1. Nasser Zhebawi
YEAR OF BIRTH : 1960
NATIONALITY : Danish
JOB TITLE : Lead Electrical Engineer
E.MAIL : nasser960@hotmail.com
MOBILE NO. : 00974 3190852
QUALIFICATION : • M.Sc. degree in Oil & gas technology / Process Automatic, Aalborg
University, Denmark. 2003.
• B.Sc. degree in Electrical Engineering, Basra University, Iraq, 1984.
KEY SKILLS :
• Electrical Power requirement calculations, HV and LV SWBD design,
Specifications, Data sheet, Key / Detailed Single Line Diagram (SLD),
Earthing System calculation, offshore & onshore engineering design.
• Power system study and network analysis, short circuit current
calculation, load flow analysis, motor starting analysis and relay
coordination by using CYME, EDSA & DOCwin software.
• Detail design, FEED package, Feasibility study, Design basis,
conceptual & preliminary design as per the International standards,
codes, practices and local statutory rules and regulations.
• Load shedding and sharing system.
• SCADA system and control panels design, schematic control wiring
diagrams, loop diagrams, hazardous area classification, instrument
specification and datasheet.
• Technical bid evaluation/ review of the Vendor’s document.
• Vendor finalization.
• Cost Estimation / Evaluation
• Project management / supervision.
EMPLOYMENT
SUMMARY
2009 – Till Date : RAMBOLL OIL & GAS QATAR
Lead Electrical Engineer
2007 -2009 : COWI A/S CONSULTING ENGINEERS, QATAR
Lead Electrical Engineer
2006 - 2007 : COWI A/S CONSULTING ENGINEERS, DENMARK
Senior Electrical Engineer
2003-2006 : ABB A/S CONSULTING ENGINEERS, DENMARK
Senior Electrical Engineer
Page 1 of 7
2. Nasser Zhebawi
1996-1998 : ANSALDO-SIEMENS, LEBANON
Electrical Quality Control (QC) engineer
1992-1995 : SOUTH OIL COMPANY
Electrical Department Manager at TUBA Site
1987-1992 : BASRA REFINERY
Electrical Engineer
1985-1987 : PEPSI COLA COMPANY
Electrical Maintenance Manager
DETAILED WORK :
HISTORY
RAMBOLL OIL & GAS QATAR
Lead Electrical Engineer
• Field Development Project 2005, Maersk Oil, Qatar A/S Oil & gas
platforms located in Al-Shaheen field
Preparation of Engineering documents and drawings for the Oil & gas offshore
platforms.
Major projects involving installation of temporary water injection facilities ,Gas
compressor Skid & its accessories, Diesel Engine generator skid & accessories,
HV/LV switchgear modifications.
Review of the documents / drawings including equipment layout, cable tray
layout, earthing layout and Hazardous area classification drawings.
Standardization procedure & check list preparation of all Electrical Deliverables.
Client: Maersk Oil, Qatar
• Engineering consultancy services for detail design / EPIC for crude oil
import/export facilities upgrade and beach landing valves at Halul
Qatar offshore crude oil is exported at Halul Island via SBMs into crude tankers
using crude oil loading pumps. Halul Terminal operations is facing difficulties
in loading crude oil using the turbine driven oil export pumps due to persistent
problems on the gas turbines. Hence, Qatar Petroleum (QP) has decided to
replace the existing three unreliable crude oil loading pump sets driven by gas
turbine with four new pumps driven by Electric Variable Speed Drives (EVSD).
My work is to carry out a detailed adequacy check report and electrical system
studies for the existing and future normal and worst electrical power system
configuration, Load flow, short circuit calculation, motor starting analysis and
relay protection coordination study by using CYME program. Specification and
Data Sheets for HV & LV switchboards, Power and Distribution Transformers,
earthing and lightning protection system design.
My work also included preparing evaluation of the Vendor’s bids (Technical Bid
Evaluation) for the HV/LV switchboards, EVSD, transformers, and the motors.
Client: DOPET/ QP, Qatar
COWI A/S CONSULTING ENGINEERS, QATAR
Lead Electrical Engineer
Lead Electrical Engineer, Oil and Gas Department. During my existing, I was
working on the following project;
Page 2 of 7
3. Nasser Zhebawi
• Feasibility & Concept Optimisation Study to Install Vapour Recovery
Unit at NGL and MPB plants, MESAIEED, QATAR
At the existing NGL and new Multi Products Berth (MPB), there is at present no
vapour recovery systems installed when loading Condensate. This may result in
hydrocarbon emissions to the atmosphere during loading operations.
For this project, I have prepared the utility supply study report for both, NGL
and MPB after adding the new Vapour Recovery units (VRU). This study
included the following;
HV & LV SWBD modification, load assessment reports, load schedule
calculations, cable sizing calculation, single line diagrams, cable routings,
equipment layout drawings, verify and update the existing CYME models to
calculate the short circuit calculation, load flow study and motor starting
analysis for the new HV & LV electrical motors.
