H.I.S.-tory
by Vince Ciotti, Episode #101:
Siemens, Part 2
© 2013 by H.I.S. Professionals, LLC, all rights reserved.
1969 = Ross &
Royal Roads,
Bridgeport 1971 = 650 Park Avenue,
King of Prussia
1981 = 51 Valley Stream Parkway, Malvern
It Was A Very Good Year!
• This week continues the HIS-tory of Siemens Healthcare, today’s #3 vendor in
annual revenue, whose HIS roots go back to the mid-1960s when IBM developed
SHAS, featured last week.
• Thanks to the many HIS veterans who contributed to the origins of SHAS, which
automated patient accounting in thousands of US hospitals who used it through
local Blue Cross, state hospital associations, and many proprietary firms like
Gamut & SMS.
• This week, we cover the early days of Shared Medical Systems for CIOs who may
not have been born when it was founded in 1969.
I was fortunate to be one of SMS’ early employees (#24, hired in October of
1969), so I’m going to relay the inside and human story of SMS’ amazing growth
to eventually being the #1 HIS vendor.
SHAS Was Not Perfect!
• SMS started running IBM’s SHAS soon after its release, and like all
new HIS products (Millennium, Paragon, Soarian, etc.) it had its
share of bugs, design flaws, missing features, etc., all to be
corrected in the 4th quarter per the vendor (but in what year?).
• We touched on one last week which was the Scalar Date routine
IBM came up with to minimize storage requirements back in the
days of their 360 mainframe, whose disk drive had one (1) meg!
• An early SMS programming maven, Glen Marshall, tells the tale
(he’s pictured on the right at our 2007 reunion in FL):
“In the mid-1980s I rewrote the old SHAS scalar date routine,
changing the base-date from 1/1/1900 to 1/1/1960. This
extended the range of dates until September 2049, well past my
100th birthday. For the geeks among us: The original scalar date
calculation was done in packed decimal arithmetic: year x 36525
/ 100 (by lopping-off 2decimal places) then calculations for
month, day, and leap-year adjustments.” (VC: simple, huh?)
Y2K Pre-Cursor (still love that
pun!)
“My rewrite was based on the date calculation formula used in satellites,
and that formula dealt with the Y2K problem as well. (I saw it coming
early...) In addition, the calculation was done in binary register arithmetic,
which cut the CPU time for date calculation by 90%. This time-savings was
significant.
The billing records were chock-full of dates that entered into the insurance
proration calculations. As I recall, the savings was nearly a net 10% savings
for the overnight billing program runs. That is a major savings for a
mainframe.
All the scalar-date using programs needed to be re-linked to pick-up the
new date calculation subroutine. A one-time conversion program was run
to change the date-base to 1960. Everything works like a charm. Only one
program was not re-linked, though, due to an oversight. And that was the
one that caused the headache and headline in 1989.” – Glen Marshall
Start-Up Ups & Downs
• There was an amazing esprit de corps at SMS in those early days –
as I’m sure there was at HIS new start-up: McAuto, HBO, SAI, etc.
Everyone knew we had to work hard just to survive, let alone ever
make the big times. The hours were long and hard too: I got up
one winter morning to a freezing rain at my home and couldn’t
get the door to my ‘vette to open – the lock was frozen solid! I
tried heating the key with matches, to no avail. Waiting an hour
for the sun to do its job, the phone rang around 9AM – it was Jim
Macaleer wondering why I wasn’t there yet: we started at 8:30!
• And I’ll never forget the “Saturday Club” – a
small group of fools like me who got their dull
admin stuff done on Saturday mornings: “Big
Jim,” Harvey Wilson (Sr. VP), Mike Mulhall (VP of
