1. Kansas Next Step 2007 Seminar: New Technology, Seismic and Seismic Interpretation Hays, Kansas August 8-9, 2007 Kent F. Perry Gas Technology Institute
2.
3. Unconventional Gas Growth Non-Arctic U.S. and Canadian Production Outlook 2003 NPC Study 0 5 10 15 20 25 30 2000 2005 2010 2015 2020 2025 Tcf ASSOCIATED CONVENTIONAL NONCONVENTIONAL 4 Tcf
4. Area of Drilling Activity Googleearth.com Niobrara Area of Activities
5.
6. 8 3/4” open hole to 376 ft. 5 1/2” casing @ 376 cemented with 145 sacks neat cement Surface Estimated Cost Savings From Conventional Rig from 25% to 35% per well Conventional Well = $125,000 Microhole = $88,000 4 ¾” Open Hole to 1180 ft. 2 7/8” “ casing @ 1179’ cemented w/45 sacks Cement Niobrara Chalk Formation k = .002 md - .5 md Porosity = 20 -35% IP After Frac = 30 - 50 Mcf/d Microhole Well Completion – Goodland, Kansas Niobrara All Wells Fracture Stimulated