Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 1
MGT610
Lecture 2
The Impact of Project Risks and
Uncertainties
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 2
Module Topics and Objectives
The role of project plans and changes
– Importance of quality of project planning.
– Recognize that plan changes and goal changes are
different.
– Analyze the impact of plan and goal changes on
project value.
– Analyze the impact of contextual factors on plan and
goal changes.
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013
Value PM: Core Conflict in Maximization Paradigm
Maximize
Project
Value
PrerequisiteRequirementObjective
The management core problem:
– Management of change: Opportunity discovery and
exploitation.
Exploit
Opportunities
Not Exploit
Opportunities
Initial
Requirements
Met
Stakeholder
Expectations
Met
PM’s
Value
Mindset
3
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013
Plans are Nothing, Changing Plans is
Everything
The Impact of Changes on Project
Success
For academic use only. 4
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 5
Conceptual Framework of Project Planning and Changing
Efficiency Customer
Satisfct.
Goal
Changes
Plan
Changes
Quality of
Planning
Context
+
+
+
+
+
+
-
-
-
-
-
-
+
Hypothesized Relations between the Planning Variables and Success
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 6
Conceptual Framework – Variable Definitions
– Plan changes: frequency
– Goal changes: importance and frequency
– Planning quality: work breakdown, resource
allocation, scheduling, budget
– Success: efficiency, customer satisfaction
– Context
• Technical Risks: demanding
• Importance: usefulness, importance for
organization
• Experience: similar project
• Manpower: personnel losses or transfer
• Parallel Projects: undertaken at the same time
• Breakthrough: technological
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 7
Conceptual Framework – Variable Measurements
Scale Measures
Efficiency
(Alpha:0.86)
1. The project had come in on schedule
2. The project had come in on budget
Customer
satisfaction
(Alpha:0.81)
1. The clients were satisfied with the process by which this project
was completed
2. The clients are satisfied with the results of the project
Plan changes The project plans (schedule, personnel, budget) were often changed
Goal changes
(Alpha:0.83)
1. Project goals were often changed
2. At least one major project goal was changed considerably
Planning quality
(Alpha:0.85)
1. The entire project task (scope) was structured in work packages.
2. Every work package was allocated with a specific time allowance.
3. We knew which activities contained slack time or slack resources.
4. All work packages had a predecessor and a successor work
package (except the first and the last).
5. There was a detailed budget plan for the project.
6. The precise demand for key personnel (who, when) was specified
in the project plan
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013
Conceptual Framework – Variable Measurements
For academic use only. 8
Scale Measures
Technical risks
(Alpha:0.79)
1. The task was technically demanding.
2. The completion of the business goals included high risks.
Importance
(Alpha:0.78)
1. It was important that the results of the project could be used as
soon as possible
2. The implementation of the project was important for the
organization’s policy
3. The implementation of the project was important for the success of
the organization
Experience The projecting company had experience with the solution of similar
problems
Manpower The project team did not experience any significant personnel losses
or transfer during the project’s development
Parallel projects The completion of the project depended on other projects,
undertaken at the same time.
Break through The project was not subject to any recent technological
breakthrough, which could have rendered it obsolete.
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 9
Empirical Findings - Sample Description
Kind of Project Absolute frequency Relative frequency
Machine tool manufacturing 25 5.6%
Plant construction 61 13.6
Building construction 30 6.7
Product development 116 25.9
Reorganization 52 11.6
Software 109 24.3
Others 55 12.3
Total 448 100.0%
Returned Questionnaires: 43%, N= 448 (257 successful, 191 unsuccessful)
Respondents: Project Leader 46%, Team 27%, Others 27%
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 10