Installations), Phil Jackson (Terminals), Tony Sam
(CSC)… you could tell who was in by the cars in
the near-empty parking lot at 650 Park Avenue…
Inside Humor
• It wasn’t all just work during
those early 10-12 hour days
either – we goofed off a lot to
keep each other half sane...
• We IDs (Installation Directors)
received a stream of memos
from K of P telling us of bugs
that were fixed and new
features or modules.
• I was an ID at SMS’ NJ office,
and wrote this mock memo
to a hot chick in King of
Prussia HQ trying to impress
her with my puny humor (she
was an English Major too).
She laughed, but didn’t buy…
Outside Humor
• ID memos were re-written
in English (sort of…) for
clients to learn of new
enhancements by our
Customer Service Center.
• They were called CSC
Memos and #531 went out
that really didn’t do a good
job of explaining some
changes in 1977 to our
new Inventory system...
• The next day, Big Jim wrote
this cover memo to a re-
written version of the
memo apologizing to our
100-odd (sic) clients!
New Product Break-throughs
• SMS had an amazing team of programmers, and one of their
technological breakthroughs was called UNIFILE – Ken Shumaker’s
incredibly powerful & flexible early data base system in the 70s.
• Unlike SHAS’ batch processing, it processed transactions in real
time as soon as they were entered (like rival McAuto’s HFC did),
and then passed them on to an on-line data base for inquiries.
• Needless to say, it sold like proverbial hot cakes but as more and
more clients jumped on board, things started to slow down as the
water-cooled IBM 370s of that era had trouble handling the many
census transactions, report writer requests, and db inquiries…
• It was eventually toned down to less-powerful
but more reliable versions called Focus &
Command, but at one of SMS’ infamous Xmas
parties, I had a blast giving Bog Jim, Harvey and
Ken Shumaker T-shirts labeled Uni, Fi and Al!
Near Misses
• The earlier HIS-tory episode on SMS (#11 –see them all at
hispros.com) as a shared system pioneer covered two near misses
that might have put SMS out of business early in the 1970s:
– Regionalization that brought SHAS down for days on June 30
– Cash Flow – turning the corner from red to black circa 1971
• Another close call was when SMS moved from rented space at
Ross & Royal Roads in Bridgeport to 650 Park Avenue in King of
Prussia. Phil Jackson, who was assigned a number of challenging
tasks (like ACTIon and the NYCHHC install) headed up moving the
data center, and he asked we IDs to go to client hospitals on three
Saturdays, the first 2 to test the move, the 3rd for the real thing.
• We all went to clients and dumped in batches of cards for the two
tests, with only a few problems switching the hundreds of phone
lines, etc. When it came time for the 3rd test we got the word: the
2nd one was the real thing – no need for #3. Few complaints…
Green IDs
• Another down side to start-up firms is the lack of
experience with the system by their “green” staff.
• Most of we IDs at SMS in the early 70s were totally new
to computers, hospitals and even accounting basics:
- I was an English major from Temple, at my first “real” job
- Al College (eventual VP) was a former school teacher & coach
- Takis Petrakis (sadly deceased) set the record for ID novitiates:
he was the former captain of a submarine in the Greek navy!
• So what, you ask, doesn’t every vendor hire rookies and train
them? We had a 3-week class that tried to teach us every aspect of
SHAS (several million lines of code!), accounting (debits vs credits)
and hospitals (what’s the difference between an RN, LPN and
Aide?) – lots of luck! We learned as as much as we could during
