Salford City College
Eccles Sixth Form Centre
BTec Level 3
Extended Diploma in Creative Media Production
Games Design
Final Major Project
Production Log
Name HamzaShahid
Date Comments
Week 1
Feb 04 – Feb 10
Had a meeting with my project manager to FMP launch and had a discussion about what I’m going to make and how would I manage it. Finished first draft of
production log and schedule.
Week 2 Half Term
Week 3
Feb 18 – Feb 24
Started carrying out the research on my FMP, which is a hybrid character, by the means of internet, articles and magazines. Refined the research and updated
production log and schedule.
Week 4
Feb 25 – March 03
Had a look at a range of different hybrid characters out there I.e. in movies, games, graphics novels and artist made and brought them in a powerpoint presentation
as an evidence for my FMP. Then I started drawing from those characters combining different parts of them in one body. Had a meeting with my project manager and
let him know what I’m up to and showed him what I’ve done until now. Updated schedule and production log.
Week 5
March 04 – March 10
Got many ideas sketched out and came up with a few stronger ideas. Worked on them and had a meeting with my project manager and showed him that I did.
Updated Production log and schedule.
Week 6
March 11 – March 17
Worked on the stronger ideas. Drew more drawings and sketched them up from different angles to get an idea that which one of them is convenient enough to
model and work on as a final idea. Had a usual meeting with my project manager and explained him about my ideas and what I think are the stronger ideas. Updated
my schedule and production log.
Week 7
March 18 – March 24
Worked on my stronger ideas and after having a thought about what could be the best for to work on as a final idea, I talked to my project manager about the final
character that is The Minotaur – Half bull and half man. Considering it as a final idea, I started drawing it from different angels and different facial expressions,
showing them continuously to my project manager and taking advice from him. Updated production log and schedule.
Week 8
March 25 – March 31 Half Term
Week 9
April 01 – April 07 Half Term
Week 10
April 08 – April 14
Worked on my final character. Made some of its body parts including face, body, horns and arms using NewTekLightwave 3D Modeller. Updated my schedule and
production log and will have a meeting with my project manager next week
Week 11
April 15 - April 21
Did some further modelling of other objects as well as my character using NewtekLightwave 3D. I modelled my character’s head, an angry bird and currently working
on modelling a super-hero. I’m doing this because I believe that modelling different things will enhance my skills and will benefit me in future. Updated production
log and schedule.
Week 12
April 22 - 28
Learnt a lot more about the 3D software I’m working in. Learnt new techniques like rigging, adding bones, making the character move, adding textures, enhancing the
appearance of the character using surface editor and made the head of the character using the ‘add points’ technique by adding a background image of the drawing
of my character’s head and working according to its features. It did take me a bit longer but in the end it was worth it.
Week 13
April 29 – May 5
Character’s body finished, bones added (named and parented). Did a few renderings recording different moves and animations of the character as an evidence in the
production log. Updated schedule and production log.
Week 14
May 6 – May 12
Character’s body finished, bones added and parented. Textures, details and facial features still need covering up. Rigged the body in layout and did some further
renderings. Updated schedule and production log.
Week 15
May 13 – May 19
Had a problem with rotating the bones and moving them in the desired way but got it sorted it out with the help of my tutor. Got some videos of my character’s
movement rendered out. Updated production log and schedule
Final Week Completed animation. Rendered out the final videos, uploaded them on youtube to share them on blog as an evidence of my work. Reviewed everything, upload final
schedule and production log on blog. Wrote evaluation of what I’ve done. FMP FINISHED!

