Info-Day nazionale sull’ Intelligent Energy Europe IEE 2012: il Programma comunitario finalizzato alla promozione dell'efficienza energetica e delle nuove fonti di energia rinnovabile
The impact of photovoltaic on power market in Italy - D.Migali, R.Covicchio, ...
Il programma “Intelligent Energy for Europe”: il bando di gara 2012 - Gianluca Tondi, Roma, 23 febbraio 2012
1. Il programma
“Intelligent Energy for Europe”:
il bando di gara 2012
Gianluca Tondi
Agenzia Esecutiva per la Competitività e l’Innovazione (EACI)
IEE Renewable Energy Unit
IEE Info Day – GSE, Roma, 23 Febbario 2012
2. Sommario
Il quadro politico/legislativo
Il Programma IEE
Il bando 2012
Panoramica azioni chiave bando 2012
3. Come raggiungere gli obiettivi
per il 2020
Reduce greenhouse Increase share of Reduce energy
gas levels by 20% renewables to 20% consumption by 20%
100%
Current Current
trend to
2020
-20% trend to
2020
-10%
• only 10% savings by 2020 on
current trends
• large untapped potential in
transport and building
sectors
Current • the public sector should lead
trend to
2020
20% by example (public buildings
make up 12% of the EU
building stock)
4. Quadro legislativo Europeo
Direttiva 2009/28/CE del Parlamento europeo e del Consiglio, del
23 aprile 2009 sulla promozione dell’uso dell’energia da fonti rinnovabili
Direttiva 2010/31/UE del Parlamento europeo e del Consiglio del 19
maggio 2010 sulla prestazione energetica nell’edilizia (recast EPBD)
Comunicazione Piano di efficienza energetica 2011 COM(2011) 109
definitivo, 8.3.2011
Proposal for a Directive on energy efficiency [COM(2011)370,
22/06/2011]
White Paper 'Roadmap to a Single European Transport Area –Towards
a competitive and resource efficient transport system [COM(2011) 144]
http://ec.europa.eu/energy/index_en.htm
http://ec.europa.eu/transport/index_en.htm
5. Sommario
Il quadro politico/legislativo
Il Programma IEE
Il bando 2012
Panoramica azioni chiave bando 2012
6. Intelligent Energy – Europe
in breve (1)
Contribuisce all’attuazione delle
politiche energetiche dell’UE
(efficienza energetica ed energie
rinnovabili) e al raggiungimento
degli obiettivi per il 2020
Promuove una maggiore
diffusione di soluzioni energetiche
intelligenti già dimostrate, pronte
per il mercato
€730 milioni nel periodo 2007-13
7. Intelligent Energy – Europe
in breve (2)
• Non e’ un programma di sviluppo
tecnologico (non finanzia ricerca e
sviluppo di nuove tecnologie),
diversamente da FP7
• Non finanzia investimenti in
infrastrutture
• Finanzia azioni ad elevato “valore
aggiunto europeo”
• Contribuisce a costruire un’Europa più
competitiva e innovativa
8. Un programma per convertire la
politica in azione
Creare condizioni di
mercato favorevoli
Facilitare l’attuazione di
politiche
Preparare il terreno per
Obiettivi UE nel investimenti
Cambiamenti
settore delle FER Formazione e capacity concreti sul
ed EE building campo
Diffusione informazioni,
changing behaviour
9. IEE in action!
Oltre 500 progetti supportati in Europa,
oltre 3.000 partecipanti da 30 paesi ....
Efficienza Utilizzo Fonti Iniziative
energetica energetico energetiche integrate
nei trasporti rinnovabili
...con risultati significativi a livello europeo
10. ATLETE
Giugno 2009 – Luglio 2011
> Objective: to increase EU-
wide implementation and
control of energy labelling
and eco-design
implementing measures
for appliances
> Methodology: pan-
European testing results
on household appliances,
detailed analysis of the
non-compliance causes,
methodology for
verification in the EU,
http://www.atlete.eu
promotional campaigns
11. ECOWILL
Maggio 2010 – Aprile 2013
> ECOWILL - ECO-driving: Widespread Implementation for Learner
Drivers and Licensed Drivers
> The project aims at reducing carbon emission by up to 8 Mt until
2015 by boosting the application of eco-driving across Europe.
> To reach the target the project will roll out short duration eco-
driving training programs for licensed drivers in 13 European
countries.
> Moreover, ECOWILL promotes the education of eco-driving for
learner drivers.
