: State of the IndustryFat Bikes and Fat Biking: State of the Industry
Fat Bikes and Fat Biking: State of the Industry
 
State of Fat Bike Access
State of Fat Bike AccessState of Fat Bike Access
State of Fat Bike Access
 
Blogging and social media for leaders - Brooklyn Center version
Blogging and social media for leaders - Brooklyn Center versionBlogging and social media for leaders - Brooklyn Center version
Blogging and social media for leaders - Brooklyn Center version
 
Blogging and social media for leaders - Mankato version
Blogging and social media for leaders - Mankato versionBlogging and social media for leaders - Mankato version
Blogging and social media for leaders - Mankato version
 
Blogging and social media for leaders - Nisswa version
Blogging and social media for leaders - Nisswa versionBlogging and social media for leaders - Nisswa version
Blogging and social media for leaders - Nisswa version
 
Government 2.0 New strategies for engaging the public
Government 2.0 New strategies for engaging the publicGovernment 2.0 New strategies for engaging the public
Government 2.0 New strategies for engaging the public
 
June 29 2011 anthony smith minnesota presentation -community
June 29 2011 anthony smith minnesota presentation -communityJune 29 2011 anthony smith minnesota presentation -community
June 29 2011 anthony smith minnesota presentation -community
 
Cannon Valley Mountain Bike Team info mtg May 15
Cannon Valley Mountain Bike Team info mtg May 15Cannon Valley Mountain Bike Team info mtg May 15
Cannon Valley Mountain Bike Team info mtg May 15
 
Minnesota high school cycling league overview for school admins
Minnesota high school cycling league overview for school adminsMinnesota high school cycling league overview for school admins
Minnesota high school cycling league overview for school admins
 
Minnesota high school cycling league background
Minnesota high school cycling league backgroundMinnesota high school cycling league background
Minnesota high school cycling league background
 
Grandview public meeting presentation, Nov. 16, 2011
Grandview public meeting presentation, Nov. 16, 2011Grandview public meeting presentation, Nov. 16, 2011
Grandview public meeting presentation, Nov. 16, 2011
 
CVEC newsletter, Nov. 2011
CVEC newsletter, Nov. 2011CVEC newsletter, Nov. 2011
CVEC newsletter, Nov. 2011
 
Citizens league & City of Edina budget workshop 2011
Citizens league & City of Edina budget workshop 2011Citizens league & City of Edina budget workshop 2011
Citizens league & City of Edina budget workshop 2011
 
Grandview District steering committee presentation Nov. 3, 2011
Grandview District steering committee presentation Nov. 3, 2011Grandview District steering committee presentation Nov. 3, 2011
Grandview District steering committee presentation Nov. 3, 2011
 
Grandview District Boards presented at 10.27.11 open house
Grandview District Boards presented at 10.27.11 open houseGrandview District Boards presented at 10.27.11 open house
Grandview District Boards presented at 10.27.11 open house
 
Edina Sports dome needs and interest survey edina final
Edina Sports dome needs and interest survey edina finalEdina Sports dome needs and interest survey edina final
Edina Sports dome needs and interest survey edina final
 

Dernier

Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceDelhi Call girls
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...Diya Sharma
 
How Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfHow Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfLorenzo Lemes
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Pooja Nehwal
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...Axel Bruns
 
Julius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the TableJulius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the Tableget joys
 
Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Krish109503
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPsychicRuben LoveSpells
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhbhavenpr
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKISHAN REDDY OFFICE
 
Minto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxMinto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxAwaiskhalid96
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书Fi L
 
28042024_First India Newspaper Jaipur.pdf
28042024_First India Newspaper Jaipur.pdf28042024_First India Newspaper Jaipur.pdf
28042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docxkfjstone13
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docxkfjstone13
 
1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.pptsammehtumblr
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)Delhi Call girls
 

Dernier (20)

Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
 
How Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfHow Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdf
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
 
Julius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the TableJulius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the Table
 
Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 
Minto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxMinto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptx
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
 
28042024_First India Newspaper Jaipur.pdf
28042024_First India Newspaper Jaipur.pdf28042024_First India Newspaper Jaipur.pdf
28042024_First India Newspaper Jaipur.pdf
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
 