This study is based on two CYME models; each model investigates the network
for two scenarios circuit configuration (normal case and worst case circuit
configuration).
• Engineering consultancy services for feasibility & concept optimization
study for light slop handling at QP refinery, Mesaieed, Qatar
The existing slop facilities are not built for handling slops with high vapour
Pressures, from a safety and environmental point of view. Therefore,
a Feasibly Study has been done for evaluation of handling of the Light Slop
Generated at the Refinery. My work was to evaluate / study the existing and the
future power supply system, load flow, short circuit calculation and motor
starting analysis by using CYME software
• FEED for Provision for produced water injection at PWI stations from
nearby degassing stations and water from new source wells at Dukhan,
Qatar
Front End Engineering Design and modification of HV (33kV & 3.3kV)and LV
power distribution network for seven degassing stations and nine PWI (produced
water injection), install HV transfer pumps and down hole pump motors, HV &
LV SWBD specification, load assessment reports, load schedule calculations,
cable sizing calculation, verify and update existing CYME models and
calculation to carry out electrical power supply study for this project, short
circuit calculation, load flow study and motor starting analysis for new electrical
motors by using CYME program. Power study report for future expansion by
year 2014.
Client: QP, Qatar
COWI A/S CONSULTING ENGINEERS, DENMARK
Senior Electrical Engineer
• Engineering Consultancy Services for Design to install new Gas
Compressor on Stenlille Gas Storage, DONG Energy, and Stenlille,
Denmark.
The injection facilities at stenlille gas storage are designed for a capacity of
Approximately 2.6 mills. Nm3 /day. Gas injection is done by three existing gas
compressors. Due to the expansion on stenlille gas storage, DONG A/S needs to
install new gas compressor. Have prepared an electrical and instrumentation
Page 3 of 7
4. Nasser Zhebawi
detail design for this purpose. To run the new gas compressor, MV motor
(10kV, 4.2 MW, 370 rpm), medium voltage switchgear, Variable Frequency
Drive (VFD), MCC panel and Local control panel besides the instruments, have
been installed in a new substation and the compressor skids.
Client: DONG, Denmark.
COWI A/S CONSULTING ENGINEERS, QATAR
Senior Electrical Engineer
• Conceptual and Preliminary Design of HV & LV system on Gabbro
Berth, Mesaieed, Qatar.
Due to the expansion of the Gabbro Berth and storage area, modifications on the
existing power distribution have been done for distribution of additional 15 MW
of electricity. The modifications cover power supply for installation of 4 Gantry
Cranes on Berth 2 & 3, 3 km distribution system for conveying of the Gabbro to
the storage area, installation of 3 new stackers lines, at the storage area storage,
2 new building complexes at the back-up and storage area and lighting for berth
3 as well as roads, car park and storage area.
Client: QP, Qatar
• Engineering Consultancy Services for Detail Design of the Stripping
unit to maximize the utilization of offshore RAG at NGL-2, Mesaieed,
Qatar.
According to rising demand of power stations in Qatar and the predictable Gas
shortage in the near future, we have modified the Stripping Unit in NGL-2 to
increase gas supply reliability and minimize flaring of gas at offshore. The
modifications activities included the piping system and the instrumentation
system.
Client: QP, Qatar
• Engineering Consultancy Services for Expansion of Ras Laffan Avenue
at Ras Laffan Industrial City.
The objectives of this project are:
• To provide additional traffic lanes, security check point facilities, and
parking facility, bus and car parking areas on Ras Laffan Avenue between
Police Station Bridge and RLC main gate to alleviate the prevailing peak
hour traffic congestion.
• To enhance the security systems at the main gate and port gate inline with
the current risk of vehicle carrying explosives into RLC area.
The Security Check Points have been provided with security systems such as
CUVSS & ANPR Camera, X-ray backscatter system, CCTV, traffic lights,
boom barriers, Package unit substation with DG, high mast flood lighting for
RLC Avenue and truck parking facility, electronic display sign board, Lighting
and Air conditioning for Guard cubicles, Lighting for Service yard and Search
zone and Security office building and area lighting.
Client: GALFAR, Qatar.
ABB A/S CONSULTING ENGINEERS, DENMARK
Senior Electrical Engineer / Project Engineer
Process Automation Technology Department. Different projects for oil and gas
Page 4 of 7
5. Nasser Zhebawi
offshore platforms (Maersk Oil and Gas, Denmark); most of these projects were
related to the following areas;
• TE- Load Shedding & Sharing System. Upgrade / Software Description. To
improve the function of the load shedding / sharing system, the actual
condition of the turbines has been used as a basis to calculate the available
power instead of the turbine nominal values. The actual condition value is
affected by four parameters; ambient temperature, the differential pressure,
maintenance time, and the mechanical degree.
Client: Maersk Oil & Gas, Denmark.
• DAN F- LV switchboard design. In this project, I have specified and
described the required LV switchboard including all its contents. Voltage
drop and short circuit calculation.
Client: Maersk Oil & Gas, Denmark.