Contenu connexe

Tendances

Schedule liam de costa
Schedule   liam de costaSchedule   liam de costa
Schedule liam de costaliam1811
 
Schedule - Liam De Costa
Schedule - Liam De CostaSchedule - Liam De Costa
Schedule - Liam De Costaliam1811
 
Schedule liam de costa
Schedule   liam de costaSchedule   liam de costa
Schedule liam de costaliam1811
 
Development plan
Development planDevelopment plan
Development planjake2233
 
Noah ashworth schedule
Noah ashworth scheduleNoah ashworth schedule
Noah ashworth schedulenoah_ashworth
 
Abbie fowler schedule
Abbie fowler scheduleAbbie fowler schedule
Abbie fowler scheduleAbbieF
 
Action planning sheet
Action planning sheetAction planning sheet
Action planning sheetasmediaf12
 
Action planning sheet done
Action planning sheet doneAction planning sheet done
Action planning sheet donejonese3
 
Emma walker production plan - template
Emma walker   production plan - templateEmma walker   production plan - template
Emma walker production plan - templateewalker1252
 
3. production experiments(3)
3. production experiments(3)3. production experiments(3)
3. production experiments(3)Allison Hewitt
 
Front cover screen shots
Front cover screen shotsFront cover screen shots
Front cover screen shotsjimmyevans30
 
Unit3 schedule engl208_spring
Unit3 schedule engl208_springUnit3 schedule engl208_spring
Unit3 schedule engl208_springStevenPfau1
 

Tendances (20)

Schedule
Schedule  Schedule
Schedule
 
Screen shots
Screen shotsScreen shots
Screen shots
 
Schedule liam de costa
Schedule   liam de costaSchedule   liam de costa
Schedule liam de costa
 
Schedule - Liam De Costa
Schedule - Liam De CostaSchedule - Liam De Costa
Schedule - Liam De Costa
 
Faiza's production log
Faiza's production logFaiza's production log
Faiza's production log
 
Schedule liam de costa
Schedule   liam de costaSchedule   liam de costa
Schedule liam de costa
 
Fmp production log_050514
Fmp production log_050514Fmp production log_050514
Fmp production log_050514
 
Production Plan
Production PlanProduction Plan
Production Plan
 
Task 8
Task 8Task 8
Task 8
 
Development plan
Development planDevelopment plan
Development plan
 
Noah ashworth schedule
Noah ashworth scheduleNoah ashworth schedule
Noah ashworth schedule
 
Abbie fowler schedule
Abbie fowler scheduleAbbie fowler schedule
Abbie fowler schedule
 
Production log
Production logProduction log
Production log
 
Development Plan
Development PlanDevelopment Plan
Development Plan
 
Action planning sheet
Action planning sheetAction planning sheet
Action planning sheet
 
Action planning sheet done
Action planning sheet doneAction planning sheet done
Action planning sheet done
 
Emma walker production plan - template
Emma walker   production plan - templateEmma walker   production plan - template
Emma walker production plan - template
 
3. production experiments(3)
3. production experiments(3)3. production experiments(3)
3. production experiments(3)
 
Front cover screen shots
Front cover screen shotsFront cover screen shots
Front cover screen shots
 
Unit3 schedule engl208_spring
Unit3 schedule engl208_springUnit3 schedule engl208_spring
Unit3 schedule engl208_spring
 

Similaire à Final production log

Fmp production log_310314
Fmp production log_310314 Fmp production log_310314
Fmp production log_310314 Thomas_Giblin_16
 
Fmp production log_170314 Thomas Giblin
Fmp production log_170314 Thomas Giblin Fmp production log_170314 Thomas Giblin
Fmp production log_170314 Thomas Giblin Thomas_Giblin_16
 
Production Diary.pptx
Production Diary.pptxProduction Diary.pptx
Production Diary.pptxTobyJackson10
 
FMP Reflective Journal
FMP Reflective JournalFMP Reflective Journal
FMP Reflective JournalShaniceYates
 
Unit66 production log_060314
Unit66 production log_060314Unit66 production log_060314
Unit66 production log_060314Deightonater
 
Ha2 production log
Ha2 production logHa2 production log
Ha2 production logsoulsama
 
FMP production log
FMP production logFMP production log
FMP production logMartinDevney
 