those 3 weeks, then were sent out to the real world to learn in the
school of hard knocks, at our client hospitals’ time & expense.
Card Column 11 of the Header Card
• Al College & I were assigned to convert St. Vincent’s Hospital in
Staten Island, which had been totally manual on NCR posting
cards. We started with AR, showing them how to fill out coding
sheets for their thousands of ledger cards for keypunching:
• The cards were then sorted into batches of ≈50 each for ease of
handling, and SHAS required each one to have a header & footer
card. On the header card went the hospital’s code (St. V = “O”),
the batch type (new AR = 05), a batch number (001 to 999), etc.
• According to the SHAS OPS manual (our bible!), card column 11
indicated outpatients with a “6.” So Al & I dutifully sorted all the
hundreds of batches by IP & OP, entering a 6 in cc 11 for OP ones.
A Catastrophe!
• I squeezed all the boxes of 5081 cards into my car on Friday, drove
them down to K of P to load onto our mainframe. On Monday I
went back to get the TCEs (Transmission Control & Error report),
and was dismayed to have as many boxes of paper error printouts
as we had submitted keypunch cards! It seems what the SHAS
OPS Manual meant to say was that cc 11 separates OP vs IP
charges (batch type 03): new AR from cards was batch type 05.
• So I drove the boxes of error reports back to the poor folks at the
hospital, who started trying to correct the bewildering array of
duplicate errors that each batch had generated: some from the
AR program, some from the OP billing program. A nightmare!
• Precious days went flying by as all patient accounting activity
halted until we could correct all the errors and balance the AR –
we never did, and after a few weeks, the CFO just wrote off the
difference (6 figures…) before we proceed on to ADT & Billing…
Near-Death Experience
• We converted Census and Billing at St. V’s much better, and the
hospital eventually benefitted enormously from automation – it is
still an SMS (Siemens) client to this day! But I must admit, I still
avoid driving over the Goethals bridge thru Staten Island, afraid
the CFO might still be gunning for me somewhere out there…
• I probably almost got fired for the screw-up – I
remember trying to explain to Steve Macaleer my
ID Manager about the error in the SHAS OPS
manual, but he told me to not screw-up again…
• The real irony is that I learned from my mistakes, became one of
SMS’ better IDs (aced my 2nd and 3rd hospitals), and was
eventually promoted to be Education Manager, in charge of
teaching all new IDs the ropes. I told this story to every trainee!
• So is it better to get a rookie who’s very bright and hard-working,
or a stogy old veteran who just repeats the same formula over &
over? I’d look for both: a veteran who is smart & willing to learn!
The Takeaway?
• So what can one take away from this story of SMS’ early days –
should a CIO stick with large proven giants like McKesson, Cerner,
Siemens, and other “Top 10” HIS vendors, or take a risk with new
products from start-ups like CSS HealthTech, or RazorInisghts?
• Like so many HIS issues, the answer has both pros & cons. Pros:
– Giants forget their own past when they too were start-ups
themselves, viz: Huff, Barrington & Owen in Walt’s kitchen!
– Small start-ups generally give the best service as any of their
early clients can get the CEO on the phone & they’ll listen!
• And on the other side of the coin, there are cons, like:
– Who can remember hot new start-ups Bulldog IT, IntraNexus
and American Health Net, who rocked just a few years ago?
– An adage from the 60s had it that “No One Ever Got Fired For
Buying IBM” – dare take an unknown name to your Board?
The answer is different for every hospital and every HIS-tory epoch…

