3. Proposed Solution
GTI offer propose solution for the Residential and commercial entity on
your environment business :
1. Triple play
2. In Building Cellular System
6. Benefit
Benefit for Owner and
tenants
Increase the maximum service for tenant
and guests
One gate provider for all telco services
Interactive TV feature and customizable
Upgrade the prestige level building so it
can increase sales and occupancies
Develop value add service through the
same media
Low Cost Investment, all layer distribution
equipment provide by grahakomindo
7. Triple Play and IBC Project Experience
Triple Play
- Bumi Serpong Damai (BSD) Resident – PT. Duta Pertiwi
- Cervino Village Apartment + Office
- Puri Park View Apartment + Office
- Sunter Park View Apartment + Office
- Sunter Icon Apartment + Office
IBC
- Permata Kuningan Building
- Manhattan Hotel
- Merlyn Hotel
- BSD Marketing Office
8. Featured and Technology
Triple Play Solution
Interactive between room and servers
Broadband internet
TV +/- 60 channel
Welcome Page
Information facilities
Added feature customizable
etc
9. Featured and Technology
Triple Play Solution
High bandwidth with technology supported :
• GPON FTTH Appilication
• Access last mile using indoor terminal (mini ONT)
• Standard ITU-T G.984 1/2/3/4
• Ethernet carried service
• Reliable security protection
- downstream data protection
- anti mac spooling
- IP ACL control
- packet restriction
- precise location
Customized feature menu
10. Customizable Digital Features Included
Triple Play Solution
Welcome message or video
with guest name
Main Menu
Language Sub Title
Customizable Main Menu
Video on Demand
Broadcast TV
News Feed
Room Messaging
World Time & Weather
Internet Radio
Hotel Information
Room Bill
Mini bar Posting
(house keeper only)
Online Chat
Help – Quick Guide
11. Topology & Network Design Concept
Triple Play Solution
Basement 3
Basement 2
Basement 1
IIX
Int.
Internet
@ Equinix Singapore
Sealed
Closures
FO Handhold/
Demarcation Point
OSP Fiber Cable
Head End
OTB
PoP GTI BBU
Manageable
Switch/L2
Fiber
Management
eth
SFU
Existing GTI
Network
ODF
SC-FC
Patch cored
Video Voice Data
12. Topology & Network Design Concept
Triple Play Solution
Home Gateway
Tenant
IPTV/ VoD
Telp / VoIP
STB
Broadband
Internet
per room
Per floor
2nd floor
3rd floor
4th floor
Broadband Remote
Access Radius Server
IP Core
IPTV &
VoDServer
Middle
ware
SoftSwitc
h
Internet
NMS & NOC Center
Distribution
Switch
Head End Room
Xth next floor
VideoVoice DataVideoVoice Data
13. Implementation Preview
Triple Play Solution
Implementation Data center (head end) at Bumi
Serpong Damai (BSD) resident
- clean and neat
- efficient room for central
service provider convergence
(head end room)
14. Implementation Preview
Triple Play Solution
Installation distribution switch and optical terminal
Installation last mile per room
- placement of the device in a
closed rack
- STB and I/O Customers
15. Implementation Preview
Triple Play Solution
NOC & TS room deployment
- 24 hours online per weeks/years
- integrated TS monitoring for
3play , IBS and others
16. Feature & Technology
IBC ( In Building Cellular ) Solution
Optional or combination of active and passive DAS
Multi operator capability with multiband support for
GSM900/1800, CDMA800/1900, WCDMA and
up to 2,6 Ghz
Technical Effectiveness and retain manageability and
realibility of DAS System ( passive and active)
17. Feature & Technology
IBC ( In Building Cellular ) Solution
High Power, low noise, multi carrier Power Amp
- high downlink power (>60dBc)
- Low noise amp to improve uplink sensitivity
Master unit support up to 4 quod-bands over single
core fiber optic cable
- more effective use of fiber-optic infrastructure
- manageable remote for configure and monitoring
Remote unit support 4-bands in a single box
- up to 46dBm downlink power per band, so it can less clutter,
simplify and lower CAPEX
- adjustable for attenuation and gain, hence need flexibility to
achieve target radio coverage across band
18. Topology & Network Design Concept
IBC ( In Building Cellular ) Solution
Operator A
Operator B
Operator C
Operator D
Master Unit Remote
Radio Unit
MCPA
Booster
Point of Interface/
Multi band Combiner
Operator BTS
ACTIVE-DAS Passive-DAS
RF-Coax Cable
Fiber Optic
Omni Antenna
19. Topology & Network Design Concept
(Active Mode)
IBC ( In Building Cellular ) Solution
Intern
et
Access Point
GSM 1 Operator
GSM XX Operator
CDMA 1 Operator
CDMA XX Operator
3G Operator
Master Unit
P
O
I
NMS
Remote Radio
Unit
Active Booster Omni Antenna
Passive DASActive DAS
Splitter tap
Master Unit(MU) deliver RF signals over
long distances to remote radio unit (RU)
via FO
Multi band Combiner (point of interface)
combines multiple operators and multiple
bands into a single RF system
The NMS Monitors and manage status and
parameter e.g. amplifier gain, operating
and environmental status, etc.
Remote radio unit amplifies RF signals to
the Passive DAS
20. Topology & Network Design Concept
(Passive Mode)
IBC ( In Building Cellular ) Solution
Remote Radio
Unit
Passive DAS
Omni Antenna
Active Booster
Splitter tap & components
Installation inside a riser
- Forms cascading network
topology to distribute RF
signals to the intended
areas of coverage
- Fully passive which does
not require electrical power
and minimal maintenance
- Signal loss and uplink
dictated by number of
branches and antenna
- Each MCPA Booster up to 40W (46dBm) downlink per
band for better flexibility in sectorisation and power
planning
- Low noise amplification improves uplink sensitivity
(<4dB)
- Simple and neat installation in riser for ease of
maintenance
21. Hardware Installation preview
IBC ( In Building Cellular ) Solution
Installation at Permata Kuningan Building and
Manhattan Hotel
- clean
- single box installation in
BTS room or riser
22. Hardware Installation preview
IBC ( In Building Cellular ) Solution
Installation Combiner at Permata Kuningan Building and
Manhattan Hotel
Multi operator Combiner
installation, GSM 900/1800, CDMA 800/1900 and
WCDMA/3G
23. Initial Step for proposed solution
Q&A
- site and resident visit survey
Prepare Initial system Design
- head end room and riser location
- number of rooms and spaces per floor
- floor plans with BTS and riser location
- radio bands and frequency assignment
- coverage area and capacity (Tx/Rx) planning
- budgetary proposal
Project Planning
- acceptance for initial system design
- detailed system design
- prioritization and implementation planning