1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
 

Grandview District Book - Draft

  • 1. Preliminary Draft Summary Grandview Small Area Plan Edina, Minnesota DRAFT November 9, 2011 DRAFT 11/09/11
  • 2. 1. Hope for Change Table of Contents Steering Committee 1. Hope for Change Ken Potts Tom Ruppert Kim Melin Peter Sussman A. Review of the Small Area Plan Guide Randy Halvorson Lisa Diehl B. Purpose of the Small Area Plan Chris Rofidal Bob Kojetin C. Project Schedule and Approach D. Background Analysis Steve Buss David Davison Gene Persha Bernie Beaver 2. Thoughts and Interactions Richard Borland Mike Platteter Larry Chestler Peyton Robb A. Community Workshop #1 Laura Giertsen Dan Gieseke B. Community Workshop #2 Ellen Jones Diane Reinhart Terry Ahlstrum James Justice 3. Patterns for a Neighrbohood Center Dick Ward Darcy Winter A. Neighborhood Center Bill Neuendorf Paul Nelson B. Frameworks and Strategies Tim McIlwain David Novak C. Land Use Options Bright Dornblaser Linda Urban D. Benchmarks Any Brown Tom Mattison E. Concept Diagram Suzanne Davison Ken and Adele Floren F. Draft Illustrative Plan G. Initiatl Phase Greg Domke Michael Schroeder H. Public Works Site Sandy Fox Kevin Staunton J. Build Form Dick Crockett Michael Fischer K. Ideas and Options Arne Cook Brett Johnson Tom Bonneville Collin Bredeson 4. Moving Forward with a Purpose Kim Montgomery Deron Lindquist Tim Murphy Eric Bredesen Jim Baisch DRAFT 11/09/11 2
  • 3. 1. Hope for Change DRAFT 11/09/11
  • 4. 1. Hope for Change Review of the Small Area Plan Guide Purpose of the Small Area Plan The GrandView District includes the area between Eden and Vernon Avenues, In late 2009, the Edina City Council – seeking to ensure that redevelopment crossing Highway 100 on each street. This crescent‐shaped district comprises of the GrandView District was driven by community residents and other 19 parcels, and a variety of land uses, including retail, commercial, office, stakeholders – approved a Small Area Guide Plan process designed to engage housing, public uses, and historic buildings. the community in developing a vision for redevelopment of the City’s old Public Works site, and the area surrounding it (the GrandView District). To Historically, the area was defined commercially by its proximity to Highway accomplish this goal, a Community Advisory Team (CAT) was formed to lead 100, built in the 1930’s. At one time, Vernon Avenue was Highway 169, which the process. In November and December of 2010, the CAT submitted the made this area an important commercial hub for shopping, recreation, and Small Area Guide Plan Report to the Edina Planning Commission and City services. Over time, the district has evolved to serve more neighborhood‐ Council. oriented needs such as grocery, hardware, restaurants, clinics, and significant public uses such as the Senior Center, Library and City Hall. As such, the After approving and adopting the Report and receiving the Livable district is seen by residents as an important node for services, and by land Communities Grant from the Metropolitan Council, the City Council owners and tenants as an ideal location adjacent to a busy highway. authorized commencement of this Small Area Plan process (essentially ‘Phase II’ of the work already underway). The Phase II process is being led by In late 2009, the Council approved a process designed to engage the a community-based Steering Committee comprised of interested residents, community in planning for the future of the old Public Works site and the members of the Guide Plan process CAT, District business and property area surrounding it. The process was to be led by a Community Advisory owners, City board and commission members, and members of the Guide Plan Team (CAT) made up of interested residents, representatives from City Design Team. Information gathered and ideas generated through this process Boards and Commissions, area business and property owners, and a school will then be used to craft a development framework and implementation plan district representative. The CAT was to be supported by a Design Team made for the GrandView District. up of Edina residents in the design field, and a staff‐led Technical Advisory Committee (TAC). The roles to be played by members of the CAT, Design Team, and TAC were outlined in writing before the process commenced. Beginning with a kick‐off meeting on April 8, 2010, the CAT met 10 times in a 20‐day period during the months of April and May 2010 to study the site and the surrounding area. They determined that the study area should encompass the commercial node at Highway 100 and Vernon, as well as the City Hall campus across Highway 100. During the process (which is described in greater detail later in this report), the CAT, TAC and Design Team members walked the study area, and looked at potential areas of change, transportation challenges, pedestrian access, and other development issues. By the end of the process, the CAT had developed a set of seven guiding principles to define the future of the Grandview District. These guiding principles were shared with the City Council in May 2010. DRAFT 11/09/11 4