Contenu connexe

Tendances

105. cerner, part 2
105. cerner, part 2105. cerner, part 2
105. cerner, part 2Tim Histalk
 
99. engelbart mouse
99. engelbart mouse99. engelbart mouse
99. engelbart mouseTim Histalk
 
85. meditech part 3
85. meditech part 385. meditech part 3
85. meditech part 3Tim Histalk
 
86. meditech part 4
86. meditech part 486. meditech part 4
86. meditech part 4Tim Histalk
 
96 epic part 2
96  epic part 296  epic part 2
96 epic part 2Hispros
 
87. meditech part 5
87. meditech part 587. meditech part 5
87. meditech part 5Tim Histalk
 
98 epic part 4
98  epic part 498  epic part 4
98 epic part 4Hispros
 
68. keane 6 first coast
68. keane 6   first coast68. keane 6   first coast
68. keane 6 first coastTim Histalk
 
97 epic part 3
97  epic part 397  epic part 3
97 epic part 3Hispros
 
106. cerner, part 3
106. cerner, part 3106. cerner, part 3
106. cerner, part 3Tim Histalk
 
124. jim macaleer
124. jim macaleer124. jim macaleer
124. jim macaleerTim Histalk
 
95 epic part 1
95  epic part 195  epic part 1
95 epic part 1Hispros
 
111. vendor c suite a
111. vendor c suite a111. vendor c suite a
111. vendor c suite aTim Histalk
 

Tendances (18)

105. cerner, part 2
105. cerner, part 2105. cerner, part 2
105. cerner, part 2
 
99. engelbart mouse
99. engelbart mouse99. engelbart mouse
99. engelbart mouse
 
85. meditech part 3
85. meditech part 385. meditech part 3
85. meditech part 3
 
86. meditech part 4
86. meditech part 486. meditech part 4
86. meditech part 4
 
96 epic part 2
96  epic part 296  epic part 2
96 epic part 2
 
87. meditech part 5
87. meditech part 587. meditech part 5
87. meditech part 5
 
98 epic part 4
98  epic part 498  epic part 4
98 epic part 4
 
78. cpsi part 3
78. cpsi part 378. cpsi part 3
78. cpsi part 3
 
68. keane 6 first coast
68. keane 6   first coast68. keane 6   first coast
68. keane 6 first coast
 
11. sms
11. sms11. sms
11. sms
 
97 epic part 3
97  epic part 397  epic part 3
97 epic part 3
 
76. cpsi part 1
76. cpsi part 176. cpsi part 1
76. cpsi part 1
 
106. cerner, part 3
106. cerner, part 3106. cerner, part 3
106. cerner, part 3
 
HIStory 11
HIStory 11HIStory 11
HIStory 11
 
77. cpsi part 2
77. cpsi part 277. cpsi part 2
77. cpsi part 2
 
124. jim macaleer
124. jim macaleer124. jim macaleer
124. jim macaleer
 
95 epic part 1
95  epic part 195  epic part 1
95 epic part 1
 
111. vendor c suite a
111. vendor c suite a111. vendor c suite a
111. vendor c suite a
 

Similaire à 101. siemens, part 2

101. siemens, part 2
101. siemens, part 2101. siemens, part 2
101. siemens, part 2Tim Histalk
 
10. ibm s_shas
10. ibm s_shas10. ibm s_shas
10. ibm s_shasHispros
 
100. siemens, part 1
100. siemens, part 1100. siemens, part 1
100. siemens, part 1Hispros
 
78. cpsi part 3
78. cpsi part 378. cpsi part 3
78. cpsi part 3Hispros
 
102. siemens, part 3
102. siemens, part 3102. siemens, part 3
102. siemens, part 3Hispros
 
21. sentry
21. sentry21. sentry
21. sentryHispros
 
4. november 1987
4. november 19874. november 1987
4. november 1987Tim Histalk
 
52. stock crashes
52. stock crashes52. stock crashes
52. stock crashesHispros
 
52. stock crashes
52. stock crashes52. stock crashes
52. stock crashesTim Histalk
 
65. keane 3 infostat
65. keane 3   infostat65. keane 3   infostat
65. keane 3 infostatTim Histalk
 
17. compucare
17. compucare17. compucare
17. compucareHispros
 
41 jim carter
41 jim carter41 jim carter
41 jim carterHispros
 
8. clinical mainframe_systems
8. clinical mainframe_systems8. clinical mainframe_systems
8. clinical mainframe_systemsHispros
 
25. ar mediquest
25. ar mediquest25. ar mediquest
25. ar mediquestHispros
 
60. hms, part 2
60. hms, part 260. hms, part 2
60. hms, part 2Hispros
 

Similaire à 101. siemens, part 2 (20)

101. siemens, part 2
101. siemens, part 2101. siemens, part 2
101. siemens, part 2
 
10. ibm s_shas
10. ibm s_shas10. ibm s_shas
10. ibm s_shas
 
100. siemens, part 1
100. siemens, part 1100. siemens, part 1
100. siemens, part 1
 