3. proposal sf 2017
3. proposal sf 20173. proposal sf 2017
3. proposal sf 2017jay birkin
 
ART Production Diary
ART Production DiaryART Production Diary
ART Production Diarybowes96123
 
Fmp proposal(1)
Fmp proposal(1)Fmp proposal(1)
Fmp proposal(1)AdamLepard
 

Similaire à Final production log (20)

Fmp production log_240314
Fmp production log_240314Fmp production log_240314
Fmp production log_240314
 
Fmp production log_310314
Fmp production log_310314 Fmp production log_310314
Fmp production log_310314
 
Fmp production log_170314 Thomas Giblin
Fmp production log_170314 Thomas Giblin Fmp production log_170314 Thomas Giblin
Fmp production log_170314 Thomas Giblin
 
Fmp production log_100314
Fmp production log_100314Fmp production log_100314
Fmp production log_100314
 
Production Diary.pptx
Production Diary.pptxProduction Diary.pptx
Production Diary.pptx
 
FMP Reflective Journal
FMP Reflective JournalFMP Reflective Journal
FMP Reflective Journal
 
Task 1
Task 1Task 1
Task 1
 
Production Log
Production LogProduction Log
Production Log
 
Fmp production log_030314
Fmp production log_030314Fmp production log_030314
Fmp production log_030314
 
Fmp production log_240214
Fmp production log_240214Fmp production log_240214
Fmp production log_240214
 
Unit66 production log_060314
Unit66 production log_060314Unit66 production log_060314
Unit66 production log_060314
 
Production t5
Production t5Production t5
Production t5
 
Ha2 production log
Ha2 production logHa2 production log
Ha2 production log
 
Unit66 production log
Unit66 production logUnit66 production log
Unit66 production log
 
FMP Evaluation
FMP EvaluationFMP Evaluation
FMP Evaluation
 
FMP production log
FMP production logFMP production log
FMP production log
 
3. proposal sf 2017
3. proposal sf 20173. proposal sf 2017
3. proposal sf 2017
 
ART Production Diary
ART Production DiaryART Production Diary
ART Production Diary
 
Ha3 evaluation 181213
Ha3 evaluation 181213Ha3 evaluation 181213
Ha3 evaluation 181213
 
Fmp proposal(1)
Fmp proposal(1)Fmp proposal(1)
Fmp proposal(1)
 

Plus de Ham'zzah Mir-zza (20)

Get started with hacking
Get started with hackingGet started with hacking
Get started with hacking
 
Activating windows 7 without actually buying the license key
Activating windows 7 without actually buying the license keyActivating windows 7 without actually buying the license key
Activating windows 7 without actually buying the license key
 
Hacking with a keylogger.
Hacking with a keylogger.Hacking with a keylogger.
Hacking with a keylogger.
 
Hacking tutorial.
Hacking tutorial.Hacking tutorial.
Hacking tutorial.
 
E6 logo Animation
E6 logo Animation E6 logo Animation
E6 logo Animation
 
Ethical Checklist
Ethical Checklist Ethical Checklist
Ethical Checklist
 
Ethical Checklist
Ethical Checklist Ethical Checklist
Ethical Checklist
 
Ethical Checklist - E6 3D Logo
Ethical Checklist - E6 3D LogoEthical Checklist - E6 3D Logo
Ethical Checklist - E6 3D Logo
 
Production
ProductionProduction
Production
 
Final schedule 1
Final schedule 1Final schedule 1
Final schedule 1
 
Final schedule
Final scheduleFinal schedule
Final schedule
 
Fmp research1
Fmp research1Fmp research1
Fmp research1
 
3 d animation
3 d animation3 d animation
3 d animation
 
Gd02 collaboration agreement
Gd02 collaboration agreementGd02 collaboration agreement
Gd02 collaboration agreement
 