Empirical Findings – Correlations between Contextual and
Planning Variables
Quality of
Planning
Goal
Changes
Plan
Changes
Personnel Constraints n.s. .226** .226**
Parallel Projects n.s. .202** .174**
Occurrence of Breakthrough n.s. .247** .127**
Technical Risks n.s. .175** .165**
Importance .204** n.s. n.s.
Experience .170** n.s. n.s.
**p<=0.01, n.s. – not significant
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 11
Empirical Findings – Path Model
Efficiency Customer
Satisfct.
Goal
Changes
Plan
Changes
Quality of
Planning
-.27 -.21
+.50
+.61
+.14+.27
-.16
-.23
n.s.
n.s.
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 12
Empirical Findings – Path Model (total)
Efficiency
-.20
R2= 26%
Cust. Sati.
R2= 55%
+.61
Technical
Risk
Goal
Changes
Plan
Changes
Quality of
Planning
Personnel
Constr.
Parallel
Projects
Break
through
Import.
Experie.
+.16 +.15 +.14 +.18
+.11
-.16
-.21
-.23
+.50
+.14
+.16
+.20
-.27
+.27
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 13
Empirical Findings – Effects of Success Factors
Planning Variables/ Impact on
Efficiency
Direct
Effect
Indirect
Effect
Total
Effect
Quality of Planning +.27 +.08 +.35
Goal Changes -.21 -.10 -.31
Plan Changes -.23 - -.23
Planning Variables/ Impact on
Customer Satisfaction
Direct
Effect
Indirect
Effect
Total
Effect
Quality of Planning +.14 +.25 +.39
Goal Changes -.15 -.19 -.34
Plan Changes - -.14 -.14
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 14
Goal
Changes
Empirical Findings – Calculation of Effects (Ex.)
• Indirect Effects of Goal Changes
• (+.50 * -. 23) = -.10
• = Indirect Effect -.10 ( )
• + Direct Effect -.21 ( )
• = Total Effect -.31
Efficiency
+.50
-.23
-.21
Plan
Changes
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 15
Summary of Empirical Findings
• The influences of planning and changes on project success
– The positive total effect of the variable quality of planning (+.35
and +.39) is completely overridden by the negative combined
effect of plan and goal changes (-.54 and -.48)
• The interactions between the planning variables
– The quality of planning reduces the level of goal changes (−0.27),
it does NOT affect plan changes
– Changing project goals leads to changes of project plans (0.50)
• The influences of context on the project planning activities
– Strategic importance and the level of experience of the project
team affecting only the quality of planning
– The others influence goal changes and plan changes
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 16
Summary of Empirical Findings
• Plan changes and goal changes are different!
• Goal changes will lead to plan changes
• The influence of frequent changes on project value is
significantly negative
• The quality of project planning can reduce goal changes
• The causes for changing project plans are contextual-
related
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013
Definitions of Project Risk and Uncertainty
• Project Risk
– Project risks also known as the Known-Unknowns are
basically events, circumstances, situations or
conditions that have a potential negative impact on
meeting predefined project objectives.
• Project Uncertainty
– Unexpected and unforeseen project situations with
potential significant impact on the value of a project.
For academic use only. 17
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013
Exploratory case based interview study
• 42 case studies
• 90-minute interviews with semi-structured questionnaire
• Creation of case study protocol and database
Research Method
Project Category Frequencies
Information Systems Projects 20
Product and Service Development Projects 9
Construction Projects 4
Business & Organization Change Projects 3
Research & Development Projects 2
Project-like tasks 4
Total 42
For academic use only. 18
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013
• Stakeholder capabilities and dynamics are the most frequent source of
uncertainties!
• Mergers and acquisitions and politics lead to uncertainty.
Categories of Uncertainties
Uncertainty Categories Uncertainty Sources Frequencies
Stakeholder uncertainty Inexperience, change, contracts 18
Organizational uncertainty M&A, politics, unknown legacy system 9
Technological uncertainty Tech. issues, tight specs 8
Contextual turbulences Legal, market 6
Project characteristics Unknown complexity 3
Malpractice Self induced uncertainty 2
For academic use only. 19