78. cpsi part 3
78. cpsi part 378. cpsi part 3
78. cpsi part 3
 
HIStory 10
HIStory 10HIStory 10
HIStory 10
 
102. siemens, part 3
102. siemens, part 3102. siemens, part 3
102. siemens, part 3
 
21. sentry
21. sentry21. sentry
21. sentry
 
20. saint
20. saint20. saint
20. saint
 
4. november 1987
4. november 19874. november 1987
4. november 1987
 
52. stock crashes
52. stock crashes52. stock crashes
52. stock crashes
 
HIStory 5
HIStory 5HIStory 5
HIStory 5
 
52. stock crashes
52. stock crashes52. stock crashes
52. stock crashes
 
65. keane 3 infostat
65. keane 3   infostat65. keane 3   infostat
65. keane 3 infostat
 
17. compucare
17. compucare17. compucare
17. compucare
 
41 jim carter
41 jim carter41 jim carter
41 jim carter
 
41 jim carter
41 jim carter41 jim carter
41 jim carter
 
8. clinical mainframe_systems
8. clinical mainframe_systems8. clinical mainframe_systems
8. clinical mainframe_systems
 
19. keane
19. keane19. keane
19. keane
 
25. ar mediquest
25. ar mediquest25. ar mediquest
25. ar mediquest
 
60. hms, part 2
60. hms, part 260. hms, part 2
60. hms, part 2
 

Plus de Tim Histalk

4. 2018 low end vendors 4-6
4. 2018 low end vendors 4-64. 2018 low end vendors 4-6
4. 2018 low end vendors 4-6Tim Histalk
 
3. 2018 mid range vendors 4-4
3. 2018 mid range vendors 4-43. 2018 mid range vendors 4-4
3. 2018 mid range vendors 4-4Tim Histalk
 
2. 2018 macro vendors 3 30
2. 2018 macro vendors 3 302. 2018 macro vendors 3 30
2. 2018 macro vendors 3 30Tim Histalk
 
1. 2018 top his vendors 3 26
1. 2018 top his vendors 3 261. 2018 top his vendors 3 26
1. 2018 top his vendors 3 26Tim Histalk
 
1. 2018 top his vendors 3 25
1. 2018 top his vendors 3 251. 2018 top his vendors 3 25
1. 2018 top his vendors 3 25Tim Histalk
 
1. 2018 top his vendors 3 23
1. 2018 top his vendors 3 231. 2018 top his vendors 3 23
1. 2018 top his vendors 3 23Tim Histalk
 
2. february 1988
2. february 19882. february 1988
2. february 1988Tim Histalk
 
5. december 1987
5. december 19875. december 1987
5. december 1987Tim Histalk
 
2 september 1987
2 september 19872 september 1987
2 september 1987Tim Histalk
 
109. cerner, part 6
109. cerner, part 6109. cerner, part 6
109. cerner, part 6Tim Histalk
 
108. cerner, part 5
108. cerner, part 5108. cerner, part 5
108. cerner, part 5Tim Histalk
 
107. cerner, part 4
107. cerner, part 4107. cerner, part 4
107. cerner, part 4Tim Histalk
 

Plus de Tim Histalk (20)

HISsies 2020
HISsies 2020HISsies 2020
HISsies 2020
 
HISsies 2019
HISsies 2019HISsies 2019
HISsies 2019
 
4. 2018 low end vendors 4-6
4. 2018 low end vendors 4-64. 2018 low end vendors 4-6
4. 2018 low end vendors 4-6
 
3. 2018 mid range vendors 4-4
3. 2018 mid range vendors 4-43. 2018 mid range vendors 4-4
3. 2018 mid range vendors 4-4
 
2. 2018 macro vendors 3 30
2. 2018 macro vendors 3 302. 2018 macro vendors 3 30
2. 2018 macro vendors 3 30
 
1. 2018 top his vendors 3 26
1. 2018 top his vendors 3 261. 2018 top his vendors 3 26
1. 2018 top his vendors 3 26
 