Project Charter
Project CharterProject Charter
Project Charter
 
Gd02 ethical checklist (1)
Gd02 ethical checklist (1)Gd02 ethical checklist (1)
Gd02 ethical checklist (1)
 
Pixel and resolution
Pixel and resolutionPixel and resolution
Pixel and resolution
 
Review
ReviewReview
Review
 
Figurative artists
Figurative artistsFigurative artists
Figurative artists
 
Fmp research1
Fmp research1Fmp research1
Fmp research1
 

Final production log

  • 1. Salford City College Eccles Sixth Form Centre BTec Level 3 Extended Diploma in Creative Media Production Games Design Final Major Project Production Log Name HamzaShahid Date Comments Week 1 Feb 04 – Feb 10 Had a meeting with my project manager to FMP launch and had a discussion about what I’m going to make and how would I manage it. Finished first draft of production log and schedule. Week 2 Half Term Week 3 Feb 18 – Feb 24 Started carrying out the research on my FMP, which is a hybrid character, by the means of internet, articles and magazines. Refined the research and updated production log and schedule. Week 4 Feb 25 – March 03 Had a look at a range of different hybrid characters out there I.e. in movies, games, graphics novels and artist made and brought them in a powerpoint presentation as an evidence for my FMP. Then I started drawing from those characters combining different parts of them in one body. Had a meeting with my project manager and let him know what I’m up to and showed him what I’ve done until now. Updated schedule and production log. Week 5 March 04 – March 10 Got many ideas sketched out and came up with a few stronger ideas. Worked on them and had a meeting with my project manager and showed him that I did. Updated Production log and schedule. Week 6 March 11 – March 17 Worked on the stronger ideas. Drew more drawings and sketched them up from different angles to get an idea that which one of them is convenient enough to model and work on as a final idea. Had a usual meeting with my project manager and explained him about my ideas and what I think are the stronger ideas. Updated my schedule and production log. Week 7 March 18 – March 24 Worked on my stronger ideas and after having a thought about what could be the best for to work on as a final idea, I talked to my project manager about the final character that is The Minotaur – Half bull and half man. Considering it as a final idea, I started drawing it from different angels and different facial expressions, showing them continuously to my project manager and taking advice from him. Updated production log and schedule. Week 8 March 25 – March 31 Half Term Week 9 April 01 – April 07 Half Term Week 10 April 08 – April 14 Worked on my final character. Made some of its body parts including face, body, horns and arms using NewTekLightwave 3D Modeller. Updated my schedule and production log and will have a meeting with my project manager next week Week 11 April 15 - April 21 Did some further modelling of other objects as well as my character using NewtekLightwave 3D. I modelled my character’s head, an angry bird and currently working on modelling a super-hero. I’m doing this because I believe that modelling different things will enhance my skills and will benefit me in future. Updated production
  • 2. log and schedule. Week 12 April 22 - 28 Learnt a lot more about the 3D software I’m working in. Learnt new techniques like rigging, adding bones, making the character move, adding textures, enhancing the appearance of the character using surface editor and made the head of the character using the ‘add points’ technique by adding a background image of the drawing of my character’s head and working according to its features. It did take me a bit longer but in the end it was worth it. Week 13 April 29 – May 5 Character’s body finished, bones added (named and parented). Did a few renderings recording different moves and animations of the character as an evidence in the production log. Updated schedule and production log. Week 14 May 6 – May 12 Character’s body finished, bones added and parented. Textures, details and facial features still need covering up. Rigged the body in layout and did some further renderings. Updated schedule and production log. Week 15 May 13 – May 19 Had a problem with rotating the bones and moving them in the desired way but got it sorted it out with the help of my tutor. Got some videos of my character’s movement rendered out. Updated production log and schedule Final Week Completed animation. Rendered out the final videos, uploaded them on youtube to share them on blog as an evidence of my work. Reviewed everything, upload final schedule and production log on blog. Wrote evaluation of what I’ve done. FMP FINISHED!