Contenu connexe

Tendances

Chapter 7 managing risk
Chapter 7   managing riskChapter 7   managing risk
Chapter 7 managing riskHammad Hashmi
 
Getting To Done - A Master Class Workshop
Getting To Done - A Master Class WorkshopGetting To Done - A Master Class Workshop
Getting To Done - A Master Class WorkshopGlen Alleman
 
76 s201905
76 s20190576 s201905
76 s201905IJRAT
 
Project management.pptx
Project management.pptxProject management.pptx
Project management.pptxNimra zaman
 
Most Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsMost Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsSHAZEBALIKHAN1
 
DCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckDCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckSHAZEBALIKHAN1
 
Project performance tracking analysis and reporting
Project performance tracking analysis and reportingProject performance tracking analysis and reporting
Project performance tracking analysis and reportingCharles Cotter, PhD
 
Project Time Management
Project Time ManagementProject Time Management
Project Time ManagementSerdar Temiz
 
My 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project ManagementMy 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project ManagementSHAZEBALIKHAN1
 
Showing how to Increase the Probability of Project Success by applying the ...
Showing how to Increase the Probability of Project Success by applying the ...Showing how to Increase the Probability of Project Success by applying the ...
Showing how to Increase the Probability of Project Success by applying the ...Glen Alleman
 
Monitor and control process group part two
Monitor and control process group part twoMonitor and control process group part two
Monitor and control process group part twoHossam Maghrabi
 
Integrating risk with earned value
Integrating risk with earned valueIntegrating risk with earned value
Integrating risk with earned valueGlen Alleman
 
Strategic portfolio management
Strategic portfolio managementStrategic portfolio management
Strategic portfolio managementGlen Alleman
 
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...Mubashir Ali
 
Project Management- introduction
Project Management- introductionProject Management- introduction
Project Management- introductionAditi Garg
 

Tendances (20)

Chapter 7 managing risk
Chapter 7   managing riskChapter 7   managing risk
Chapter 7 managing risk
 
Getting To Done - A Master Class Workshop
Getting To Done - A Master Class WorkshopGetting To Done - A Master Class Workshop
Getting To Done - A Master Class Workshop
 
76 s201905
76 s20190576 s201905
76 s201905
 
Project Control System
Project Control SystemProject Control System
Project Control System
 
Chap001 (1)
Chap001 (1)Chap001 (1)
Chap001 (1)
 
Project management.pptx
Project management.pptxProject management.pptx
Project management.pptx
 
Most Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsMost Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management Terms
 
Chap007
Chap007Chap007
Chap007
 
DCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckDCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality Check
 
Project performance tracking analysis and reporting
Project performance tracking analysis and reportingProject performance tracking analysis and reporting
Project performance tracking analysis and reporting
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
My 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project ManagementMy 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project Management
 
Showing how to Increase the Probability of Project Success by applying the ...
Showing how to Increase the Probability of Project Success by applying the ...Showing how to Increase the Probability of Project Success by applying the ...
Showing how to Increase the Probability of Project Success by applying the ...
 
06 pert cpm
06 pert cpm06 pert cpm
06 pert cpm
 
Monitor and control process group part two
Monitor and control process group part twoMonitor and control process group part two
Monitor and control process group part two
 
Integrating risk with earned value
Integrating risk with earned valueIntegrating risk with earned value
Integrating risk with earned value
 
Strategic portfolio management
Strategic portfolio managementStrategic portfolio management
Strategic portfolio management
 
Pep
PepPep
Pep
 
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
 
Project Management- introduction
Project Management- introductionProject Management- introduction
Project Management- introduction
 

En vedette

Reading week09 lechler_cc
Reading week09 lechler_ccReading week09 lechler_cc
Reading week09 lechler_cchenry KKK
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slideshenry KKK
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slideshenry KKK
 
Reading week08 saaty_ahp_prediction
Reading week08 saaty_ahp_predictionReading week08 saaty_ahp_prediction
Reading week08 saaty_ahp_predictionhenry KKK
 
Week05 slides
Week05 slidesWeek05 slides
Week05 slideshenry KKK
 
Reading week08 shah_ahp_case
Reading week08 shah_ahp_caseReading week08 shah_ahp_case
Reading week08 shah_ahp_casehenry KKK
 
Week12 slides
Week12 slidesWeek12 slides
Week12 slideshenry KKK
 

En vedette (7)

Reading week09 lechler_cc
Reading week09 lechler_ccReading week09 lechler_cc
Reading week09 lechler_cc
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slides
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slides
 
Reading week08 saaty_ahp_prediction
Reading week08 saaty_ahp_predictionReading week08 saaty_ahp_prediction
Reading week08 saaty_ahp_prediction
 