• TW- Load Shedding & Sharing System / Software & Installation
Description. I have updated the system by considering the actual condition
of the turbines as in Tyra East. I have made new function block diagrams to
show the events sequence.
Client: Maersk Oil & Gas, Denmark.
• GORM C- Pre alarm earth Fault GC-SWBD-3KV. I have made a pre
warning earth fault system and test procedure for three cooling water pumps
to avoid the trip of both side of 3KV SWBD. This task has been done by
installing current transformer, current monitor and ammeter on each pump
feeder. To warn the operators in the CCR earlier about an earth fault
situation, digital alarm signals will be shown on the display VDU.
Client: Maersk Oil & Gas, Denmark.
• GORM C- Interlocks between upstream & downstream breakers. There are
six downstream breakers, which can be switched ON when the upstream
breakers are on the earth position, therefore it causes shutdown status. This
problem has been solved by installing new relays in the upstream breakers in
order to transfer a service signal and inhibit close signal to the downstream
breaker, so it will not be possible to switch the downstream breaker ON,
unless the upstream breaker is closed and its isolator is in service status.
Client: Maersk Oil & Gas, Denmark.
• TW- Distribution Boards Trace Heating. I have specified and described two
new identified distribution boards trace heating that should be replaced the
old trace heating boards, besides updating the MEL and the related
drawings.
Client: Maersk Oil & Gas, Denmark.
• T W- DOCwin Max. / Min. short circuit calculation. This project was a pure
short circuit calculation studying for whole platform (3KV switchboards and
LV distribution boards) by DOCwin program. The studying included the
maximum, minimum mode at normal and emergency operation
configuration.
Client: Maersk Oil & Gas, Denmark.
• Harald- DOCwin Max. / Min. short circuit calculation. This project was
pure short-circuit calculation studying for whole platform
(3KVandLVswitchboard) by DOCwin program. The studying included the
maximum and minimum mode at normal operation configuration.
• Harald- Power distribution to level gauge illumination. In this project, I
have specified and supplied nine level glasses that should be installed on
Page 5 of 7
6. Nasser Zhebawi
five different vessels. This project included a Max. & Min. short circuit
current calculation by DOCwin program.
Client: Maersk Oil & Gas, Denmark.
• SIRI- Load shedding and start up interlock system. I have done in this
project two packages (software & installation). The first package has been
done in coordination with Odense. I have determined the functional block
diagram (flow chart) and specified the priority table, which used by the load
shedding program to select the loads to be load. Load shedding program
reacts with three parameters; Power overload of generator, generator
winding temperature, and turbine operating temperature. We have used the
available power on the bus bars is the reference for program operation to
detect the necessity to shed the loads according to the priority table. In the
installation package, I have described an interface design for all signals that
required achieving the program properly. For this task, we needed the
current measurement (AI) and the open breaker signal (DO) for each load,
besides six (AI) signals from the generator control panel; Active Power
(KW), Reactive Power (Kvar), Total Current Value (Amp), Turbine
Operating Temperature (T54), Generator Winding Temperature (TWIN),
and the Ambient Inlet Temperature (TAMB).
Client: DONG, Denmark.
ANSALDO-SIEMENS, LEBANON
Electrical / Instrumentation Quality Control (QC) engineer
Daily close observation for installation of HV & MV switchgears, LV
switchboards, Transformers, control panels, instruments, HVAC equipments,
outdoor & indoor lighting, and cable trays, included testing all the power and
control cables in the power plant.
Client: Beddawi Combined Cycle Power Plant (450 MW).
SOUTH OIL COMPANY
Electrical Department Manager on TUBA Site
Tuba field in Basra. MCC. Panels, Control panels,380V, 6KV & 11 KV
switchgears, transfer pumps, Control of HVAC systems, Electrical and
instrument hazardous area installations, transformers,
Pumps, Motors.
BASRA REFINERY
Electrical Engineer
Electrical engineer on the maintenance department. HV and LV switchgears,
MCC, Control panels, Transformers, HV and LV motors, compressors, lighting
System, Electrical and instrument hazardous area installations.
PEPSI COLA COMPANY
Electrical Department Manager
MCC. panels, Control panels, CO2 generation
System, Pumps, Central Refrigerators, HVAC system, lighting, and Diesel
generators.
ADDITIONAL : Specialisation
INFORMATION • HV & LV Switchboard Design.
• Power System Study and Network Analysis.
• Short Circuit Calculation, Load flow and motor starting analysis by using
CYME, EDSA & DOCwin software.
• Earthing System Calculation.
LANGUAGES : English , Danish and Arabic
KNOWN
Page 6 of 7
7. Nasser Zhebawi
PUBLICATIONS : MSc. thesis (PID / PLC Control for Subsea Inspection Equipments in
Offshore). September 2003, Denmark.
PROFESSIONAL Member of the Danish Society of Engineers (IDA)
SOCIETIES : Member of the Iraqi Society of Engineers
Member of I.E.E.E (Institution of Electrical and Electrical Engineers)
Page 7 of 7