  • 5. 1. Hope for Change Guiding Principles Approach of the Small Area Plan The Consulting Team will work closely with the Steering Committee and its The Guiding Principles sub-committee structure to support a process that is focused on key issues, opportunities, and recommendations. The approach is organized around the 1.Leverage publicly-owned parcels and civic presence to create a vibrant Steering Committee that meets on a regular basis to guide the Consulting and connected district that serves as a catalyst for high quality, integrated Team. A key feature of the approach is using a Community Workshop format public and private development. to facilitate a highly interactive process over an approximately four (4) month schedule, which continues the progress that has been made by the Steering 2.Enhance the District’s economic viability as a neighborhood center Committee and community stakeholders. The Workshop format is designed with regional connections, recognizing that meeting the needs of to quickly and efficiently present ideas, get feedback, make adjustments, and both businesses and residents will make the district a good place to do re-engage local stakeholders business. 3.Turn perceived barriers into opportunities. Consider layering The plan is to conduct three (3) Community Workshops at specific milestones. development over supporting infrastructure and taking advantage of the The community participation process includes these primary groups of natural topography of the area. participants: Steering Committee, Executive Committee, Work Groups, City Staff, Focus Groups (land owners, neighborhoods, public officials, school 4.Design for the present and the future by pursuing logical increments of district, institutions, city departments, business operators, and others as change using key parcels as stepping stones to a more vibrant, walkable, identified during the process), Plan Commission, and City Council. Additional functional, attractive, and life-filled place. Focus Group meetings may be held with representatives from the development and construction sectors to provide context and more detail regarding trends, 5.Organize parking as an effective resource for the district by linking market, and costs. Each of these groups is engaged at key times throughout the community parking to public and private destinations while also process. providing parking that is convenient for businesses and customers. 6.Improve movement within and access to the district for people of all ages by facilitating multiple modes of transportation, and preserve future transit opportunities provided by the rail corridor. 7.Create an identity and unique sense of place that incorporates natural spaces into a high quality and sustainable development reflecting Edina’s innovative development heritage. DRAFT 11/09/11 5
  • 6. 1. Hope for Change Project Schedule and approach GrandView District Small Area Plan Project Schedule Project Schedule Part I – Discussion and Discovery Exhibit C Part I is about learning from and listening to the Steering Committee, Work Sept Oct Nov Dec Groups, and other stakeholders; analyzing the study area and understanding Part I the work done to-date; appreciating the larger dynamics of the area; and Discussion and Discovery clearly defining the opportunities. An initial Community Workshop is held to Community Workshop #1 Part II conduct work group discussions/downloads; a public meeting/presentation is Ideas and Options hosted by the Steering Committee and the Consulting Team. Community Workshop #2 Part III Part II – Ideas and Options Decide and Deliver Part II focuses on developing ideas and options that address the specific issues Community Workshop #3 raised by the Steering Committee, stakeholders and the public process. The Deliverables Consulting Team conducts a three-day Community Workshop (to be held in Project/Community Meetings Sept Oct Nov Dec the study area) that will include Steering Committee meetings, focus group Steering Committee Staff Coordination meetings, stakeholder interviews, team work sessions, and conclude with a Executive Team Meeting public meeting/presentation. Community Workshop #1 #2 #3 Work Group Meetings Part III – Decide and Deliver Plan Commission/Council Project Update Part III consolidates all the comments, ideas, and options into a preferred Note: Scope and schedule subject to review and approval by the Client and Cuningham Group direction. This part includes a third Community Workshop and public meeting. The Consulting Team prepares a summary document that may be widely Community Workshops Typical Workshop Schedule distributed via a variety of sources (i.e., print, web, etc.) and a Sketch-up 3D Community workshops are held over a 2-3 Day 1/2 model of the area with preferred options. day period as an inter-active way to facilitate Morning stakeholder focus groups and provide the • Team coordination consulting team a continuous point of contact • Focus and work group meetings and organization with the Steering Committee, Lunch staff and stakeholders. The first day would • Focus group meetings accommodate focus group meetings, Evening • Steering Committee meeting interviews, and consultant team coordination. The first day would conclude with a Steering Day 3 Committee meeting in the evening. The • Team work session second day would allow for additional team Lunch work-sessions and client coordination prior to • Team work session hosting a public meeting in the evening. • Meeting preparation Evening • Community presentation DRAFT 11/09/11 6 9