Week05 slides
Week05 slidesWeek05 slides
Week05 slides
 
Reading week08 shah_ahp_case
Reading week08 shah_ahp_caseReading week08 shah_ahp_case
Reading week08 shah_ahp_case
 
Week12 slides
Week12 slidesWeek12 slides
Week12 slides
 

Similaire à Week02 slides spring_2013

Week06 slides
Week06 slidesWeek06 slides
Week06 slideshenry KKK
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800PRIYANSHU KUMAR
 
Project Scope Baseline presentation outlining every
Project Scope Baseline presentation outlining everyProject Scope Baseline presentation outlining every
Project Scope Baseline presentation outlining everydickmorty400
 
Project Management
Project ManagementProject Management
Project Managementirfan ali
 
Lecture07 vo customer
Lecture07 vo customerLecture07 vo customer
Lecture07 vo customertoushi0616
 
Week07 slides 2013_s
Week07 slides 2013_sWeek07 slides 2013_s
Week07 slides 2013_shenry KKK
 
Mega project not mega problems session 1
Mega project not mega problems session 1Mega project not mega problems session 1
Mega project not mega problems session 1Aconex
 
Lecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdfLecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdfTanzeelShahid5
 
1.1 introduction to real estate project management
1.1 introduction to real estate project management1.1 introduction to real estate project management
1.1 introduction to real estate project managementIrefuser1
 
Essentials of Entry Level Project Management - Rev A
Essentials of Entry Level Project Management - Rev AEssentials of Entry Level Project Management - Rev A
Essentials of Entry Level Project Management - Rev ASteve Kiester
 
ANALYSIS OF PROJECT SCOPE CHANGE MANAGEMENT AS A TOOL FOR PROJECT SUCCESS CA...
ANALYSIS OF PROJECT SCOPE CHANGE MANAGEMENT AS A TOOL FOR PROJECT SUCCESS  CA...ANALYSIS OF PROJECT SCOPE CHANGE MANAGEMENT AS A TOOL FOR PROJECT SUCCESS  CA...
ANALYSIS OF PROJECT SCOPE CHANGE MANAGEMENT AS A TOOL FOR PROJECT SUCCESS CA...Karla Adamson
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)DrFereydounDejahang
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)drdej19
 
021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)Dr Fereidoun Dejahang
 
PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112
PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112
PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112McDonald Stewart
 

Similaire à Week02 slides spring_2013 (20)

Week06 slides
Week06 slidesWeek06 slides
Week06 slides
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
 
Project Scope Baseline presentation outlining every
Project Scope Baseline presentation outlining everyProject Scope Baseline presentation outlining every
Project Scope Baseline presentation outlining every
 
Project Management Introduction
Project Management IntroductionProject Management Introduction
Project Management Introduction
 
Managing project (snowball)
Managing project (snowball)Managing project (snowball)
Managing project (snowball)
 
Project Management
Project ManagementProject Management
Project Management
 
Lecture07 vo customer
Lecture07 vo customerLecture07 vo customer
Lecture07 vo customer
 
Week07 slides 2013_s
Week07 slides 2013_sWeek07 slides 2013_s
Week07 slides 2013_s
 
Mega project not mega problems session 1
Mega project not mega problems session 1Mega project not mega problems session 1
Mega project not mega problems session 1
 
Project
Project Project
Project
 
Lecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdfLecture 2 30-01-2020.pdf
Lecture 2 30-01-2020.pdf
 
Project Management overview talk 2021
Project Management overview talk  2021Project Management overview talk  2021
Project Management overview talk 2021
 
1.1 introduction to real estate project management
1.1 introduction to real estate project management1.1 introduction to real estate project management
1.1 introduction to real estate project management
 
PART- 2: Engineering Project Management
PART- 2: Engineering Project Management PART- 2: Engineering Project Management
PART- 2: Engineering Project Management
 
Essentials of Entry Level Project Management - Rev A
Essentials of Entry Level Project Management - Rev AEssentials of Entry Level Project Management - Rev A
Essentials of Entry Level Project Management - Rev A
 