1. 2018 top his vendors 3 25
1. 2018 top his vendors 3 251. 2018 top his vendors 3 25
1. 2018 top his vendors 3 25
 
1. 2018 top his vendors 3 23
1. 2018 top his vendors 3 231. 2018 top his vendors 3 23
1. 2018 top his vendors 3 23
 
HISsies 2018
HISsies 2018HISsies 2018
HISsies 2018
 
3. march 1988
3. march 19883. march 1988
3. march 1988
 
2. february 1988
2. february 19882. february 1988
2. february 1988
 
1. jan 1988
1. jan 19881. jan 1988
1. jan 1988
 
5. december 1987
5. december 19875. december 1987
5. december 1987
 
3. october 1987
3. october 19873. october 1987
3. october 1987
 
2 september 1987
2 september 19872 september 1987
2 september 1987
 
109. cerner, part 6
109. cerner, part 6109. cerner, part 6
109. cerner, part 6
 
108. cerner, part 5
108. cerner, part 5108. cerner, part 5
108. cerner, part 5
 
107. cerner, part 4
107. cerner, part 4107. cerner, part 4
107. cerner, part 4
 
1. august 1987
1. august 19871. august 1987
1. august 1987
 
Cerner Part 3
Cerner Part 3Cerner Part 3
Cerner Part 3
 

Dernier

Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 

Dernier (20)

Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 

101. siemens, part 2

  • 1. H.I.S.-tory by Vince Ciotti, Episode #101: Siemens, Part 2 © 2013 by H.I.S. Professionals, LLC, all rights reserved. 1969 = Ross & Royal Roads, Bridgeport 1971 = 650 Park Avenue, King of Prussia 1981 = 51 Valley Stream Parkway, Malvern
  • 2. It Was A Very Good Year! • This week continues the HIS-tory of Siemens Healthcare, today’s #3 vendor in annual revenue, whose HIS roots go back to the mid-1960s when IBM developed SHAS, featured last week. • Thanks to the many HIS veterans who contributed to the origins of SHAS, which automated patient accounting in thousands of US hospitals who used it through local Blue Cross, state hospital associations, and many proprietary firms like Gamut & SMS. • This week, we cover the early days of Shared Medical Systems for CIOs who may not have been born when it was founded in 1969. I was fortunate to be one of SMS’ early employees (#24, hired in October of 1969), so I’m going to relay the inside and human story of SMS’ amazing growth to eventually being the #1 HIS vendor.
  • 3. SHAS Was Not Perfect! • SMS started running IBM’s SHAS soon after its release, and like all new HIS products (Millennium, Paragon, Soarian, etc.) it had its share of bugs, design flaws, missing features, etc., all to be corrected in the 4th quarter per the vendor (but in what year?). • We touched on one last week which was the Scalar Date routine IBM came up with to minimize storage requirements back in the days of their 360 mainframe, whose disk drive had one (1) meg! • An early SMS programming maven, Glen Marshall, tells the tale (he’s pictured on the right at our 2007 reunion in FL): “In the mid-1980s I rewrote the old SHAS scalar date routine, changing the base-date from 1/1/1900 to 1/1/1960. This extended the range of dates until September 2049, well past my 100th birthday. For the geeks among us: The original scalar date calculation was done in packed decimal arithmetic: year x 36525 / 100 (by lopping-off 2decimal places) then calculations for month, day, and leap-year adjustments.” (VC: simple, huh?)
  • 4. Y2K Pre-Cursor (still love that pun!) “My rewrite was based on the date calculation formula used in satellites, and that formula dealt with the Y2K problem as well. (I saw it coming early...) In addition, the calculation was done in binary register arithmetic, which cut the CPU time for date calculation by 90%. This time-savings was significant. The billing records were chock-full of dates that entered into the insurance proration calculations. As I recall, the savings was nearly a net 10% savings for the overnight billing program runs. That is a major savings for a mainframe. All the scalar-date using programs needed to be re-linked to pick-up the new date calculation subroutine. A one-time conversion program was run to change the date-base to 1960. Everything works like a charm. Only one program was not re-linked, though, due to an oversight. And that was the one that caused the headache and headline in 1989.” – Glen Marshall
  • 5. Start-Up Ups & Downs • There was an amazing esprit de corps at SMS in those early days – as I’m sure there was at HIS new start-up: McAuto, HBO, SAI, etc. Everyone knew we had to work hard just to survive, let alone ever make the big times. The hours were long and hard too: I got up one winter morning to a freezing rain at my home and couldn’t get the door to my ‘vette to open – the lock was frozen solid! I tried heating the key with matches, to no avail. Waiting an hour for the sun to do its job, the phone rang around 9AM – it was Jim Macaleer wondering why I wasn’t there yet: we started at 8:30! • And I’ll never forget the “Saturday Club” – a small group of fools like me who got their dull admin stuff done on Saturday mornings: “Big Jim,” Harvey Wilson (Sr. VP), Mike Mulhall (VP of Installations), Phil Jackson (Terminals), Tony Sam (CSC)… you could tell who was in by the cars in the near-empty parking lot at 650 Park Avenue…
  • 6. Inside Humor • It wasn’t all just work during those early 10-12 hour days either – we goofed off a lot to keep each other half sane... • We IDs (Installation Directors) received a stream of memos from K of P telling us of bugs that were fixed and new features or modules. • I was an ID at SMS’ NJ office, and wrote this mock memo to a hot chick in King of Prussia HQ trying to impress her with my puny humor (she was an English Major too). She laughed, but didn’t buy…
  • 7. Outside Humor • ID memos were re-written in English (sort of…) for clients to learn of new enhancements by our Customer Service Center. • They were called CSC Memos and #531 went out that really didn’t do a good job of explaining some changes in 1977 to our new Inventory system... • The next day, Big Jim wrote this cover memo to a re- written version of the memo apologizing to our 100-odd (sic) clients!
  • 8. New Product Break-throughs • SMS had an amazing team of programmers, and one of their technological breakthroughs was called UNIFILE – Ken Shumaker’s incredibly powerful & flexible early data base system in the 70s. • Unlike SHAS’ batch processing, it processed transactions in real time as soon as they were entered (like rival McAuto’s HFC did), and then passed them on to an on-line data base for inquiries. • Needless to say, it sold like proverbial hot cakes but as more and more clients jumped on board, things started to slow down as the water-cooled IBM 370s of that era had trouble handling the many census transactions, report writer requests, and db inquiries… • It was eventually toned down to less-powerful but more reliable versions called Focus & Command, but at one of SMS’ infamous Xmas parties, I had a blast giving Bog Jim, Harvey and Ken Shumaker T-shirts labeled Uni, Fi and Al!