  • 7. 1. Hope for Change                                                                                                                         GrandView District – Small Area G In 2008, the Edina Comprehensive Plan was amended to identify several Potential Areas of  Background Analysis Change in the City.  As shown in the chart below, the GrandView District is one of these  Potential Areas of Change.   Edina Potential Areas of Change     The amended Comprehensive Plan provides that small area studies of these areas should be Grandview Aerial conducted in consultation with residents, property owners, business owners and commercia property owners, to produce a guide for redevelopment. A request to initiate a specific smal area plan or study can be made by community groups, business groups, the Planning  Commission, or City staff. A development proposal that involves a Comprehensive Plan  Amendment or a rezoning will require a small area plan study prior to planning application.  However, the authority to initiate a small area plan rests with the City Council.     In late 2009, the Council approved a process designed to engage the community in planning  the future of the old Public Works site and the area surrounding it. The process was to be led a Community Advisory Team (CAT) made up of interested residents, representatives from Ci Boards and Commissions, area business and property owners, and a school district  representative.  The CAT was to be supported by a Design Team made up of Edina residents  DRAFT 11/09/11 7 the design field, and a staff‐led Technical Advisory Committee (TAC). The roles to be played b members of the CAT, Design Team, and TAC were outlined in writing before the process  commenced. Copies of the descriptions are attached at Appendix B.  
  • 8. 1. Hope for Change DRAFT 11/09/11 8
  • 9. 1. Hope for Change Building Footprints Site Topography Public Right of Way Building Uses DRAFT 11/09/11 9
  • 10. 1. Hope for Change Sidewalks Parking DRAFT 11/09/11 10
  • 11. 1. Hope for Change East/West section through site North/South Section through site DRAFT 11/09/11 11
  • 12. 1. Hope for Change Aerial of site from southeast Aerial of site from northwest DRAFT 11/09/11 12
  • 13. 1. Hope for Change History • Historical Society maintains history of the community; Heritage Preservation Board is the official city organization with staff support from Joyce Repya • There is reference to “natural” togography but in reality terrain has been significantly altered over time with hill tops removed and the excavation of Hwy 100 (material was deposited at what is now the sports fields at OLG) • Yancy family was one of the early (minority) families that owned and help settle the GrandView Heights area • Area was considered third class farmland more appropriate for grazing; mention of orchards – were probably apples • Hwy 169 (Vernon) and Hwy 212 intersected here at grade; later Hwy 100 was introduced as one of the first metropolitan “ring” roads in the country. • Train service around late 1800’s, probably around 1890 provided passenger service into Minneapolis • City grew up around the Edina Mills site on the creek; the Grange Hall was originally located at the SE corner of Woodale and W 50th St. Mills site is now an archaeology resource • Current of location of Tupa Park is general area of city public works (in the “woods”); Grange Hall and Cahill School are both listed on the National Register but were moved to present location. Access is not good and the two wood buildings should not be co-located – fire hazard • Historical Society has artifacts and items in storage and have available area in Arneson Acres park • Society has had issues generating support and attendance at functions like board meetings; Grange Hall was the social and public/governmental center of the city for years • Jerrys was originally a Krogers and was local market before that; other businesses in that location included Humpty Dumpty, Jerrys Lucky Dollar, Animal Crackers, Lucilles, Jerrys Printing, Cedars and a drive-in DRAFT 11/09/11 13
  • 14. 2. Thoughts and Interactions DRAFT 11/09/11
  • 15. 2. Thoughts and Interactions Community Workshop #1 September 21, 2011 A) What is the best thing about If we have a community commons at GrandView? Grandview, what would it be? • Services (variety useful and accessible) 13 • Open space bordered by community center, • My first thought is that I don’t see a need for good eating • Location: 6 a community commons area. It may be OK. I • Civic Places: 2 don’t see it yet. • Gathering place for activities • A place to gather, farmers market, learning/ • “Gathering place” with places to meet, eat, and B) What is the worst thing about performance center sit for awhile GrandView? • Public meeting spaces - open building • Build on city hall and library/senior center in architecture including art, cafe, restaurant space area including landscape area • Lack of accessibility by • A gathering place with greens, restaurants, peds and bikes: 9 • Community center adjoined to by a green thoroughfare to small stores, services, sitting theater, bicycle paths and possibly a light rail • Unattractive: 6 station area, and rest spots • Parking and traffic: 6 • Community center with meeting rooms, • Outdoor gathering space, indoor and outdoor • Disconnected: 4 meeting space recreation and cultural spaces • Margo’s big table, a place to gather (with a • Park-like - an open shelter for events, play area, reason that makes us want to gather there), a trees, benches, etc. place with a community feel • A community center with green space, meeting • A public-private configuration of spaces that areas, roof top cafe, arts space, a place to spend allow people to gather - almost a Starbucks time writ large • Safe place for teens to meet • Must have shade trees, greenscape, must have • Place to gather as well as to have retail public art activities to do like a public gallery, shopping, should have regional focus seating outside and inside for groups of people, • Public area of aesthetic and purposeful place for other groups to gather gathering • A bazaar-type space for local food, plant and • A performing and visual arts center with walk flower vendors, plus arts and crafts booths, with paths and benches around it adjacent meeting space for community groups • Community center should include recreational • An informally programmed outdoor space facilities, meeting rooms, outdoor spaces, and that allows for current generations of users to public art, space to house community needs congregate and do as they wish that previously have not been served or that are being served in obsolete facilities DRAFT 11/09/11 15