ANALYSIS OF PROJECT SCOPE CHANGE MANAGEMENT AS A TOOL FOR PROJECT SUCCESS CA...
ANALYSIS OF PROJECT SCOPE CHANGE MANAGEMENT AS A TOOL FOR PROJECT SUCCESS  CA...ANALYSIS OF PROJECT SCOPE CHANGE MANAGEMENT AS A TOOL FOR PROJECT SUCCESS  CA...
ANALYSIS OF PROJECT SCOPE CHANGE MANAGEMENT AS A TOOL FOR PROJECT SUCCESS CA...
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 
021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)
 
PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112
PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112
PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112
 

Plus de henry KKK

Yiheng deng hw3
Yiheng deng hw3Yiheng deng hw3
Yiheng deng hw3henry KKK
 
Yiheng deng hw2
Yiheng deng hw2Yiheng deng hw2
Yiheng deng hw2henry KKK
 
Yiheng deng hw1
Yiheng deng hw1Yiheng deng hw1
Yiheng deng hw1henry KKK
 
Examples of smart_objective_attributes
Examples of smart_objective_attributesExamples of smart_objective_attributes
Examples of smart_objective_attributeshenry KKK
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slideshenry KKK
 
Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1henry KKK
 
Week11 slides
Week11 slidesWeek11 slides
Week11 slideshenry KKK
 
Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1henry KKK
 
Week08 slides
Week08 slidesWeek08 slides
Week08 slideshenry KKK
 
Week05 spc single_case
Week05 spc single_caseWeek05 spc single_case
Week05 spc single_casehenry KKK
 
Week05 reading
Week05 readingWeek05 reading
Week05 readinghenry KKK
 
Week05 exercise
Week05 exerciseWeek05 exercise
Week05 exercisehenry KKK
 
Week03 slides spring_2013
Week03 slides spring_2013Week03 slides spring_2013
Week03 slides spring_2013henry KKK
 
Week03 reading lechler_pm_mindset
Week03 reading lechler_pm_mindsetWeek03 reading lechler_pm_mindset
Week03 reading lechler_pm_mindsethenry KKK
 
Week02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changingWeek02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changinghenry KKK
 
Week01 slides spring_2013
Week01 slides spring_2013Week01 slides spring_2013
Week01 slides spring_2013henry KKK
 
Toc evaporating cloud
Toc evaporating cloudToc evaporating cloud
Toc evaporating cloudhenry KKK
 
Toc evaporating cloud
Toc evaporating cloudToc evaporating cloud
Toc evaporating cloudhenry KKK
 
Syllabus mgt610 2013_s
Syllabus mgt610 2013_sSyllabus mgt610 2013_s
Syllabus mgt610 2013_shenry KKK
 
Reading week08 shah_ahp_case
Reading week08 shah_ahp_caseReading week08 shah_ahp_case
Reading week08 shah_ahp_casehenry KKK
 

Plus de henry KKK (20)

Yiheng deng hw3
Yiheng deng hw3Yiheng deng hw3
Yiheng deng hw3
 
Yiheng deng hw2
Yiheng deng hw2Yiheng deng hw2
Yiheng deng hw2
 
Yiheng deng hw1
Yiheng deng hw1Yiheng deng hw1
Yiheng deng hw1
 
Examples of smart_objective_attributes
Examples of smart_objective_attributesExamples of smart_objective_attributes
Examples of smart_objective_attributes
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slides
 
Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1
 
Week11 slides
Week11 slidesWeek11 slides
Week11 slides
 
Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1
 
Week08 slides
Week08 slidesWeek08 slides
Week08 slides
 
Week05 spc single_case
Week05 spc single_caseWeek05 spc single_case
Week05 spc single_case
 
Week05 reading
Week05 readingWeek05 reading
Week05 reading
 
Week05 exercise
Week05 exerciseWeek05 exercise
Week05 exercise
 
Week03 slides spring_2013
Week03 slides spring_2013Week03 slides spring_2013
Week03 slides spring_2013
 
Week03 reading lechler_pm_mindset
Week03 reading lechler_pm_mindsetWeek03 reading lechler_pm_mindset
Week03 reading lechler_pm_mindset
 
