This document provides information about a hydraulic central located near a waterfall on the Ezaro River in Corcubion, Spain. It has been operating for over 100 years, first using the waterpower to feed furnaces and now generating electricity. The central includes three buildings with various turbines that generate electricity using the potential energy of water that falls over 200 meters from the Pindo dam. It produces a total of around 100,000 kW of power and employs 30 people for maintenance and operation.