  • 16. 2. Thoughts and Interactions Community Workshop #1 September 21, 2011 Describe one successful outcome within 5 years. • Steps toward services of need and enjoyment for local residents and greater • Decision to use public squares, etc., for public purpose vs. commercial community • Off-road biking, safe pedestrian paths, better flow • More connections within area to enable easy walking • Breaking ground on a public realm element that begins to attract people to • Traffic reduced to make the area pedestrian-friendly “stay” • Sidewalks and pathways in logical configuration, development of Public • Improved access to Grandview from the other side of Vernon and across Works site with multi-use public/private facilities Hwy 100 • Transit station • Redevelopment of north side of Eden Ave from Vernon to Hwy 100 • A community building built with uses designated • Safe bike and foot traffic, restaurants and green space and performance space • Keep it small. I live on a feeder street, which is too busy now. • Pedestrian and bike improvements (i.e. safety, ease of access) along with • Rail station/connections to places nearby, commons better traffic management • Bus garage to higher/better use, intro of residential uses, pedestrian • Create multi-age community center improvements • Taming traffic and parking • A greater sense of community, perhaps partially due to CAT efforts • Transportation issues would be “fixed,” park once to do all my business • A new community center and a green walkway that covers part of the RR there tracks • Identity as center for services with draw for residents • Beginnings of a community building - maybe just a hole in the ground • Promote renting of space in the existing homes so people will not need to drive so far DRAFT 11/09/11 16
  • 17. 2. Thoughts and Interactions Community Workshop #1 September 21, 2011 Describe one successful outcome within 20 years. • Community gathering place - transportation center, art in public places, a • A thriving community/public use and lively retail hub with good access ? for Edina • Bring in housing apartments or ? • A place that is comfortable to go to - no high rises - all on human scale • Recognition of foresight for gathering place and excellence for community where there is a common area nd transportation flow is even better - more service small businesses, especially services, a thriving “civic gathering spot” • Rail transit center, new freeway interchanges • A new configuration of the transportation infrastructure • Incorporating mass transit in a meaningful way • More densely developed mixed-use center with commercial uses, communityh benefits, and possibly a residential component, also a transit • A new configuration of bridge and roads over Hwy 100 and the trails hub • True community space, vibrant, walkable, a market, artists, people • Better use of Hwy 100 public area, including improved pedestrian access interacting in and with a beautiful place from one side to another • Light rail • Redevelopment of functionally obsolete real estate and incorporating sustainable improvements • Solve connectibility issues: transit, walking/biking, connections to neighborhood • More choesive/neighborhood feel, businesses/residential share goals and identity and spaces - cooperative-openn-pleasant destination • Some sort of efficient, green mass transit connection (LRT?, PRT?) to downtown Mpls • Focus of transit within Edina and beyond for residents • Completed project for public enjoyment • Circle tram to go from place to place • A cultural center with meeting rooms and a performing arts venue, as well as shopping • Reorganization of transportation facilities - ped plaza over TH 100 with park and public art, elimination of concrete and duplicate roadways • Transit station, multi-modal transportation auto/bicycle/pedestrian DRAFT 11/09/11 17
  • 18. 2. Thoughts and Interactions Community Workshop #2 October 25, 2011 Program Meeting Summaries Three Rivers Park District – working on regional level connections/projects CP Rail corridor will probably not be feasible for a bik/pedestrian trail due to 8:00am Legacy and Sustainability slope and ROW constraints • Stormwater management – GrandView sits in both the Minnehaha Creek Hennepin County promotes Active Living which may apply here and Nine Mile Creek watersheds Senior Center may be under-programmed; parking need for the library during • Remember Minnehaha Creek is nearby – how do we connect to several weekdays and nights GrandView? OLG – play fields have been upgraded and are very well used; school is K-8 • Can we consider a sustainability ordinance? – state code does not equal local with about 650 students. Considered potential for Park n Ride in the past. ordinance Warner property is potential development site (housing of some type?) • Think in terms of the ‘sustainability infrastructure’, and how to work with the market 10:00am Arts and Culture • Consider the Bergamot Station in Santa Monica as a model • Incorporate electric vehicle charging stations into new parking areas/decks • Use empty storefronts as a way to build awareness and communicate arts • Consider the play fields at OLG as potential use for geothermal • Arts Center is limited by its location and converted residential structure is a • Hennepin County has ‘complete streets’ policy but no current plans for long term constraint; membership and activity is limited Vernon – think in terms of measurement, community education and brand- sustainability • Consider mapping the arts and culture assets of the community and consider how to incorporate ’placemaking’ into the process – think about who are the • AIA Green Building Council has policies/principles that can apply to where