Week02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changingWeek02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changing
 
Week01 slides spring_2013
Week01 slides spring_2013Week01 slides spring_2013
Week01 slides spring_2013
 
Toc evaporating cloud
Toc evaporating cloudToc evaporating cloud
Toc evaporating cloud
 
Toc evaporating cloud
Toc evaporating cloudToc evaporating cloud
Toc evaporating cloud
 
Syllabus mgt610 2013_s
Syllabus mgt610 2013_sSyllabus mgt610 2013_s
Syllabus mgt610 2013_s
 
Reading week08 shah_ahp_case
Reading week08 shah_ahp_caseReading week08 shah_ahp_case
Reading week08 shah_ahp_case
 

Dernier

8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 

Dernier (20)

8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 

Week02 slides spring_2013

  • 1. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 1 MGT610 Lecture 2 The Impact of Project Risks and Uncertainties
  • 2. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 2 Module Topics and Objectives The role of project plans and changes – Importance of quality of project planning. – Recognize that plan changes and goal changes are different. – Analyze the impact of plan and goal changes on project value. – Analyze the impact of contextual factors on plan and goal changes.
  • 3. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013 Value PM: Core Conflict in Maximization Paradigm Maximize Project Value PrerequisiteRequirementObjective The management core problem: – Management of change: Opportunity discovery and exploitation. Exploit Opportunities Not Exploit Opportunities Initial Requirements Met Stakeholder Expectations Met PM’s Value Mindset 3
  • 4. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013 Plans are Nothing, Changing Plans is Everything The Impact of Changes on Project Success For academic use only. 4
  • 5. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 5 Conceptual Framework of Project Planning and Changing Efficiency Customer Satisfct. Goal Changes Plan Changes Quality of Planning Context + + + + + + - - - - - - + Hypothesized Relations between the Planning Variables and Success
  • 6. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 6 Conceptual Framework – Variable Definitions – Plan changes: frequency – Goal changes: importance and frequency – Planning quality: work breakdown, resource allocation, scheduling, budget – Success: efficiency, customer satisfaction – Context • Technical Risks: demanding • Importance: usefulness, importance for organization • Experience: similar project • Manpower: personnel losses or transfer • Parallel Projects: undertaken at the same time • Breakthrough: technological
  • 7. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 7 Conceptual Framework – Variable Measurements Scale Measures Efficiency (Alpha:0.86) 1. The project had come in on schedule 2. The project had come in on budget Customer satisfaction (Alpha:0.81) 1. The clients were satisfied with the process by which this project was completed 2. The clients are satisfied with the results of the project Plan changes The project plans (schedule, personnel, budget) were often changed Goal changes (Alpha:0.83) 1. Project goals were often changed 2. At least one major project goal was changed considerably Planning quality (Alpha:0.85) 1. The entire project task (scope) was structured in work packages. 2. Every work package was allocated with a specific time allowance. 3. We knew which activities contained slack time or slack resources. 4. All work packages had a predecessor and a successor work package (except the first and the last). 5. There was a detailed budget plan for the project. 6. The precise demand for key personnel (who, when) was specified in the project plan
  • 8. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013 Conceptual Framework – Variable Measurements For academic use only. 8 Scale Measures Technical risks (Alpha:0.79) 1. The task was technically demanding. 2. The completion of the business goals included high risks. Importance (Alpha:0.78) 1. It was important that the results of the project could be used as soon as possible 2. The implementation of the project was important for the organization’s policy 3. The implementation of the project was important for the success of the organization Experience The projecting company had experience with the solution of similar problems Manpower The project team did not experience any significant personnel losses or transfer during the project’s development Parallel projects The completion of the project depended on other projects, undertaken at the same time. Break through The project was not subject to any recent technological breakthrough, which could have rendered it obsolete.