  • 9. Near Misses • The earlier HIS-tory episode on SMS (#11 –see them all at hispros.com) as a shared system pioneer covered two near misses that might have put SMS out of business early in the 1970s: – Regionalization that brought SHAS down for days on June 30 – Cash Flow – turning the corner from red to black circa 1971 • Another close call was when SMS moved from rented space at Ross & Royal Roads in Bridgeport to 650 Park Avenue in King of Prussia. Phil Jackson, who was assigned a number of challenging tasks (like ACTIon and the NYCHHC install) headed up moving the data center, and he asked we IDs to go to client hospitals on three Saturdays, the first 2 to test the move, the 3rd for the real thing. • We all went to clients and dumped in batches of cards for the two tests, with only a few problems switching the hundreds of phone lines, etc. When it came time for the 3rd test we got the word: the 2nd one was the real thing – no need for #3. Few complaints…
  • 10. Green IDs • Another down side to start-up firms is the lack of experience with the system by their “green” staff. • Most of we IDs at SMS in the early 70s were totally new to computers, hospitals and even accounting basics: - I was an English major from Temple, at my first “real” job - Al College (eventual VP) was a former school teacher & coach - Takis Petrakis (sadly deceased) set the record for ID novitiates: he was the former captain of a submarine in the Greek navy! • So what, you ask, doesn’t every vendor hire rookies and train them? We had a 3-week class that tried to teach us every aspect of SHAS (several million lines of code!), accounting (debits vs credits) and hospitals (what’s the difference between an RN, LPN and Aide?) – lots of luck! We learned as as much as we could during those 3 weeks, then were sent out to the real world to learn in the school of hard knocks, at our client hospitals’ time & expense.
  • 11. Card Column 11 of the Header Card • Al College & I were assigned to convert St. Vincent’s Hospital in Staten Island, which had been totally manual on NCR posting cards. We started with AR, showing them how to fill out coding sheets for their thousands of ledger cards for keypunching: • The cards were then sorted into batches of ≈50 each for ease of handling, and SHAS required each one to have a header & footer card. On the header card went the hospital’s code (St. V = “O”), the batch type (new AR = 05), a batch number (001 to 999), etc. • According to the SHAS OPS manual (our bible!), card column 11 indicated outpatients with a “6.” So Al & I dutifully sorted all the hundreds of batches by IP & OP, entering a 6 in cc 11 for OP ones.
  • 12. A Catastrophe! • I squeezed all the boxes of 5081 cards into my car on Friday, drove them down to K of P to load onto our mainframe. On Monday I went back to get the TCEs (Transmission Control & Error report), and was dismayed to have as many boxes of paper error printouts as we had submitted keypunch cards! It seems what the SHAS OPS Manual meant to say was that cc 11 separates OP vs IP charges (batch type 03): new AR from cards was batch type 05. • So I drove the boxes of error reports back to the poor folks at the hospital, who started trying to correct the bewildering array of duplicate errors that each batch had generated: some from the AR program, some from the OP billing program. A nightmare! • Precious days went flying by as all patient accounting activity halted until we could correct all the errors and balance the AR – we never did, and after a few weeks, the CFO just wrote off the difference (6 figures…) before we proceed on to ADT & Billing…
  • 13. Near-Death Experience • We converted Census and Billing at St. V’s much better, and the hospital eventually benefitted enormously from automation – it is still an SMS (Siemens) client to this day! But I must admit, I still avoid driving over the Goethals bridge thru Staten Island, afraid the CFO might still be gunning for me somewhere out there… • I probably almost got fired for the screw-up – I remember trying to explain to Steve Macaleer my ID Manager about the error in the SHAS OPS manual, but he told me to not screw-up again… • The real irony is that I learned from my mistakes, became one of SMS’ better IDs (aced my 2nd and 3rd hospitals), and was eventually promoted to be Education Manager, in charge of teaching all new IDs the ropes. I told this story to every trainee! • So is it better to get a rookie who’s very bright and hard-working, or a stogy old veteran who just repeats the same formula over & over? I’d look for both: a veteran who is smart & willing to learn!
  • 14. The Takeaway? • So what can one take away from this story of SMS’ early days – should a CIO stick with large proven giants like McKesson, Cerner, Siemens, and other “Top 10” HIS vendors, or take a risk with new products from start-ups like CSS HealthTech, or RazorInisghts? • Like so many HIS issues, the answer has both pros & cons. Pros: – Giants forget their own past when they too were start-ups themselves, viz: Huff, Barrington & Owen in Walt’s kitchen! – Small start-ups generally give the best service as any of their early clients can get the CEO on the phone & they’ll listen! • And on the other side of the coin, there are cons, like: – Who can remember hot new start-ups Bulldog IT, IntraNexus and American Health Net, who rocked just a few years ago? – An adage from the 60s had it that “No One Ever Got Fired For Buying IBM” – dare take an unknown name to your Board? The answer is different for every hospital and every HIS-tory epoch…