producers and who are the consumers to build, building performance, and neighborhood pattern • Sewell Ballet could use “big rooms” for classes and education • About 160 homes in Edina are in the “Home Energy Squad” • Hopkins is good model that is a community facility but is run as a 501c3 and • Excel has a solar rewards program and programs that require energy programmed by 8 different local organizations that rent the space mandates • Need to think beyond the bricks and mortar and understand the “content” of arts and culture for the city – what is that and then how does the city/process 9:00am Parks and Public Realm respond] Consider rain gardens and other stormwater runoff design similar to what Edina County Club has done (and what was not done at the new City Hall • Good examples – Museum of Possibilites in Montreal, Asia Art Archives in Hong Kong; Grand Rapids Art Prize project) Minnehaha Creek Watershed provided additional funding ($600-700k) for green roofs and underground recharge areas in the West End development (St. 11:00am Facilities and Community Needs • Edina High School senior survey – need more activities for teens; school Louis Park) already has May Term (custom curriculum in last May of senior year), movie Jerrys parking is located in the Nine Mile Creek watershed nights, and Group 212 – community service oriented City of Edina currently exceeds national park standards/benchmarks • City priorities – better operational performance for facilities; how to (15ac/1000 pop. vs. about 20-25ac/1000pop.) program or change; are there potentials to consolidate some buildings and Garden Club – use walking boulevards to connect City Hall with Westside (re: functions (e.g., move toddler use out of the Edinborough building) Longfellow gardens bridging Hwy 55) DRAFT 11/09/11 18
  • 19. 2. Thoughts and Interactions • How can City think about more or better use of Senior Center – not just board meetings; Grange Hall was the social and public/governmental center a building dedicated to a single demographic – think more inter-generational of the city for years • Consider how wellness should be a quality of life issue for all demographics • Jerrys was originally a Krogers and was local market before that; other • Mankato University has a presence in Edina and is adding 30,000 sf to businesses in that location included Humpty Dumpty, Jerrys Lucky Dollar, location at 7700 France Ave Animal Crackers, Lucilles, Jerrys Printing, Cedars and a drive-in • Need to better support the neighborhood associations 2:00pm Transportation and Highway 100 • Lack of cultural venues – many people leave the community for needs/ • Metro Transit confirmed need for a Park N Ride here; they refer to this activities…. location as a “hide n ride” as commuters are parking here (mostly in the city parking deck) and catching the 587 express to downtown. This route makes 1:00pm History and Meaning of Place it way along Normandale (frontage road west of Hwy 100) to GrandView • Edina Historical Society maintains history of the community; Heritage stops before getting onto Hwy 100 Preservation Board is the official city organization with staff support from Joyce Repya • Metro Transit is ready to work with the City and land owners to build a park n ride lot; their market research indicates a need for abou 170 parking spaces • There is reference to “natural” togography but in reality terrain has been significantly altered over time with hill tops removed and the excavation of • Hennepin County encourages multi-modal use of facilities for bikes, Hwy 100 (material was deposited at what is now the sports fields at OLG) pedestrians with their complete streets policy which could be applied to Vernon; nothing identified for Vernon in the 5 year CIP but other types of • Yancy family was one of the early (minority) families that owned and help funding could be considered for pedestrian and bike improvements settle the GrandView Heights area • Mn Dot representatives were not present at this meeting • Area was considered third class farmland more appropriate for grazing; mention of orchards – were probably apples • Hwy 169 (Vernon) and Hwy 212 intersected here at grade; later Hwy 100 was introduced as one of the first metropolitan “ring” roads in the country. • Train service around late 1800’s, probably around 1890 provided passenger service into Minneapolis • City grew up around the Edina Mills site on the creek; the Grange Hall was originally located at the SE corner of Woodale and W 50th St. Mills site is now an archaeology resource • Current of location of Tupa Park is general area of city public works (in the “woods”); Grange Hall and Cahill School are both listed on the National Register but were moved to present location. Access is not good and the two wood buildings should not be co-located – fire hazard • Historical Society has artifacts and items in storage and have available area in Arneson Acres park • Society has had issues generating support and attendance at functions like DRAFT 11/09/11 19