  • 9. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 9 Empirical Findings - Sample Description Kind of Project Absolute frequency Relative frequency Machine tool manufacturing 25 5.6% Plant construction 61 13.6 Building construction 30 6.7 Product development 116 25.9 Reorganization 52 11.6 Software 109 24.3 Others 55 12.3 Total 448 100.0% Returned Questionnaires: 43%, N= 448 (257 successful, 191 unsuccessful) Respondents: Project Leader 46%, Team 27%, Others 27%
  • 10. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 10 Empirical Findings – Correlations between Contextual and Planning Variables Quality of Planning Goal Changes Plan Changes Personnel Constraints n.s. .226** .226** Parallel Projects n.s. .202** .174** Occurrence of Breakthrough n.s. .247** .127** Technical Risks n.s. .175** .165** Importance .204** n.s. n.s. Experience .170** n.s. n.s. **p<=0.01, n.s. – not significant
  • 11. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 11 Empirical Findings – Path Model Efficiency Customer Satisfct. Goal Changes Plan Changes Quality of Planning -.27 -.21 +.50 +.61 +.14+.27 -.16 -.23 n.s. n.s.
  • 12. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 12 Empirical Findings – Path Model (total) Efficiency -.20 R2= 26% Cust. Sati. R2= 55% +.61 Technical Risk Goal Changes Plan Changes Quality of Planning Personnel Constr. Parallel Projects Break through Import. Experie. +.16 +.15 +.14 +.18 +.11 -.16 -.21 -.23 +.50 +.14 +.16 +.20 -.27 +.27
  • 13. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 13 Empirical Findings – Effects of Success Factors Planning Variables/ Impact on Efficiency Direct Effect Indirect Effect Total Effect Quality of Planning +.27 +.08 +.35 Goal Changes -.21 -.10 -.31 Plan Changes -.23 - -.23 Planning Variables/ Impact on Customer Satisfaction Direct Effect Indirect Effect Total Effect Quality of Planning +.14 +.25 +.39 Goal Changes -.15 -.19 -.34 Plan Changes - -.14 -.14
  • 14. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 14 Goal Changes Empirical Findings – Calculation of Effects (Ex.) • Indirect Effects of Goal Changes • (+.50 * -. 23) = -.10 • = Indirect Effect -.10 ( ) • + Direct Effect -.21 ( ) • = Total Effect -.31 Efficiency +.50 -.23 -.21 Plan Changes
  • 15. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 15 Summary of Empirical Findings • The influences of planning and changes on project success – The positive total effect of the variable quality of planning (+.35 and +.39) is completely overridden by the negative combined effect of plan and goal changes (-.54 and -.48) • The interactions between the planning variables – The quality of planning reduces the level of goal changes (−0.27), it does NOT affect plan changes – Changing project goals leads to changes of project plans (0.50) • The influences of context on the project planning activities – Strategic importance and the level of experience of the project team affecting only the quality of planning – The others influence goal changes and plan changes
  • 16. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 16 Summary of Empirical Findings • Plan changes and goal changes are different! • Goal changes will lead to plan changes • The influence of frequent changes on project value is significantly negative • The quality of project planning can reduce goal changes • The causes for changing project plans are contextual- related
  • 17. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013 Definitions of Project Risk and Uncertainty • Project Risk – Project risks also known as the Known-Unknowns are basically events, circumstances, situations or conditions that have a potential negative impact on meeting predefined project objectives. • Project Uncertainty – Unexpected and unforeseen project situations with potential significant impact on the value of a project. For academic use only. 17
  • 18. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013 Exploratory case based interview study • 42 case studies • 90-minute interviews with semi-structured questionnaire • Creation of case study protocol and database Research Method Project Category Frequencies Information Systems Projects 20 Product and Service Development Projects 9 Construction Projects 4 Business & Organization Change Projects 3 Research & Development Projects 2 Project-like tasks 4 Total 42 For academic use only. 18
  • 19. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013 • Stakeholder capabilities and dynamics are the most frequent source of uncertainties! • Mergers and acquisitions and politics lead to uncertainty. Categories of Uncertainties Uncertainty Categories Uncertainty Sources Frequencies Stakeholder uncertainty Inexperience, change, contracts 18 Organizational uncertainty M&A, politics, unknown legacy system 9 Technological uncertainty Tech. issues, tight specs 8 Contextual turbulences Legal, market 6 Project characteristics Unknown complexity 3 Malpractice Self induced uncertainty 2 For academic use only. 19