SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
Supercap data sheet..
1. SUPERCAP™ CONCRETE CAPPING CEMENT
SUPERCAP™™ THE NEXT GENERATION SLAB
SUPERCAP - THE NEXT GENERATION SLAB
SUPERCAP™ is a specially designed, high-performance, self-leveling, cement-based product
designed for capping of interior concrete surfaces. The slab should be finished rough and open
(bull-floated only) and does not need to be finished in the traditional way (power-troweling).
SUPERCAP™ can be applied to new concrete as soon as three days after pour depending on
factors such as mix design, jobsite conditions and end-user requirements. Finished floor goods may
be installed as soon as 7 days after application of SUPERCAP™ depending on thickness, drying
conditions and type of flooring materials.
SUPERCAP™
CONCRETE
SLAB
METAL DECK
PERFORMANCE CHARACTERISTICS
• Pour depths of 1/8” to 1 ½” – designed to remove camber in slab or concrete surface variation
• Low alkali formulation allows for quick installation of finished floor goods
• SUPERCAP™ can receive floor covering in as soon as 7 days after application depending on
thickness and jobsite conditions
• The product is water damage stable and will not deteriorate, warp, buckle, or change shape
even when soaked or exposed to high moisture conditions
• Surface is walkable in 1-4 hours and may be open to construction traffic within 24 hours
• Can be left open to normal trades traffic for up to 1 year prior to installation of floor coverings
• Inorganic formulation will not contribute to or harbor growth of mold or mildew
• Will not contribute to damaging emissions or irritating fumes upon setting or curing (in
compliance with strict indoor air quality demands)
TECHNICAL DATA SUPERCAP .
Pour Depth 1/8” to 1 ½” plus
Coverage (SQ. FT. @ ¼” per 50 LB bag) 29
Walkable 1-4 hours
Finished goods installed 7 days (at 3/8")
14 days (at 3/4")
28 days (at 1 ½”)
Tensile Bond Strength (ASTM C 4541) >250 PSI
Flexural Strength (ASTM C 348) 700 PSI
Compressive Strength (ASTM C 109) 3500 PSI
pH (wet) 11
Working Time 10-20 minutes
Dry Density 131 lb/ft³
PRODUCT Ideal Slump Range 10 – 11 inches
PRODUCT
INFORMATION Installed Weight (per SQ.FT. @ ¼”) 2.73 lbs
INFORMATION
REV 2009-01
REV 2008-5-29
2. SUPERCAP™- THE NEXT GENERATION SLAB
SURFACE PREPARATION
SUPERCAP™ is formulated to be poured over properly prepared concrete slabs. The use of SUPERCAP™ eliminates the
need for labor and equipment-intensive floor smoothing techniques. Any new slab can be poured at a depth approximately
1/2” lower than desired final slab height and should be finished rough and open. Bull-floating or equivalent is all that is
required to prepare surface for SUPERCAP™ installation. Wax-based curing agents should not be used, since they are
bond-breakers. Since leveling will be achieved using SUPERCAP™, traditional methods such as power-troweling are not
required. New concrete should be allowed to dry for a minimum of 3 days prior to installation of SUPERCAP™. Relative
humidity of substrate should be tested according to ASTM F 2170 and must be 95% or less. Substrate shall be free from
dust, dirt, oil, grease, paint or any other jobsite contaminants which may inhibit the bond to the surface. Weak or
contaminated surfaces must be mechanically cleaned by shot blasting or scarifying. Never use chemicals to clean the
substrate without prior written consent from the manufacturer. Surface bond strength of the substrate should be minimum
100 psi (0.7 MPa). If required to meet level tolerances, survey surface using PTI’s LEVELMASTER and apply LEVEL
PEGS. Substrate should be primed with SUPERCAP™ PRIMER (see primer literature for proper preparation and use).
Substrate temperature should be a minimum 43°F (6°C) during application and ambient temperature maintained between
50-77°F (10-25°C). Adequate ventilation should be provided to ensure uniform drying.
APPLICATION
Pour blended material onto substrate at a thickness of between 1/8” to 1 ½” (3-38mm) for all surfaces except lightweight
concrete, where a thickness of 1/4” to 3/8” (6-10mm) must be maintained. Perform slump test and adjust water accordingly
until ideal patty size of 10-11 inches for SUPERCAP™. Immediately smooth the poured slurry with a gauge rake, notched
trowel or smoother. Material can be walked on after 1-4 hours.
FLOORING INSTALLATION
Finished floor material may be installed as soon as 7 days over SUPERCAP™ after application, depending on thickness,
drying conditions and type of finished floor. Due to the relatively low pH level of SUPERCAP™, finished floor goods can be
applied rapidly without risk of adhesive bond failure. As a general rule, permeable materials such as carpeting may be
adhesively or mechanically applied to SUPERCAP™ when RH level of substrate (i.e. concrete slab, etc) is 95% or below.
Non-permeable floor goods such as VCT may be applied when the RH level of the substrate is 85% or below. Installation
must allow for the eventual drying of the concrete substrate. RH levels should be determined according to ASTM standard
F2170. In all cases, the recommendations of the floor covering manufacturer should be followed.
LIMITATIONS
For indoor applications only. Not intended for use as a wear surface. Not for applications exposed to continuous water of
intrusion.
STORAGE
Product should be stored in dry conditions and in the original packaging. Use within 6 months of date of manufacture.
NOTE: Information contained within this brochure is not legally binding. Information contained herein is presented in good
faith but the manufacturer will not be held liable for information which has been misunderstood or used incorrectly. The
manufacturer will not be held liable for improperly applied or used products, nor the specific use or pertinence of a product to
a particular project. Information contained herein or otherwise administered by the manufacturer or its affiliates is based on
the current and present knowledge of the products when used under normal circumstances according to manufacturer
recommendations.
WARNING: Dust may cause skin, eye nose, throat, or reparatory irritation. Avoid dust inhalation and exposure to dust. If
dusty, wear a NIOSH/MSHA-approved dust respirator. Use proper ventilation to reduce dust exposure. Portland cement is
strongly alkaline and can be corrosive to eyes, skin and respiratory tract. Wear eye and skin protection. If eye contact
occurs, immediately flush thoroughly with water for 15 minutes and get medical attention. Do not ingest. If ingested and any
discomfort occurs, call physician.
Product Technologies LLC
www.supercap.us.com
info@supercap.us.com
Toll free 866 704 2247
PRODUCT
INFORMATION
REV 2009- 01