  • 20. 2. Thoughts and Interactions Community Workshop #2 October 27, 2011 Small Group Responses What do you like about what you saw tonight? • Tony: financial reality • Green/complete streets, especially Eden • Green bridge over 100 (bike/ped only) • Cloverleaf: more land, less congestion, neighborhood alternatives, potential for • Topic of 100 and Vernon interchange • Choices for bikes and peds upgrading bridges • Like seeing PW and bus sites developed • Process: understand the tools, input is • Realigning Eden • Like that people invited important • Civic buildings • Cul-de-sac - ?? • Considering phases in next steps, knowing it will take years • Green connector over 100 • Central corridor concept • Understanding the sub-region in terms of • Bikeways • Pedestrian and wheelchair emphasis traffic • GrandView Square • Streets that I can’t cross • Open space with walks • Pedestrian connections • Not remove ?? winter and snow • Look at potential for all sites, even Jerry’s • Green space • Focus on safety and less car traffic • Realistic/feasible about what likely won’t • Park and ride place • Development is away from homes change • Multi-purpose space and public realm • Better, wider sidewalks GrandView housing (170 families), big impact • Priority on traffic flow and movement on them • Increased green space • Pedestrian bridge over 100 • Connection to Minnehaha Creek • Bike paths and pedestrian concept • Bridge over tracks--important • Capacity to expand on pedestrian and bike • Cleans up “mess” ideas in the future • Bicycle improvements • Financial perspective • More accessible towards area • Mixed-use and community-oriented • Vernon traffic improvements • Use of topography • Traffic calming • Possibility to include this as part of • Looking at all ingredients comprehensive plan • Bike and pedestrian solution focus on Eden DRAFT 11/09/11 20
  • 21. 2. Thoughts and Interactions Community Workshop #2 October 27, 2011 Small Group Responses What do you dislike about what you saw tonight? • Not sure what deficit is today • Specifically address ADA • Extremes--more mixed, not all commercial or • Concern about civic center economics residential • Park and ride • Bus garage/civic/housing sandwich • Developers build the city--parks, public • Bridge over tracks--necessary? • Not sure (confirm need, support, capacity) for buildings • Large parking ramps--like the close parking to civic building, make sure it can happen • False dichotomy--financial analysis to explore services • Bus garage partnerships, perhaps last opportunity • No new residential--focus on businesses and • Park and repark offices • Moved away from major public amenity, and perhaps a later phase • Clean up car wash site • No McDonald’s • Underlying implication of “heavier” mixed-use • Missing loop on 100 access • City may let ALL public works site go private • Take a position on LRT • Not seeing a balance of parking types: pull-up • Want to have people gather outside front door parking very important in addition • Not dense enough development--want mixed- to ramps use • Missing focal point • Interlachen part of traffic evaluation • No identity/gateway/announcement of • Winter activity/use GrandView • Change to 100 not realistic, underestimated • Attention to balancing additional traffic that comes with new development • Primary/secondary/ancillary--how big is the draw, the market? • No eminent domain--it’s shown • Will commercial development “pay for this” • Road redesign is critical • Traffic flow and intersections--need traffic flow • Reduction in Vernon--it’s the ?? things are, but safety is good • All the restaurants--want to keep a quiet neighborhood • No new intersection DRAFT 11/09/11 21
  • 22. 2. Thoughts and Interactions Community Workshop #2 October 27, 2011 Small Group Responses What would you change? • Not recorded • How is the southwest corner traffic working on • Prepare PW site for development • Prepare public works site for development Eden Ave/100/with more density • Conditions can be set for development • Set conditions for development • Change all things we don’t like! :) • Connectivity needs to occur early over railroad • Connectivity needs to occur early over railroad • Use railroad bridges as land masses • Center of center at public works, not east of • Connection, extension, expansion related to • Water systems: drainage, retention, recycling 100 50th and France (draw from the east side) • Be deliberate, purposeful • Financial: money from public works site to • Right where we need to be in this process work bus site • More landowner participation • Establish and follow strong overarching guiding principles • More connectivity for pedestrian movements, • What caused business failure gathering spaces, promenade • More detail--rearranging 100 intriguing-- • Add a timeline to the process Interlachen good insight • Do green bridge later • Full assessment of public need • Would like to keep scale small • Did not see storefronts facing green spaces • Offering option for public realm and how to • Not enough E-W ?? • Add focus on night activities--lighting needed pay for them-show us how to get this! • No stoplight--like roundabouts, one-way • Reroute Link Road soon so can assemble land • Continue to show examples in similar climates streets, two levels for ped/bikes • Light rail potential • Parking for bikes • Smaller buildings • Zoning changes required for height and • Existing parking ramp potential for change • Start out slower and smaller sustainability • Based on this plan, want no new • Emphasis on ROI vs quality of life taxes--10/100,000 • Build additional emphasis on “intangibles” • Better define mixed-use • No toll/big buildings • What kind of residential--like cottage concept • Light rail potential • Zoning changes required--height, sustainability DRAFT 11/09/11 22
  • 23. 3. Patterns for a Neighborhood Center DRAFT 02/10/10
  • 24. 3. Patterns for a Neighborhood Center Neighborhood Center Excelsior and Grand, Saint Louis Park, MN Lniden Hills, Minneapolis MN Highland Park, Saint Paul, MN DRAFT 02/10/10 24
  • 25. 3. Patterns for a Neighborhood Center Frameworks Streets as Frame Emphasis on the frame...pursue the “Living Streets” approach Emphasis on the Frame . . . pursue 4 the ‘Living Streets’ approach Eden Avenue as Main Street...creating a signature destination Eden Avenue Main Street . . . 7 creating a signature destination DRAFT 02/10/10 25