Find out here
the golden rules
for eco-driving!
http://www.ecodrive.org
12. PV LEGAL
Luglio 2009 – Febbraio 2012
Reduction of legal-administrative barriers for PV
system installations in Europe
> PV LEGAL aims at…
> Providing transparency with regard to administrative requirements
> Streamlining planning, constructing & operating procedures for PV systems
> Reducing costs for investors in PV systems
http://www.pvlegal.eu/
13. Covenant Capacity
Giugno 2011 – Maggio 2014
> Capacity buiding of local authorities
> COVENANT CAPACITY takes up the challenge to develop
more sustainable energy communities across Europe.
> Comprehensive European capacity building
programme for local governments
> Support all the phases of implementing a Sustainable
Energy Action Plan (SEAP) – from motivation, planning,
implementation, to monitoring and evaluating
> Support municipalities to participate in the Covenant of
Mayors
http://www.covenant-capacity.eu/
15. Sommario
Il quadro politico/legislativo
Il Programma IEE
Il bando 2012
Panoramica azioni chiave bando 2012
16. Chi può beneficiare del
programma IEE?
INDIRETTAMENTE
> Beneficiare delle migliori condizioni di
mercato
> Come “target group” di un progetto
> Come sponsor di un progetto
DIRETTAMENTE
> Partecipare ad un progetto come
coordinatore o partner
> Partecipare ad un tender
> Come valutatori delle proposte
17. Il bando 2012
Limite ultimo per la presentazione
delle proposte:
Martedì 8 Maggio 2012, ore 17:00
Ad eccezione di “Build Up Skills”:
“Pillar I”: 9 febbraio 2012 (chiuso)
“Pillar II”: 30 Aprile 2013, ore 17:00
Esclusivamente invio elettronico
Per ulteriori informazioni: http://ec.europa.eu/intelligentenergy
18. Distribuzione
budget 2011
€ 72 milioni
per finanziare “promotion and dissemination projects”
(fino al 75% dei costi del progetto)
€ 39 milioni
per i fondi “ELENA” (attraverso istituti finanziari: EIB,
KfW, CEB and EBRD)
€ 19 milioni
per acquisto di servizi (tender) e attività non finanziate
direttamente attraverso il bando (e.g. standard)
19. Come deve essere
un progetto IEE?
Un progetto che…
Contribuisce agli obiettivi energetici e di lotta
al cambiamento climatico dell’Unione Europea
E’ in linea con le priorità del Work Programme
2012
Coinvolge almeno 3 partner da 3 diversi paesi
ad eccezione di “Build Up Skills” e “Mobilising local energy
investments – Project Development Assistance”
Durata del progetto da 2 a max 3 anni
non vengono finanziati investimenti e progetti
di ricerca e sviluppo!
20. Chi può partecipare
Qualsiasi organizzazione
pubblica o privata con sede in
EU-27+ Norvegia, Islanda,
Liechtenstein, Croazia, FYROM
(controllare il sito IEE)
Organizzazioni internazionali
Persone fisiche non possono
partecipare
21. Le varie fasi
Piano di
lavoro
Feedback Bando
Risultati e impatto Presentazione
proposte
Realizzazione, Valutazione,
monitoring, selezione
supervisione
Negoziazione
Inizio progetto del contratto
22. Tempistica bando 2012: dalla
proposta alla firma del contratto
Risultati:
20 Dicembre Novembre
2011 2012
Bando di gara Valutazione Negoziazione Attuazione del progetto
Scadenza:* Marzo-Aprile 2013
8 Maggio 2012
* Ad eccezione dell’iniziativa Build Up Skills
23. Sommario
Il quadro politico/legislativo
Il Programma IEE
Il bando 2012
Panoramica azioni chiave bando 2012
24. Azioni chiave bando 2012
1. Energy efficiency 1.1. Industrial excellence in energy
(SAVE ~ 15 M€) 1.2. Consumer behaviour
1.3. Energy services
2. Renewable energy 2.1. Electricity from RES (RES-e)
sources (ALTENER 2.2. Bioenergy
~ 12 M€)
2. Energy use in 3.1. Energy-efficient transport
transport (STEER ~ 3.2. Clean and energy efficient vehicles
€12.5 M)
4.1. Energy-efficient Public Spending
4.2. Local Energy Leadership
4. Integrated initiatives 4.3. Mobilising Local Energy Investments
(~ 32.5 M€) 4.4. EE and RES in buildings
4.5. Build Up Skills
25. GRAZIE PER LA VOSTRA ATTENZIONE !
Gianluca Tondi, Senior Project Officer
Executive agency for Competitiveness and Innovation (EACI)
IEE Renewable Energy Unit
gianluca.tondi@ec.europa.eu