3. Ivan Sanders
Ivan Sanders is a SharePoint MVP/MCT Author and independent consultant with
more than 15 years of broad-based hands-on experience with the design and
development of mission-critical applications that include Business Intelligence
Dashboards in the enterprise and deployment of Microsoft products, while
delivering nothing but Microsoft SharePoint solutions since 2004.
Ivan is active in the SharePoint Community through the MSDN and TechNet
forums, Teched and PDC Birds of a Feather, SharePoint Saturday, SharePoint
Conferences, SharePoint ShopTalk, INETA, GITCA, and Local Southern California
User Groups.
twitter http://twitter.com/iasanders
LinkedIn http://www.linkedin.com/in/iasanders,
Blog http://msmvps.com/blogs/ivansanders
MVP Profile https://mvp.support.microsoft.com/profile/Ivan.Sanders
Codeplex: http://SharePointDemoBuilds.Codeplex.com
Amazon: http://www.amazon.com/Business-Intelligence-Microsoft-SharePoint-
2013/dp/0735675430
4.
5. Component SharePoint 2010 Minimum
Requirement
SharePoint “2013” Minimum
Requirement
Processor 64-bit, four cores 64-bit, four cores
RAM 4 GB for developer or evaluation use
8 GB for production use in a single
server or multiple server farm
4 GB for developer or evaluation use
8 GB for production use in a single server
or in a multiple server farm
Hard disk 80 GB for system drive
Maintain twice as much free space as
you have RAM for production
environments.
80 GB for system drive
Maintain twice as much free space as you
have RAM for production environments.
6. Component SharePoint 2010 Minimum
Requirement
SharePoint “2013” Minimum
Requirement
Processor 64-bit, 4 cores for small deployments
64-bit, 8 cores for medium deployments
64-bit, 4 cores for small deployments
64-bit, 8 cores for medium deployments
RAM 8 GB for small deployments
16 GB for medium deployments
8 GB for small deployments
16 GB for medium deployments
Hard disk 80 GB for system drive
Hard disk space is dependent on the
size of your SharePoint content
80 GB for system drive
Hard disk space is dependent on the size
of your SharePoint content
7. Feature Multidimensional Tabular
RAM Some (16/32 GB) A lot (64/128)
RAM Speed Important Crucial
Number of cores 4/8/16 4/8/16
Core speed Less Important Crucial
Disk speed Very Important NA
SSD Disk Usage Strongly recommended NA
Network speed Important Important
Concurrency Pretty good Not enough experience…
8.
9.
10.
11.
12.
13. Visio Web
Access
Custom Data
Providers
Visio JSOM
Mash-Up API
Web Part
Connections
Visio Proxy
Visio Graphics Service
VDW/b/m
SharePoint Content DatabaseExternal Data Sources
Web Front
End
Application
Server
Backend SQL
OLEDB/ODB
C
XLSX SP Lists
SQL
Azure
External
Lists
15. Web Parts
Web Services
Rendering
Custom Editors
Web Services
Authoring
SharePoint Data Store
Monitoring Services
Application Proxy
Data Source Extensibility
PPS App Settings
SharePoint Repository
PerformancePoint
Services WCF Interface
External Data
Sources
Client
Web
Front
End
Application
Server
Backend
HTTP/HTML AJAX/JSON SOAP/XML
SharePoint Data Store
31. Atera Prime K2
Axceler KnowledgeLake
CBT Clips KwizCom
Dell QuickStart
Hershey Technologies Virtualworks
Platinum
& Gold
Sponsors
Silver
Sponsors
Notes de l'éditeur
Self service
Talk about 10 slides
20 minutes 40 minutes demoi
Ideas are brought to the team or we think of them (ex: How customers engage with our products?)Identify the data, clean it, and capture it.Build a report in the DW.This usually takes 4, 5, or 6 weeks depending on the data, report, etc.Often times when the stakeholder looks at the report, they say something like "Now that I see this, I really want X.“
THIS SHOULD BE YOUR SECOND TO LAST SLIDE – Encourage everyone to attend and remind them that the Daily Pint is just a few blocks up Pico from SMC (North East)
THIS SHOULD BE YOUR LAST SLIDE – Please ensure to leave this on as people are walking out and you’re wrapping things up. Thanks so much!