  • 26. 3. Patterns for a Neighborhood Center Frameworks Center The Village Center.... one signature gathering place at the heart Small Area Guide Concept Plan Plan Illustrative...the Small Area Guide Plan Illustrative . . . 3 The Village Center . . . one signature gathering place at the heart Three distinct places...but green bridge 1 the green bridge connected Concept Plan Three Distinct Places . . . 2 but connected DRAFT 02/10/10 26
  • 27. 3. Patterns for a Neighborhood Center Frameworks Internal Streets New England / European Village... work withthe topography New England / European Village . . . 6 work with the topography Emphasis on the internal streets...the connective tiissue Emphasis on the Internal Streets . . . 5 the connective tissue DRAFT 02/10/10 27
  • 28. 3. Patterns for a Neighborhood Center Strategies Break Down the Scale Mix up the uses Easty to get to; easy to get around Connect throughout DRAFT 02/10/10 28
  • 29. 3. Patterns for a Neighborhood Center Land Use Options More Commercial More Residential More Mixed-use DRAFT 02/10/10 29
  • 30. 3. Patterns for a Neighborhood Center Benchmarks Legacy and Sustainability 1. Take a position on sustainability . . . expectations and outcomes Facilities and Community Needs 2. Be a model for city wide sustainability ordinance 1. Determine best use of existing facilities…efficiency, improvements, relocate 3. Define incentives to attract “Best-in-Class” development 2. Address needs of underserved populations…teens, singles, etc. 4. Seek partners and follow the money (creative financing strategies) 3. Establish community commons at Grandview…multi-purpose model with 5. Maximize use of the freebies . . . focus on what and why, not how connections to wide audience 6. Connect to Minnehaha Creek 4. Provide indoor and outdoor spaces for both planned and spontaneous activities 5. Respond to “Whole Life – Whole Body” approach…food, exercise, rest, etc. Parks and Public Realm 1. Acknowledge “No net loss”, yet aggressively seek new public space 2. Provide legible green armature as primary form giver 3. Build on existing strengths…inventory; assessment; repurpose; improve History and Meaning of Place 4. Reject single purpose in favor of integrated/overlapping goals 1. Is “Grandview Heights” the place name? 5. Re-prioritize bike and pedestrian movement as a district signature 2. Tell the stories…connect the dots with historic and interpretive sites 6. Health and wellness underpins design decisions 3. Reveal the resource…increase community awareness and active use of existing facilities 4. Develop the Mill Site…celebrate the “Birthplace” of Edina Arts and Culture 5. Record the oral history of the Grandview District 1. Create a recognized, visible, connected arts identity (uniquely Grandview) Make it Beautiful ! 2. Resolve…Consolidated (central) vs. Fragmented (satellite) 3. Advocate for content…then build Transportation and Highway 100 infrastructure 1. Partner to implement Park-n-Ride in Grandview…on your terms 4. Build on and leverage what you have 2. Identify and implement demonstration project for “Complete/Living” streets 5. Build capacity for both producers 3. It’s not safe!! Parking, access, movement, lighting need attention now and consumers 4. Complete the public walkway system…bikes and pedestrians are a priority 6. Provide space/place for community 5. Take leadership and direct discussion related to highway 100 interchange… purpose build the “Reason Platform” 7. Napa + Brooklyn = Edina DRAFT 02/10/10 30
  • 31. 3. Patterns for a Neighborhood Center Concept Diagram Key Elements to the Concept Diagram Vernon is improved to become a Main Street Eden is realigned to connect the Library to City Hall The barrier Hwy 100 is reduced by eliminating redundant ramps A strong connection between City hall and the ibrary is created through the site Three smaller “villages” connected by a prominent public realm. DRAFT 02/10/10 31
  • 32. 3. Patterns for a Neighborhood Center Illustrative Master Plan Public Realm Illustrative Master Plan - Full Build-Out - 20 years Street Network & Parking DRAFT 02/10/10 32
  • 33. 3. Patterns for a Neighborhood Center Illustrative Master Plan DRAFT 02/10/10 33
  • 34. 3. Patterns for a Neighborhood Center East West Section - Existing Vernon Jerry’s public rail Public Works site Arcadia Hwy 100 grarage East West Section - Proposed DRAFT 02/10/10 34
  • 35. 3. Patterns for a Neighborhood Center Potential Early Phase New Bridge Park and Ride beneath the “Center for the Center.” Community Use Commercial development Mixed-use development Residential development DRAFT 02/10/10 35
  • 36. 3. Patterns for a Neighborhood Center Potential Early Phase Parcels & Proposed Projects A- Public Works site B- School garage site C- Warner site- OLG D- CSM tenant building E- City parking deck 1- New East-West Bridge 2- New deck access ramp 3- Single bay parking deck 4- Multi-level parking/Park-n-Ride/Green Deck 5- Remove exit ramp 6- Remove entrance ramp 7- Arcadia/Eden/Normandale roundabout 8- Potential street connection 9- Potential street connection DRAFT 02/10/10 36
  • 37. 3. Patterns for a Neighborhood Center Public Works Site DRAFT 02/10/10 37
  • 38. 3. Patterns for a Neighborhood Center Transportation and Movement DRAFT 02/10/10 38
  • 39. 3. Patterns for a Neighborhood Center DRAFT 02/10/10 39
  • 40. 3. Patterns for a Neighborhood Center Built Form Great Lawn Civic Center DRAFT 02/10/10 40
  • 41. 3. Patterns for a Neighborhood Center Ideas and Options DRAFT 02/10/10 41
  • 42. 3. Patterns for a Neighborhood Center Ideas and Options Bracketing the Options Emphasize the Frame Emphasize the East West Green Connection Emphasize the Interior Network Public Works Site DRAFT 02/10/10 42
  • 43. 3. Patterns for a Neighborhood Center Ideas and Options Alternatives DRAFT 02/10/10 43
  • 44. 3. Patterns for a Neighborhood Center Ideas and Options DRAFT 02/10/10 44