25. Conclusion
• The simulation model helped analyzing several issues
related to the upgrading project.
• The existing cranes is a bottleneck.
• The new routing strategy that can give 2% increase in
the productivity ($2 million of sales).
• The analysis of the waiting time using this model
improved the production scheduling.